4_AppendixD_RoadReconPlans_SuppSpecifications.pdf
PDF 5 MB Posted
- Attached to
- Promenade Park Stewardship IRSC
- Solicitation number
- 12363N26Q4160
- Issued by
-
Department of Agriculture Forest Service
About this file
This document consists of reconstruction plans and Forest Service Supplemental Specifications (FSSS) for road reconstruction work on four specified roads in the Promenade Park Stewardship Integrated Resource Salvage Contract (IRSC) located in the Lassen National Forest, Almanor Ranger District, California. The project encompasses 6.58 miles of road reconstruction across Roads 28N06 (3.05 miles), 28N06A (0.45 miles), 28N22 (1.35 miles), and 29N32 (1.73 miles), all requiring reconstruction and reconditioning work.
The work includes mobilization, removal of concrete mixing pads, pipe culvert installation (24-inch diameter with specific compaction methods), reconditioning of drainage structures (catchbasins, inlets, rolling dips, and jack pipes), roadbed reconditioning, seeding, mulching, and aggregate surface course application. Specific work items identified in the estimate of quantities table include approximately 40 linear feet of pipe culvert, 9-14 drainage structure reconditions per road, rolling dips, aggregate surface course (10 cubic yards on Road 29N32), and seeding and mulching across 1.12-1.20 acres per road. The FSSS modifies the standard FP-24 specifications by incorporating Forest Service-specific requirements for water quality management, erosion control, traffic control plans, and quality control procedures. Payment precision levels are specified for various unit measurements, with quantity adjustments permitted only when discrepancies exceed 15 percent. Merchantable timber removal follows provisions of the timber sale contract. Construction tolerances apply to all roads, and contractor authorization to use Forest Service roads is conditional upon preventing damage to roads and resources.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
ED
D
IN
G ,C
A
.3 M
IL
ES
SP
EC
IF
IE
D R
O
AD
S
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 7/2
6 1 1:
G
ZE
PE
DA
BU
EN
RO
ST
RO
C :\U
SE
RS
\G
ZE
PE
DA
BU
EN
RO
ST
RO
\B
OX
\77
TR
AN
SP
OR
TA
TI
ON
SY
ST
EM
\P
RO
JE
CT
S\
_B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
(N O
BI
D
- C
AN
CE
LL
ED
)\D
RA
W
IN
GS
\B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
PL
AN
S.
DW
G;
R5
PACIFIC SOUTHWEST
PROMENADE
PARK
STEWARDSHIP
IRSC
LASSEN NATIONAL
FOREST
ALMANOR RANGER DISTRICT
VICINITY MAP
4/16/2026
G.ZB
G.ZB
T.S.
G-02 002 009
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 7/2
6 1 1:
G
ZE
PE
DA
BU
EN
RO
ST
RO
C :\U
SE
RS
\G
ZE
PE
DA
BU
EN
RO
ST
RO
\B
OX
\77
TR
AN
SP
OR
TA
TI
ON
SY
ST
EM
\P
RO
JE
CT
S\
_B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
(N O
BI
D
- C
AN
CE
LL
ED
)\D
RA
W
IN
GS
\B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
PL
AN
S.
DW
G;
R5
PACIFIC SOUTHWEST
PROMENADE
PARK
STEWARDSHIP
IRSC
LASSEN NATIONAL
FOREST
ALMANOR RANGER DISTRICT
GENERAL NOTES
4/16/2026
G.ZB
G.ZB
T.S.
G-03 003 009
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/2 4/2
6 1 4:
G
ZE
PE
DA
BU
EN
RO
ST
RO
C :\U
SE
RS
\G
ZE
PE
DA
BU
EN
RO
ST
RO
\B
OX
\77
TR
AN
SP
OR
TA
TI
ON
SY
ST
EM
\P
RO
JE
CT
S\
!C
LO
SE
D
(O R
IN
AC
TI
VE
)\2
6_
BI
DW
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
(N O
BI
D
- C
AN
CE
LL
ED
)\D
RA
W
IN
GS
\B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
PL
AN
S.
DW
G;
R5
PACIFIC SOUTHWEST
PROMENADE
PARK
STEWARDSHIP
IRSC
LASSEN NATIONAL
FOREST
ALMANOR RANGER DISTRICT
ESTIMATE OF
QUANTITIES
4/16/2026
G.ZB
G.ZB
T.S.
G-04 004 009
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 7/2
6 1 1:
G
ZE
PE
DA
BU
EN
RO
ST
RO
C :\U
SE
RS
\G
ZE
PE
DA
BU
EN
RO
ST
RO
\B
OX
\77
TR
AN
SP
OR
TA
TI
ON
SY
ST
EM
\P
RO
JE
CT
S\
_B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
(N O
BI
D
- C
AN
CE
LL
ED
)\D
RA
W
IN
GS
\B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
PL
AN
S.
DW
G;
R5
PACIFIC SOUTHWEST
PROMENADE
PARK
STEWARDSHIP
IRSC
LASSEN NATIONAL
FOREST
ALMANOR RANGER DISTRICT
WORKLIST
4/16/2026
G.ZB
G.ZB
T.S.
G-05 005 009
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 7/2
6 1 1:
G
ZE
PE
DA
BU
EN
RO
ST
RO
C :\U
SE
RS
\G
ZE
PE
DA
BU
EN
RO
ST
RO
\B
OX
\77
TR
AN
SP
OR
TA
TI
ON
SY
ST
EM
\P
RO
JE
CT
S\
_B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
(N O
BI
D
- C
AN
CE
LL
ED
)\D
RA
W
IN
GS
\B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
PL
AN
S.
DW
G;
R5
PACIFIC SOUTHWEST
PROMENADE
PARK
STEWARDSHIP
IRSC
LASSEN NATIONAL
FOREST
ALMANOR RANGER DISTRICT
ROAD STRUCTURE
DETAIL
4/16/2026
G.ZB
G.ZB
T.S.
C-01 006 009
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 7/2
6 1 1:
G
ZE
PE
DA
BU
EN
RO
ST
RO
C :\U
SE
RS
\G
ZE
PE
DA
BU
EN
RO
ST
RO
\B
OX
\77
TR
AN
SP
OR
TA
TI
ON
SY
ST
EM
\P
RO
JE
CT
S\
_B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
(N O
BI
D
- C
AN
CE
LL
ED
)\D
RA
W
IN
GS
\B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
PL
AN
S.
DW
G;
R5
PACIFIC SOUTHWEST
PROMENADE
PARK
STEWARDSHIP
IRSC
LASSEN NATIONAL
FOREST
ALMANOR RANGER DISTRICT
CLEARING DETAIL
4/16/2026
G.ZB
G.ZB
T.S.
C-02 007 009
PLACE CLEAN 3"-5" PIT RUN FOR ARMORING.
PIT RUN SHALL BE KEYED (ROLLED) INTO
SUBGRADE.
NATIVE SURFACE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 7/2
6 1 1:
G
ZE
PE
DA
BU
EN
RO
ST
RO
C :\U
SE
RS
\G
ZE
PE
DA
BU
EN
RO
ST
RO
\B
OX
\77
TR
AN
SP
OR
TA
TI
ON
SY
ST
EM
\P
RO
JE
CT
S\
_B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
(N O
BI
D
- C
AN
CE
LL
ED
)\D
RA
W
IN
GS
\B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
PL
AN
S.
DW
G;
R5
PACIFIC SOUTHWEST
PROMENADE
PARK
STEWARDSHIP
IRSC
LASSEN NATIONAL
FOREST
ALMANOR RANGER DISTRICT
ROLLING DIP DETAIL
4/16/2026
G.ZB
G.ZB
T.S.
C-03 008 009
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 7/2
6 1 1:
G
ZE
PE
DA
BU
EN
RO
ST
RO
C :\U
SE
RS
\G
ZE
PE
DA
BU
EN
RO
ST
RO
\B
OX
\77
TR
AN
SP
OR
TA
TI
ON
SY
ST
EM
\P
RO
JE
CT
S\
_B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
(N O
BI
D
- C
AN
CE
LL
ED
)\D
RA
W
IN
GS
\B
ID
W
EL
L
PA
RK
F
IR
E
SA
LV
AG
E
PL
AN
S.
DW
G;
R5
PACIFIC SOUTHWEST
PROMENADE
PARK
STEWARDSHIP
IRSC
LASSEN NATIONAL
FOREST
ALMANOR RANGER DISTRICT
PIPE CULVERT DETAIL
4/16/2026
G.ZB
G.ZB
T.S.
C-04 009 009
Contents
PREFACE
Section 101. – TERMS, FORMAT, AND DEFINITIONS Section 101. – TERMS, FORMAT, AND DEFINITIONS Section 101. – TERMS, FORMAT, AND DEFINITIONS Section 101. – TERMS, FORMAT, AND DEFINITIONS Section 102. - BID, AWARD, AND EXECUTION OF CONTRACT Section 103. – SCOPE OF WORK Section 104. – CONTROL OF WORK Section 104. – CONTROL OF WORK Section 104. – CONTROL OF WORK Section 104. – CONTROL OF WORK Section 105. – CONTROL OF MATERIAL Section 106. – ACCEPTANCE OF WORK Section 106. – ACCEPTANCE OF WORK Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Section 108. - PROSECUTION AND PROGRESS Section 109. - MEASUREMENT AND PAYMENT Section 109. - MEASUREMENT AND PAYMENT Section 109. - MEASUREMENT AND PAYMENT Section 155. – SCHEDULES FOR CONSTRUCTION CONTRACTS Section 201. - CLEARING AND GRUBBING
PREFACE
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-24 for construction of National Forest System Roads. The Forest Service Supplemental Specifications (FSSS) shall be incorporated in the FP-24. The applicable specifications for the project will be the FP-24 as modified by the FSSS.
Section 101. – TERMS, FORMAT, AND DEFINITIONS
Add the following paragraph to Subsection 101.01 Meaning of Terms:
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
Section 101. – TERMS, FORMAT, AND DEFINITIONS
Add the following paragraph to Subsection 101.01 Meaning of Terms:
Delete all references to the FAR (Federal Acquisition Regulations) in the specifications when incorporating into 2400-6(T) Timber Sale or 2400-13(T) Stewardship contracts.
Section 101. – TERMS, FORMAT, AND DEFINITIONS
Add the following to Subsection 101.03 Abbreviations:
(a) Acronyms.
AGAR — Agriculture Acquisition Regulations
AFPA — American Forest and Paper Association
FSSS – Forest Service Supplemental Specifications
MSHA — Mine Safety and Health Administration
NESC — National Electrical Safety Code
WCLIB — West Coast Lumber Inspection Bureau
(d) Miscellaneous unit abbreviations.
MP - milepost location ppm - parts per million volume
STA – station location
MFBM - thousand feet board measure volume
Section 101. – TERMS, FORMAT, AND DEFINITIONS
Make the following changes to Subsection 101.04 Definitions:
Delete these definitions and replace with the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings —Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work. (Timber Contracts) does not apply, replace NTP with Contract Award.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service — The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Forest Service Supplemental Specifications – The Forest Service uses supplemental specifications to modify the FP-24 to meet the agency needs and intents. FSSS revise the FP-24 by adding, deleting, replacing, revising, replacing part of entire sections or subsections or adding new sections to the FP..
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Utilization Standards — The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and stewardship contract provisions to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms
Section 102. - BID, AWARD, AND EXECUTION OF CONTRACT
Delete Section 102 Bid, Award, and Execution of Contract in its entirety.
Section 103. – SCOPE OF WORK
Delete all of Section 103 Scope of Work except Subsection 103.01 Intent of Contract.
Section 104. – CONTROL OF WORK
Delete Subsections 104.01 Authority of Contracting Officer, 104.02 Authority of Contracting Officer’s Representative, 104.03 Authority of Inspectors.
Section 104. – CONTROL OF WORK
Delete Subsection 104.06 Specifications and Drawings and replace with the following:
Refer to FAR 52.236-21 Specifications and Drawings for Construction (FEB 1997).
Section 104. – CONTROL OF WORK
Delete Subsection 104.07 Coordination of Contract Documents.
Section 104. – CONTROL OF WORK
Add the following Subsection 104.12 Use of Roads by Contractor:
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Section 105. – CONTROL OF MATERIAL
Delete second paragraph and subparagraphs (a) and (b) in Subsection 105.05 Use of Material Found in the Work and replace it with the following:
The right to use and process material found in the work excludes the use and processing of material for nongovernment contract work, except for the disposal of waste material. Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material at government-approved agreed to location(s), at no additional cost to government.
Section 106. – ACCEPTANCE OF WORK
Delete the 3rd and 4th paragraphs in Subsection 106.01 Conformity with Contract Requirements.
Section 106. – ACCEPTANCE OF WORK
Delete Subsection 106.06 Partial and Final Acceptance.
Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE
PUBLIC
Delete Subsection 107.05 Responsibility for Damage Claims.
Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE
PUBLIC
Delete Subsection 107.08 Sanitation, Health, and Safety and replace with the following:
Refer to FAR 52.236-13 Accident Prevention Alternate I (NOV 1991).
Section 108. - PROSECUTION AND PROGRESS
Delete Section 108 Prosecution and Progress in its entirety.
Section 109. - MEASUREMENT AND PAYMENT
Delete Subsections 109.06 Pricing and Adjustments, 109.07 Estimated Work, 109.08 Progress Payments, and 109.09 Final Payment.
Section 109. - MEASUREMENT AND PAYMENT
Delete Table 109-1 of Subsection 109.01 Measurement of Work and replace with the following:
Table 109-1
Decimal Accuracy of Quantities for Payment
Pay Item Level of Precision Acre 0.01 Cubic Foot 1 Cubic Yard 1 Cubic Yard Exception - Structure Excavation;
Sheathing; Materials; Bedding, Bed Course, and Backfill, Materials; Gabions;
0.1
Cubic Yard Exception – Concrete; Masonry 0.01 Day 1 Each 1 Gallon 1 Hour 0.1 Linear Foot 1 Linear Foot Exception - Timber, Steel, and Concrete Piles
0.1
M-Gallon 0.1 Mile 0.01 Month 0.1 Pound 1 Square Foot 0.1 Square Yard 0.1 Station 0.1 Thousand Board Feet Measure 0.01 Ton 0.1 Ton Exception - Calcium Chloride; Sodium Chloride;
Hydrated Lime; Bituminous Materials; Pavements; Bed Course Materials
0.01
Week 0.1
Section 109. - MEASUREMENT AND PAYMENT
Delete Subsection 109.02(c) Measurement Terms and Definitions, Contract quantity and replace with:
(c) Contract quantity. The quantity to be paid is the quantity listed in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity when that error exceeds 15% or more. If there is evidence that a quantity specific as a contract quantity is incorrect by 15% or more, submit calculations, drawings, or other evidence indicating why the quantity is in error and request in writing that the quantity be adjusted.
Section 155. – SCHEDULES FOR CONSTRUCTION CONTRACTS
Delete Section 155 Schedules for Construction Contracts in its entirety.
Section 201. - CLEARING AND GRUBBING
Delete Subsection 201.06 Disposal and replace with the following:
201.06 Disposal. Dispose of merchantable timber designated for removal according to the provisions of the timber sale contract.
File details come from the government source that posted it. Updated .