4--4- Unit Price Schedule- PAR123757 Butterfield Canyon Trailhead Maintenance Building.pdf

PDF 84 KB Posted

Attached to
SLCo PAR123757 Butterfield Canyon Trailhead Maintenance Building - CONST
Solicitation number
SLCo PAR123757 Butterfield Canyon Trailhead Maintenance Building - CONST
Issued by
Salt Lake County, Hildale City, Utah

About this file

This document is a Unit Price Schedule from a county government procurement process for a construction or infrastructure project. The schedule lists 11 distinct line items for various construction and landscaping activities, including earthwork, grading, fencing, paving, and site preparation tasks. The county requires contractors to submit installed unit costs that include overhead and profit, with the pricing applicable for both adding and deleting items during construction. The document provides a structured template for bidders to fill in unit prices for each specified item, measured in units such as cubic yards, linear feet, square feet, and face square feet.

The pricing schedule is designed to be submitted through the Online Solicitation System (OSS) and covers a range of construction-related services like rough grading, structural fill placement, precast retaining wall installation, rail and chain link fencing, concrete and gravel paving, PVC sleeve pipe installation, topsoil placement, and hydroseed application. The document allows for up to 19 total line items, though only 11 are currently populated. The unit price approach provides flexibility for the county in managing potential scope changes during the project, with contractors required to maintain consistent pricing for additions or deletions of specified work items.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 2 – Document 2.0

Unit Price Schedule

County requires Contractor to submit the following installed unit costs, which include Contractor overhead and profit. Should the need arise to add or delete items during construction, the unit cost must be valid for either adding or deleting. This unit price schedule must be attached in the Online Solicitation System (OSS).

Item No.

Unit

Description of Item

Unit Bid Price Dollars Cents

1. Cubic Yard Earthwork – Rough Grading

2. Cubic Yard Import & Place Structural Fill

3. Face Sq Foot Precast Retaining Wall

4. Lineal Foot Remove and Relocate Rail Fencing

5. Lineal Foot New Rail Fencing

6. Lineal Foot 6’ Chain Link Fencing

7. Square Foot Concrete Paving

8. Cubic Yard Import & Place Compacted Gravel Paving

9. Lineal Foot 3” Class 200 PVC Sleeve Pipe

10. Cubic Yard Import and Place Topsoil

11. Square Foot Hydroseed

12.

13.

14.

15.

16.

17.

18.

19.

File details come from the government source that posted it. Updated .