This document consists of reconstruction plans and Forest Service Supplemental Specifications (FSSS) for road reconstruction work on four specified roads in the Promenade Park Stewardship Integrated Resource Salvage Contract (IRSC) located in the Lassen National Forest, Almanor Ranger District, California. The project encompasses 6.58 miles of road reconstruction across Roads 28N06 (3.05 miles), 28N06A (0.45 miles), 28N22 (1.35 miles), and 29N32 (1.73 miles), all requiring reconstruction and reconditioning work.

The work includes mobilization, removal of concrete mixing pads, pipe culvert installation (24-inch diameter with specific compaction methods), reconditioning of drainage structures (catchbasins, inlets, rolling dips, and jack pipes), roadbed reconditioning, seeding, mulching, and aggregate surface course application. Specific work items identified in the estimate of quantities table include approximately 40 linear feet of pipe culvert, 9-14 drainage structure reconditions per road, rolling dips, aggregate surface course (10 cubic yards on Road 29N32), and seeding and mulching across 1.12-1.20 acres per road. The FSSS modifies the standard FP-24 specifications by incorporating Forest Service-specific requirements for water quality management, erosion control, traffic control plans, and quality control procedures. Payment precision levels are specified for various unit measurements, with quantity adjustments permitted only when discrepancies exceed 15 percent. Merchantable timber removal follows provisions of the timber sale contract. Construction tolerances apply to all roads, and contractor authorization to use Forest Service roads is conditional upon preventing damage to roads and resources.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

ED

D

IN

G ,C

A

.3 M

IL

ES

SP

EC

IF

IE

D R

O

AD

S

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/2 7/2

6 1 1:

G

ZE

PE

DA

BU

EN

RO

ST

RO

C :\U

SE

RS

\G

ZE

PE

DA

BU

EN

RO

ST

RO

\B

OX

\77

TR

AN

SP

OR

TA

TI

ON

SY

ST

EM

\P

RO

JE

CT

S\

_B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

(N O

BI

D

- C

AN

CE

LL

ED

)\D

RA

W

IN

GS

\B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

PL

AN

S.

DW

G;

R5

PACIFIC SOUTHWEST

PROMENADE

PARK

STEWARDSHIP

IRSC

LASSEN NATIONAL

FOREST

ALMANOR RANGER DISTRICT

VICINITY MAP

4/16/2026

G.ZB

G.ZB

T.S.

G-02 002 009

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/2 7/2

6 1 1:

G

ZE

PE

DA

BU

EN

RO

ST

RO

C :\U

SE

RS

\G

ZE

PE

DA

BU

EN

RO

ST

RO

\B

OX

\77

TR

AN

SP

OR

TA

TI

ON

SY

ST

EM

\P

RO

JE

CT

S\

_B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

(N O

BI

D

- C

AN

CE

LL

ED

)\D

RA

W

IN

GS

\B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

PL

AN

S.

DW

G;

R5

PACIFIC SOUTHWEST

PROMENADE

PARK

STEWARDSHIP

IRSC

LASSEN NATIONAL

FOREST

ALMANOR RANGER DISTRICT

GENERAL NOTES

4/16/2026

G.ZB

G.ZB

T.S.

G-03 003 009

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/2 4/2

6 1 4:

G

ZE

PE

DA

BU

EN

RO

ST

RO

C :\U

SE

RS

\G

ZE

PE

DA

BU

EN

RO

ST

RO

\B

OX

\77

TR

AN

SP

OR

TA

TI

ON

SY

ST

EM

\P

RO

JE

CT

S\

!C

LO

SE

D

(O R

IN

AC

TI

VE

)\2

6_

BI

DW

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

(N O

BI

D

- C

AN

CE

LL

ED

)\D

RA

W

IN

GS

\B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

PL

AN

S.

DW

G;

R5

PACIFIC SOUTHWEST

PROMENADE

PARK

STEWARDSHIP

IRSC

LASSEN NATIONAL

FOREST

ALMANOR RANGER DISTRICT

ESTIMATE OF

QUANTITIES

4/16/2026

G.ZB

G.ZB

T.S.

G-04 004 009

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/2 7/2

6 1 1:

G

ZE

PE

DA

BU

EN

RO

ST

RO

C :\U

SE

RS

\G

ZE

PE

DA

BU

EN

RO

ST

RO

\B

OX

\77

TR

AN

SP

OR

TA

TI

ON

SY

ST

EM

\P

RO

JE

CT

S\

_B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

(N O

BI

D

- C

AN

CE

LL

ED

)\D

RA

W

IN

GS

\B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

PL

AN

S.

DW

G;

R5

PACIFIC SOUTHWEST

PROMENADE

PARK

STEWARDSHIP

IRSC

LASSEN NATIONAL

FOREST

ALMANOR RANGER DISTRICT

WORKLIST

4/16/2026

G.ZB

G.ZB

T.S.

G-05 005 009

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/2 7/2

6 1 1:

G

ZE

PE

DA

BU

EN

RO

ST

RO

C :\U

SE

RS

\G

ZE

PE

DA

BU

EN

RO

ST

RO

\B

OX

\77

TR

AN

SP

OR

TA

TI

ON

SY

ST

EM

\P

RO

JE

CT

S\

_B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

(N O

BI

D

- C

AN

CE

LL

ED

)\D

RA

W

IN

GS

\B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

PL

AN

S.

DW

G;

R5

PACIFIC SOUTHWEST

PROMENADE

PARK

STEWARDSHIP

IRSC

LASSEN NATIONAL

FOREST

ALMANOR RANGER DISTRICT

ROAD STRUCTURE

DETAIL

4/16/2026

G.ZB

G.ZB

T.S.

C-01 006 009

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/2 7/2

6 1 1:

G

ZE

PE

DA

BU

EN

RO

ST

RO

C :\U

SE

RS

\G

ZE

PE

DA

BU

EN

RO

ST

RO

\B

OX

\77

TR

AN

SP

OR

TA

TI

ON

SY

ST

EM

\P

RO

JE

CT

S\

_B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

(N O

BI

D

- C

AN

CE

LL

ED

)\D

RA

W

IN

GS

\B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

PL

AN

S.

DW

G;

R5

PACIFIC SOUTHWEST

PROMENADE

PARK

STEWARDSHIP

IRSC

LASSEN NATIONAL

FOREST

ALMANOR RANGER DISTRICT

CLEARING DETAIL

4/16/2026

G.ZB

G.ZB

T.S.

C-02 007 009

PLACE CLEAN 3"-5" PIT RUN FOR ARMORING.

PIT RUN SHALL BE KEYED (ROLLED) INTO

SUBGRADE.

NATIVE SURFACE

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/2 7/2

6 1 1:

G

ZE

PE

DA

BU

EN

RO

ST

RO

C :\U

SE

RS

\G

ZE

PE

DA

BU

EN

RO

ST

RO

\B

OX

\77

TR

AN

SP

OR

TA

TI

ON

SY

ST

EM

\P

RO

JE

CT

S\

_B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

(N O

BI

D

- C

AN

CE

LL

ED

)\D

RA

W

IN

GS

\B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

PL

AN

S.

DW

G;

R5

PACIFIC SOUTHWEST

PROMENADE

PARK

STEWARDSHIP

IRSC

LASSEN NATIONAL

FOREST

ALMANOR RANGER DISTRICT

ROLLING DIP DETAIL

4/16/2026

G.ZB

G.ZB

T.S.

C-03 008 009

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/2 7/2

6 1 1:

G

ZE

PE

DA

BU

EN

RO

ST

RO

C :\U

SE

RS

\G

ZE

PE

DA

BU

EN

RO

ST

RO

\B

OX

\77

TR

AN

SP

OR

TA

TI

ON

SY

ST

EM

\P

RO

JE

CT

S\

_B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

(N O

BI

D

- C

AN

CE

LL

ED

)\D

RA

W

IN

GS

\B

ID

W

EL

L

PA

RK

F

IR

E

SA

LV

AG

E

PL

AN

S.

DW

G;

R5

PACIFIC SOUTHWEST

PROMENADE

PARK

STEWARDSHIP

IRSC

LASSEN NATIONAL

FOREST

ALMANOR RANGER DISTRICT

PIPE CULVERT DETAIL

4/16/2026

G.ZB

G.ZB

T.S.

C-04 009 009

Contents

PREFACE

Section 101. – TERMS, FORMAT, AND DEFINITIONS Section 101. – TERMS, FORMAT, AND DEFINITIONS Section 101. – TERMS, FORMAT, AND DEFINITIONS Section 101. – TERMS, FORMAT, AND DEFINITIONS Section 102. - BID, AWARD, AND EXECUTION OF CONTRACT Section 103. – SCOPE OF WORK Section 104. – CONTROL OF WORK Section 104. – CONTROL OF WORK Section 104. – CONTROL OF WORK Section 104. – CONTROL OF WORK Section 105. – CONTROL OF MATERIAL Section 106. – ACCEPTANCE OF WORK Section 106. – ACCEPTANCE OF WORK Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Section 108. - PROSECUTION AND PROGRESS Section 109. - MEASUREMENT AND PAYMENT Section 109. - MEASUREMENT AND PAYMENT Section 109. - MEASUREMENT AND PAYMENT Section 155. – SCHEDULES FOR CONSTRUCTION CONTRACTS Section 201. - CLEARING AND GRUBBING

PREFACE

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-24 for construction of National Forest System Roads. The Forest Service Supplemental Specifications (FSSS) shall be incorporated in the FP-24. The applicable specifications for the project will be the FP-24 as modified by the FSSS.

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Add the following paragraph to Subsection 101.01 Meaning of Terms:

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Add the following paragraph to Subsection 101.01 Meaning of Terms:

Delete all references to the FAR (Federal Acquisition Regulations) in the specifications when incorporating into 2400-6(T) Timber Sale or 2400-13(T) Stewardship contracts.

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Add the following to Subsection 101.03 Abbreviations:

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSSS – Forest Service Supplemental Specifications

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(d) Miscellaneous unit abbreviations.

MP - milepost location ppm - parts per million volume

STA – station location

MFBM - thousand feet board measure volume

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Make the following changes to Subsection 101.04 Definitions:

Delete these definitions and replace with the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings —Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work. (Timber Contracts) does not apply, replace NTP with Contract Award.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Forest Service Supplemental Specifications – The Forest Service uses supplemental specifications to modify the FP-24 to meet the agency needs and intents. FSSS revise the FP-24 by adding, deleting, replacing, revising, replacing part of entire sections or subsections or adding new sections to the FP..

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Utilization Standards — The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and stewardship contract provisions to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms

Section 102. - BID, AWARD, AND EXECUTION OF CONTRACT

Delete Section 102 Bid, Award, and Execution of Contract in its entirety.

Section 103. – SCOPE OF WORK

Delete all of Section 103 Scope of Work except Subsection 103.01 Intent of Contract.

Section 104. – CONTROL OF WORK

Delete Subsections 104.01 Authority of Contracting Officer, 104.02 Authority of Contracting Officer’s Representative, 104.03 Authority of Inspectors.

Section 104. – CONTROL OF WORK

Delete Subsection 104.06 Specifications and Drawings and replace with the following:

Refer to FAR 52.236-21 Specifications and Drawings for Construction (FEB 1997).

Section 104. – CONTROL OF WORK

Delete Subsection 104.07 Coordination of Contract Documents.

Section 104. – CONTROL OF WORK

Add the following Subsection 104.12 Use of Roads by Contractor:

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Section 105. – CONTROL OF MATERIAL

Delete second paragraph and subparagraphs (a) and (b) in Subsection 105.05 Use of Material Found in the Work and replace it with the following:

The right to use and process material found in the work excludes the use and processing of material for nongovernment contract work, except for the disposal of waste material. Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material at government-approved agreed to location(s), at no additional cost to government.

Section 106. – ACCEPTANCE OF WORK

Delete the 3rd and 4th paragraphs in Subsection 106.01 Conformity with Contract Requirements.

Section 106. – ACCEPTANCE OF WORK

Delete Subsection 106.06 Partial and Final Acceptance.

Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE

PUBLIC

Delete Subsection 107.05 Responsibility for Damage Claims.

Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE

PUBLIC

Delete Subsection 107.08 Sanitation, Health, and Safety and replace with the following:

Refer to FAR 52.236-13 Accident Prevention Alternate I (NOV 1991).

Section 108. - PROSECUTION AND PROGRESS

Delete Section 108 Prosecution and Progress in its entirety.

Section 109. - MEASUREMENT AND PAYMENT

Delete Subsections 109.06 Pricing and Adjustments, 109.07 Estimated Work, 109.08 Progress Payments, and 109.09 Final Payment.

Section 109. - MEASUREMENT AND PAYMENT

Delete Table 109-1 of Subsection 109.01 Measurement of Work and replace with the following:

Table 109-1

Decimal Accuracy of Quantities for Payment

Pay Item Level of Precision Acre 0.01 Cubic Foot 1 Cubic Yard 1 Cubic Yard Exception - Structure Excavation;

Sheathing; Materials; Bedding, Bed Course, and Backfill, Materials; Gabions;

0.1

Cubic Yard Exception – Concrete; Masonry 0.01 Day 1 Each 1 Gallon 1 Hour 0.1 Linear Foot 1 Linear Foot Exception - Timber, Steel, and Concrete Piles

0.1

M-Gallon 0.1 Mile 0.01 Month 0.1 Pound 1 Square Foot 0.1 Square Yard 0.1 Station 0.1 Thousand Board Feet Measure 0.01 Ton 0.1 Ton Exception - Calcium Chloride; Sodium Chloride;

Hydrated Lime; Bituminous Materials; Pavements; Bed Course Materials

0.01

Week 0.1

Section 109. - MEASUREMENT AND PAYMENT

Delete Subsection 109.02(c) Measurement Terms and Definitions, Contract quantity and replace with:

(c) Contract quantity. The quantity to be paid is the quantity listed in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity when that error exceeds 15% or more. If there is evidence that a quantity specific as a contract quantity is incorrect by 15% or more, submit calculations, drawings, or other evidence indicating why the quantity is in error and request in writing that the quantity be adjusted.

Section 155. – SCHEDULES FOR CONSTRUCTION CONTRACTS

Delete Section 155 Schedules for Construction Contracts in its entirety.

Section 201. - CLEARING AND GRUBBING

Delete Subsection 201.06 Disposal and replace with the following:

201.06 Disposal. Dispose of merchantable timber designated for removal according to the provisions of the timber sale contract.