This is a bid tabulation document for the Kennedy Road Culvert Replacement Contract No. 2026-01, administered by Prospect Borough, Pennsylvania. The project involves the replacement of a culvert stream crossing located at 233 Kennedy Road, Prospect, PA 16052, with an expected project duration of 60 days. Sealed bids were received electronically via the PennBid Program with a submission deadline of September 8, 2026, at 10:00 A.M. local time. A non-mandatory pre-bid conference was scheduled for Monday, August 24, 2026, at 1:00 P.M. at the project site. The work consists of ten line items including demolition, installation of 36-inch and 15-inch HDPE culvert pipes, stone rip-rap placement, precast concrete endwalls, asphalt restoration, erosion and sediment controls, site restoration, traffic control, and mobilization with insurance and bonds.
Nine contractors submitted bids for the project: Protocol LLC, LM&R Excavating LLC, Quigley Development Inc., Thoroughbred Construction Group LLC, Verardi Landscapes LLC, All-Terra Construction Inc., Chivers Construction Company Inc., Gregori Construction Inc., and Grossman Construction. Base bid pricing ranged from $74,092.06 to $159,331.00, with the lowest responsive bid at $74,092.06 and the highest at $159,331.00. The project is subject to prevailing wage requirements as determined by the Pennsylvania Department of Labor and Industry, compliance with the Public Works Employment Verification Act (Act 127 of 2012), and requirements that all steel products be made in the United States. Bidders were required to pay a fee to be confirmed with PennBid upon contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-450-29 - IFB.pdf | ||
| 3-450-29 Addendum 1.pdf | ||
| 1-450-29 2026-01 Bid Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Cost
# Items Lowest Quantity RequiredUnit of MeasureUnit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost
#1-1 Demolition $ 3,500.0 1 LS $ 5,500.0 $ 5,500.0 $ 21,221.0 $ 21,221.0 $ 7,000.0 $ 7,000.0 $ 20,000.0 $ 20,000.0 $ 15,649.0 $ 15,649.0 $ 15,000.0 $ 15,000.0 $ 3,500.0 $ 3,500.0 $ 9,840.0 $ 9,840.0 $ 9,700.0 $ 9,700.0
#1-2 36” HDPE Culvert Pipe $ 8,550.0 38 LF $ 630 $ 23,940.0 $ 254 $ 9,652.0 $ 460 $ 17,480.0 $ 975 $ 37,050.0 $ 225 $ 8,550.0 $ 750 $ 28,500.0 $ 650 $ 24,700.0 $ 246.37 $ 9,362.06 $ 391.75 $ 14,886.5
#1-3 15” HDPE Pipe $ 15,390.0 270 LF $ 105 $ 28,350.0 $ 57 $ 15,390.0 $ 110 $ 29,700.0 $ 81.5 $ 22,005.0 $ 80 $ 21,600.0 $ 60 $ 16,200.0 $ 129 $ 34,830.0 $ 62.26 $ 16,810.2 $ 71.2 $ 19,224.0
#1-4 R-6 Stone Rip-Rap $ 1,800.0 30 Ton $ 175 $ 5,250.0 $ 155 $ 4,650.0 $ 170 $ 5,100.0 $ 60 $ 1,800.0 $ 110 $ 3,300.0 $ 70 $ 2,100.0 $ 75 $ 2,250.0 $ 86.9 $ 2,607.0 $ 144.5 $ 4,335.0
#1-5 Precast Concrete Endwall $ 13,201.2 2 EA $ 11,040.0 $ 22,080.0 $ 14,455.0 $ 28,910.0 $ 8,410.0 $ 16,820.0 $ 12,500.0 $ 25,000.0 $ 15,000.0 $ 30,000.0 $ 26,500.0 $ 53,000.0 $ 10,300.0 $ 20,600.0 $ 6,600.6 $ 13,201.2 $ 17,200.0 $ 34,400.0
#1-6 Asphalt Restoration $ 3,600.0 60 SY $ 150 $ 9,000.0 $ 260 $ 15,600.0 $ 390 $ 23,400.0 $ 257 $ 15,420.0 $ 140 $ 8,400.0 $ 60 $ 3,600.0 $ 210 $ 12,600.0 $ 146.28 $ 8,776.8 $ 247.75 $ 14,865.0
#1-7 Erosion and Sediment Controls $ 500 1 LS $ 13,450.0 $ 13,450.0 $ 9,863.0 $ 9,863.0 $ 16,000.0 $ 16,000.0 $ 4,425.0 $ 4,425.0 $ 8,000.0 $ 8,000.0 $ 500 $ 500 $ 12,500.0 $ 12,500.0 $ 1,284.0 $ 1,284.0 $ 21,100.0 $ 21,100.0
#1-8 Site Restoration $ 1,500.0 1 LS $ 8,580.0 $ 8,580.0 $ 16,892.0 $ 16,892.0 $ 3,500.0 $ 3,500.0 $ 12,000.0 $ 12,000.0 $ 4,500.0 $ 4,500.0 $ 1,500.0 $ 1,500.0 $ 5,500.0 $ 5,500.0 $ 8,260.8 $ 8,260.8 $ 7,910.0 $ 7,910.0
#1-9 Traffic Control $ 1,250.0 1 LS $ 4,675.0 $ 4,675.0 $ 3,898.0 $ 3,898.0 $ 5,000.0 $ 5,000.0 $ 1,500.0 $ 1,500.0 $ 8,000.0 $ 8,000.0 $ 2,500.0 $ 2,500.0 $ 2,500.0 $ 2,500.0 $ 1,250.0 $ 1,250.0 $ 8,035.5 $ 8,035.5
#1-10 Mobilization, Demobilization, Insurance, and Bonds$ 2,700.0 1 LS $ 9,000.0 $ 9,000.0 $ 20,816.0 $ 20,816.0 $ 12,000.0 $ 12,000.0 $ 12,000.0 $ 12,000.0 $ 12,000.0 $ 12,000.0 $ 10,000.0 $ 10,000.0 $ 9,500.0 $ 9,500.0 $ 2,700.0 $ 2,700.0 $ 24,875.0 $ 24,875.0
Protocol LLCLM&R EXCAVATING LLC
Base Bid Pricing (10)
Quigley Development, Inc.
Thoroughbred
Construction Group, LLC Verardi Landscapes LLC
$ 129,825.0 $ 146,892.0 $ 136,000.0 $ 151,200.0 $ 119,999.0 $ 132,900.0 $ 128,480.0 $ 74,092.06 $ 159,331.0
All-Terra Construction, Inc.
Chivers Construction
Company, Inc. Gregori Construction Inc. Grossman Construction