4--7- Exhibit A- MinimumStandards for Responsiveness- PAR127551.pdf
PDF 142 KB Posted
- Solicitation number
- SLCo PAR127551 Fairmont Aquatics Roof System Replacement - CONST
- Issued by
- Utah
About this file
This is a Minimum Standards for Responsiveness exhibit for Salt Lake County's construction project PAR127551, addressing the removal and replacement of the entire roof waterproofing system at Fairmont Aquatics Center. The project will be coordinated with a separate RTU replacement project occurring concurrently at the facility. Proposers must affirmatively answer all eight responsiveness questions to avoid having their bids deemed non-responsive and non-responsible. The qualification requirements address the contractor's experience over the past three to five years, including successful completion of roofing projects without surety involvement, default claims, or liquidated damages assessments; experience with projects of similar size and scope; completion of commercial or government projects; ability to provide a minimum of three references; willingness to support third-party inspectors and material testing firms; and successful experience constructing projects in occupied adjacent areas.
The document establishes contractor eligibility criteria rather than pricing terms, set-asides, or funding information. All responses must be included in the bid package as required forms for submittal, and Salt Lake County reserves the right to investigate further any responses provided. The scope of work encompasses multiple technical specifications including selective demolition, joint sealants, plumbing and mechanical systems work, HVAC requirements, hydronic piping, metal ducts, and custom natatorium air-handling units, with all work subject to project management and coordination requirements, photographic documentation, submittal procedures, quality requirements, temporary facilities controls, and closeout procedures as outlined in the associated project specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MINIMUM STANDARDS FOR RESPONSIVENESS
YES NO QUESTIONS
CONTRACT SPECIFIC PERFORMANCE:
PROJECT SPECIFIC PERFORMANCE:
EXHIBIT A PROJ. ID.
CONSTRUCTION SERVICES FOR: PAR127551 Fairmont Aquatics Roof System Replacement
Proposer must answer, in the affirmative, to all questions below or the Proposer's bid will be deemed non-responsive and non-responsible.
In the last five years, has your firm, acting as the General Contractor:
Completed all roofing projects without the owner(s) calling in or involving sureties to assist in completing or assuming responsibility for completing a project?
Completed all roofing replacement projects without being removed from the project upon a claim by the Owner for default or breach of contract?
Completed all construction projects without assessment or payment of Liquidated Damages?
In the last five years, has your firm, acting as the General Contractor worked on a project of similar size and scope?
In the last 3 years, has your firm, acting as the General Contractor, worked on a commercial project(s) and/or Government projects(s) outside of new single-family homes and single-family renovations?
From the last five years, is your firm able to provide a minimum of 3 references who will speak to your performance?
Will your firm and your sub-contractors support third-party inspectors and material testing firms on this project?
Does your firm have successful experience constructing projects while fully occupied in adjacent areas?
This form must be included in your bid package as part of the required forms for submittal.
The County reserves the right to investigate further, any of the responses to the above questions.
COMPANY NAME
SIGNER
TITLE
SALT LAKE COUNTY - SMALL PROJECT
| 00 0100 MINIMUM STANDARDS FOR RESPONSIVENESS |
| 00 0101 PROJECT COVER PAGE |
| 00 0110 TABLE OF CONTENTS |
| 00 3143 - PERMIT APPLICATION |
| 01 1000 - SUMMARY |
| 01 2500 - SUBSTITUTION PROCEDURES |
| 01 3100 - PROJECT MANAGEMENT AND COORDINATION |
| 01 3233 - PHOTOGRAPHIC DOCUMENTATION |
| 01 3300 - SUBMITTAL PROCEDURES |
| 01 4000 - QUALITY REQUIREMENTS |
| 01 4200 - REFERENCES |
| 01 5000 - TEMPORARY FACILITIES AND CONTROLS |
| 01 6000 - PRODUCT REQUIREMENTS |
| 01 7300 - EXECUTION |
| 01 7419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL |
| 01 7700 - CLOSEOUT PROCEDURES |
| 01 7823 - OPERATION AND MAINTENANCE DATA |
| 01 7839 - PROJECT RECORD DOCUMENTS |
| 02 4119 - SELECTIVE DEMOLITION |
| 07 9200 - JOINT SEALANTS |
| 220500 Common Work Results for Plumbing (lead free) |
| 221316 Sanitary Waste and Vent Piping - 2019-04-02 |
| 230100 Mechanical Requirements -2014-11-24 |
| 230513 Common Motor Requirements for HVAC Equipment - 2013-01-15 |
| 230519 Meters and Gages for HVAC - 2013-03-15 |
| 230523 General-Duty Valves for HVAC Piping - 2013-03-15 |
| 230529 Hangers and Supports for HVAC Piping and Equipment - 2014-05-13 |
| 230548 Vibration and Seismic Controls for HVAC - 2020-03-30 |
| 230550 Operation and Maintenance of HVAC Systems - 2016-01-18 |
| 230593 Testing Adjusting and Balancing for HVAC - 2013-09-26 |
| 230713 Duct Insulation - 2014-05-02 |
| 230719 HVAC Piping Insulation - 2016-01-19 |
| 230900 Sequence of Operations |
| 232113 Hydronic Piping - 2017-09-13 |
| 232116 Hydronic Piping Specialties - 2016-05-09 |
| 232500 Chemical Water Treatment |
| 233113 Metal Ducts - 2015-12-09 |
| 237324 CUSTOM NATATORIUM AIR-HANDLING UNITS 2015-11-12 |
File details come from the government source that posted it. Updated .