10-10- Plans- PAR123757 Butterfield Canyon Trailhead Maintenance Building.pdf
PDF 34 MB Posted
- Solicitation number
- SLCo PAR123757 Butterfield Canyon Trailhead Maintenance Building - CONST
- Issued by
- Salt Lake County, Hildale City, Utah
About this file
This document is a comprehensive architectural and engineering set of design plans for the Butterfield Canyon Trailhead Maintenance Building project for Salt Lake County, located in Herriman, Utah. The project consists of constructing a new 1,786 square foot maintenance building with a base bid that includes a shop, office, locker room, and public restroom, with an alternate bid option for an additional 858 square foot garage and related work. The design documents, prepared by THINK Architecture, detail a single-story Type V-B construction building with a metal roof, concrete masonry unit walls, and a projected completion date of August 2025.
The project is designed with a total estimated building area of 2,312 square feet, with a modest occupancy load of 4 persons across various spaces. The design incorporates standard building systems including concrete foundations, concrete masonry units, wood trusses, and metal roofing. Electrical service will be provided through a 120/240V single-phase transformer, with two primary electrical panels (P1 and P2) to support the facility's power needs. The project appears to be funded by Salt Lake County and will serve park operations staff, with considerations for accessibility, energy efficiency, and functional workspace design evident throughout the architectural plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLOOR OR POINT ELEVATION
CENTER LINE
KEY NOTE
WALL TYPE
DOOR NUMBER
WINDOW NUMBER
FIXTURE TAG
REVISION TAG
DETAIL
BUILDING SECTION
ROOM NAME & NUMBER
WALL SECTION
MASTER GRID LINES
X-XX
XXX
A101
SIM
Room name
A101
SIM
SPECIFICATION KEY NOTE
XXX
INTERIOR ELEVATIONA101
1Ref
R e f
R e f
1Ref
A
A101
Ref
Re f
Re f
Ref
BUILDING ELEVATION
PARKING GRID LINES
-A
BUILDING GRID LINES
A
1X
CONCRETE MASONRY UNIT
BRICK VENEER
STONE VENEER
CONCRETE
GYPSUM BOARD OR GROUT
MORTAR
BATT INSULATION
RIGID INSULATION
PLYWOOD
ROUGH WOOD-CONTINUOUS
ROUGH WOOD-BLOCKING
WOOD TRIM
STEEL
GRAVEL
EARTH
E.I.F.S.
B1
A101
SIM
# NUMBER
@ AT
A.B. ANCHOR BOLT
ABV. ABOVE
ADJ. ADJUSTABLE
A.F.F. ABOVE FINISHED FLOOR
ALUM. ALUMINUM
BD BOARD
BLDG. BUILDING
B.M. BENCHMARK
B.O. BOTTOM OF
BOT. BOTTOM
B.P. BASE PLATE
BRG. BEARING
BTWN. BETWEEN
C.J. CONSTRUCTION JOINT
CLG. CEILING
CLR. CLEAR
CMU CONCRETE MASONRY UNIT
COL. COLUMN
CONC. CONCRETE
CONT. CONTINUOUS
CONST. CONSTRUCTION
C.T.J. CONTRACTION JOINT
DBL. DOUBLE
DFT./DTL. DETAIL
DIA. DIAMETER
DTL. DETAIL
DWGS DRAWINGS
E.F. EACH FACE
E.J. EXPANSION JOINT
EL/ELEV. ELEVATION
EQ. EQUAL
E.S. EACH SIDE
E.W. EACH WAY
EXIST. EXISTING
EXPAN. EXPANSION
EXT. EXTERIOR
E.W.C. ELECTRIC WATER COOLER
F.D. FLOOR DRAIN
FDN./FDTN FOUNDATION
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
F.F. FINISH FLOOR
FIN. FINISH
FLR. FLOOR
FT FEET
FTG. FOOTING
GA. GAGE/GAUGE
GALV. GALVANIZED
GPM GALLONS PER MINUTE
GND GROUND
GOVT. GOVERNMENT
GYP. BD. GYPSUM WALL BOARD
HC HANDICAPPED
HDW. HARDWARE
H.M. HOLLOW METAL
HORIZ. HORIZON
HT. HEIGHT
HVAC HEATING/VENTIALTION/AIR CONDITIONING
HYD HYDRANT
I.D. INSIDE DIAMETER
INFO. INFORMATION
INSUL. INSULATION
LAV LAVATORY
LT. LIGHT
LT WT LIGHT WEIGHT
MAINT. MAINTENANCE
MANUF. MANUFACTURER
MAX. MAXIMUM
MAT MATERIAL
M.C.J. MASONRY CONTROL JOINT
MECH. MECHANICAL
MIN. MINIMUM
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
MTL. METAL
N.I.C. NOT IN CONTRACT
N.T.S. NOT TO SCALE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.F. OUTSIDE FACE
PERP PERPENDICULAR
PL PLATE
PTD. PAINTED
QTY. QUANTITY
R.D. ROOF DRAIN
RAD. RADIUS
RFINF. REINFORCED
REQ'D. REQUIRED
RM ROOM
R.O. ROUGH OPENING
SCHED SCHEDULE
SHT. SHEET
SIM SIMILAR
SPEC. SPECIFICATION
STC SOUND TRANSMISSION COEFFICIENT
STRUCT. STRUCTURAL
SUSP. SUSPENDED
T.O. TOP OF
T.O.C. TOP OF CURB
T.O.F. TOP OF FOOTING
T.O.S. TOP OF SLAB OR SIDEWALK
T.O.W. TOP OF WALL
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
VERT. VERTICLE
W/ WITH
WD. WOOD
W.W.F. WELDED WIRE FABRIC
PROJECT NO.
SHEET TITLE:
Pl o t D a te
Architecture Interior Design Landscape Architecture Land Planning Construction Management
7927 So. Highpoint Parkway, Suite 300
Sandy, Utah 84094
ph. 801.269.0055 fax 801.269.1425 www.thinkaec.com
The designs shown and described herein including all technical drawings, graphic representation & models thereof, are proprietary & can not be copied, duplicated, or commercially exploited in whole or in part without the sole and express written permission from THINK Architecture, inc.
These drawings are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors, and office personnel only in accordance with this notice.
SHEET NUMBER:
REVISIONS:
DATE:
2022 THINK ARCHITECTURE INC.
/1
/2
:2
:5
A
M
BU
TT
ER
FI
EL
D
T
RA
IL
H
EA
D
M A
IN
TE
N A
N C
E
BU
IL
D
IN
G
H
ER
RI
M
A N
H W
Y.
H
ER
RI
M A
N , U
T
12 AUGUST,
25-034
COVER SHEET
G000
BI
D
S
ET
PE
RM
IT
S
ET
NORTH
BUTTERFIELD TRAILHEAD MAINTENANCE BUILDING
ARCHITECT:
7927 SOUTH HIGH POINT WAY, SUITE 300
SANDY, UT 84094
801.269.0055
THINK ARCHITECTURE:
STRUCTURAL ENGINEER:
50 EAST 100 SOUTH
HEBER CITY, UT 84032
435.654.6600
EPIC ENGINEERING
MECHANICAL ENGINEER:
ELECTRICAL ENGINEER:
CIVIL ENGINEER:
9089 SOUTH 1300 WEST, SUITE 160
WEST JORDAN, UT 84088
801.628.6004
PERIGEE CONSULTING
LANDSCAPE ARCHITECT:
GENERAL CONTRACTOR:
TO BE DETERMINED
OWNER:
3383 S 300 E, SALT LAKE CITY, UT 84115
SALT LAKE COUNTY
PROJECT TEAM SEAL
SPECIAL INSPECTIONS REQUIREMENTS
DEFERRED SUBMITTALS ARE THOSE PORTIONS OF DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE PERMIT APPLICATION AND HAVE RECEIVED PRIOR APPROVAL FROM THE
BUILDING OFFICIAL TO BE DEFERRED.
THE DEFERRED SUBMITTALS SHALL BE SUBMITTED TO THE ARCHITECT AND GENERAL CONTRACTOR WITHIN SIX WEEKS TO COMMENCEMENT OF CONSTRUCTION TO THIS PORTION
OF WORK.
DEFERRED SUBMITTAL PROCESS:
1. THE DEFERRED SUBMITTAL SHALL FIRST BE REVIEWED BY THE GENERAL CONTRACTOR FOR COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS. THE SUBMITTAL MUST BE
REVIEWED, APPROVED, STAMPED AND SIGNED BY THE GENERAL CONTRACTOR BEFORE BEING SUBMITTED TO THE ARCHITECT.
2. THE GENERAL CONTRACTOR SHALL DIGITALLY SUBMIT DEFERRED SUBMITTALS TO THE ARCHITECT.
3. THE DEFERRED SUBMITTAL ITEMS WILL BE REVIEWED BY THE ENGINEER OR ARCHITECT IN RESPONSIBLE CHARGE. THE ENGINEER OR ARCHITECT WILL ATTACH A LETTER TO THE
SUBMITTAL STATING THAT THE DEFERRED ITEM IS IN CONFORMANCE WITH THE DESIGN OF THE STRUCTURE.
4. THE APPROVED SUBMITTALS WILL BE RETURNED TO THE GENERAL CONTRACTOR. TWO SETS OF THE DEFERRED SUBMITTAL ARE THEN SUBMITTED TO THE CITY FOR REVIEW.
5. THE GENERAL CONTRACTOR SHALL MAINTAIN ONE SET OF THE APPROVED SUBMITTAL ON SITE FOR REFERENCE BY THE CITY INSPECTOR.
6. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL.
7. SEE STRUCTURAL NOTES FOR ADDITIONAL REQUIREMENTS FOR STRUCTURAL DEFERRED SUBMITTALS.
DEFERRED SUBMITTAL ITEMS
1. PRE - ENGINEERED ROOF TRUSSES
2. FIRE ALARM DRAWINGS AND SPECIFICATIONS.
SPECIAL INSPECTIONS ARE REQUIRED IN ACCORDANCE WITH IBC 2021 CHAPTER 17, SECTION 1704.
SPECIAL INSPECTORS SHALL KEEP RECORDS OF INSPECTIONS. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL, AND TO THE REGISTERED
DESIGN PROFESSIONALS IN RESPONSIBLE CHARGE. (2021 IBC SECTION 1704.2.4).
SEE PROJECT MANUAL / SPECIFICATIONS, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL GENERAL NOTES FOR ADDITIONAL SPECIAL INSPECTION REQUIREMENTS.
DEFERRED SUBMITTAL REQUIREMENTS
GOVERNING BUILDING CODES & INFORMATION
BUILDING CODE: 2021 INTERNATIONAL BUILDING CODE (I.B.C.)
WITH UTAH STATE AMENDMENTS
PLUMBING CODE: 2021 INTERNATIONAL PLUMBING CODE (I.P.C.)
ELECTRICAL CODE: 2020 NATIONAL ELECTRICAL CODE (N.E.C.)
ACCESSIBILITY: 2009 ANSI 117.1
MECHANICAL CODE: 2021 INTERNATIONAL MECHANICAL CODE (I.M.C.)
FIRE CODE: 2021 INTERNATIONAL FIRE CODE (I.F.C.)
ENERGY CONSERVATION: 2021 INTERNATIONAL ENERGY CONSERVATION CODE
(I.E.C.C.)
OCCUPANCY GROUP: S-2 BUILDING TYPE: TYPE V-B ALLOWABLE BUILDING HEIGHT AND AREA: 40'-0"/ 2 STORIES; 13,500 S.F.
ACTUAL BUILDING HEIGHT AND AREA: 20'-0"/ 1 STORY; 2,312 S.F.
FIRE SPRINKLER: NO FIRE SPRINKLER TYPE: NA ADDRESSABLE FIRE ALARM: NO
RISK CATEGORY (I.C. 104.5): II SITE EXPOSURE: B BASIC WIND SPEED: 90 MPH
ULTIMATE WIND SPEED: 115 MPH
OCCUPANCY LOAD (TABLE 1004.5): STORAGE/GARAGE = 3; OFFICE = 1; TOTAL = 4 OCCUPANTS
MATERIALS: CONCRETE FOUNDATIONS, CONCRETE MASONRY UNITS, WOOD TRUSSES, & METAL ROOFING.
ABBREVIATIONS GRAPHIC SYMBOLS/ MATERIAL LEGENDS VICINITY MAP
CITY APPROVAL STAMP
BUILDING AREAS OWNER & MUNICIPAL DRAWING APPROVALS
OWNER:
CITY PLANNING & ZONING DEPARTMENT:
DATE:
DATE:
CITY BUILDING DEPARTMENT: DATE:
CITY ENGINEER:
CITY FIRE DEPARTMENT:
DATE:
DATE:
CITY POLICE DEPARTMENT: DATE:
8307 HERRIMAN HWY.
HERRIMAN, UTAH 84096
PROPERTY I.D. NUMBER:
DRAWING INDEX
BUILDING AREA - FINISHED
AREA FINISHED
BUILDING AREA - UNFINISHED
AREA UNFINISHED
GENERAL
SHEET # SHEET NAME # DATE
G000 COVER SHEET
G001 GENERAL NOTES
G002 LIFE SAFETY PLAN & AREA PLAN 1 -.-.-
G003 ACCESSIBILITY DETAILS
G004 ACCESSIBILITY DETAILS
G005 WALL AND CEILING TYPE DETAILS
CIVIL
SHEET # SHEET NAME # DATE
01 SD01-STORM DRAIN
02 UTO1-UTILITY KEY MAP
03 UT02-UTILITY
04 UT03-UTILITY PLAN
05 UT04-UTILITY PLAN
06 DT01-DETAIL
LANDSCAPE
SHEET # SHEET NAME # DATE
LP101 PLANTING PLAN
LI101 IRRIGATION PLAN
LI102 IRRIGATION PLAN
ARCHITECTURAL
SHEET # SHEET NAME # DATE
AS101 SITE PLAN
AS102 EROSION CONTROL DETAILS
A101 SLAB PLAN
A102 FOUNDATION ISOMETRIC
A103 FLOOR PLAN
A104 CEILING PLAN
A105 ROOF PLAN
A201 EXTERIOR ELEVATIONS
A202 EXTERIOR ELEVATIONS
A203 MATERIAL BOARD
A301 BUILDING SECTIONS
A302 BUILDING SECTIONS
A303 BUILDING SECTIONS
A304 WALL SECTIONS
A401 INTERIOR ELEVATIONS & ENLARGED PLANS
STRUCTURAL
SHEET # SHEET NAME # DATE
S0.1 STRUCTURAL GENERAL NOTES
S0.2 STRUCTURAL GENERAL NOTES
S0.3 STRUCTURAL SPECIAL INSPECTIONS
S1.1 FOUNDATION PLAN
S1.3 FRAMING PLAN - ROOF
S1.5 SHEAR WALL PLAN - LEVEL 1
S5.1 STRUCTURAL DETAILS
S5.2 STRUCTURAL DETAILS
MECHANICAL
SHEET # SHEET NAME # DATE
M0.1 MECHANICAL GENERAL NOTES
M0.2 HVAC ZONING
M0.3 HEAT LOSS CALCULATIONS
M1.1 FIRST LEVEL MECHANICAL PLAN
M5.1 MECHANICAL DETAILS
M5.2 MECHANICAL DETAILS
PLUMBING
SHEET # SHEET NAME # DATE
P0.1 PLUMBING GENERAL NOTES
P1.1 FIRST LEVEL PLUMBING PLAN
P2.1 FIRST LEVEL SANITARY PLAN
P5.1 PLUMBING DETAILS AND SCHEDULES
P5.2 PLUMBING DETAILS AND SCHEDULES
ELECTRICAL
SHEET # SHEET NAME # DATE
E0.1 ELECTRICAL SYMBOLS & NOTES
E0.2 ELECTRICAL GENERAL NOTES
E1.1 FIRST LEVEL ELECTRICAL PLAN
E1.2 ELECTRICAL PLAN
E2.1 FIRST LEVEL LIGHTING PLAN
E3.1 PANEL SCHEDULES
E4.1 ELECTRICAL DETAILS
7927 SOUTH HIGH POINT WAY, SUITE 300
SANDY, UT 84094
801.269.0055
THINK ARCHITECTURE:
50 EAST 100 SOUTH
HEBER CITY, UT 84032
435.654.6600
EPIC ENGINEERING
50 EAST 100 SOUTH
HEBER CITY, UT 84032
435.654.6600
EPIC ENGINEERING
BASE BID 1,786 SQ. FT
SITE DEVELOPMENT
SHEET # SHEET NAME # DATE
LS001 EXISTING CONDITIONS & OVERALL SITE PLAN
LS100 DEMOLITION PLAN
LS101 SITE DEVELOPMENT PLAN
LS501 SITE DETAILS
LS502 SITE DETAILS
ARCHITECTURAL
SHEET # SHEET NAME # DATE
A402 INTERIOR ELEVATIONS & ENLARGED PLANS
A403 INTERIOR ELEVATIONS & ENLARGED PLANS
A601 DOOR SCHEDULE & ELEVATIONS
A602 WINDOW SCHEDULE & ELEVATIONS
A701 ROOM FINISH SCHEDULE
A800 FOUNDATION ISOMETRIC
A801 OPTIONAL ADDITION - PLANS
A802 OPTIONAL ADDITION - ELEVATIONS & SECTIONS
OCT. 17, 2025
LOCATION TYPE THICKNESS "R" VALUE REMARKS
1. SLAB ON GRADE RIGID INSULATION 2" TOTAL THICKNESS R-10 MINIMUM 2" RIGID FOAM INSULATION INSTALLED HORIZONTALLY 4'-0" WIDE DIRECTLY BELOW SLAB AT
PERIMETER - OWENS CORNING FORMULAR 25 PSI.
2. PERIMETER FOUNDATION RIGID INSULATION 2" TOTAL THICKNESS R-10 MINIMUM EXTERIOR, BURIED - PERIMETER - OWENS CORNING FORMULAR 250 INSULATION SHALL BE CONT.
FROM TOP OF FOOTING TO UNDERSIDE OF SLAB. INSULATION TO OCCUR AT PERIMETER OF
OCCUPIED/ HEATED SPACES ONLY. DO NOT PROVIDE INSULATION AT UNHEATED SPACES. REFER
TO DETAILS ON THE DRAWINGS AND THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
3. WALL INSULATION EXTERIOR FRAMED
WALLS
BATT R-21 CERTAINTEED CERTA PRO ACOUSTICAL THERM UNFACED FRICTION BATTS or THERMAFIBER
SAFE or OWENS CORNING - THERMAL BATT - FILL STUD CAVITY TIGHT AS PER MANUFACTURER'S
RECOMMENDATIONS. COORDINATE WITH WALL TYPES AND SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS
4. JOIST SPACE OVER OPEN EXPOSED
SPACE AT OFFICE
5. ROOF AT TRUSSES/ STICK FRAMING N/A CERTAINTEED OPTIMA BIB BLOWN FIBERGLASS SYSTEM WITH VAPOR BARRIER SYSTEM
INSTALLED AS PER MANUFACTURER (O.A.E.). PROVIDE PREFABRICATED POLYSTYRENE AIR
BAFFLE VENTILATION SYSTEM.
7. BATHROOMS SOUND BATTS 3 1/2" MATCH WALL CAVITY- R-13
8. DUCTWORK/PLUMBING LINES N/A SEE MECHANICAL AND PLUMBING - FOR ALL INSULATION REQUIREMENTS
NOTES:
1. COORDINATE WITH SPECIFICATION FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
2. ALL INSULATION SHALL BE TIGHT, AND NO GAPS SHALL BE LEFT.
3. ALL INSULATION AT PIPES SHALL BE INSTALLED AT COLD SIDE ONLY, NO EXCEPTIONS.
CERTAINTEED CERTA PRO ACOUSTICAL THERM UNFACED FRICTION BATTS or THERMAFIBER
SAFE or OWENS CORNING - THERMAL BATT - FILL STUD CAVITY TIGHT AS PER MANUFACTURER'S
RECOMMENDATIONS. COORDINATE WITH WALL TYPES AND SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS
CERTAINTEED CERTA PRO ACOUSTICAL THERM UNFACED FRICTION BATTS or THERMAFIBER SAFE or OWENS CORNING - THERMAL BATT - FILL STUD CAVITY TIGHT AS PER MANUFACTURER'S
RECOMMENDATIONS. COORDINATE WITH WALL TYPES AND SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS
INSULATION SCHEDULE
4. WHERE INSULATION IS REQUIRED THE MOST RESTRICTIVE BETWEEN THE RESCHECK AND THE INSULATION SCHEDULE
SHALL BE INSTALLED. SEE RESCHECK.
5. CONTRACTOR SHALL CAULK ALL ELECTRICAL BOXES AT EXTERIOR WALL FOR AIR LEAKAGE.
N/A 9 1/2" BATT INSULATION = R-30
N/A
9 1/2" TOTAL THICKNESS
5 1/2" TOTAL THICKNESS
N/A
6. FURRED OUT WALLS AT BASEMENT N/AN/A N/A CERTAINTEED CERTA PRO ACOUSTIC THERM UNFACED FRICTION BATTS or THERMAFIBER SAFE or OWENS CORNING - THERMAL BATT - FILL STUD CAVITY TIGHT AS PER MANUFACTURER'S
RECOMMENDATIONS. COORDINATE WITH WALL TYPES AND SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS
ENERGY STRATEGY:
PRESCRIPTIVE PER IBC RESCHECK - 2021 IECC RESCHECK - UTAH 2021
N/A N/A
PROJECT GENERAL NOTES
1. DEFINITIONS
a. PROVIDE:
MEANS TO PROVIDE, FURNISH AND INSTALL, A COMPLETE SYSTEM AND READY FOR OPERATIONS AND USE
FOR PURPOSE INTENDED INCLUDES THOSE ITEMS SPECIFIED WITHIN THE DRAWINGS AND SPECIFICATIONS AS
WELL AS THOSE ITEMS THAT ARE REQUIRED TO PROVIDE A COMPLETE SYSTEM. THE CONTRACTOR AND SUB
CONTRACTORS ARE REQUIRED TO PROVIDE THE FULL AND COMPLETE SYSTEM.
b. FURNISH:
MEANS TO SUPPLY, PURCHASE, PROCURE AND DELIVER COMPLETE WITH RELATED ACCESSORIES, READY FOR
ASSEMBLY, APPLICATION, INSTALLATION, AND SIMILAR OPERATIONS, AS APPLICABLE IN EACH INSTANCE.
c. INSTALL:
MEANS TO CONSTRUCT, ASSEMBLE, ERECT, MOUNT, ANCHOR, PLACE, CONNECT, APPLY AND SIMILAR
OPERATIONS, COMPLETE WITH RELATED ACCESSORIES, AS APPLICABLE IN EACH INSTANCE.
d. EQUIVALENT:
MEANS "EQUIVALENT AS ACCEPTED BY THE ARCHITECT." WITH RESPECT TO PRODUCTS, EQUIVALENT MEANS A
LIKE DEGREE OF FEATURES, ATTRIBUTES, PERFORMANCES, OR QUALITIES DEEMED ESSENTIAL TO THE DESIGN
INDICATED INSTEAD, THE TERM INTENDED TO MEAN ARCHITECT WILL CONSIDER SUBSTITUTION PROPOSALS
FOR THE PRODUCT. DO NOT ASSUME THAT SUBSTITUTE PRODUCTS ARE ACCEPTABLE. SUBSTITUTIONS MADE
BY THE CONTRACTOR WITHOUT FULL AND FINAL APPROVAL, MAY REQUIRE TO BE REMOVED IF NOT DEEMED
ACCEPTABLE BY THE ARCHITECT. ALL COSTS ASSOCIATED TO REMOVAL OF SUBSTITUTION NOT APPROVED, AND INSTALLATION OF ACCEPTED PRODUCTS WILL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
GENERAL NOTES
G1. INTENT OF THE DOCUMENTS:
DRAWINGS AND SPECIFICATIONS ARE INTENDED TO PROVIDE THE BASIS FOR THE PROPER COMPLETION OF
THE PROJECT, SUITABLE FOR THE INTENDED USE OF THE OWNER. ITEMS NOT EXPRESSLY SET FORTH WITHIN THE
DRAWINGS AND SPECS , BUT WHICH ARE REASONABLY IMPLIED FOR COMPLETION OF A COMPLETE SYSTEM, OR NECESSARY, FOR THE PROPER PERFORMANCE OF THE WORK SHALL BE INCLUDED.
G2. DRAWINGS AND SPECIFICATIONS:
SPECIFICATIONS ARE INTENDED TO BE COMPLIMENTARY AND SUPPLEMENTAL TO THE DRAWINGS. NO
RELATIVE IMPORTANCE OF DRAWINGS VERSUS SPECIFICATIONS HAS BEEN ESTABLISHED AND NONE SHOULD
BE ASSUMED, BUT THE MOST STRINGENT CONDITIONS SHOULD BE ASSUMED FOR ALL BIDDING AND
CONSTRUCTION REQUIREMENTS. IN THE EVENT OF DISCREPANCIES OR CONFLICTS, THE ARCHITECT SHALL BE
CONSULTED IN ORDER TO RENDER AN INTERPRETATION.
BIDDING, PRICING OR CONSTRUCTION DONE PRIOR TO RECEIVING FINAL BUILDING DEPARTMENT PERMITS IS
AT THE CONTRACTORS OWN RISK. CHANGES TO THE DRAWINGS MAY BE REQUIRED AS PART OF THE PLAN
CHECK AND/ OR OWNER REVIEW PROCESS. THINK ARCHITECTURE INC. AND ITS CONSULTING ENGINEERS
WILL NOT BE HELD LIABLE FOR, NOR COMPENSATE FOR, CHANGES TO THESE DRAWINGS BEFORE FINAL
JURISDICTION AND OWNER APPROVAL IS OBTAINED.
DRAWINGS FOR THIS PROJECT IS COMPILED INTO 2 VOLUMES, AND BOTH VOLUMES SHALL BE USED FOR THE
CONSTRUCTION OF THIS PROJECT. THE DRAWINGS ARE INTENDED AS AN ENTIRE GROUP, AND NO SET OF
DRAWINGS TAKE PRECEDENCE. ALL CONTRACTORS WORKING ARE RESPONSIBLE FOR ALL ITEMS WITHIN
THIS SET OF DRAWINGS, AND NOT INDIVIDUAL AREA. FAILURE TO REVIEW AND PROVIDE COSTS FOR ALL
ITEMS WITHIN THEIR RESPECTIVE SCOPE OF WORK WHEREVER SHOWN WITHIN THE DRAWINGS IS THE BURDEN
OF THE GENERAL CONTRACTOR AND SUB -CONTRACTORS FOR THOSE ITEMS MISSED, AND SHALL NOT BE
AVAILABLE FOR CHANGE ORDERS FROM THE OWNER FOR MISSED SCOPE OF WORK IN THE BIDDING PROCESS.
G3. WORK NOT INCLUDED:
ANY ITEM INDICATED ON THE DRAWINGS AS “N.I.C.” (NOT IN CONTRACT), OR OTHERWISE DESIGNATED TO BE
DONE BY OTHERS IS NOT A PART OF THE CONTRACT. INSTALLATION AND/OR BACKING MAY BE REQUIRED
FOR SOME EQUIPMENT FURNISHED BY OWNER OR OWNER’S SUBCONTRACTOR. REFER TO DRAWINGS FOR
SPECIFIC REQUIREMENTS.
G4. CONTRACT DOCUMENTS AT SITE:
THE CONTRACTOR SHALL MAINTAIN CURRENT PERMIT DRAWINGS; SHOP DRAWINGS; REVISED DRAWINGS;
AND CLARIFICATION DRAWINGS, ADDENDA; CHANGE ORDERS; BULLETINS; INSPECTIONS; TEST
CERTIFICATIONS AND RECORDS; PRODUCT SUBMITTAL DATA AND SAMPLES. FIELD OFFICE SHALL CONTAIN A
CURRENT COPY OF ALL GOVERNING BUILDING CODE(S). MAKE DOCUMENTS AVAILABLE AT ALL TIMES FOR
ARCHITECT’S REVIEW. ALL DRAWINGS MUST BE CLEARLY MARKED AS TO THE FINAL APPROVED DRAWINGS.
G5. RECORD DRAWINGS:
THE MAINTAIN ACCURATELY DIMENSIONED RECORDS OF ALL UNDERGROUND LINES, SERVICES, AND UTILITIES, AS WELL AS ANY DISCREPANCIES OR REQUIRED CHANGES IN THE CONTRACT DOCUMENTS. AT THE END OF
THE PROJECT, FORWARD TO ARCHITECT FOR FUTURE RECORDS. ONE (1) CD OF COMPLETE RECORD
DRAWINGS TO OWNER IN PDF FORMAT AFTER COMPLETING FINAL PUNCH LIST.
G6. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES; DO NOT SCALE DRAWINGS TO DETERMINE ANY
LOCATIONS. THE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES, PRIOR TO CONTINUING WITH WORK.
G7. FIELD CONFIRMATION OF DISCREPANCIES SHALL BE RECORDED ON REPRODUCIBLE DOCUMENT AND
IMMEDIATELY TRANSMITTED TO ARCHITECT FOR PROJECT RECORD, COORDINATION, AND NECESSARY
RESOLUTION PRIOR TO CONTINUING WITH WORK.
G8. FIELD MEASUREMENTS:
VERIFY FIELD MEASUREMENTS BEFORE ORDERING MATERIALS AND PREFABRICATED ITEMS. ANY NECESSARY
ADJUSTMENTS BETWEEN FIELD MEASUREMENTS AND DRAWINGS SHALL BE MADE IN CONSULTATION WITH THE
ARCHITECT.
G9. ALL WORK SHALL CONFORM TO THE LATEST ADOPTED EDITIONS OF ALL APPLICABLE BUILDING CODES, THE
AMERICANS WITH DISABILITIES ACT, AS WELL AS ALL OTHER LOCAL GOVERNING CODES AND ORDINANCES.
G10. REFERENCE STANDARDS:
COMPLY WITH ASSOCIATION, TRADE, FEDERAL, COMMERCIAL, ASTM, AND OTHER SIMILAR STANDARDS
REFERENCED WITHIN INDIVIDUAL SECTIONS, EXCEPT WHERE MORE EXPLICIT OR STRINGENT REQUIREMENTS
ARE INDICATED, OR REQUIRED BY APPLICABLE CODES. REFERENCE STANDARDS HAVE SAME FORCE AND
EFFECT AS IF BOUND INTO CONTRACT DOCUMENTS. SHOULD SPECIFIED REFERENCE STANDARDS CONFLICT
WITH CONTACT DOCUMENTS, REQUEST CLARIFICATION FROM ARCHITECT BEFORE PROCEEDING.
CONTRACTOR
C1. THE CONTRACTOR SHALL BE RESPONSIBLE TO FIELD VERIFY ALL EXISTING SITE CONDITIONS, UTILITIES, CONNECTIONS, LOCATIONS, ETC, AND NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES PRIOR TO
COMMENCEMENT OF CONSTRUCTION.
C2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING UTILITIES, WHETHER SHOWN HEREIN
OR NOT, AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE FOR THE REPAIR
OR REPLACEMENT OF UTILITIES AND ALL OTHER PROPERTY DAMAGED BY OPERATIONS IN CONJUNCTION WITH
EXECUTION OF WORK.
C3. CONTRACTOR SHALL, PRIOR TO COMMENCEMENT OF WORK, FIELD VERIFY ALL EXISTING PROJECT CONDITIONS, INCLUDING DIMENSIONS, UTILITY LOCATIONS, AND UTILITY SIZES.
C4. THE CONTRACTOR SHALL BE REQUIRED TO MEET ALL NATIONAL, STATE AND LOCAL, AND RELATED CODES FOR
STANDARD CONSTRUCTION PRACTICES.
C5. INSTALLATION STANDARDS:
ALL MANUFACTURED MATERIALS AND PRODUCTS SHALL BE APPLIED, INSTALLED, CONNECTED, CLEANED AND
CONDITIONED IN ACCORDANCE WITH THE MANUFACTURER’S PRINTED INSTRUCTIONS. ALL REFERENCES TO
STANDARDS OR TO MANUFACTURER’S SPECIFICATIONS SHALL BE TO THE LATEST EDITIONS OR LATEST
AMENDMENTS.
C6. HOURS OF WORK:
ALL DEMOLITION, GRADING, AND CONSTRUCTION WORK SHALL BE LIMITED TO THE FOLLOWING HOURS:
MONDAY THROUGH SATURDAY 7:00 AM TO 7:00 PM, OR AS REQUIRED BY THE HERRIMAN
PLANNING AND ZONING. NO ACTIVITIES ON SUNDAY. AFTER-HOURS WORK WILL NOT BE PERMITTED
WITHOUT PRIOR WRITTEN APPROVAL FROM THE PERSONS/AGENCIES THAT HAVE JURISDICTION.
C7. TESTING AGENCIES:
THE CONTRACTOR SHALL PROVIDE AND PAY FOR INSPECTIONS, TESTS, AND OTHER SERVICES SPECIFIED.
REFER TO INDIVIDUAL SELECTIONS FOR ADDITIONAL REQUIREMENTS. EMPLOYMENT OF TESTING
LABORATORY SHALL IN NO WAY RELIVE CONTRACTOR OF OBLIGATION TO PERFORM WORK IN
ACCORDANCE WITH REQUIREMENTS OF CONTRACT DOCUMENTS.
C8. PROJECT LOG:
MAINTAIN DAILY LOG CONTAINING ALL INFORMATION REGARDING CONSTRUCTION OPERATIONS AND
OTHER OCCURRENCES PERTAINING TO THE PROJECT. MAKE LOG AVAILABLE FOR ARCHITECT’S REVIEW.
C9. WORK PROGRESS SCHEDULE:
MAINTAIN AN UPDATED WORK PROGRESS SCHEDULE POSTED IN A VISIBLE PLACE LOCATED IN FIELD OFFICE.
UPDATE SCHEDULE DAILY TO REFLECT WORK PROGRESS.
C10. THE GENERAL BUILDING PERMITS SHALL BE PAID FOR BY THE OWNER AND SECURED BY THE GENERAL
CONTRACTOR. ALL OTHER REQUIRED PERMITS SHALL BE SECURED AND PAID FOR BY THE CONTRACTOR OR
SUBCONTRACTOR DIRECTLY RESPONSIBLE.
C11. CONTRACTOR SHALL ASSIST OWNER IN OBTAINING FINAL APPROVAL OF LOCAL HEALTH DEPARTMENT AND THE
TEMPORARY AND FINAL CERTIFICATES OF OCCUPANCY.
C12. ADDITIONAL REQUIRED CITY AND COUNTY LICENSES SHALL BE ACQUIRED AND PAID FOR BY THE INDIVIDUAL
TRADES.
C13. ALL CONTRACTORS SHALL HAVE VALID CERTIFICATES OF WORKMAN'S COMPENSATION OF FILE WITH THE
APPROPRIATE AGENCIES.
C14. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE OCCUPANTS AND
WORKERS AT ALL TIMES.
C15. CONTRACTOR’S FIELD OFFICE:
PROVIDE AND MAINTAIN A FIELD OFFICE ON THE PREMISES WHERE DIRECTED. OFFICE SHALL BE OF NEAT, SUBSTANTIAL CONSTRUCTION. PROVIDE HANGING PLAN FILES AND MAINTAIN WITH ALL CURRENT
DRAWINGS.
a. STORAGE STRUCTURE:
PROVIDE AND MAINTAIN, WHERE DIRECTED, A WATERTIGHT STORAGE STRUCTURE FOR ALL
MATERIALS WHICH MIGHT BE DAMAGED BY WEATHER, INCLUDING STORAGE FACILITIES FOR
CONCRETE TEST SAMPLES, OR OTHER MATERIAL SAMPLES REQUIRED FOR WORK.
b. COSTS:
PAY COSTS FOR A LOCAL BUSINESS TELEPHONE FOR USE BY CONTRACTOR, OWNER AND
ARCHITECT THROUGHOUT CONTRACT PERIOD.
c. COMMUNICATION EQUIPMENT:
PROVIDE A TELEPHONE ON SITE. ASSIGN A RESPONSIBLE PERSON TO ANSWER ALL TELEPHONE CALLS
IN EVENT THE SUPERINTENDENT IS ABSENT FROM THE PREMISES. PROVIDE APPROVED MEANS TO
ESTABLISH URGENT COMMUNICATIONS (CELLULAR TELEPHONE OR PAGER).
C16. TEMPORARY FACILITIES:
PROVIDE TEMPORARY FACILITIES AND CONNECTIONS AS REQUIRED FOR THE PROPER COMPLETION OF THE
PROJECT. PROVIDE AND MAINTAIN TEMPORARY UTILITY SERVICES. PROVIDE SUITABLE WASTE DISPOSAL UNITS
AND EMPTY REGULARLY. DO NOT PERMIT ACCUMULATION OF TRASH AND WASTE MATERIALS. PROVIDE
TEMPORARY SANITARY FACILITIES AS REQUIRED.
C17. STORAGE AND PROTECTION:
STORE AND PROTECT PRODUCTS IN ACCORDANCE WITH MANUFACTURER’S INSTRUCTIONS WITH LABELS
INTACT AND LEGIBLE. STORE SENSITIVE PRODUCTS IN WEATHERTIGHT, CLIMATE CONTROLLED ENCLOSURES.
PROVIDE OFFSITE STORAGE AND PROTECTION WHEN SITE DOES NOT PERMIT ON SITE STORAGE.
C18. FIELD QUALITY CONTROL:
EMPLOY ONLY EXPERIENCED INSTALLERS AND FURNISH EVIDENCE OF EXPERIENCE IF REQUESTED. USE OF ANY
SUBCONTRACTOR OR INSTALLER IS SUBJECT TO OWNER’S APPROVAL. EMPLOY FULL-TIME, COMPETENT
SUPERINTENDENT AS WELL AS NECESSARY ASSISTANTS. SUPERINTENDENT SHALL REPRESENT THE CONTRACTOR
AND ALL COMMUNICATIONS GIVEN TO THE SUPERINTENDENT SHALL BE AS BINDING AS IF GIVEN TO THE
CONTRACTOR.
S4. SOURCE QUALITY CONTROL:
PROVIDE PRODUCTS OF ACCEPTABLE MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN
SIMILAR SERVICE FOR THREE YEARS, UNLESS MORE STRINGENT CRITERIA ARE SPECIFIED IN INDIVIDUAL
SECTIONS. USE OF ANY SUPPLIER IS SUBJECT TO OWNER’S APPROVAL.
C19. PRODUCT HANDLING:
TRANSPORT AND HANDLE PRODUCTS IN ACCORDANCE WITH MANUFACTURER’S INSTRUCTIONS. DELIVER
PRODUCTS IN UNDAMAGED CONDITION, IN MANUFACTURER’S ORIGINAL UNOPENED CONTAINER’S OR
PACKING, WITH IDENTIFYING LABELS INTACT AND LEGIBLE. PROMPTLY INSPECT SHIPMENTS TO ENSURE THAT
PRODUCTS COMPLY WITH REQUIREMENTS OF CONTRACT DOCUMENTS, QUANTITIES ARE CORRECT, AND
PRODUCTS ARE UNDAMAGED.
C20. COMPLIANCE WITH MANUFACTURER'S INSTRUCTIONS:
HANDLE, INSTALL, ERECT, CONNECT, CONDITION, USE, ADJUST, AND CLEAN PRODUCTS IN STRICT
ACCORDANCE WITH MANUFACTURER’S INSTRUCTION AND IN CONFORMITY WITH SPECIFIED REQUIREMENTS, INCLUDING EACH STEP IN SEQUENCE. DO NOT OMIT PREPARATORY STEPS OR INSTALLATION PROCEDURES
UNLESS SPECIFICALLY MODIFIED OR EXEMPTED BY CONTRACT DOCUMENTS. SHOULD JOB CONDITIONS OR
SPECIFIED REQUIREMENTS CONFLICT WITH MANUFACTURER’S INSTRUCTIONS, REQUEST CLARIFICATION IN
WRITING FROM ARCHITECT BEFORE PROCEEDING. INSTALL MATERIALS IN PROPER RELATION WITH ADJACENT
CONSTRUCTION AND WITH PROPER APPEARANCE.
C21. MANUFACTURER'S FIELD SERVICES:
WHEN SPECIFIED IN INDIVIDUAL SECTIONS, REQUIRE MATERIAL OR PRODUCT SUPPLIERS OR MANUFACTURERS
TO PROVIDE QUALIFIED STAFF PERSONNEL TO OBSERVE SITE CONDITIONS, CONDITIONS OF SURFACES, QUALITY OF WORKMANSHIP, AND CONDITIONS OF INSTALLATION AS APPLICABLE AND TO INITIATE
ADDITIONAL INSTRUCTIONS WHEN NECESSARY.
S5. SUBSTITUTIONS:
PROPOSALS FOR SUBSTITUTION OF MATERIALS, EQUIPMENT, AND METHODS WILL ONLY BE CONSIDERED WHEN
ACCOMPANIED BY FULL AND COMPLETE TECHNICAL DATA AS WELL AS ANY OTHER INFORMATION REQUIRED
TO EVALUATE THE PROPOSED SUBSTITUTION. SUBSTITUTIONS ARE UNACCEPTABLE UNLESS SPECIFICALLY
APPROVED BY THE ARCHITECT. IN THE EVENT OF SUBSTITUTION PROPOSALS AFTER THE CONTRACT HAS BEEN
AWARDED, ALL SUCH PROPOSALS SHALL BE ACCOMPANIED BY SUBSTANTIAL COST SAVINGS FOR THE OWNER.
S6. AVAILABILITY OF PRODUCTS:
VERIFY PRIOR TO CONSTRUCTION START THAT ALL SPECIFIED ITEMS WILL BE AVAILABLE IN TIME FOR
INSTALLATION DURING ORDERLY AND TIMELY PROGRESS OF THE WORK. IN THE EVENT SPECIFIED ITEM OR
ITEMS WILL NOT BE SO AVAILABLE, NOTIFY THE ARCHITECT PRIOR TO START OF CONSTRUCTION. COST OF
DELAYS BECAUSE OF NON-AVAILABILITY OF SPECIFIED ITEMS OR SUBSTITUTED ITEMS, WHEN THE
CONTRACTOR COULD HAVE AVOIDED SUCH DELAYS, WILL BE BORNE BY THE CONTRACTOR.
S7. PRODUCTS AND MATERIALS:
PROVIDE PRODUCTS AND MATERIALS SPECIFIED. REQUEST ARCHITECTS SELECTION OF COLORS AND
ACCESSORIES IN SUFFICIENT TIME TO AVOID DELAYING PROGRESS OF THE WORK.
C22. CONTRACTOR SHALL VERIFY, AND BE RESPONSIBLE FOR, ALL WORK AND MATERIALS - INCLUDING THOSE
FURNISHED BY SUBCONTRACTORS.
C23. NON-CONFORMING WORK:
REMOVE AND REPLACE WORK THAT DOES NOT CONFORM TO THE CONTRACT DOCUMENTS AT NO
ADDITIONAL EXPENSE TO THE OWNER.
C24. PRODUCT IDENTIFICATIONS:
NAMEPLATES, TRADEMARKS, LOGOS, AND OTHER IDENTIFYING MARKS ON PRODUCTS ARE NOT PERMITTED ON
SURFACES EXPOSED TO VIEW IN PUBLIC AREAS, INTERIOR OR EXTERIOR. PLUMBING, MECHANICAL, AND
ELECTRICAL EQUIPMENT NOT EXPOSED TO PUBLIC VIEW ARE EXECUTED FROM FOREGOING LIMITATION.
REQUIRED UL OR FM LABELS ARE ALSO EXCLUDED.
C25. PROTECTION OF ADJACENT WORK:
PROVIDE TEMPORARY PROTECTION FOR ADJACENT AREAS TO PREVENT DAMAGE BY INSTALLATION OF NEW
WORK OR DEMOLITION OF EXISTING CONSTRUCTION. PROMPTLY REPAIR ANY DAMAGE AT NO ADDITIONAL
COST TO THE OWNER. PROTECT ADJACENT AREAS FROM CONTAMINATION BY CONSTRUCTION DUST AND
DEBRIS. PROVIDE TEMPORARY BARRICADES AS NECESSARY TO ENSURE PROTECTION OF THE PUBLIC. MAINTAIN
EGRESS WITHIN AND AROUND CONSTRUCTION AREAS.
C26. DAMAGED PRODUCTS:
DO NOT USE PRODUCTS IN WORK, WHICH HAVE DETERIORATED, BECOME DAMAGED, OR ARE OTHERWISE
UNFIT FOR USE. RESTORE UNITS DAMAGED DURING INSTALLATION. REPLACE UNITS, WHICH CANNOT BE
RESTORED AT NO ADDITIONAL EXPENSE TO THE OWNER.
C27. SECURITY:
PROVIDE FACILITIES TO PROTECT WORK FROM UNAUTHORIZED ENTRY, VANDALISM, AND THEFT. CONDUCT
OPERATIONS IN MANNER TO AVOID RISK OF LOSS, THEFT, OR DAMAGE BY VANDALISM.
C28. TEMPORARY CONTROLS:
a. HEAT:
PRIOR TO ENCLOSURE, PROVIDE HEATING AS NECESSARY TO PROTECT MATERIALS, PRODUCTS, AND
FINISHES FROM DAMAGE DUE TO TEMPERATURE OR HUMIDITY. ENCLOSURE IS DEFINED AS STATE OF
CONSTRUCTION WHEN EXTERIOR WALLS ARE ERECTED, DOORS AND WINDOWS ARE INSTALLED AND
GLAZED, ROOF DECK AND ROOFING ARE COMPLETE, AND WHEN OTHER OPENINGS IN EXTERIOR
ENVELOPE ARE EQUIPPED WITH TEMPORARY CLOSURES. EXCEPT WHERE INDICATED OTHERWISE IN
INDIVIDUAL SPECIFICATION SECTIONS, MAINTAIN MINIMUM AMBIENT TEMPERATURE OF 50 DEGREES F. IN
AREAS WHERE CONSTRUCTION IS IN PROGRESS.
b. VENTILATION:
VENTILATE ENCLOSED AREAS TO ASSIST CURE OF MATERIALS, TO DISSIPATE HUMIDITY, AND TO PREVENT
ACCUMULATION OF DUST, FUMES, VAPORS, OR GASES.
c. BARRIERS AND CLOSURES:
PROVIDE BARRIERS TO PREVENT UNAUTHORIZED ENTRY TO CONSTRUCTION AREAS AND TO PROTECT
EXISTING FACILITIES AND ADJACENT PROPERTIES FROM DAMAGE FROM CONSTRUCTION OPERATIONS.
d. FIRE PROTECTION:
COMPLY WITH LOCAL FIRE PROTECTION CODE AND GOVERNING AUTHORITIES. PROVIDE AND MAINTAIN
ADEQUATE FIRE PROTECTION INCLUDING, WITHOUT LIMITATION, FIRE EXTINGUISHERS AND OTHER
APPROPRIATE EQUIPMENT FOR FIRE EXTINGUISHING READY FOR IMMEDIATE USE. MAINTAIN ANY
REQUIRED FIRE ALARM SYSTEMS IN OPERATION DURING CONSTRUCTION. DISTRIBUTE EQUIPMENT
AROUND SITE AND PARTICULARLY IN IMMEDIATE VICINITY OF PERFORMANCE OF WELDING OR SIMILAR
HAZARDOUS WORK.
C29. INTERRUPTION OF SERVICES:
INTERRUPTIONS TO ANY SERVICE FOR THE PURPOSE OF MAKING OR BREAKING A CONNECTION SHALL BE
MADE ONLY AFTER CONSULTATION WITH THE OWNER AND SHALL BE AT SUCH TIME AND OF SUCH DURATION
AS MAY BE DIRECTED.
C30. EXCAVATIONS OR TRENCHING:
KEEP THE INTERVALS BETWEEN EXCAVATION OR TRENCHING, INSTALLATION OF CONDUIT OR PIPING, AND
BACK FILLING OPERATIONS TO AN ABSOLUTE MINIMUM. PROVIDE SUITABLE TEMPORARY COVERS FOR
EXCAVATIONS OR TRENCHING CROSSING ROADWAYS, WALKS, OR OTHER TRAFFIC WAYS AS REQUIRED BY
GOVERNING AGENCIES.
C31. CUTTING AND PATCHING:
DO NOT CUT AND PATCH IN A MANNER THAT WOULD RESULT IN A FAILURE OF THE WORK TO PERFORM AS
INTENDED, DECREASE FIRE PERFORMANCE, DECREASE ACOUSTICAL PERFORMANCE, DECREASE ENERGY
PERFORMANCE, DECREASE OPERATIONAL LIFE, OR DECREASE SAFETY FACTORS. DO NOT REMOVE OR ALTER
STRUCTURAL COMPONENTS WITHOUT WRITTEN APPROVAL FROM THE ARCHITECT. CUT WITH TOOLS
APPROPRIATE FOR MATERIALS TO BE CUT. PATCH WITH MATERIALS AND METHODS TO PRODUCE PATCH THAT IS
NOT VISIBLE FROM A DISTANCE OF THREE FEET.
C32. COORDINATION AND CLEARANCES:
VERIFY AND COORDINATE CLEARANCES, DIMENSIONS, AND INSTALLATION OF ADJOINING CONSTRUCTION, EQUIPMENT, PIPING, DUCTS, CONDUITS, OR OTHER MECHANICAL OR ELECTRICAL ITEMS OR APPARATUS. VERIFY
DIMENSIONS FOR PRODUCTS TO BE FITTED INTO WORK.
a. ATTACHMENTS AND CONNECTIONS:
PROVIDE ATTACHMENT AND CONNECTION DEVICES METHODS FOR SECURING AND ANCHORING
WORK. SECURE IN PLACE WITH DEVICES DESIGNATED AND SIZED TO WITHSTAND STRESSES, VIBRATION, PHYSICAL DISTORTION, OR DISFIGUREMENT.
b. EXPANSION AND MOVEMENT:
ALLOW FOR EXPANSION OF MATERIALS AND BUILDING MOVEMENT.
c. ISOLATION OF DISSIMILAR ITEMS:
ISOLATE EACH UNIT OF WORK FROM INCOMPATIBLE WORK AS NECESSARY TO PREVENT DETERIORATION
AND ELECTROLYTIC ACTION.
d. MAINTENANCE:
CLEAN AND PERFORM MAINTENANCE ON INSTALLED WORK AS FREQUENTLY AS NECESSARY THROUGH
REMAINDER OF CONSTRUCTION PERIOD. LUBRICATE OPERABLE COMPONENTS TO ENSURE OPERABILITY
WITHOUT DAMAGING EFFECTS.
e. ADJUSTMENTS:
ADJUST OPERATING PRODUCTS AND EQUIPMENT TO ENSURE SMOOTH AND UNHINDERED OPERATION.
C33. EXAMINATION OF CONDITIONS:
EXAMINE SUBSTRATES AND CONDITIONS UNDER WHICH WORK IS TO BE PERFORMED. DO NOT COMMENCE
WORK OVER UNSATISFACTORY CONDITIONS DETRIMENTAL TO PROPER AND TIMELY EXECUTION OF WORK. DO
NOT PROCEED WITH WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. COMMENCEMENT
OF INSTALLATION CONSTITUTES ACCEPTANCE OF CONDITIONS AND COSTS OF ANY CORRECTIVE MEASURES
ARE RESPONSIBILITY OF CONTRACTOR.
C34. CONTRACTOR SHALL PROVIDE BACKING SUPPORT OF ALL WALL, CEILING, AND PARTITION MOUNTED ITEMS
SUCH AS TABLE BRACKETS, LIGHT FIXTURES, ARTIFACTS, SHELVING, EQUIPMENT, AND TELEVISIONS.
COORDINATE LOCATIONS AND REQUIREMENTS WITH THE PLUMBING, MECHANICAL, ELECTRICAL DRAWINGS.
C35. EXTERIOR OPENINGS SHALL COMPLY WITH ALL SECURITY REQUIREMENTS AS OUTLINED IN ALL LOCAL BUILDING
CODES AND ORDINANCES.
C36. GLASS AND GLAZING FOR ALL WINDOWS SHALL COMPLY WITH ALL APPLICABLE BUILDING CODES. IN
ADDITION ALL WINDOWS MUST MEET THE "AAMA" WINDOW STANDARDS FOR INSTALLATION. THE
CONTRACTOR SHALL OBTAIN, AND SHALL FOLLOW ALL REQUIREMENTS OF THE "AAMA" STANDARDS IN
ADDITION TO THE MANUFACTURER SPECIFICATIONS AND ARCHITECTURAL DETAILS INCLUDED WITHIN THE
DRAWINGS.
C37. ROOFING WORK SHALL BE PERFORMED AND ALL PENETRATIONS THROUGH THE ROOFING MEMBRANE SHALL BE
PATCHED OR FLASHED AS PER THE MANUFACTURER'S STANDARDS.
C38. ROOF OBSTRUCTIONS SUCH AS TELEVISION ANTENNAE, SOLAR PANELS, AND GUY WIRES SHALL NOT BE LOCATED
OR INSTALLED IN SUCH A WAY AS TO PREVENT FIRE DEPARTMENT ACCESS OR EGRESS IN THE EVENT OF A FIRE.
C44. DISPOSAL OF TRASH AND EXCESS EXCAVATION:
DISPOSE OF TRASH, AND DEBRIS AT DESIGNATED AREAS OFF THE PREMISES AT NO ADDITIONAL COST TO THE
OWNER. BURNING OF TRASH AND DEBRIS ON THE PREMISES IS PROHIBITED. COORDINATE TRASH REMOVAL
WITH LANDLORD WHERE APPLICABLE.
C45. THE CONTRACTOR IS RESPONSIBLE TO COORDINATE ALL WORK TO AVOID CONFLICTS BETWEEN TRADES. THE
CONTRACTOR SHALL PERFORM ALL WORK TO PROVIDE COMPLETE FUNCTIONING SYSTEMS IN ACCORDANCE
WITH THE INTENT INDICATED ON THE PLANS. THE CONTRACTOR SHALL CONFIRM AND PROVIDE ALL ITEMS
WHETHER SPECIFIED ON THE DRAWING OR SPECIFICATION OR NOT TO COMPLETE AND PROVIDE A FULL
OPERATIONAL SYSTEM. ALL SYSTEMS SHALL BE FULLY COORDINATED AND INSTALLED AS PER THE INTENT
ON THE DRAWINGS. ANY AND ALL CHANGES MADE IN THE FIELD SHALL BE VERIFIED AND CONFIRMED WITH
THE ARCHITECT AND DESIGN TEAM PRIOR INSTALLATION TO BEGIN. FAILURE TO CONFIRM CHANGES OR
THOSE ITEMS NEEDED FOR THE COMPLETED SYSTEM SHALL BE THE COST TO THE CONTRACTOR AND SHALL NOT
BE CONSIDERED AS A CHANGE ORDER TO THE OWNER.
C46. CLEANING MATERIALS AND EQUIPMENT:
PROVIDE ALL REQUIRED PERSONNEL, EQUIPMENT, AND MATERIALS NEEDED TO MAINTAIN THE SPECIFIED
STANDARD OF CLEANLINESS. USE ONLY THE CLEANING MATERIALS AND EQUIPMENT WHICH ARE COMPATIBLE
WITH THE SURFACE BEING CLEANED, AS RECOMMENDED BY THE MANUFACTURER OF THE MATERIAL.
TOLERANCES
T1. TOLERANCES:
INSTALL WORK TRUE TO LINE, PLUMB, AND LEVEL. EXCEPT WHERE SPECIFIED OTHERWISE, WORK EXECUTED WITHIN
THE FOLLOWING TOLERANCE WILL BE ACCEPTABLE.
a. TRUE TO LINE:
ALLOWED DEVIATION FROM AN ABSOLUTELY STRAIGHT LINE OF SIGHT WITHIN PLUS OR MINUS 1/8 INCH
IN 10 FT. AND WITHIN PLUS OR MINUS ¼ INCH FOR ENTIRE LENGTH OF A PARTICULAR ELEMENT OF
CONSTRUCTION OVER 20’-0” IN LENGTH.
b. PLUMB:
ALLOWED DEVIATIONS FROM AN ABSOLUTELY VERTICAL PLANE OF PLUS OR MINUS 1/8 INCH IN 10 FT.
AND WITHIN PLUS OR MINUS ¼ INCH FOR ENTIRE LENGTH OF A PARTICULAR ELEMENT OF CONSTRUCTION
OVER 20’-0” IN LENGTH.
c. LEVEL:
ALLOWED DEVIATIONS FROM AN ABSOLUTELY HORIZONTAL PLANE OF PLUS OR MINUS 1/8 INCH IN 10 FT.
AND WITHIN PLUS OR MINUS ¼ INCH FOR ENTIRE LENGTH OF A PARTICULAR ELEMENT OF CONSTRUCTION
OVER 20’-0” IN LENGTH.
d. ALLOWED DEVIATIONS FROM AN ABSOLUTELY FLAT IF WITHIN PLUS OR MINUS 1/16 INCH IN ONE SQUARE
FOOT, WITHIN PLUS OR MINUS 1/8 INCH IN AN AREA 10 FEET BY 10 FEET, AND WITHIN PLUS OR MINUS ¼
INCH FOR ENTIRE AREA OF A PARTICULAR ELEMENT OF CONSTRUCTION OVER 20’-0” IN LENGTH.
T2. REFER TO SPECIFICATIONS FOR ADDITIONAL TOLERANCE REQUIREMENTS.
a. SUBSTANTIAL COMPLETION:
AT SUBSTANTIAL COMPLETION OF THE PROJECT, SCHEDULE AND ATTEND A PUNCH LIST WALK
THROUGH OF REMAINING WORK FOR REVIEW WITH THE ARCHITECT AND OWNER. COMPLETE ALL
DEFECTS AND OMISSIONS NOTED IN THE FINAL PUNCHLIST PROMPTLY, IN THE TIME PERIOD
AGREED UPON WITH THE OWNER, AT NO ADDITIONAL EXPENSE TO THE OWNER.
PROJECT CONTRACT CLOSEOUT:
b. CERTIFICATE OF OCCUPANCY:
PROVIDE THE FINAL CERTIFICATE OF OCCUPANCY FROM THE BUILDING DEPARTMENT.
c. PERMITS/INSPECTION CARDS:
FURNISH COPIES OF PERMITS AND SIGNED INSPECTION CARDS FOR EACH OF THE FOLLOWING
AGENCIES: BUILDING DEPARTMENT; PLUMBING/MECHANICAL DEPARTMENT; ELECTRICAL
DEPARTMENT; FIRE DEPARTMENT; HEALTH DEPARTMENT; OTHERS AS REQUIRED.
d. FURNISH COPIES OF PERMITS AND SIGNED INSPECTION CARDS FOR EACH OF THE FOLLOWING
AGENCIES: BUILDING DEPARTMENT; PLUMBING/MECHANICAL DEPARTMENT; ELECTRICAL
DEPARTMENT; FIRE DEPARTMENT; HEALTH DEPARTMENT; OTHERS AS REQUIRED.
e. MAINTENANCE MANUALS AND WARRANTIES:
FURNISH (2) COPIES FOR EACH UNIT OF ALL MANUALS, MAINTENANCE INSTRUCTIONS,
CONTRACTORS AND MANUFACTURER’S PRINTED WARRANTIES, AND INSTRUCTIONS FOR
OPERATION OF ALL EQUIPMENT SPECIFIED HEREIN OR SHOWN ON DRAWINGS, TRAIN OWNER’S
PERSONNEL IN USE OF BUILDING SYSTEMS.
f. TOUCH-UP MATERIAL:
FURNISH OWNER WITH ONE GALLON OF EACH PAINT AND STAIN USED PER UNIT. PROVIDE AN
ADDITIONAL 2 PERCENT OF QUANTITY INSTALLED OF ALL FINISH MATERIAL INCLUDING CEILING
PANELS, TILE, AND SHEET GOODS.
g. SUBCONTRACTORS:
PROVIDE THE OWNER THE NAMES, ADDRESSES, AND PHONE NUMBERS OF ALL SUBCONTRACTORS,
FINAL UNCONDITIONAL LIEN RELEASES, AND WARRANTIES FROM EACH.
h. FINAL CLEANING AND REPAIRS:
REMOVE TEMPORARY FACILITIES AND PROVIDE FINAL CLEANING AND TOUCH-UP. RESTORE
PORTIONS OF BUILDING, SITE IMPROVEMENTS, LANDSCAPING AND OTHER ITEMS DAMAGED BY
CONSTRUCTION OPERATIONS TO THE SATISFACTION OF THE ARCHITECT, AT NO ADDITIONAL
EXPENSE TO THE OWNER.
i. CLOSEOUT DOCUMENTS:
PROVIDE THE OWNER WITH A COMPACT DISK OF ALL RECORD DRAWINGS IN PDF FORMAT, COPY
OF ALL SHOP DRAWINGS AND PRODUCT SUBMITTALS, SERVICE CONTRACTS, HVAC AIR BALANCE
REPORT, AND WASTELINE VIDEO INSPECTION REPORT.
SUBMITTALS/SUBSTITUTIONS
S1. CONTRACTOR SHALL PROVIDE COMPLETE LIST OF SUBMITTALS TO ARCHITECT/OWNER WITHIN 1 WEEK OF
OBTAINING BUILDING PERMIT.
S2. ALL SUBMITTALS SHALL BE COMPLETE AND SUBMITTED WITHIN FIRST 90 DAYS OF WORK.
S3. ALL ITEMS NOTED AS DESIGNED "BY MANUFACTURED" IS A DEFERRED DESIGN AND SHALL BE RESPONSIBILITY OF
THE CONTRACTOR TO COORDINATE WITH MANUFACTURER FOR FINAL DESIGN AND SUBMIT FINAL DESIGN
FOR APPROVAL. CONTRACTOR IS RESPONSIBLE TO COORDINATE ALL FIELD DIMENSIONS.
C47. CAULKING
THE CONTRACTOR SHALL PROVIDE CAULKING AT ALL LOCATIONS OF DIS-SIMILAR MATERIAL BOTH AT
INTERIOR AND EXTERIOR CONDITIONS. CAULKING AT WEATHER CONDITIONS SHALL BE SILICONE BASE
CAULKING. ALL JOINTS SHALL BE PREPARED TO RECEIVE CAULKING AND SHALL HAVE BACKER RODS AS
REQUIRED.
C39. INTERIOR WALL AND CEILING FINISHES SHALL NOT EXCEED FLAME SPREAD CLASSIFICATIONS DICTATED BY ALL
APPLICABLE BUILDING CODES.
C40. GYPSUM BOARD AND SUSPENDED CEILING SYSTEMS SHALL CONFORM TO ALL LOCAL GOVERNING BUILDING
CODES AND ORDINANCES.
C41. PIPES, CONDUITS, OR DUCTS EXCEEDING ONE THIRD OF THE SLAB OR MEMBER THICKNESS SHALL NOT BE PLACED
IN STRUCTURAL CONCRETE UNLESS SPECIFICALLY DETAILED. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL DRAWINGS FOR LOCATION OF SLEEVES AND OTHER ACCESSORIES.
C42. VERIFY FIRE EXTINGUISHER REQUIREMENTS AND LOCATIONS WITH FIRE MARSHAL AND OWNER'S REPRESENTATIVE
PRIOR TO THE FINAL INSTALLATION. FAILURE TO OBTAIN PRELIMINARY APPROVALS WITH LOCAL FIRE
MARSHALL, AND FIRE EXTINGUISHERS ARE REQUIRED TO BE MOVE UPON FINAL INSPECTION, CONTRACTOR
SHALL BE RESPONSIBLE FOR ALL COST TO MOVE TO THE DIRECT COSTS.
C43. CONTRACTOR SHALL SEAL ALL GAPS, HOLES, AND CRACKS IN BUILDING CONSTRUCTION AS REQUIRED TO
CONTROL INFILTRATION OF INSECTS.
PROJECT NO.
SHEET TITLE:
Pl o t D a te
Architecture Interior Design Landscape Architecture Land Planning Construction Management
7927 So. Highpoint Parkway, Suite 300
Sandy, Utah 84094
ph. 801.269.0055 fax 801.269.1425 www.thinkaec.com
The designs shown and described herein including all technical drawings, graphic representation & models thereof, are proprietary & can not be copied, duplicated, or commercially exploited in whole or in part without the sole and express written permission from THINK Architecture, inc.
These drawings are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors, and office personnel only in accordance with this notice.
SHEET NUMBER:
REVISIONS:
DATE:
2022 THINK ARCHITECTURE INC.
/1
/2
:2
:5
A
M
BU
TT
ER
FI
EL
D
T
RA
IL
H
EA
D
M A
IN
TE
N A
N C
E
BU
IL
D
IN
G
H
ER
RI
M
A N
H W
Y.
H
ER
RI
M A
N , U
T
12 AUGUST,
25-034
GENERAL NOTES
G001
BI
D
S
ET
PE
RM
IT
S
ET
BID DESCRIPTION
THERE WILL BE TWO BIDS REQUIRED FOR THE BIDDING OF
THIS PROJECT. THE FIRST WILL BE THE BASE BID (SEE
DESCRIPTION BELOW) AND AN ALTERNATE BID PACKAGE
#1. (SEE DESCRIPTION BELOW)
BASE BID
THE BASE BID WILL INCLUDE ALL WORK FOR
CONSTRUCTION OF NEW RESTROOM/ MAINTENANCE
BUILDING FOR SALT LAKE COUNTY. THIS WORK
INCLUDES THE SITE WORK, UTILITY WORK, LANDSCAPE
AND SITE WORK, AND BUILDING CONSTRUCTION AS
IDENTIFIED WITHIN THE CONSTRUCTION DRAWINGS AND
SPECIFICATIONS.
ALTERNATE BID #1
THIS ALTERNATE BID INCLUDES THE ADDITION OF
STORAGE ROOM TO BE ATTACHED TO THE BUILDING.
THIS ROOM WILL BE DIRECTLY ATTACHED AND IS NOTED
WITHIN THE DRAWINGS. THE ADDITION OF THIS ROOM
WILL HAVE AFFECTS ON THE EXTERIOR OF THE BASE BID.
ALTERNATE BIDS
GAS GAS
ELEC ELEC
CODE ANALYSIS LEGEND
GENERAL NOTES
SEE G002A FOR COMPLETE WRITTEN CODE ANALYSIS & REVIEW - ALL AREAS SHOWN HERE ARE REFERENCED WITHIN
CODE ANALYSIS.
1. BUILDING IS FULLY SPRINKLED AS PER NFPR 13 AND CAN THEREFORE BE USED FOR BUILDING AREA
INCREASE.
2. SEE CODE ANALYSIS PLANS FOR THE LOCATION OF FIRE EXTINGUISHERS (FE-1).
3. REFER TO PARTITION AND ASSEMBLY SCHEDULE ON WALL TYPES AND FINISH PLANS.
4. PROVIDE TEMPORARY FIRE PROTECTION DURING CONSTRUCTION AS PER REQUIREMENTS OF THE
INTERNATIONAL FIRE CODE.
5. 2015 IBC SEISMIC DESIGN CATEGORY D - SEE STRUCTURAL DRAWINGS.
6. THE ROOFING ON THIS BUILDING IS REQUIRED TO HAVE A CLASS A FLAME SPREAD INDEX.
7. WALL AND CEILING FINISHES ARE REQUIRED TO HAVE A CLASS A FLAME SPREAD INDEX.
8. CONCEALED INSULATING MATERIALS MUST HAVE A FLAME-SPREAD RATING OF NO MORE THAN 25 AND
A SMOKE DEVELOPED INDEX OF NOT MORE THAN 450. SEE IC 2015 SECTION 720.2.
9. REFER TO ELECTRICAL DRAWINGS FOR EMERGENCY EXIT SIGNS AND LIGHTS.
10. ALL EXITS ARE TO BE READILY OPENABLE FROM EGRESS SIDE WITHOUT THE USE OF A KEY OR SPECIAL
KNOWLEDGE OR EFFORT.
11. PRIOR TO PROJECT SUBSTANTIAL COMPLETION THE BUILDING IS TO COMPLY WITH THE CITY FIRE
DEPARTMENT'S REQUIREMENTS FOR RADIO COVERAGE THROUGHOUT FACILITY FOR EMERGENCY
RESPONSE USE.
MINIMUM REQUIRED STAIR WIDTH
MINIMUM REQUIRED EXIT WIDTH
REQUIRED EXIT LIGHT LOCATIONS. SEE IBC 2015
SECTION 1011. (SHOWN ON ELECTRICAL DRAWINGS)
MAXIMUM OCCUPANT LOAD THRU EXIT
MAXIMUM OCCUPANT LOAD THRU EXIT
FIRE DEPARTMENT CONNECTION (FDC)
EXIT WIDTH PROVIDED
STAIR WIDTH PROVIDED
EXIT
166 OCC.
3'-0"R
4'-0"P
NUMBER OF OCCUPANTS IN EXIT ROUTE
STAIR
166 OCC.
4'-6"R
6'-0"P
ROOMS WITH AN OCCUPANT LOAD OF
50 OR MORE IN GROUP A OCCUPANCY SHALL HAVE
TWO EXITS AND ARE REQUIRED TO HAVE PANIC
HARDWARE (IBC 2015 SECTION 1008.1.10)
(LOCATION SHOWN BY LARGE ARROW)
ACCESSIBLE ELEMENT
NON-ACCESSIBLE ELEMENT
NON-RATED SURFACE MOUNTED FIRE EXTINGUISHER
CABINET AND FIRE EXTINGUISHER
FIRE EXTINGUISHER - 4A: 60BC
FE2
PANIC HARDWARE REQUIRED
CLASS 1 STAND-PIPE (905.3.1 - EXCEPTION #1)
ED
ONE-HOUR FIRE RATED RECESSED FIRE EXTINGUISHER
CABINET AND FIRE EXTINGUISHER
FIRE EXTINGUISHER - 2A: 10BC
FE1
1 HOUR FIRE PARTITION PER IBC 708
2 HOUR FIRE BARRIER PER IBC 707- SEE WALL TYPES
GAS LINE/ METER
ELECTRICAL LINE/ METER
G
E
BUILDING REQUIRED EXIT
KNOX BOX
A2/A3 OCCUPANCY
B OCCUPANCY- WHERE
SHOWN.
CPT
COMMON PATH OF TRAVEL AS PER IBC 1006.2.1
ROOM/AREA REQUIRED EXIT
GENERAL PATH OF EGRESS
EXIT DISCHARGE TO PUBLIC WAY - 2018 IBC 1028
BUILDING OCCUPANCIES
R OCCUPANCY
ACCESSORY
OCCUPANCIES
3 HOUR FIRE WALL- PER IBC 706. SEE WALL TYPES
SF OCC
OLF OL
ROOM/AREA SQUARE FOOTAGE
OCCUPANCY GROUP
OCCUPANT LOAD
OCCUPANCY LOAD FACTOR
(n=NET SF, g=GROSS SF)
VEHICLE CIRCULATION
SOME OCCUPANCIES MAY NOT OCCUR WITHIN THE BUILDING. REFER TO THE CODE ANALYSIS PLANS FOR
OCCUPANCIES WITHIN THE BUILDING.
1 HOUR FIRE BARRIER PER IBC 707
3 HOUR FIRE BARRIER- PE IBC 707 - SEE WALL TYPES
2 HOUR FIRE WALL PER IBC 706- SEE WALL TYPES
S-2 OCCUPANCY
U OCCUPANCY
EXIT TO EGRESS STAIR - 2018 IBC 1023
TYPE A
UNIT TYPE
TYPE A UNIT TYPE
WITH ROLL-IN
SHOWER
TYPE A UNIT TYPE-
SENSORY IMPAIRED
UNITS
I.T. CLOSET
858 SF S-2
200 GROSS 5 OCC.
EXIT
5 OCC.
1" R
3'-0" P
EXIT
5 OCC.
1" R
3'-0" P
EXIT
2 OCC.
1" R
3'-0" P
EXIT
2 OCC.
1" R
3'-0"P
FE 1
MEN
MECH
WOMEN
RESTROOM
LOCKER ROOM
GARAGE
OFFICE
225 SF B
150 GROSS 2 OCC.
117 SF -
150 GROSS 1 OCC.
229 SF B
150 GROSS 2 OCC.
79 SF B
150 GROSS 1 OCC.
116 SF B
3 OCC.50 GROSS
131 SF B
1 OCC.150 GROSS
CPT = 36'-9"
CPT = 38'-6"
CPT = 34'-4"
C
PT
1' -6
CPT = 19'-0"
C
PT
'-6
C
PT
'-6
CPT = 38'-10"
ALTERNATE BID #1 BASE BID
1/4" / 12"
SEE G001 FOR ALTERNATE BID DESCRIPTION SEE G001 FOR BASE BID CLARIFICATION
Area
EMPLOYEE
AREA
MAINTENANCE
GARAGES
PUBLIC
RESTROOM
ALTERNATE
AREA -
POLICE
SPACE
858 SF
MAINTENANCE
GARAGES
347 SF
EMPLOYEE
AREA
581 SF
PUBLIC RESTROOM
544 SF
ALTERNATE AREA -
POLICE SPACE
ALTERNATE BID #1 BASE BID
SEE G001 FOR ALTERNATE BID DESCRIPTION SEE G001 FOR BASE BID CLARIFICATION
PROJECT NO.
SHEET TITLE:
Pl o t D a te
Architecture Interior Design Landscape Architecture Land Planning Construction Management
7927 So. Highpoint Parkway, Suite 300
Sandy, Utah 84094
ph. 801.269.0055 fax 801.269.1425 www.thinkaec.com
The designs shown and described herein including all technical drawings, graphic representation & models thereof, are proprietary & can not be copied, duplicated, or commercially exploited in whole or in part without the sole and express written permission from THINK Architecture, inc.
These drawings are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors, and office personnel only in accordance with this notice.
SHEET NUMBER:
REVISIONS:
DATE:
2022 THINK ARCHITECTURE INC.
/1
/2
:2
:5
A
M
BU
TT
ER
FI
EL
D
T
RA
IL
H
EA
D
M A
IN
TE
N A
N C
E
BU
IL
D
IN
G
H
ER
RI
M
A N
H W
Y.
H
ER
RI
M A
N , U
T
12 AUGUST,
25-034
LIFE SAFETY PLAN &
AREA PLAN
G002
BI
D
S
ET
PE
RM
IT
S
ET
1/4" = 1'-0" G002
LEVEL 1 - LIFE SAFETY PLAN 1
1/4" = 1'-0" G002
AREA PLAN LEVEL 1 Copy 1 2
1 -.-.- XX
NOTES
1- EACH OF THESE ARE INTERCHANGEABLE.
2- A TURNING SPACE IS REQUIRED IN EACH SPACE EXCEPT:
(2.1) DOORS IN SERIES.
(2.2) TOILET & BATHROOMS THAT ARE NOT
REQUIRED TO FOLLOW DETAILS ON SHEET 2
(2.3) CERTAIN PANTRY'S AND CLOSETS - SEE
DETAIL 8 ON THIS SHEET.
3- DOORS CAN SWING INTO TURNING SPACE, U.N.O.
5'-0" MIN.
3' -0
" M
IN
. 5' -0
" M
IN
1'-0" MIN. 3'-0" MIN. 1'-0" MIN.
OR
5'-0" MIN.
304.3.1 CIRCULAR SPACE.
THE TURNING SPACE SHALL BE A CIRCULAR SPACE WITH A 60-INCH MINIMUM DIAMETER. THE TURNING SPACE SHALL BE
PERMITTED TO INCLUDE KNEE AND TOE CLEARANCE. .
304.3.2 T-SHAPED SPACE.
THE TURNING SPACE SHALL BE A T-SHAPED SPACE WITHIN A 60-INCH MINIMUM SQUARE, WITH ARMS AND BASE 36
INCHES MINIMUM IN WIDTH. EACH ARM OF THE T -SHAPED SPACE SHALL BE CLEAR OF OBSTRUCTIONS 12 INCHES
MINIMUM IN EACH DIRECTION, AND THE BASE SHALL BE CLEAR OF OBSTRUCTIONS 24 INCHES MINIMUM. THE TURNING
SPACE SHALL BE PERMITTED TO INCLUDE KNEE AND TOE CLEARANCE.
ANSI 117.1 SECTION 304.3- ACCESSIBLE TURNING SPACES
4" MAX
G
RE
A
TE
R
TH
A N
7"
G
RE
A
TE
R
TH
A N
0"
ADDITIONAL PROTECTION NOT
NEEDED BETWEEN WING WALLS
PROTRUDING OBJECTS
HANGING ON WALL WITH
LEADING EDGES ABOVE 27
INCHES
WING WALLS DOWN TO FLOOR
SECTION 404.2.2.
NO PROJECTIONS INTO THE CLEAR OPENING WIDTH
LOWER THAN 34" ABOVE THE FLOOR. PROJECTIONS
INTO THE CLEAR OPENING WIDTH BETWEEN 34" AND 80
INCHES SHALL NOT EXCEED 4"
EXCEPTION. DOOR CLOSERS AND DOOR STOPS
SHALL BE PERMITTED TO BE 78" MIN. ABOVE FLOOR.
307.2 PROTRUDING LIMITS
OBJECTS WITH LEADING EDGES MORE THAN 27
INCHES AND NOT MORE THAN 80" ABOVE THE
FLOOR SHALL PROTRUDE 4" INCHES MAXIMUM
HORIZONTALLY INTO THE CIRCULATION PATH.
EXCEPTION. HANDRAILS SHALL BE PERMITTED TO
PROTRUDE 4 1/2 INCHES MAXIMUM
ft
M
IN
2 ft MAX.
" M
IN
4" M
A X.
C
LE
A R
W
ID
TH
C O
N
TI
N U
O U
S
PA
SS
A
G E
C
LE
A R
W
ID
TH
PO
IN
T
PA
SS
A
G E
SECTION 307
LIMITS OF PROTRUDING OBJECTS
FR
O
N T
A
PP
RO
A
C H
FR
O
N T
A
PP
RO
A
C H
5' -0
" M
IN
PULL SIDE
MANEUVERING CLEARANCES AT SWINGING DOORS
A
C
18" MIN
FRONT APPROACH, PULL SIDE
FR
O
N T
A
PP
RO
A
C H
FR
O
N T
A
PP
RO
A
C H
5' -0
" M
IN
B
12" MIN*
FRONT APPROACH, PUSH SIDE
*DIMENSION REQUIRED IF BOTH CLOSER
AND LATCH ARE PROVIDED
6'-0"
5' -0
3'-0"
HINGE APPROACH - PULL SIDE D HINGE APPROACH - PULL SIDE
PULL SIDE
6'-6"
4' -6
3'-6"
5'-11"
" M
IN
1'-10"
5'-0"
4' -0
2'-0"
12" MIN. *
E HINGE APPROACH - PUSH SIDE F LATCH APPROACH - PULL SIDE
*DIMENSION REQUIRED IF BOTH CLOSER AND LATCH
ARE PROVIDED
**48" MIN IF BOTH CLOSER AND LATCH PROVIDED.
*54" MIN IF CLOSER IS PROVIDED
5'-2"
" M
IN
24" MIN.
G
LATCH APPROACH - PUSH SIDE
**48" MIN IF BOTH CLOSER AND LATCH PROVIDED.
FRONT APPROACH
POCKET OR HINGE DOOR
FRONT APPROACH
SIDE APPROACH
MANEUVERING CLEARANCES - SLIDING /FOLDING DOORS
32" MIN.1'-10" 3'
-6
STOP OF LATCH APPROACH
32" MIN. 3'
-6
MANEUVERING CLEARANCES AT DOORS WITHOUT DOORS
2'-8"
4' -0
2'-8"
4' -0
3' -6
NOTE:
ANSI 404.2.3.2 ALL SWINGING DOORS SHALL HAVE
MANEUVERING CLEARANCES COMPLYING WITH
ILLUSTRATIONS ABOVE.
NOTE:
ANSI 404.2.3.3 SLIDING DOORS AND FOLDING DOORS
SHALL HAVE MANEUVERING CLEARANCES AS SHOWN
ABOVE.
NOTE:
ANSI 404.2.3.4 DOORWAYS WITHOUT DOORS THAT
ARE LESS THAN 36" IN WIDTH SHALL HAVE THE
MANEUVERING CLEARANCES SHOWN ABOVE.
FR
O
N T
A
PP
RO
A
C H
8"
1.5 ft MIN.
ft
M
IN
RECESSED DOOR AT PULL SIDE
8"4 ft M
IN
RECESSED DOOR AT PUSH SIDE
(STANDARD HARDWARE)
8"4 ft M
IN
RECESSED DOOR AT PUSH SIDE
(DOOR PROVIDED WITH BOTH CLOSER AND
LATCH)
1 ft MIN.
ft
M
IN
5 ft MIN.
5 ft MIN.
ft
M
IN
D
O O
R W
ID
TH
D O
O R
W
ID
TH
ft M
IN
D O
O R
W
ID
TH
5 ft MIN.
ANSI 404.2.3.5 RECESSED DOORS
WHERE ANY OBSTRUCTION WITHIN 18" OF THE LATCH SIDE OF
A DOORWAY PROJECTS MORE THAN 8" BEYOND THE FACE
OF THE DOOR, MEASURED PERPENDICULAR TO THE FACE OF
THE DOOR, MANEUVERING CLEARANCES FOR A FORWARD
APPROACH SHALL BE PROVIDED.
ANSI 404.3 AUTOMATIC DOORS
AUTOMATIC DOORS AND AUTOMATIC GATES SHALL COMPLY WITH SECTION 404.3.
FULL POWERED AUTOMATIC DOORS SHALL COMPLY WITH ANSI/BHMA A156.10 LISTED IN SECTION
ANSI 105.2.4 .
POWER ASSIST AND LOW ENERGY DOOR SHALL COMPLY WITH ANSI/BHMA A156.19 LISTED IN ANSI
SECTION 105.2.3
CLEAR WIDTH.
DOORWAYS SHALL HAVE A CLEAR OPENING WIDTH OF 32" IN POWER-ON AND POWER OFF MODES.
THE MINIMUM CLEAR OPENING WIDTH FOR AUTOMATIC DOOR SYSTEMS SHALL BE BASED ON THE
CLEAR OPENING WIDTH PROVIDED WITH ALL LEAFS IN THE OPEN POSITION.
MANEUVERING CLEARANCES
MANEUVERING CLEARANCE AT POSER - ASSISTED DOORS SHALL COMPLY WITH ANSI SECTION 4040.2.3
CONTROL SWITCHES.
MANEUVERING CLEARANCES AT RECESSED DOORS
ANSI 404.2.3.5 DOORS IN SERIES
DISTANCE BETWEEN TWO HINGED OR PIVOTED DOORS IN SERIES SHALL BE 48" INCHES MINIMUM PLUS
THE WIDTH OF ANY DOOR SWINGING INTO THE SPACE. THE SPACE BETWEEN THE DOORS SHALL
PROVIDE A TURNING SPACE COMPLYING WITH SECTION 304. (SHOWN ABOVE)
ANSI 117.1 SECTION 40.2.3 MANEUVERING CLEARANCES
1:20 MAX
ft
M
IN
1:
M A
X
C
RO
SS
-S
LO
PE
NOTES:
402.2 ACCESSIBLE ROUTES SHALL CONSIST OF ONE OR MORE OF THE FOLLOWING COMPONENTS: WALING
SURFACE WITH SLOPE NOT STEEPER THAN 1:20, DOORS AND DOORWAYS, RAMPS, CURB RAMPS , EXCLUDING THE
FLARED SIDES, ELEVATORS AND PLATFORM LIFTS. ALL COMPONENTS OF AN ACCESSIBLE ROUTE SHALL COMPLY
WITH THE APPLICABLE PORTIONS OF THIS STANDARD.
402.3 REVOLVING DOORS, REVOLVING GATES ND TURNSTILES SHALL NOT BE A PART OF AN ACCESSIBLE ROUTE.
WALKING SURFACES
403.3 THE RUNNING SLOPE OF WALKING SURFACES SHALL NOT BE STEEPER THAN 1:20. THE CROSS SLOPE OF A
WALKING SURFACE SHALL NOT BE STEEPER THAN 1:48.
SLOPE
" C
LE
A
R
1:20 MAX
2 ft MAX. 4 ft MIN. 2 ft MAX.
ft
M
IN
1:
M A
X
C
RO
SS
-S
LO
PE
SLOPE
ANSI 117.1 SECTION 402- ACCESSIBLE ROUTES
403.5 CLEAR WIDTH OF AN ACCESSIBLE ROUTE SHALL BE 36" INCHES IN WIDTH - MIN. (SEE BELOW)
403.5 EXCEPTION
THE CLEAR WIDTH SHALL BE PERMITTED TO BE REDUCED TO 32" MINIMUM FOR LENGTH OF 24" MAXIMUM PROVIDED THE
REDUCED WIDTH SEGMENTS ARE SEPARATED BY SEGMENTS THAT ARE 48" INCHES MINIMUM IN LENGTH AND 36"
MINIMUM IN WIDTH.