C05_Amendment1_SF30 with Attachment1_SiteVisitNotes_12363N26Q4160.pdf
PDF 420 KB Posted
- Attached to
- Promenade Park Stewardship IRSC
- Solicitation number
- 12363N26Q4160
- Issued by
-
Department of Agriculture Forest Service
About this file
This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for the Promenade Park Stewardship Integrated Resource Service Contract (IRSC). The amendment, issued on June 29, 2026, with an effective date of July 17, 2026, modifies RFQ 12363N26Q4160 for the USDA Forest Service Stewardship Contracting Branch, Sisters Ranger District, Lassen National Forest, Almanor Ranger District. Amendment 0001 adds Attachment 11 containing site visit notes from July 8, 2026, and replaces the original Attachment 5b Contract Area Map with an updated version dated July 14, 2026, which includes an additional water hole located south of Unit 5 that was approved by the District Hydrologist. The deadline for receipt of quotes remains unchanged.
The site visit notes document details from an industry pre-bid meeting attended by representatives from Peterson Timber, Markit Forestry, Apex Enterprises, J.W. Bamford, North Fork Enterprises, Tyrrell Resources, and Ceres Forestry, among others. Key contract requirements include: temporary road access via a $7,500/year rental agreement with Circle S Ranch; Wolf Limited Operating Period language requiring consultation with California Department of Fish and Wildlife; cultural resource protocols with one site in Unit 65; all units are tractor ground (less than 35% slope) requiring 100% removal of marked material; mandatory directional felling and soil erosion protection measures in Riparian Conservation Areas; flexibility in product type (whole logs or chips); existing landings available for reuse; and potential coordination with PG&E regarding powerline tree removal in Units 30 and 31. The quote submission deadline is July 28, 2026, to Karen Ruklic via email.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12363N26Q4160 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
363N
SISTERS OR OR 97759
201 N PINE STREET
SISTERS RANGER DISTRICT
USDA-FS STEWARDSHIP CONTRACTING BR
SISTERS OR 97759
363N
201 N PINE STREET
PO BOX 249
SISTERS RANGER DISTRICT
USDA-FS STEWARDSHIP CONTRACTING BR
DIS07/17/20260001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/29/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return _________1_________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Promenade Park Stewardship IRSC
PACIFIC SOUTHWEST (PSW) STEWARDSHIP BPA
Lassen National Forest; Almanor Ranger District
1) Add Attachment 11. Promenade Park Stewardship IRSC - Site Visit Notes to the solicitation. Notes provided on pages 3-5. Amend Clause 5. Solicitation Attachments to add this document.
2) Strike Attachment 5b. Contract Area Map and replace with an amended version dated
7/14/26. Having received approval from Hydrology, an additional water hole has been added
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
KAREN I. RUKLIC
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
1169309
X
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 5CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12363N26Q4160/0001 just south of Unit 5. No other map edits were made.
**Deadline for receipt of quotes is unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
RFQ: 12363N26Q4160 - Attachment 11
Promenade Park Stewardship IRSC Site Visit Notes 7/8/26
Prepared by: Darby Hespelt
Government Representatives:
Darby Hespelt Heidi Van Geison Ryan Wellings Cole Jucksch Natalie Murron
Industry Attendees:
Name Company Contact Details Zane Peterson Peterson Timber petersonzane100@gmailcom Irish Kinder Markit Forestry irishkinder@markitforestry.com Logan Bamford Johnathon Carter
Apex Enterprises lwb@apexenterprisesinc.com
Clint Adams J.W. Bamford estimating@bamfordinc.net Joe Williamson North Fork Enterprises jwilliamson@northforkent.com Brent Tyrrell Tyrrell Resources tyrrellresources@sbcglobal.net Al Johnson Not provided Johnson.arthur13@yahoo.com Mike Duchi Not provided Mduchi1993@gmail.com Jason Smith Ceres Forestry Ceresforestry.com
Stop #1: Section 27, south of Units 83 and 6
• Viewed potential temporary road location for hauling. Proposed temporary road location routes around the private property Circle S Ranch located in Section 27 on Contract Area Map (CAM).
o Road Rental Agreement in place with Circle S Ranch for $7,500/year if contractor wishes to use section of road.
o Temporary road location will be by agreement between FS and contractor post award.
• New Wolf Limited Operating Period (LOP) language located in Clause 18 – requires additional pre-implementation consultation with California Department of Fish and Wildlife.
• Question: No specific units lied to LOP?
o Answer: Correct, there are currently no Wolves in sale area, additional consultation will determine if anything has changed or new wolves moved into the area.
• Cultural Resources – one site located in Unit 65. If archeology monitor is available, would be treated; if no archeology monitor is available during operations, then it will be treated as a Flag and Avoid location.
• Section 13 – 29N48 o Currently there is a washout from winter storm damage o Forest Service Road Crew will repair washout in the road prior to 7/29/26 to accommodate 7/28/26 quote due date and avoid any hauling conflicts with project.
Stop #2: Located on Road 172 between Units 65 and Unit 5.
• Question: Additional waterhole not on CAM that was used during previous hazard tree service contract – would this be available for Promenade?
o Forest Service to work with Hydrology to verify if waterhole can be used during operations and would be added to CAM if approved by district Hydrologist.
• Existing landings from previous Integrated Resource Service Contract (IRSC) located in contract area. Contractors can re-utilize those landings if desired, however left-over existing material in the landing is not required to be removed as part of Promenade contract.
• Clauses verses Appendix B, C Provisions – some contract requirements can be found in the Clauses located in the Solicitation, and some contract requirements can be found in Appendix B – Timber Removal.
• Equipment Exclusion Zones (EEZ) boundaries are painted on ground, Riparian Conservation Areas (RCA) buffers are Geo-fence as shown on the CAM
• Question: Are all units tractor ground?
o Answer: Yes, all units are less than 35% Slope.
• Question: mandatory cut and remove in RCAs?
o Answer: Yes, directional felling away from EEZ required, limited turning and
Soil Erosion Protection Measures (SEPM) requirements within RCAs
• Question: 100% removal of required material?
o Yes
• Cal Trans will be doing culvert replacement along sections of 172 road in 2027, FS will coordinate with contractor once Cal Trans gives FS timeline for replacement.
• PG&E will also be doing work along powerline in Sections 28 and 27, Units 30 and 31.
o Performing tree removal along powerline. Coordination with FS and Contractor will be required prior to operations to make sure PG&E doesn’t cut and/or remove material within Units 30 and 31.
o No timeline for PG&E work at this time.
• Quotes are due to Karen Ruklic via email on 7/28.
• Question: What is the intended haul route for southern units?
o 29N48 is the most direct route, however there is a winter Recreation Limited Operating Period.
• Potential future IRSCs for additional treatments planned for outyear Fiscal Years.
• Question: Non-Governmental Organization (NGO) partnership for this project?
o No.
• No requirements for material removal as far as product type. Can go out as either whole logs or chips to allow flexibility for markets.