2--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- SLCo PAR127551 Fairmont Aquatics Roof System Replacement - CONST
- Issued by
- Utah
About this file
This is a Schedule of Values document for the State of Utah's construction project PAR127551, the Fairmont Aquatics Roof System Replacement. The project scope encompasses the complete removal and replacement of the roof waterproofing system at Fairmont Aquatics Center, with coordination required for a concurrent RTU replacement project. The Schedule of Values template is structured to accommodate a base bid and four alternate bids (Alternates 1 through 4, plus Alternates B and C), with line items organized by payment and performance bond, insurance and builder's risk, and Division 01 General Conditions. Bidders are required to complete this form with pricing for each division of work and enter corresponding totals that match amounts submitted in the Online Solicitation System (OSS).
The document establishes that all base bid totals and alternate bid totals must align precisely with figures entered into the OSS. Bidders must identify their company name and ensure accuracy across all pricing entries. The template contains multiple blank line items under Division 01 General Conditions to allow bidders to specify their complete work scope with examples provided. No specific contract award date, term duration, renewal options, funding amounts, or set-aside provisions are detailed within this Schedule of Values document, as it functions primarily as a standardized pricing submission form for the construction contract bidding process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Section 2 - Document 3.0 | ||||||||
| Schedule Of Values | ||||||||
| Project: PAR127551 Fairmont Aquatics Roof System Replacement | ||||||||
| Divisions of Work | Base Bid | Alternate 1 | Alternate 2 | Alternate 3 | Alternate 4 | |||
| (Specify entire work scope; examples are listed below) | Alternate B | Alternate C | Total | |||||
| Payment & Performance Bond | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Insurance & Builder's Risk | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Division 01-General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Totals (Enter in OSS) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS). |
| The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS) |
| Name of Company Bidding ________________________________ |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .