This document is Attachment 3 – Appendix C to the Promenade Lassen National Forest Park Stewardship contract (IRSC 12363N26Q4160), containing detailed road maintenance T-specifications and requirements for the Almanor Ranger District. The contractor is responsible for all pre-haul, during-haul, and post-haul road maintenance at no compensation from the Forest Service on a 236,000-ton timber sale.
The specifications address fourteen maintenance categories: vegetation removal (roadway and roadside), pavement cleaning, bridge deck and curb cleaning, road grading, slide removal and slump repair (maximum 20 cubic yards contractor responsibility), bituminous surface repair, aggregate/native surface repair, dust abatement, ditch maintenance, drainage structures, miscellaneous structures (gates and cattleguards), waterbars, and closure devices. The contract identifies 14 roads requiring maintenance across pre-haul, during-haul, and post-haul phases, with varying mileage requirements. Dust abatement shall use water applied once daily for up to 10 loads per day and as needed for loads exceeding 10 per day. Key maintenance requirements include road grading using compaction method A (with moisture adjustment and equipment operation until consolidation ceases), slide material disposal at designated sites, drainage structure cleaning minimum 3 feet from culvert inlets/outlets, and vegetation removal to 5 feet outside roadway with 6-inch maximum height. The document provides comprehensive technical definitions, maintenance procedures, compaction specifications, and reference drawings for waterbars and earthen barriers.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lassen National Forest Promenade Park Stewardship IRSC 12363N26Q4160 Page 1 of 25 Almanor Ranger District
ATTACHMENT 3 - Appendix C
C5.31# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
PRE HAUL
ROAD TERMINI MILES ROAD MAINTENACE T-SPECIFICATIONS
FROM TO T-801 T-802 T-803 T-804 T-805 T-806 T-807 T-808 T-809
28N06 0 3.05 3.05 C 28N06A 0 0.45 0.45 C
28N22 0 1.35 1.35 C
29N04 0 0.5 0.5 C 29N29 0 0.96 0.96 C 29N32 0 0.185 0.185 C
29N32 0.185 1.73 1.545 C 29N48 0 5 5 29N48 5 7 2 29N48 7 8 1 29N48 8 10.06 2.06
29N48K 0 0.41 0.41 C 29N62 0 0.083 0.083 29N62 0.083 2.28 2.197 C
DURING HAUL
ROAD TERMINI MILES ROAD MAINTENACE T-SPECIFICATIONS
FROM TO T-801 T-802 T-803 T-804 T-805 T-806 T-807 T-808 T-809
28N06 0 3.05 3.05 C C 28N06A 0 0.45 0.45 C C
28N22 0 1.35 1.35 C C
29N04 0 0.5 0.5 C C 29N29 0 0.96 0.96 C C 29N32 0 0.185 0.185 C C 29N32 0.185 1.73 1.545 C C
29N48 0 5 5 C C
29N48 5 7 2 C C 29N48 7 8 1 C C 29N48 8 10.06 2.06 C C
29N48K 0 0.41 0.41 C C
29N62 0 0.083 0.083 29N62 0.083 2.28 2.197 C C
Page 2 of 25 Almanor Ranger District
POST HAUL
ROAD TERMINI MILES ROAD MAINTENACE T-SPECIFICATIONS
FROM TO T-801 T-802 T-803 T-804 T-805 T-806 T-807 T-808 T-809
28N06 0 3.05 3.05 C 28N06A 0 0.45 0.45 C
28N22 0 1.35 1.35 C
29N04 0 0.5 0.5 C
29N29 0 0.96 0.96 C
29N32 0 0.185 0.185 C
29N32 0.185 1.73 1.545 C
29N48 0 5 5 C
29N48 5 7 2 C
29N48 7 8 1 C
29N48 8 10.06 2.06 C
29N48K 0 0.41 0.41 C
29N62 0 0.083 0.083
29N62 0.083 2.28 2.197 C
Notes:
C = Contractor Performance Item The maximum volume of Contractor responsibility for Slide and Slump repair is 20 cubic yards O = Optional Contract Line Item NFSR = National Forest Service Road CR = County Road JCT = Junction MP = Milepost EOR = End of Road
Page 4 of 25 Almanor Ranger District
Dust Abatement Plan (C5.31, T809)
Material Type or Grade
Application Rate Frequency of Subsequent Application
Preparation Method
Wt-Vol Conversion
Method Road No. Initial Subsquent 28N06 water n/a n/a Watering shall be performed once each day for haul up to 10 loads/day
For haul over 10 loads/day, watering shall be performed as needed to abate dust
T-809 as needed n/a 28N06A water n/a n/a 28N22 water n/a n/a 29N04 water n/a n/a 29N29 water n/a n/a 29N32 water n/a n/a 29N32 water n/a n/a 29N48 water n/a n/a 29N48 water n/a n/a 29N48 water n/a n/a 29N48 water n/a n/a
29N48K water n/a n/a 29N62 water n/a n/a 29N62 water n/a
Sale Name PROMENADE PARK STEWARDSHIP IRSC
Sale Volume 236000 Ton
Page 5 of 25 Almanor Ranger District
Revised 1.27.2025
ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS
Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
Contractor will be responsible for doing all pre, during and post haul road maintenance with no compensation from the Forest Service.
T-SPECIFICATIONS
T-SPEC NUMBER SPECIFICATION TITLE
T-801 Vegetation Removal – Roadway T-802 Vegetation Removal – Roadside T-803 Pavement Cleaning T-804 Bridge Deck and Curb Cleaning T-805 Road Grading T-806 Slide Removal and Slump Repair T-807 Surface Repair (Bituminous) T-808 Surface Repair (Aggregate and Native) T-809 Dust Abatement T-810 Ditch Maintenance T-811 Drainage Structures T-812 Miscellaneous Structures T-813 Waterbar T-814 Closure Devices
Page 6 of 25 Almanor Ranger District
Revised 1.27.2025
Definitions
Wherever the road maintenance specifications use the following terms (Figure 1), the user shall interpret the intent and meaning as follows:
Base course. Material used to reinforce subgrade or, as shown on drawings, placed on subgrade to distribute wheel loads. Base course usually consists of aggregate (treated or untreated). It serves as the immediate support for the surface course and may be built directly on subgrade if no subbase is called for.
The requirements for building on subgrade are more stringent than for building with a subbase.
Berm. A curb or dike constructed to prevent uncontrolled roadway runoff water from discharging onto fillslope.
Bituminous. Of or containing bitumen.
Borrow. Material taken from designated borrow sites.
Crown, inslope, and outslope. The cross slope of the roadway, which aids in drainage and traffic maneuverability.
Culvert. A conduit or passageway under a road or trail.
Drainage dip. A dip in the roadway that intercepts and diverts surface water runoff. A drainage dip does not block the movement of traffic.
Drainage structure. A manufactured structure that controls the runoff of water from the roadway, including (but not limited to) overside drains, aprons, flumes, down drains, downpipes, and culverts.
Lead-off ditch. A ditch used to transmit water from a drainage structure or drainage dip outlet to the natural drainage area.
Maintenance activity. Items of work leading to the upkeep of a road within the right of way and necessary to sustain the road's anticipated traffic.
Maintenance specifications. Specifications that detail conditions and requirements peculiar to the individual project in addition to requirements identified in the national specifications.
Roadbed. The portion of a road between the intersection of subgrade and side slopes, excluding that portion of the ditch below subgrade. Roadbed consists of suitable native soil. It supports the base course and surface course.
Roadside. A term denoting the area adjoining the outer edge of the roadway.
Roadway. A term denoting the area consisting of the traveled way and shoulders.
Shoulder. That portion of roadway contiguous with the traveled way for accommodation of stopped vehicles, for emergency use, and lateral support of base and surface course, if any.
Slide. A concentrated deposit of soil, rock, and other debris from the cut slope, often extending onto the
Page 7 of 25 Almanor Ranger District
Revised 1.27.2025 roadway, whether caused by mass land movement or accumulated raveling.
Slump. A localized portion of the roadbed which has slipped or otherwise become lower than that of the adjacent roadbed and constitutes a hazard to traffic.
Subbase. Consists of either compacted granular material (treated or untreated) or a compacted layer of treated soil. It may help protect the base course and surface course from intrusion of fine-grained roadbed soils, damage from frost, and accumulation of water in or below the pavement structure. The pavement structure consists of the subbase, base course, and surface coarse.
Subgrade. Top surface of roadbed upon which subbase, base course, or surface course is constructed.
For roads without subbase, base course, or surface course, that portion of roadbed prepared as the finished roadway. Subgrade consists of suitable native soil (treated or untreated). It serves as the top of the roadbed where the subbase or base course is constructed.
Surface course. The material placed on the base course or subgrade to enhance traction, distribute concentrated wheel loads and resist abrasion and the effects of climate. Surface course may be referred to as surfacing.
Surface course consists of an aggregate mixture that may include a binder (plastic fines or bituminous material). It must carry the traffic load, provide a smooth riding surface, and resist skidding and traffic wear while keeping water from penetrating into pavement structure.
Traveled way. That portion of roadway, excluding shoulders, used for the movement of traffic.
Turnouts. Short sections of traveled way constructed with additional width to allow for safe passing of traffic.
Waterbar. A constructed feature in the roadbed that intercepts surface runoff and diverts the water off the roadway. A waterbar is not designed to be traversable by traffic.
Water source. A place designated in individual projects for acquiring water for road maintenance purposes.
Page 8 of 25 Almanor Ranger District
Revised 1.27.2025
Figure 1—Road structure terms.
Page 9 of 25 Almanor Ranger District
Revised 1.27.2025
T–801 Vegetation Removal—Roadway
801.01 Description
Work consists of removing fallen trees and snags that encroach within 5 feet of the roadway.
801.02 Maintenance Requirements
A. Deck portions of trees that meet utilization standards in A/AT2 along the roadside at locations that do not impair the traveled way or sight distance (agreed to in writing).
B. Limb sub-merchantable material and cut it into lengths for handling. Scatter the material outside ditches and drainages, off the roadway and turnouts, or at staked locations.
C. Do not leave woody debris and slash on the roadway or concentrations that may plug ditches, culverts, or drainage channels.
D. Place residual root wads in an upright position out of the clearing limits.
Page 10 of 25 Almanor Ranger District
Revised 1.27.2025
T–802 Vegetation Removal—Roadside
802.01 Description
Work consists of cutting and disposing of vegetation that reduces the operational capability of the road, including compromised visibility of signing, gates, or approach railings on bridges. Work also includes removing vegetation for the purpose of restoring site distance to an acceptable level.
802.02 Maintenance Requirements
A. Remove vegetative matter that reduces sight distance, impedes vehicular travel, or interferes with road maintenance operations (such as surface blading, ditch and culvert cleaning, and bridge deck and curb cleaning) to a maximum height of 6 inches and a minimum of 5 feet outside of the roadway.
B. No need to remove low shrubs and brush which do not restrict sight distance and do not impede road maintenance if the road surface can be adequately maintained without doing so. This is not applicable to bridge sites.
C. For bridge sites, remove roadway vegetation within a minimum of 20 feet from abutments as measured along the center line of the road. Cut vegetation to provide a vertical clearance of 14 feet from the road and bridge surface elevation by trimming any encumbering tree limbs.
D. Do not leave woody debris and slash on the roadway or concentrations which may plug ditches, culverts, or drainage channels.
Page 11 of 25 Almanor Ranger District
Revised 1.27.2025
T–803 Pavement Cleaning
803.01 Description
Work consists of removing loose material from paved traveled ways, paved shoulders, and paved turnouts.
803.02 Maintenance Requirements
A. Clean the surface to the extents of the existing pavement without obstructing surface drainage.
B. Move materials away from the road centerline on double-lane roads.
C. When paved road structure includes aggregate lateral support, pavement cleaning shall leave (as much as practicable) the aggregate in its original form and assure support material is not adversely affected.
803.03 Equipment
A. Equipment shall have the capability of removing all loose material from paved surfaces without damage to the surface. Surface damage includes but is not limited to:
a. Divots in the paved surface
b. Peeling of surface material
c. Cracking or breaking pavement edges
B. Use of hydraulic flushing equipment will not be permitted within a horizontal distance of from a live stream, unless approved by the Forest Service.
Page 12 of 25 Almanor Ranger District
Revised 1.27.2025
T–804 Bridge Deck and Curb Cleaning
804.01 Description
Work consists of cleaning bridge decks and curbs.
804.02 Maintenance Requirements
A. Maintain bridges and associated components as identified on the sale area map or as indicated in table 1.
B. Bridge deck and curbs.
a. Remove debris and sediment from the bridge deck, running planks, and the top and roadside face of the curbs. Ensure that all scuppers and drainage openings on the bridge are clear and operating as intended.
b. Do not allow debris and sediment to enter the stream or stream channel.
c. Haul sediment and other debris to a disposal area designated by the Forest Service in accordance with Section T–806 Slump Removal and Slump Repair.
C. Vegetation removal.
a. Remove and dispose of vegetation at the bridge in accordance with T–802 Vegetation Removal.
Table 1—Bridge identification
Bridge name Road number Milepost
N/A
Page 13 of 25 Almanor Ranger District
Revised 1.27.2025
T–805 Road Grading
805.01 Description
Work consists of keeping a native or aggregate roadbed in a condition that facilitates traffic and provides proper drainage. It includes maintaining the crown, inslope, outslope or drainage dips of the traveled way;
maintaining turnouts and shoulders; repairing berms; and blending approach road intersections.
805.02 Maintenance
A. Road grading shall be performed as often as necessary, per C/CT 5.31, to facilitate safe use and proper drainage.
B. Road grading shall preserve the existing cross-section. Surface irregularities shall be eliminated and the surface left in a free-draining state and to a smoothness needed to facilitate traffic. On aggregate-surfaced roads, thoroughly loosen surfacing material to no less than a 2-inch depth or the depth of defects. Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected but will be considered incidental to blading. Do not scarify to a depth that will cause contamination of the surfacing. Surface material that has been displaced to the shoulders or turnouts shall be returned to the traveled way. A grading pattern shall be established to retain surface material on the roadbed and to provide for a thorough mixing of the materials within the completed surface width.
C. Unless otherwise shown in table 2, compaction of the traveled ways will be accomplished using compaction method A and will commence immediately following blading.
a. Compaction method A: adjust the moisture content of the material to a content suitable for compaction. Fill the interstices around rock with earth or other fine material, as practical.
Operate hauling and spreading equipment uniformly over the full width of each layer until there is no visible evidence of further consolidation.
b. Compaction method B: operate a 7- to 10-ton pneumatic, steel, or equivalent vibratory roller to cover the full width three times. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material, as practical.
D. Smooth blading may be used as an interim measure on aggregate-surfaced roads to remove loose surfacing material from the wheel paths. Store removed materials in a recoverable windrow until blade processing (as described above) is feasible. Watering is not required for smooth blading. Accomplish smooth blading without distorting the existing cross-slope or crown of the traveled way.
E. Move and store loose surfacing materials on the high side of super-elevated curves and sections with uniform inslope or outslope. In crowned sections, store the material on either or both sides, as elected.
Windrow and place stored materials to provide not less than 12 feet of smooth traveled way on one-lane segments, or 20 feet of smooth traveled way on two-lane segments or segments with turnouts. Place holes through windrows for drainage every 500 feet or less to provide drainage.
F. Water, taken from water sources designated on the sale area map, shall be applied during blading if sufficient moisture is not present to cut, mix, or compact the surface material.
G. On native-surfaced roads, material generated under other maintenance specifications may be blended with the surface material being worked. On aggregate surfaced roads this material shall not be blended with surface or base course material unless otherwise agreed.
H. Roadway cut slopes or berms shall not be undercut, nor shall new berms be established unless otherwise agreed.
I. Berms shall be repaired by placing material, as needed to restore the berm, to reasonably blend with existing line, grade, and cross-section.
Page 14 of 25 Almanor Ranger District
Revised 1.27.2025
J. Drainage dips shall be cleaned and maintained to reasonably blend with existing line, grade, and cross-section. Lead-off ditches shall be maintained in accordance with T-810 Ditch Maintenance.
K. Intersecting road junctions that are not closed or restricted from vehicular use shall be bladed to assure proper blending of the two riding surfaces.
L. Rocks or other material remaining on the traveled way after the final pass that are larger than 4 inches in diameter or are larger than the maximum size of imported surfacing shall be removed. Unless otherwise designated by the Forest Service, the oversized material shall be removed and placed outside the roadway; do not obstruct drainage ways or structures. Placement into streams, lakes, or water courses will not be permitted.
M. Material resulting from work under this specification shall not remain on or in structures, such as culverts, overside drains, cattleguards, ditches, and drainage dips.
N. Material resulting from work under this specification, plus any accumulated debris, shall be removed from bridge decks and the deck drains opened.
Table 2—Compaction requirement Road number Beginning milepost Ending milepost
Note: Roads listed in this table require compaction method B, as specified in 806.02-C.
Page 15 of 265 Almanor Ranger District
Revised 1.27.2025
T–806 Slide Removal and Slump Repair
806.01 Description
Work includes excavating, loading, hauling, placing, and compacting waste or replacement material. Work under T–806 is work that cannot be handled by a motor grader during T–805 Road Grading or T–810 Ditch Maintenance.
806.02 Maintenance Requirements
A. Slide material, including soil, rock, and vegetative matter that encroaches into the roadway shall be removed. The slope which contributed the slide material shall be reshaped as practicable to reduce future sliding, as agreed to with the Forest Service. Slide material on the fill slope and below the roadway will not be removed unless needed for slope stability or to protect adjacent resources.
a. Surface and base courses shall not be excavated during T–806 Slide Removal operations.
b. Slide material which cannot be used for other beneficial purposes shall be placed at disposal sites shown on the sale area map or designated by the Forest Service. Compact material shall be placed in disposal sites only if required by the Forest Service.
B. Material for slump repair is from agreed upon borrow sites, placed in layers no more than 12-inches thick, and compacted in accordance with T–805 method A or other methods approved by the Forest Service.
a. Existing aggregate surfacing shall be salvaged when practical and replaced after depressions have been filled.
b. Damaged aggregate base, aggregate surfacing, and bituminous pavement shall be repaired under T–807 Surface Repair (Bituminous) and T–808 Surfacing Repairs.
c. Following slide removal, the roadway shall be shaped to reasonably conform to its original cross-section.
Page 16 of 25 Almanor Ranger District
Revised 1.27.2025
T–807 Surface Repair (Bituminous)
807.01 Description
Work consists of bituminous surface repair and includes repairing potholes or small, failed areas within the roadway. Includes preparing the area, furnishing, hauling, and placing all materials, and other work necessary for repairing the bituminous surface within the traveled way.
807.02 Maintenance Requirements
A. Unless otherwise specified, the purchaser is responsible for furnishing all needed material to complete the work (table 3). Bituminous product mix type shall be hot mix, unless otherwise specified.
B. The Forest Service will mark the areas to receive bituminous surface repairs on the road surface before the purchaser performs the work.
C. Soft spots and potholes require the excavation of surface and base course material necessary to reach firm, suitable material. The minimum depth of excavation shall be 2 inches and the maximum depth shall be to the top of the subgrade. The edges of the prepared hole shall be extended to form a vertical face in unfractured asphalt surfacing. Shape shall be generally circular or square, dry, and cleared of all loose material.
D. The prepared hole should be patched immediately or barricaded in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) until patched.
E. The faces of the hole shall be prepared by thoroughly applying emulsified asphalt tack coat.
F. The bituminous mixture shall be placed in layers not to exceed a compacted depth of 2 inches. Each layer shall be compacted thoroughly with hand or mechanical tampers or rollers. Compaction shall not be accomplished using equipment wheels.
G. The completed, compacted patch in the pothole shall be flush, with an allowable tolerance up to ½ inch above the level of the adjacent pavement.
H. Skin patches required for surface sealing shall uniformly distribute the bituminous mixture with feathered edges in even layers.
I. Damaged segments of asphalt berm shall be removed and the exposed ends beveled at 45 degrees from vertical. The berm foundation shall be cleaned and patched as necessary. The foundation and adjoining surfaces shall be prepared by thoroughly applying emulsified asphalt tack coat. Asphalt mix shall be placed and compacted to conform to the shape and alignment of the undamaged segment.
J. Unsuitable material shall be disposed of only at locations designated by the Forest Service or as shown on the sale area map.
Table 3—Material types
Road Material type* number
*Identify material type: asphalt (hot mix or cold mix), other bituminous materials.
Page 17 of 25 Almanor Ranger District
Revised 1.27.2025
T–808 Surface Repair (Aggregate/Native)
808.01 Description
Work consists of repairing potholes, minor washouts, and soft areas on aggregate- or native-surfaced roads. Includes preparing the area; removing unsuitable material; furnishing, hauling, and placing all materials; and other work necessary to make the repair and blend into the adjacent surface section to provide a uniform cross section.
808.02 Maintenance Requirements
Table 4 identifies material sources.
Prepare the area as approved by the Forest Service. Soft spots on native- or aggregate-surfaced roads shall be repaired by placing the imported material on top of the soft spot in layers until a firm surface is produced, as evident by no surface deflection under normal operating loads. Repair material shall be uniformly distributed in layers not to exceed 6 inches compacted depth. Ensure adequate moisture. Material placement shall not cause surface irregularities and shall preserve the existing cross section.
Unsuitable material shall be disposed of at locations designated by the Forest Service or shown on the sale area map.
Material provided shall be certified weed-free.
Table 4—Specified material sources
Road number
Material type* Source** Gradation
N/A
Page 18 of 25 Almanor Ranger District
Revised 1.27.2025
T–809 Dust Abatement
809.01 Description
Work consists of preparing the traveled way and furnishing and applying materials to abate dust.
809.02 Material
A. A dust abatement plan must be agreed on before hauling on roads that require dust abatement, as shown in C/CT5.31#. The plan must include the type of dust abatement material to use, the rates of application, and the frequency of applications. Table 5 shows special requirements for dust abatement that the dust abatement plan should include.
B. The sale area map designates the locations of approved water sources. The Forest Service may approve alternate water sources.
C. Dust abatement materials shall meet the following requirements:
a. Magnesium chloride liquid—ASTM D 1298, Type S, 28 percent min. by mass, specific gravity 1.29 to 1.33
b. Calcium chloride liquid—AASHTO M 144, Type L, 35 percent min. by mass
c. Calcium chloride flake—AASHTO M 144, Type S Grades 1, 2, or 3, Class A
d. Lignosulfonate liquid—Dry solids 50 percent, specific gravity 1.20 min. (ASTM D1475), pH (ASTM E70 3.0 to 8.0)
D. Certification of magnesium or calcium chloride brine, calcium chloride flake, and lignosulfonate liquid shall be in accordance with the concentrations listed above.
809.03 Maintenance Requirements
A. Dust abatement materials shall be applied to the road surface as necessary to control road surface loss, provide for road user safety, and minimize damage to adjacent resources.
B. The traveled way shall be prepared and finished in accordance with the manufacturer’s requirements or recommendations.
C. Dust abatement materials other than water shall be applied within tolerances specified by the manufacturer.
D. Dust abatement materials shall not be applied when it is raining. Lignosulfonate and magnesium chloride shall be applied when the atmospheric temperature is 40 °F or above.
E. The designated water sources may require some work before use. Such work may include cleaning ponded areas, installing temporary weirs or sandbags, pump installation, or other items appropriate to the purchaser's operations. Water source preparation requires contracting officer approval before use.
Table 5—Dust abatement application rate
Road number Material type Application rate
All Roads Water Once each day for up to 10 loads per day.
For over 10 loads per day, as needed
Page 19 of 25 Almanor Ranger District
Revised 1.27.2025
T–810 Ditch Maintenance
810.01 Description
Work consists of routine maintenance to provide unobstructed drainage for various types of ditches.
810.02 Maintenance Requirements
A. Maintain existing ditches by removing rock, soil, wood, and other materials to provide unobstructed flow.
B. Do not undercut backslopes during ditch maintenance operations.
C. Remove suitable material up to 4 inches in greatest dimension from the ditches and blend it into the existing native road surface and shoulder or place it in a designated berm.
D. Do not blend material from ditch cleaning operations into aggregate surfaced roads. Do not blade material across bituminous surfaced roads, unless approved in writing by the Forest Service.
E. Dispose of excess material which cannot be used for other beneficial purposes at disposal sites shown on the sale area map or at sites designated by the Forest Service. Material placed in disposal sites does not require compaction, unless required by the Forest Service.
F. Remove limbs and wood chunks that exceed 12 inches in length or 3 inches in diameter from ditches and place outside the roadway.
G. Clean paved surfaces of all materials resulting from ditch maintenance work.
H. Shape lead-off ditches to drain away from the traveled way.
Page 20 of 25 Almanor Ranger District
Revised 1.27.2025
T–811 Drainage Structures
811.01 Description
Work consists of maintaining drainage structures such as culverts, armored crossings, surface water deflectors, inlet and outlet channels, related ditches, existing riprap, trash racks, and drop inlets. This includes overside drains and cattleguards that function as drainage structures.
811.02 Maintenance Requirements
A. Drainage structures and related items shall be cleared of all foreign material that has been deposited above the bottom of the structure and all vegetative growth that interferes with the flow pattern.
B. Culvert inlets and outlets shall be cleaned a minimum of 3 feet, as measured along the invert, unless otherwise directed by the Forest Service.
a. Recondition culvert inlets and outlets by field methods such as jacking out or cutting away damaged metal that obstructs water flow. Treat cut metal edges with a zinc-rich coating, according to AASHTO M 36 and ASTM A849.
b. Clean catch basins by removing the material within the basin floor to conform to the original grade from the invert and shape the basin to reasonably match the original catch basin cutslope.
c. Clean the inlet channel transition from the drainage ditch to the catch basin and outlet ditches a minimum of 10 feet, or a sufficient distance to allow free drainage of water.
C. Ditches shall be cleaned to conform to previous line, grade, and cross section for positive drainage.
D. Drainage dip maintenance consists of cleaning existing dips on native- and aggregate-surfaced roads.
Drainage dips shall be shaped to a depth and width to provide positive drainage and to reasonably conform to the original lines, grades, and cross sections, unless otherwise agreed upon. Lead-off ditches shall be cleaned a minimum of 10 feet from the drainage dip.
E. Riprap shall be maintained in good condition, including the replacement of riprap, if necessary, to previous line, grade, and cross section.
F. Headwalls, aprons, inlet assemblies, overside drains, riprap, geotextiles, trash racks, and other facilities related to the drainage structure shall be maintained to ensure proper function.
G. Material removed, if suitable, may be blended into existing native road surfaces or shoulders. On aggregate surface roads, care must be taken to ensure the material is not mixed into the existing aggregate. Haul unsuitable material to a disposal area designated by the Forest Service in accordance with Section T–806, or as otherwise agreed. Side casting into streams, lakes, or watercourses is not permitted.
Page 21 of 25 Almanor Ranger District
Revised 1.27.2025
T–812 Miscellaneous Structures
812.01 Description
Work consists of maintaining miscellaneous structures—including cattleguards, gates, and other similar, previously installed structures—to ensure safe and efficient operation of the road.
812.03 Maintenance Requirements
A. Cattleguards.
a. Loose rail or wing elements shall be straightened and welded or bolted back in place.
b. Excess material carried into the cattleguard shall be removed when drainage is blocked or when it reaches 6 inches from the bottom of the cattleguard frame. Drainage into and from the cattleguard shall be kept open according to T–811 Drainage Structures.
B. Gates.
a. Gates shall be kept in good repair and made to swing easily. Hinges or latches shall be repaired if not operating properly and hinges shall be oiled. Vegetation and debris shall be removed from within the swinging radius according to T–802 Vegetation Removal—Roadside.
b. Loose wire gate ends and internal stays shall be maintained in good condition. Gate wire shall be maintained as necessary to ensure proper operation of the gate both as a vehicular passageway and as a barrier to cattle movement.
C. Other miscellaneous structures shall be maintained as needed to ensure safe and efficient operation of the road.
Page 22 of 25 Almanor Ranger District
Revised 1.27.2025
T–813 Waterbar
813.01 Description
Work consists of restoring waterbars in the roadbed.
813.02 Maintenance Requirements
A. Waterbars shall be restored in accordance with figure 2.
B. All material excavated shall be used in the restoration of the waterbar. Berm material shall be compacted by operating heavy equipment over the entire length and width of the berm.
C. Waterbars may need to be restored between seasons of use and then removed when haul is resumed.
Waterbar restoration may also be required when use of a road is complete.
D. Waterbar restorations shall be as agreed upon in the purchaser’s plan of operations (B/BT6.311) or as directed by the Forest Service.
Figure 2—A waterbar (typical).
Source:
Page 23 of 25 Almanor Ranger District
Revised 1.27.2025
• The National Engineering Roads Drawing Library https://fsweb.sdtdc.wo.fs.fed.us/programs/eng/natlib/drawings/
• Water Bar—Driveable-G3-3 https://fsweb.sdtdc.wo.fs.fed.us/programs/eng/natlib/drawings/pdf/G3/C-GROUP_3_G3- 3_WATER_BAR-DRIVEABLE.pdf
• Note: The drawing here has a minor modification from the original.
https://fsweb.sdtdc.wo.fs.fed.us/programs/eng/natlib/drawings/ https://fsweb.sdtdc.wo.fs.fed.us/programs/eng/natlib/drawings/pdf/G3/C-GROUP_3_G3-https://fsweb.sdtdc.wo.fs.fed.us/programs/eng/natlib/drawings/pdf/G3/C-GROUP_3_G3-
Page 24 of 25 Almanor Ranger District
Revised 1.27.2025
T–814 Closure Devices
814.01 Description
Work consists of furnishing, installing, or removing barriers to facilitate road closures. Gates are not included.
814.02 Maintenance Requirements
A. Barriers shall be removed or installed in accordance with table 6, or as otherwise provided by the Forest Service.
B. Earthen barriers shall be installed such that excavation areas drain, ditch lines do not impede flow, and as indicated in figure 3.
C. Other barrier types shall be installed as directed by the Forest Service.
D. The sale area map or stakes on the ground show the location of barriers to be removed or installed. Table 6 also identifies this information. Installation or removal may occur as often as road use is terminated or resumed.
Page 25 of 25 Almanor Ranger District
Revised 1.27.2025
Figure 3—An earthen barrier.
Page 25 of 25 Almanor Ranger District
Revised 1.27.2025
Source:
• The National Engineering Roads Drawing Library https://fsweb.sdtdc.wo.fs.fed.us/programs/eng/natlib/drawings/
• Earthen Barrier-G3-4 https://fsweb.sdtdc.wo.fs.fed.us/programs/eng/natlib/drawings/pdf/G3/C- GROUP_3_G3-4_EARTHEN_BARRIER.pdf
Note: Note: The drawing here has a minor modification https://fsweb.sdtdc.wo.fs.fed.us/programs/eng/natlib/drawings/ https://fsweb.sdtdc.wo.fs.fed.us/programs/eng/natlib/drawings/pdf/G3/C-GROUP_3_G3-https://fsweb.sdtdc.wo.fs.fed.us/programs/eng/natlib/drawings/pdf/G3/C-GROUP_3_G3-
| ATTACHMENT 3 - Appendix C |
| C(T)5.31# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary: |
| ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS |
| Definitions |
| T–801 Vegetation Removal—Roadway |
| 801.01 Description |
| 801.02 Maintenance Requirements |
| T–802 Vegetation Removal—Roadside |
| 802.01 Description |
| 802.02 Maintenance Requirements |
| T–803 Pavement Cleaning |
| 803.01 Description |
| 803.02 Maintenance Requirements |
| 803.03 Equipment |
| T–804 Bridge Deck and Curb Cleaning |
| 804.01 Description |
| 804.02 Maintenance Requirements |
| T–805 Road Grading |
| 805.01 Description |
| 805.02 Maintenance |
| Table 2—Compaction requirement |
| T–806 Slide Removal and Slump Repair |
| 806.01 Description |
| 806.02 Maintenance Requirements |
| T–807 Surface Repair (Bituminous) |
| 807.01 Description |
| 807.02 Maintenance Requirements |
| T–808 Surface Repair (Aggregate/Native) |
| 808.01 Description |
| 808.02 Maintenance Requirements |
| T–809 Dust Abatement |
| 809.01 Description |
| 809.02 Material |
| 809.03 Maintenance Requirements |
| T–810 Ditch Maintenance |
| 810.01 Description |
| 810.02 Maintenance Requirements |
| T–811 Drainage Structures |
| 811.01 Description |
| 811.02 Maintenance Requirements |
| T–812 Miscellaneous Structures |
| 812.01 Description |
| 812.03 Maintenance Requirements |
| T–813 Waterbar |
| 813.01 Description |
| 813.02 Maintenance Requirements |
| T–814 Closure Devices |
| 814.01 Description |
| 814.02 Maintenance Requirements |