This is a pre-bid agenda presentation and invitation to bid document for the Dunmore Carpet Factory Renovation and Site Work project issued by Hoofty Holdings, LLC for the property located at 105 Corner Street, Dunmore, PA 18512. The project involves interior and exterior renovations to an existing approximately 15,200 gross square foot structure, including exterior masonry repair and restoration, interior and exterior wall and floor construction, roof replacement, and shell work for Electrical, HVAC, and Fire Protection systems. The work will be performed under a single prime lump sum contract with an estimated budget of $4.3 million. A mandatory pre-bid meeting was scheduled for August 28, 2026, at 1:00 PM at the project site. Sealed bids were due by 2:00 PM on September 22, 2026 (with a discrepancy noting September 29, 2026 in the contract opportunity description), to be opened publicly at 3:00 PM via online meeting through PennBid. Questions from bidders were accepted until September 9, 2026, at 3:00 PM and were to be directed via email to the project design and management team. The contract award date is October 27, 2026, with a proposed construction start date of November 30, 2026, and an estimated completion date of November 30, 2027. All milestone dates are contractual requirements with liquidated damages enforceable for non-compliance.
Bidders must submit a bid bond equal to ten percent of the total bid amount with a corporate surety authorized to do business in Pennsylvania, along with a non-collusion affidavit, agreement of surety, letter of insurer, and contractor qualification statement. The successful bidder will be required to provide performance and payment bonds each in the amount of one hundred percent of the contract value. The project is subject to prevailing wage requirements under the Commonwealth of Pennsylvania Prevailing Wage Act and is funded through a Redevelopment Assistance Capital Program (RACP) Grant administered by the Office of the Budget. The bid form includes a base bid price for all work, four deductible or addable alternates related to office fitout, basement finishing, stucco end walls, and first floor fitout, twelve unit price line items for contingency work such as rock excavation, unstable material removal, and specialty trade hourly rates, and fourteen quantity allowances with estimated quantities for various construction items. Contractors are responsible for obtaining their own licenses, business privilege taxes, and other required fees from the Borough of Dunmore. The project requires weekly superintendents' progress meetings and bi-weekly project manager meetings, with all communication conducted via email.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALLOY5 - DUNMORE CARPET FACTORY
PRE-BID AGENDA | 2026-08-11
Pre-Bid Agenda - August 28th, 2026
INTRODUCTIONS:
Owner: Hoofty Holdings LLC
Design Team: Alloy5 Architecture
MEP: Smith Miller Associates
Civil Engineer: GPI
Structural Engineer: designBLD
QUESTIONS DURING BIDDING
Questions during bidding should be directed as follows:
All questions must be submitted via email. Phone calls are not permitted:
• Mackenzie Semken, Alloy5 - Project Designer (msemken@alloy5.com)
• James Margotta, Alloy5 - Project Manager (jmargotta@alloy5.com)
All questions must be copied to:
• Sean McNamera, AIA, CHA - Project Manager (SMcNamara@chasolutions.com)
• Jessica Deegan, CHA - Project Administrator (JDeegan@chasolutions.com)
All MEP questions must be copied to:
• Nelson Gonzalez, Smith Miller Associates (ngonzalez@SmithMiller.net)
All Site related questions must be copied to:
• Metthew Chorba, GPI Engineering (mchorba@gpinet.com)
All Structure related questions must be copied to:
• Dave Johns, designBLD (djohns@designbld.com)
All Environmental Abatement questions must be copied to:
• Dave Kuchinski, Spotts, Stevens, and Mccoy (Dave.Kuchinski@ssmgroup.com)
BID OPENING INFORMATION:
Bids Due:
Location:
Bid Opening:
See Specification Section 002113, Instructions to Bidders, for instructions on how to title Bid Submission email and items that may be included in the Bidder’s submission.
Tuesday, September 22, 2026 @ 2:00 PM
PennBid
Opened publicly and read at 3:00 PM via public online meeting.
PROJECT OVERVIEW:
The project consists of interior and exterior renovations to an existing structure, ap-proximately 15,200 gross SF. The estimated budget is $4.3M.
The project will be constructed under a SINGLE PRIME LUMP SUM CONTRACT.
| • | Existing building exterior repairs and new interior fitout |
| • | New building core and shell |
The project address is as follows:
• 105 Corner Street, Dunmore, PA 18512
Overall Project Schedule:
| • | Award Date - October 27, 2026 |
| • | Proposed Start Date - November 30, 2026 |
| • | Estimated Competion Date - November 30, 2027 |
The work under the General Construction Contract includes all work defined in the doc-uments. The general scope of work is defined as follows:
• The existing building core and shell work (renovations) includes exterior masonry repair and restoration, interior and exterior wall and floor construction, roof replacement, and shell work for Electrical, HVAC, and Fire Protection.
CHESTNUT ST.
CORNER ST.
EXIST. 3-STORY BUILDING
EXISTING PARKING AREA TO
BE RENOVATED FOR RE-USE 105 CORNER STREET
EXIST. MULTI-
FAMILY
RESIDENCE
EXIST.
CARPORT
EXIST.
RESIDENCE
EXIST. DRIVEWAY
EXIST. DRIVEW
AY
EXIST. 2-
STORY
ADDITION
PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O
PY
RI
GH
T
AL
LO
Y5
A
RC
H
IT
EC
TU
RE
CIVIL:
MEPF:
ARCHITECT:
STRUCTURAL:
ALLOY5
ARCHITECTURE
NOT FOR
CONSTRUCTION
1" = 10'-0"
8/ 3/
:1
2:
P M
G1 .1
2023.06.30
ZH/JG
RG
22-0047
SITE PLAN
DUNMORE CARPET
FACTORY
RENOVATIONS
DUNMORE LOFTS @ 105 CORNER STREET
DUNMORE, PA 18512
GPI
SMITH MILLER
ASSOCIATES
designBLD
HOOFTY HOLDINGS
1 E BROAD STREET, BETHLEHEM, PA 18018
1" = 10'-0"
1 ARCHITECTURAL SITE PLAN
NOTE: SITE PLAN FOR GRAPHICAL INFORMATION ONLY - REFER TO CIVIL ENGEINEER'S
DRAWINGS FORE MORE INFORMATION
NO. ISSUE DESCRIPTION DATE
1 EXTERIOR PACKAGE 2023.06.30
2 ISSUE FOR PERMIT 2025.12.23
SITE PLAN:
GENERAL PLAN NOTES
1. REFERENCE CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, &
TELECOM, DRAWINGS FOR ADDITIONAL INFORMATION.
2. ALL DIMENSIONS ARE NOMINAL UNLESS NOTED OTHERWISE.
3. ALL CORRIDOR PARTITIONS ARE TO EXTEND TO THE UNDERSIDE OF THE FLOOR/ROOF STRUCTURE
ABOVE, SEAL PARTITIONS SOUND TIGHT.
4. PROVIDE BLOCKING IN PARTITIONS AS REQUIRED FOR INSTALLATION OF ALL WALL MOUNTED
CABINETRY, SHELVING, EQUIPMENT, HANDRAILS, AND ACCESSORIES.
5. CABINET MAKER SHALL PROVIDE ALL CUTOUTS, HOLES, ETC. FOR ELECTRICAL, PLUMBING, AND
MECHANICAL DEVICES AS REQUIRED. GENERAL CONTRACTOR TO COORDINATE.
6. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING ROOMS, SIGNS, DOORS, KEYS, EQUIPMENT, PANELS, ETC BY THE OWNER'S FINAL NUMBERING - NOT THE ARCHITECTURAL
NUMBERS.
7. ALL APARTMENTS TO COMPLY WITH "TYPE B" DWELLING UNITS ANSI-A117.1-2009, U.N.O.
A2.01
A2.03
A2.02
1 2 3 4 5
A
B
E
A3.04
B
A3.01
D
A3.03
A
A3.00
C
A3.02
EXISTING BASEMENT UNOCCUPIED
EXISTING STAIR
TO REMAIN
15'-6" 12'-8" 13'-5 1/2" 12'-10" 13'-1" 13'-4 15/16"
'-8
'-0
/2
'-5
'-6 " E
XI
ST
+/-17'-8" EXIST.
'-1
/2
" E
XI
ST
IN
G
+/-80'-11 7/16" EXIST.
THIRD FLOOR
SECOND FLOOR
GROUND FLOOR
BASEMENT
ROOF
PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O
PY
RI
GH
T
AL
LO
Y5
A
RC
H
IT
EC
TU
RE
CIVIL:
MEPF:
ARCHITECT:
STRUCTURAL:
ALLOY5
ARCHITECTURE
NOT FOR
CONSTRUCTION
As indicated
8/ 3/
:1
2:
P M
A1 .0
2026.08.03
ZH/JG
RG
22-0047
FLOOR PLAN -
BASEMENT - NEW
WORK
DUNMORE CARPET
FACTORY
RENOVATIONS
DUNMORE LOFTS @ 105 CORNER STREET
DUNMORE, PA 18512
GPI
SMITH MILLER
ASSOCIATES
designBLD
HOOFTY HOLDINGS
1 E BROAD STREET, BETHLEHEM, PA 18018
1/4" = 1'-0"
1 BASEMENT FLOOR PLAN
□□ KEYED PLAN NOTES
NO. NOTE
1 REPLACEMENT OVERHEAD ROLLER DOOR W/ EGRESS MAN DOOR, SEE EXTERIOR ELEVATIONS
2 CMU INFILL, REFER TO STRUC. DWG.'S FOR MORE INFO
3 EXISTING PIPE COLUMN TO REMAIN
4 NEW STOREFRONT SYSTEM REFER TO GLAZING ELEVATIONS
5 INFILL EXTERIOR WALL CONSTRUCTION. SEE STRUC. DWG'S FOR MORE INFO.
6 EXISTING COLUMN TO REMAIN, CONCEAL IN NEW WALL FRAMING
7 CLOSET SHELF W/ POLE
8 INFILL FLOOR W/ LIKE CONSTRUCTION. SEE STRUC. DWG.'S FOR MORE INFO
9 EXISTING WALL TO BE REFINISHED W/ 5/8" FIRE-RATED GYPSUM WALL BOARD EA. SIDE
NO. ISSUE DESCRIPTION DATE
1 EXTERIOR PACKAGE 2023.06.30
2 ISSUE FOR PERMIT 2025.12.23
3 ISSUE FOR BID 2020.08.03
BASEMENT FLOOR PLAN:
DN
UP
A2.01
A2.00
A2.03
A2.02
1 2 4 5
A
B
E
A3.04
E
A3.04
B
A3.01
D
A3.03
D
A3.03
A
A3.00
A
A3.00
C
A3.02
C
A3.02
B B B B B B B
AA
C
C
C
0.
B
0.
A
B B
SIDEWALK TO BE REGRADED @ 1:20 MAX GRADIENT W/ 1:48
MAX. CROSS SLOPE FOR ADA ACCESS
ADA ACCESSIBLE ENTRY
EXISTING STAIR.
CONDITION TO BE
REVIEWED
EXISTING
STAIR.
CONDITION TO
BE REVIEWED
SF3
SF2 SF1SF2
3 33 3
4 4 4 4 4
15'-6" 12'-8" 13'-1" 13'-4 15/16"
'-4
'-0
/2
'-1
'-6 " E
XI
ST
+/- 17'-0" EXIST.
0'
-5
/2 " E
XI
ST
+/- 80'-11 7/16" EXIST.
EXIST. FENCE
288 SF
CONFERENCE
205 SF
VESTIBULE
101.B 101.C
237 SF
RECEPTION
105.A 105.B
158 SF
CORRIDOR
1011 SF
OPEN OFFICE
43 SF
PASSAGE
62 SF
PASSAGE
107 SF
MEN'S
100 SF
WOMEN'S
119 SF
OFFICE
118 SF
OFFICE
113 SF
OFFICE
112 SF
OFFICE
33 SF
J.C.
901 SF
OPEN OFFICE
36 SF
A5.00
0' -3
/2
AL
IG
N
TO
E
XI
ST
. C
OL
'-4
/2
" V .I.
F.
V.I.F. ALIGN TO EXIST. OPENING
15'-5 3/32" 0'-5 1/2"
V.I.F. ALIGN TO EXIST. OPENING
13'-4 1/2" 0'-3 1/2"
A7.01
A7.01 10
A7.01
P50B
P50A
P50A P50A
P50B
P50C
P50A
P50A P50A
P50A P50A
P50A P50AP50B
P50B
P50B
P50A
P50A
P53AF1D
A7.01
A7.01
182 SF
CONFERENCE
P58A
P58A
P58A
P58A P58A P58A P58A
P58A
P58A
P58A P58A
A7.01
F1B
REF DW DW REF
'-1
'-0
/2
'-4
FEC
FEC
EWC
TV
TV
TV TV
TV
A7.01
326 SF
RECEPTION
0' -3
/2
9'
-0
3/
0'
-3
/2
9' -2
3/
0' -3
/2
8'
-6
/3 2"
0' -5
/2
5'
-5
/4
0' -3
/2
6'
-2
/4
0' -5
/2
9'
-1
5/ 8"
7'-8" 0'-3 1/2" 5'-7 3/4" 0'-3 1/2" 7'-8"
0' -7
/4
1'
-1
3/ 4"
0' -3
/2
0'
-1
1/ 4"
0'-3 1/2" 13'-3 1/4"
0'-5 1/2"
12'-7 3/4" 0'-3 1/2" 25'-1 15/16"
12'-10 3/8" 0'-3 1/2" 1'-0" 0'-3 1/2" 11'-11 1/8"
8'-5 1/8"
0'-3 1/2"
5'-5 1/4"
0'-3 1/2"
11'-11 1/8"
0' -3
/2
'-2
/1 6"
0' -3
/2
"1 '-5
5/
0' -3
/2
" 7' -0
/8
0'-5 1/2"
0'-3 1/2" 8'-9 5/8"
0'-3 1/2"
V.I.F. ALIGN TO EXIST. OPENING
14'-4 15/32" 0'-5 1/2"
P54A P54A
P54AP54A P54A
P54A P54A
EXIST. STAIR
A7.0114
OPP.
2' -1
2'-1" 2'-1"
2' -1
2' -2
/4
2' -2
2'-5"
2' -1
/1 6"
5' -1
/1
6"
5'-9 31/32"
2' -6
8'
-1
0'-5" 0'
-5
SIMILAR TO ROOM #
RECEPTION 102
6' -0
A5.003
A7.02
RELOCATED
GAS METER
SERVICE
REPLACEMENT
CONCRETE TREAD/RISER
AT MAX 7" H AND MIN.
11" DEEP
SF4
A6.20 11
SLOPE SLOPE
11'-8" 10'-0" 11'-8"
A5.01
A9.00
GRAY AREA INDICATES
DEDUCT ALTRERNATE 1
P54A
GRAY AREA INDICATES
DEDUCT ALTRERNATE 1
THIRD FLOOR
SECOND FLOOR
GROUND FLOOR
BASEMENT
ROOF
GENERAL PLAN NOTES
1. REFERENCE CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, &
TELECOM, DRAWINGS FOR ADDITIONAL INFORMATION.
2. ALL DIMENSIONS ARE NOMINAL UNLESS NOTED OTHERWISE.
3. ALL CORRIDOR PARTITIONS ARE TO EXTEND TO THE UNDERSIDE OF THE FLOOR/ROOF STRUCTURE
ABOVE, SEAL PARTITIONS SOUND TIGHT.
4. PROVIDE BLOCKING IN PARTITIONS AS REQUIRED FOR INSTALLATION OF ALL WALL MOUNTED
CABINETRY, SHELVING, EQUIPMENT, HANDRAILS, AND ACCESSORIES.
5. CABINET MAKER SHALL PROVIDE ALL CUTOUTS, HOLES, ETC. FOR ELECTRICAL, PLUMBING, AND
MECHANICAL DEVICES AS REQUIRED. GENERAL CONTRACTOR TO COORDINATE.
6. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING ROOMS, SIGNS, DOORS, KEYS, EQUIPMENT, PANELS, ETC BY THE OWNER'S FINAL NUMBERING - NOT THE ARCHITECTURAL
NUMBERS.
7. ALL APARTMENTS TO COMPLY WITH "TYPE B" DWELLING UNITS ANSI-A117.1-2009, U.N.O.
PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O
PY
RI
GH
T
AL
LO
Y5
A
RC
H
IT
EC
TU
RE
CIVIL:
MEPF:
ARCHITECT:
STRUCTURAL:
ALLOY5
ARCHITECTURE
NOT FOR
CONSTRUCTION
As indicated
8/ 3/
:1
2:
P M
A1 .0
2026.08.03
ZH/JG
RG
22-0047
FLOOR PLAN -
GROUND FLOOR - NEW
WORK
DUNMORE CARPET
FACTORY
RENOVATIONS
DUNMORE LOFTS @ 105 CORNER STREET
DUNMORE, PA 18512
GPI
SMITH MILLER
ASSOCIATES
designBLD
HOOFTY HOLDINGS
1 E BROAD STREET, BETHLEHEM, PA 18018
1/4" = 1'-0"
1 GROUND FLOOR PLAN
□□ KEYED PLAN NOTES
NO. NOTE
1 REPLACEMENT OVERHEAD ROLLER DOOR W/ EGRESS MAN DOOR, SEE EXTERIOR ELEVATIONS
2 CMU INFILL, REFER TO STRUC. DWG.'S FOR MORE INFO
3 EXISTING PIPE COLUMN TO REMAIN
4 NEW STOREFRONT SYSTEM REFER TO GLAZING ELEVATIONS
5 INFILL EXTERIOR WALL CONSTRUCTION. SEE STRUC. DWG'S FOR MORE INFO.
6 EXISTING COLUMN TO REMAIN, CONCEAL IN NEW WALL FRAMING
7 CLOSET SHELF W/ POLE
8 INFILL FLOOR W/ LIKE CONSTRUCTION. SEE STRUC. DWG.'S FOR MORE INFO
9 EXISTING WALL TO BE REFINISHED W/ 5/8" FIRE-RATED GYPSUM WALL BOARD EA. SIDE
NO. ISSUE DESCRIPTION DATE
1 EXTERIOR PACKAGE 2023.06.30
2 ISSUE FOR PERMIT 2025.12.23
FIRST FLOOR PLAN:
DN
UP
WH
WH
WH
WH
A2.01
A2.00
A2.03
A2.02
1 2 3 4 5
A
B
E
A3.04
E
A3.04
B
A3.01
B
A3.01
D
A3.03
D
A3.03
A
A3.00
A
A3.00
C
A3.02
C
A3.02
C CBBB B B B B B
BBB B B B B B B B BB
B B
EXISTING STAIR TO
REMAIN
EXISTING STAIR TO
REMAIN
15'-6" 12'-8" 13'-5 1/2" 12'-10" 13'-1" 13'-4 15/16"
'-4
'-0
/2
'-1
'-5
/2
"E
XI
ST
+/- 80'-11 7/16" EXIST.
1273 SF
2 BEDROOM
1270 SF
2 BEDROOM
631 SF
1 BEDROOM
11 SF
TRASH
208 SF
CORRIDOR
204 SF
EXIST. STAIR
MECH.
MECH.
MECH.
MECH.
1 BEDROOM
F1B
F1B
F1B
F1B
F1B
F1B
F1B
F1D
P54A
P54A
P58A
P58A
P58A P58A P58A
P58A
P58A P58A P58A P58A P58A P58A
P58A P58A P58A P58A P58A
F1B
P50A
F1B
P50B
P53A
P53A
P50A
P50A
P50A
P50A
P50B
P50A
P50A
P53A
F1D
P50A
P50A
F1B
2 20
203.A
3.
D
203.C
P58A
0.
F
2'-0"
REFREF
DW
DW
W
D
W D
D
W
REF
DW
REF
DW
W
F1B
F1D
F.E.C.
2'-0"
D
P50A
P50A
P50A
200.A
200.B
0.
C
200.D 20 0.
E
P53A
P50A
P50A
A7.00
A7.00
SIM.
SIM.
SIM.
SIM.
SIM.
SIM.
SIM.
SIM.
A7.00
A7.00
A7.00 10 SIM.
A7.0011SIM.
A7.00 10
A7.0011
A7.00 8
SIM.
SIM.
A7.00 8
A7.00
SIM.
SIM.
3'-0"
A7.011
A7.00 5A7.01
A7.015
A7.00 7
A7.02
3.
B
18" MIN.
203.E
A7.007
OPP.
A7.007
BEDROOMLIVING RM.
KITCHEN
CLOS.
LAUND.BATH
W.I.C.
KITCHEN
LIVING RM.BEDROOM
CLOS.
BEDROOM
W.I.C.
BATH
BATH
W.I.C.
BEDROOM BEDROOM LIVING RM.
KITCHEN
CLOS.
BATH
LAUND.
HALL
BATH LAUND.
CLOS.
CLOS.LIVING RM.
KITCHEN
BATH
CLOS.
LAUND.
BEDROOM
P50A
P50A
P50A
P50A
P50A
P50A
P50A
P50A
P50A
P53A
P50A
P53A
P50A
P50A
P50A
P53A
P53A
P50A
P50AP50A
P50A
P50A
P50A
P50A
P50A
P50A
P50A
P50A
P53A
P53A
P50A
P50AP50A
P53A
P50A
P50AP50A
P53A
P50A
2.
C
2.
D20 2.
F
202.G
202.E
2.
B
2.
A
2.
H
P50A
1.
C
1.
D
1.
B
1.
H
201.G
1.
F
201.E
1.
A
0' -3
/2
'-8
/2
0' -5
/2
'-8
/2
0' -3
/2
2' -6
/8
0' -3
/2
"5' -1
/4
" 0' -3
/2
7' -4
/4
0' -3
/2
'-1
1/
8"
'-1
1/ 8"
0' -3
/2
7' -4
/4
0' -3
/2
"5' -1
/4
" 0' -3
/2
2' -6
/8
7'-0 1/16"
0'-3 1/2"
5'-3 29/32"
0'-3 1/2"
2'-6 11/32" 0'-3 1/2" 6'-7 1/32"
0'-3 1/2"
6'-2 3/16"
0'-3 1/2"
2'-7 1/4"
0'-3 1/2"
0'-3 1/2"
4'-1 1/4"
0'-3 1/2"
5'-8 13/16" 0'-3 1/2" 8'-7 3/32" 0'-3 1/2" 13'-8 25/32" 0'-3 1/2" 10'-5 27/32"
0'-5 1/2" EXIST.
+/-6'-0 9/16"
3'-8"
3' -0
/1
6" 3'
-9
3/
6'
-0
3'-10 1/4"
2'-1 1/4"
6' -1
3/
8" 0'
-3
/2
0' -3
/2
4'
-1
3/ 4"
0' -3
/2
0'-3 1/2" 15'-5 3/8" 0'-3 1/2" 13'-3 1/4" 0'-3 1/2" 17'-3 5/8"
46'-10 3/4" 0'-3 1/2" 31'-0 3/16"
17'-3 5/8" 0'-3 1/2" 13'-1 9/16" 0'-3 1/2"
2'-1 1/4"
0' -3
/2
6'
-1
/4
0' -3
/2
0' -3
/2
'-1 1"
0' -3
/2
7'
-5
/4
0' -3
/2
7'
-0
/8
0' -3
/2
6'
-5
/4
0' -3
/2
5'
-6
/8
0' -5
/2
"V.
I.F
4' -7
/8
V.
I.F
5' -2
/8
" E
XI
ST
3' -0
0' -3
/2
5' -8
/2
0' -3
/2
'-3
/8
0' -3
/2
5'
-3
/4
0' -3
/2
'-3
/8
4'-0"
4'-0"
5' -0
5'
-0
0'-3 1/2" 15'-5 3/8" 0'-3 1/2" 13'-3 1/4" 0'-3 1/2" 17'-3 5/8" 0'-3 1/2" 13'-6 1/8" 0'-3 1/2" 16'-11 1/16" 0'-3 1/2"
2'-1 1/4"
0' -3
/2
6'
-1
1/ 4"
9' -7
9/
0' -3
/2
4'-0" CLEAR
2' -2
7/
0'-3 1/2" 6'-9 11/16"
3'-10 1/4" 3'-8"
6' -0
0' -3
/2
5'
-7
/4
0' -5
/2
6'
-8
/8
0'-3 1/2"
2'-8 5/8"
0'-3 1/2"
5'-7 1/16"
10'-3 1/8"
0'-3 1/2"
2' -1
2'
-1
2'-1"
2'-1"
2'-1"
2'-1"
P53A
THIRD FLOOR
SECOND FLOOR
GROUND FLOOR
BASEMENT
ROOF
GENERAL PLAN NOTES
1. REFERENCE CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, &
TELECOM, DRAWINGS FOR ADDITIONAL INFORMATION.
2. ALL DIMENSIONS ARE NOMINAL UNLESS NOTED OTHERWISE.
3. ALL CORRIDOR PARTITIONS ARE TO EXTEND TO THE UNDERSIDE OF THE FLOOR/ROOF STRUCTURE
ABOVE, SEAL PARTITIONS SOUND TIGHT.
4. PROVIDE BLOCKING IN PARTITIONS AS REQUIRED FOR INSTALLATION OF ALL WALL MOUNTED
CABINETRY, SHELVING, EQUIPMENT, HANDRAILS, AND ACCESSORIES.
5. CABINET MAKER SHALL PROVIDE ALL CUTOUTS, HOLES, ETC. FOR ELECTRICAL, PLUMBING, AND
MECHANICAL DEVICES AS REQUIRED. GENERAL CONTRACTOR TO COORDINATE.
6. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING ROOMS, SIGNS, DOORS, KEYS, EQUIPMENT, PANELS, ETC BY THE OWNER'S FINAL NUMBERING - NOT THE ARCHITECTURAL
NUMBERS.
7. ALL APARTMENTS TO COMPLY WITH "TYPE B" DWELLING UNITS ANSI-A117.1-2009, U.N.O.
□□ KEYED PLAN NOTES
NO. NOTE
1 REPLACEMENT OVERHEAD ROLLER DOOR W/ EGRESS MAN DOOR, SEE EXTERIOR ELEVATIONS
2 CMU INFILL, REFER TO STRUC. DWG.'S FOR MORE INFO
3 EXISTING PIPE COLUMN TO REMAIN
4 NEW STOREFRONT SYSTEM REFER TO GLAZING ELEVATIONS
5 INFILL EXTERIOR WALL CONSTRUCTION. SEE STRUC. DWG'S FOR MORE INFO.
6 EXISTING COLUMN TO REMAIN, CONCEAL IN NEW WALL FRAMING
7 CLOSET SHELF W/ POLE
8 INFILL FLOOR W/ LIKE CONSTRUCTION. SEE STRUC. DWG.'S FOR MORE INFO
9 EXISTING WALL TO BE REFINISHED W/ 5/8" FIRE-RATED GYPSUM WALL BOARD EA. SIDE
PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O
PY
RI
GH
T
AL
LO
Y5
A
RC
H
IT
EC
TU
RE
CIVIL:
MEPF:
ARCHITECT:
STRUCTURAL:
ALLOY5
ARCHITECTURE
NOT FOR
CONSTRUCTION
As indicated
8/ 3/
:1
2:
P M
A1 .0
2026.08.03
ZH/JG
RG
22-0047
FLOOR PLAN - SECOND
FLOOR - NEW WORK
DUNMORE CARPET
FACTORY
RENOVATIONS
DUNMORE LOFTS @ 105 CORNER STREET
DUNMORE, PA 18512
GPI
SMITH MILLER
ASSOCIATES
designBLD
HOOFTY HOLDINGS
1 E BROAD STREET, BETHLEHEM, PA 18018
1/4" = 1'-0"
1 SECOND FLOOR PLAN
NO. ISSUE DESCRIPTION DATE
1 EXTERIOR PACKAGE 2023.06.30
2 ISSUE FOR PERMIT 2025.12.23
SECOND FLOOR PLAN:
WH
WH
WH
WH
A2.01
A2.00
A2.03
A2.02
1 2 3 4 5
A
B
E
A3.04
E
A3.04
B
A3.01
B
A3.01
D
A3.03
D
A3.03
A
A3.00
A
A3.00
C
A3.02
C
A3.02
BBB B B B B B B B
BBB B B B B B B B BB
B B
EXISTING STAIR TO
REMAIN
15'-6" 12'-8" 13'-5 1/2" 12'-10" 13'-1" 13'-4 15/16"
'-4
'-0
/2
'-1
0'
-5
/2 " E
XI
ST
+/- 80'-11 7/16" EXIST.
2'-0 1/16"
REF
REF
DW
DW
W D
D
W
REF
DW
REF
DW
MECH.
790 SF
1 BEDROOM
1270 SF
2 BEDROOM
1271 SF
2 BEDROOM
11 SF
TRASH
283 SF
CORRIDOR
604 SF
1 BEDROOM
105 SF
EXIST. STAIR
301E
1A
301G
1H
1C
1F
1B
1D
303303C
3B
3A
303D
0B
0A
300D
300C
F1B
F1B
F1B
F1B
F1B
F1B
F1B
F1D
P50A
P50A
P50A
P50A
P50A
P50A
P50A
P50A
P50A
P53A
P50A
P53A
P50A
P50A
P50A
P53A
P50A
P50AP50A
F1B P53A
P58A P58A P58A
P58A P58A
P58A P58A P58A
P58A
P58A
P58AP58AP58A
P58A
P58A
P58AP58A
P58A P58A
P58A
P58A
P58A
P58A
P58A
P53A
P50A
P50A
P50A
P50A
P53A
P53A
F1D
P50A
P50A
P50A
P50A
P53A
P50A
P50A
P50A P50A
P50A
F1B
MECH.
MECH.
P58A
MECH.
P50A
2'-0"
F1B
F.E.C.
A7.00 8
A7.00
A7.00
A7.00 10
P50A
A7.00 4
A7.001
A7.00
A7.00 20
A7.0011
A7.008
A7.00 8
SIM.
SIM.
A7.00
SIM.
SIM.
SIM.
SIM.
A7.00
A7.00
SIM.
SIM.
SIM.
SIM.
SIM.
SIM.
SIM.
SIM.
A7.00 10 SIM.
A7.0011SIM.
A7.02
A7.025
3'-8"
6' -0
3'-10 1/4"
BEDROOM BEDROOM
CLOS.
W.I.C.
BATH
BATH
LAUND.
HALL
LIVING RM.
KITCHEN
CLOS.
BATH
W.I.C.
BEDROOM BEDROOM
BATH
LAUND. CLOS.
LIVING RM.
KITCHEN
LIVING RM.
HALL
BEDROOM
KITCHEN
LIVING RM.
LAUND.
BATH
BEDROOM
CLOS.
HALL
LAUND.
KITCHEN
A7.007
OPP.
A7.007
BATH
0' -3
/2
7'
-5
5/
0'
-3
/2
3' -0
1/
0' -3
/2
V.
I.F
6' -1
/8
" E
XI
ST
0'-3 1/2" 46'-7 1/4" 0'-3 1/2" 30'-7 3/32" 0'-3 1/2"
0' -3
/2
'-0
/8
0' -3
/2
5' -3
/4
0' -3
/2
'-0
/8
0'-3 1/2"
3'-0 5/8"
0' -3
/2
5' -3
/4
0'
-3
/2
7' -1
/3 2"
0' -3
/2
5'
-0
/3 2"
0' -3
/2
'-1
/2
0' -3
/2
'-8
/2
0' -5
/2
'-8
/2
0' -3
/2
'-1
1/
8" 0'
-3
/2
7' -4
/4
0' -3
/2
5' -1
/4
0' -3
/2
2' -6
/8
302.E
2.
B
302.F
2.
H
2.
A
2.
G
2.
C
2.
D
P50A
P50A
P50A
P50A
P50A
P50A
P50A
P50A
P50A
P53A P53A
P50A
P50A
P50A
P53A
P50A
P50A
P50A
P53A
P50A
15'-5 3/8" 0'-3 1/2" 13'-3 1/4" 0'-3 1/2" 17'-3 5/8"
2'-1 5/8"
2' -6
/8
0' -3
/2
5' -1
/4
0' -3
/2
7'
-4
/4
0' -3
/2
'-1
1/ 8"
7'-0 1/8"
0'-3 1/2"
5'-3 29/32"
0'-3 1/2"
2'-6 11/32" 0'-3 1/2" 6'-7 1/32"
0'-3 1/2"
6'-2 3/16"
0'-3 1/2"
2'-7 1/4" 0'-3 1/2"
0'-3 1/2" 4'-1 1/4"
0'-3 1/2"
5'-8 13/16" 0'-3 1/2" 8'-7 3/32" 0'-3 1/2" 8'-10 25/32"
0'-3 1/2"
2'-4 1/2" 0'-3 1/2"
7'-4 7/32" 0'-3 1/2"
5'-3 7/16"
AL
IG
N
9'-9"
135°
0' -3
/2
'-6
/4
0' -3
/2
4' -7
/8
0' -3
/2
7' -1
1/
2"
0'-3 1/2" 15'-5 3/8" 0'-3 1/2" 13'-3 1/4" 0'-3 1/2" 17'-3 5/8" 0'-3 1/2" 13'-8" 0'-3 1/2" 16'-7 5/8" 0'-3 1/2"
3' -7
/4
0'-3 1/2" 9'-4 7/8" 0'-3 1/2" 6'-9 7/32"
0'-3 1/2" 5'-0 1/32"
0'-3 1/2" 9'-5 5/32"
3'-8" 3'-10 1/4"
4' -8
/1
6" 6'
-0
4'-0"
5' -0
0' -3
/2
6' -1
1/
4"
12'-1 5/16" 0'-3 1/2" 18'-2 9/32"
2' -1
2'-1"
2'-1"
2'-1" 2'-1"
2' -1
2' -1
P53A
THIRD FLOOR
SECOND FLOOR
GROUND FLOOR
BASEMENT
ROOF
GENERAL PLAN NOTES
1. REFERENCE CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, &
TELECOM, DRAWINGS FOR ADDITIONAL INFORMATION.
2. ALL DIMENSIONS ARE NOMINAL UNLESS NOTED OTHERWISE.
3. ALL CORRIDOR PARTITIONS ARE TO EXTEND TO THE UNDERSIDE OF THE FLOOR/ROOF STRUCTURE
ABOVE, SEAL PARTITIONS SOUND TIGHT.
4. PROVIDE BLOCKING IN PARTITIONS AS REQUIRED FOR INSTALLATION OF ALL WALL MOUNTED
CABINETRY, SHELVING, EQUIPMENT, HANDRAILS, AND ACCESSORIES.
5. CABINET MAKER SHALL PROVIDE ALL CUTOUTS, HOLES, ETC. FOR ELECTRICAL, PLUMBING, AND
MECHANICAL DEVICES AS REQUIRED. GENERAL CONTRACTOR TO COORDINATE.
6. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING ROOMS, SIGNS, DOORS, KEYS, EQUIPMENT, PANELS, ETC BY THE OWNER'S FINAL NUMBERING - NOT THE ARCHITECTURAL
NUMBERS.
7. ALL APARTMENTS TO COMPLY WITH "TYPE B" DWELLING UNITS ANSI-A117.1-2009, U.N.O.
PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O
PY
RI
GH
T
AL
LO
Y5
A
RC
H
IT
EC
TU
RE
CIVIL:
MEPF:
ARCHITECT:
STRUCTURAL:
ALLOY5
ARCHITECTURE
NOT FOR
CONSTRUCTION
As indicated
8/ 3/
:1
2:
P M
A1 .0
2026.08.03
ZH/JG
RG
22-0047
FLOOR PLAN - THIRD
FLOOR - NEW WORK
DUNMORE CARPET
FACTORY
RENOVATIONS
DUNMORE LOFTS @ 105 CORNER STREET
DUNMORE, PA 18512
GPI
SMITH MILLER
ASSOCIATES
designBLD
HOOFTY HOLDINGS
1 E BROAD STREET, BETHLEHEM, PA 18018
1/4" = 1'-0"
1 THIRD FLOOR PLAN
□□ KEYED PLAN NOTES
NO. NOTE
1 REPLACEMENT OVERHEAD ROLLER DOOR W/ EGRESS MAN DOOR, SEE EXTERIOR ELEVATIONS
2 CMU INFILL, REFER TO STRUC. DWG.'S FOR MORE INFO
3 EXISTING PIPE COLUMN TO REMAIN
4 NEW STOREFRONT SYSTEM REFER TO GLAZING ELEVATIONS
5 INFILL EXTERIOR WALL CONSTRUCTION. SEE STRUC. DWG'S FOR MORE INFO.
6 EXISTING COLUMN TO REMAIN, CONCEAL IN NEW WALL FRAMING
7 CLOSET SHELF W/ POLE
8 INFILL FLOOR W/ LIKE CONSTRUCTION. SEE STRUC. DWG.'S FOR MORE INFO
9 EXISTING WALL TO BE REFINISHED W/ 5/8" FIRE-RATED GYPSUM WALL BOARD EA. SIDE
NO. ISSUE DESCRIPTION DATE
1 EXTERIOR PACKAGE 2023.06.30
2 ISSUE FOR PERMIT 2025.12.23
THIRD FLOOR PLAN:
MILESTONE DATES:
1. Milestone dates are contractual requirements, liquidated damages enforceable and will be applied for non-compliance.
2. All Prime Contractor is responsible for coordination and individual activity scheduling within milestone schedule.
Project Milestone Schedule Alloy5 Dunmore Carpet Factory
Project Milestone Dates Award Date
Proposed Construction Start Date
Estimated Completion Date
October 27, 2026
November 30, 2026
November 30, 2027
CONTRACTOR BID SUBMISSIONS:
• Bid Form - Proposal
• Bid Bond
• Non-Collusion Affidavit
• Agreement of Surety
• Letter of Insurer
• Contractor Qualification Statement
• Insurance Requirements: Worker’s Compensation, General Liability, Umbrella/
Excess
• Builders Risk Insurance by Owner
BID FORM:
GENERAL CONSTRUCTION BID FORM
SECTION 00.4116 - 1
BID FOR HOOFTY HOLDINGS, LLC
DUNMORE CARPET FACTORY RENOVATIONS AND SITE WORK
GENERAL CONTRACTOR
Submitted To: Submitted By:
Hoofty Holdings, LLC _______________________________________________
1 E. Broad Street, Suite 310 _______________________________________________
Bethlehem, PA 18018 _______________________________________________
THIS BID FORM SHALL NOT BE ALTERED IN ANY MANNER. ANY ALTERED BID FORMS SHALL BE
CONSIDERED NON-RESPONSIVE AND WILL BE REJECTED.
1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an Agreement with
OWNER in the form included in the Contract Documents to complete all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the Contract Documents.
2. BIDDER accepts all of the terms and conditions of the Instructions to Bidders, including without limitation, those dealing with disposition of Bid Security. This Bid will remain open for SIXTY (60) days after the day of Bid Opening. BIDDER will sign the Agreement and submit the Contract Security and other documents required by the Contract Documents within ten (10) days after the date of OWNER'S Notice of Award.
3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that:
a. BIDDER has examined copies of all Contract Documents, Advertisement to Bid, and the Instructions to
Bidders. Additionally, the BIDDER hereby acknowledges receipt of the following addenda:
Addendum No. _____; _____; _____; _____; _____; _____; _____; _____.
b. BIDDER has examined the site and locality where the Work is to be performed, the legal requirements
(federal, state, and local laws, ordinances, rules and regulations) and the conditions affecting cost, progress or performance of the Work and has made such independent investigations as BIDDER deems necessary. Failure to visit the Project site shall be no reason for future request for additional compensation or costs of any kind.
c. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, form, or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other BIDDER to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for himself any advantage over any other BIDDER or OWNER.
HOOFTY HOLDINGS, LLC GENERAL CONSTRUCTION BID FORM
DUNMORE CARPET FACTORY RENOVATIONS AND SITE WORK SECTION – 00.4116
GENERAL CONSTRUCTION BID FORM
SECTION 00.4116 - 2
4. The BIDDER agrees to perform the various items of Work for the following Lump Sum Price:
BASE BID PROPOSAL: Base Bid Price (INCLUDING Project Allowances) for all Work indicated on the Contract Documents.
_____________________________________________________________________________Dollars.
(Words)
(Figures)
5. ALTERNATES: The BIDDER agrees that the OWNER shall have the right to accept or reject any or all of the following alternates, which acceptance or rejection shall enter into the determination of the lowest Bidder. The BIDDER agrees that the Contract Time shall not be increased on account of the acceptance of any one or combination of alternates unless specifically stated in such alternate description(s). The BIDDER agrees that the OWNER shall have the right to accept an alternate that is higher in price than the Base Bid or other alternate.
Alternates’ prices shall include the cost of furnishing and installing all materials, labor, tools, equipment and other incidentals necessary to complete the Work in accordance with the design intent, manufacturers’ recommendations, building codes, authorities having jurisdiction, and the Construction Documents. Do not adjust material allowances under any alternate bid items. Indicate whether alternate cost is an add or deduct when a choice is provided.
ALTERNATE No. 1: The Bidder shall state the cost to be DELETED from the Base Bid amount for deleting the scope of work related to the first floor small Offices and Kitchenettes, the work for the ceilings, lights and sprinklers shall not be deleted.
DEDUCT_______________________________________________________________________Dollars.
ALTERNATE No. 2: The Bidder shall state the cost to be ADDED to the Base Bid amount for all Work necessary to repair, recoat and paint all basement walls, and paint ceilings in the basement.
ADD _______________________________________________________________________Dollars.
ALTERNATE No. 3: The Bidder shall state the cost to be ADDED to the Base Bid amount for all Work necessary to provide all preparation work and installation of new stucco finish to both end walls of the building.
BID FORM:
SECTION 00.4116 - 3
ADD __________________________________________________________________________Dollars.
ALTERNATE No. 4: The Bidder shall state the cost to be DELETED from the Base Bid amount for deleting all fit out of the first floor.
DEDUCT______________________________________________________________________Dollars.
6. UNIT PRICES: OWNER shall make adjustments to the Contract based on the actual field conditions encountered using the Unit Prices included with the Bid. The BIDDER agrees that OWNER reserves the right to reject or otherwise not agree to use the Unit Prices submitted, if in the OWNER’s opinion, the nature or quantity of the Work encountered is such that the Unit Price cost no longer applies to the Work. The OWNER also reserves the right to solicit independent proposals as required by the Department of Education guidelines, under a separate contract, to perform the services required. The responsiveness of the Bid, and if the Bid is responsible, may be determined by the OWNER on the basis of the Unit Prices proposed by the BIDDER. Unit Prices shall be consistent with verifiable average costs for the Work to be performed. BIDDERS agree that a Bid may be rejected if the Unit Prices submitted are inconsistent with the average cost. Under NO circumstances will BIDDER perform Unit Price Work without prior written authorization from OWNER. Unit Prices shall include costs for furnishing and installing all materials, labor, tools, equipment, and other incidental costs necessary to complete the specified operation. Unit Prices will be used to ADD/DEDUCT to the Contract cost where appropriate. The BIDDER agrees that in the event of any inconsistency between a Unit Price and the extension of a Unit Price in a Material Allowance, the Unit Price shall control, the Material Allowance extension shall be recalculated.
UNIT PRICE 1: BIDDER agrees to excavate and legally dispose of trench rock encountered and replace with compacted 2A modified natural stone. All rock must be identified and measured in situ by the Owner’s Representative prior to and during removal. Rock shall be removed by hydraulic or mechanical methods only; no blasting will be permitted.
The contract Unit Price per cubic yard for trench rock excavation by hydraulic or mechanical methods up to 100 cubic yards in one defined contiguous area is:
$__________ per cubic yard
UNIT PRICE 2: BIDDER agrees to excavate, remove, and legally dispose off-site, unstable materials encountered and replace with compacted 2A modified natural stone. All removal must be identified and measured in situ by the Owner’s Representative prior to and during removal.
BID FORM:
SECTION 00.4116 - 7
Quantity Allowance 12D: 100 hours of unit price 12D Work.
Quantity Allowance 12E: 100 hours of unit price 12E Work.
TOTAL ALL
ALLOWANCES)
TOTAL BASE BID (BASE BID PLUS ALL ALLOWANCES) $_______________
8. BIDDER accepts the provisions of the Agreement as to the liquidated damages in the event of failure to complete the Work by the dates and milestones defined in the Contract Documents.
9. In submitting this Bid, it is understood that the OWNER reserves the unrestricted right to reject any and all bids, or to waive any informalities or technicalities in said Bids.
10. BIDDER understands that OWNER reserves the right to consider Alternates Prices in determining the low bidder.
All Alternate Prices shall include costs for furnishing and installing all materials, labor, tools equipment, and other incidentals necessary to complete the specified operation in accordance with the Project Specifications and the manufacturer’s recommendations.
11. Accompanying this Bid is Security in the form of _________________________________ in the amount of ten percent (10%) of the total of the Base Bid and all possible add alternates.
SECTION 00.4116 - 6
UNIT PRICE 12D: BIDDER agrees to provide a journeyman electrician.
The fully burdened contract Unit Price per hour to provide a journeyman electrician is: $ _____________per hour
UNIT PRICE 12E: BIDDER agrees to provide a journeyman plumber.
The fully burdened contract Unit Price per hour to provide a journeyman plumber is: $____________per hour
7. PROJECT QUANTITY ALLOWANCES:
The Owner’s Representative must field measure and approve all allowance work prior to the Contractor performing the Work. Should the allowance amount be exceeded, the Contractor will be paid by Change Order addition at the Unit Price established for the related Work. Similarly, should the allowance used be less than the allowance amount, the Contractor will credit the OWNER for the unused quantity in accordance with the related Unit Price by a Change Order credit.
BIDDER agrees to include in the Base Bid Price, in addition to the Work shown on the Construction Documents the following:
Quantity Allowance 1: 50 cubic yards of unit price 1 Work.
Quantity Allowance 2: 50 cubic yards of unit price 2 Work.
Quantity Allowance 3A: 500 square feet of unit price 3A Work.
Quantity Allowance 3B: 800 Linear feet of unit price 3B Work.
Quantity Allowance 4: 200 square feet of unit price 4 Work.
Quantity Allowance 5: 5 each of unit price 5 Work.
Quantity Allowance 6: 200 pounds of unit price 6 Work.
Quantity Allowance 7: 500 square feet of unit price 7 Work.
Quantity Allowance 8: 2 switches of unit price 8 Work.
Quantity Allowance 9: 20 outlets of unit price 9 Work.
Quantity Allowance 10: 10 devices of unit price 10 Work.
Quantity Allowance 11: 2 each of unit price 11 Work.
Quantity Allowance 12A: 100 hours of unit price 12A Work.
Quantity Allowance 12B: 100 hours of unit price 12B Work.
Quantity Allowance 12C: 100 hours of unit price 12C Work.
PROJECT ALLOWANCES:
PROJECT REQUIREMENTS:
Commissioning & TAB
• General Commissioning Requirements, refer to Section 019113
• Contractors are responsible to assist and cooperate with the commissioning requirements and training of all the system they install.
IMPORTANT PROJECT INFORMATION:
Progress Meetings:
• The Project Manager will conduct progress meetings every two weeks.
• A superintendant’s progress meeting is required to be conducted weekly.
• All written communication will occur through email.
Permits/Fees:
• The Building Permit is being paid by the Owner. Contractors need to pay for and ob-tain contractor licenses, business privelage taxes and other fees from the Borough.
IMPORTANT PROJECT INFORMATION (cont.):
Temporary Facilities & Controls:
• See Section 015000 - Temporary Facilities and Controls
• Temporary electric service by EC.
• Trailers by GC for PM and all contractors provide their own trailer. EC to provide power and data to trailers.
• All utility costs for metered power and water will be paid by the Owner as outlined in the specifications.
Project Scheduling & Coordination:
• General Contractor is the scheduling coordinator and lead project coordinator.
• HVAC Contractor is the subordinate scheduling coordinator and is responsible for coordination between himself and the PC and EC.
• HVAC Contractor is responsible for preparation of BIM coordination drawings be-tween the above noted primes (PC, EC, etc. are to provide their information to the
HVAC Contractor in the model electronically).
• Monthly updates of project schedule required.
• All project milestones must be net.
Construction Testing & Inspections:
• All on site construction testing to be performed by Owner’s separate testing agency, unless indicated otherwise in the specs. Contractors must coordinate and cooperate.
• Pressure testing of pipes, ductwork testing, hydraulic testing, etc. is by contractors.
All scheduling is the responsibility of the contractors.
• All onsite inspections will be coordinated by the respective contractor. The Owner will be billed directly for these costs.
Electrical inspections
• Owner will hire separate Testing, Adjusting, and Balancing Professional.
BUILDING CONDITIONS:
GROUND FLOOR
0'-0"
SECOND FLOOR
13'-1 3/8"
THIRD FLOOR
24'-6 1/2"
ROOF
44'-0"
RIDGE
56'-0"
ATTIC
36'-8 1/2"
LOW ROOF
17'-6"
D
A3.03
A
A3.00
C
A3.02
B B BBBBBBBBB B
B B BBBBBBBBB B
A A100.B 100.A
SF1
SF3SF2
NEW ALUMINUM PARAPET GRAVEL
STOP
NEW ASPHALT ROOF SHINGLES, ICE &
WATER SHIELD MIN. 4-0" FROM EAVES ON
FELT UNDERLAYMENT - TYP.
EXISTING BRICK JACK ARCHED WINDOW
HEADS TO BE REPAIRED WHERE
SHOWING SIGNS INCLUDING BUT NOT
LIMITED TO WATER DAMAGE, AGE
RELATED DECAY, CHIPPING, AND/OR
DISRUPTION. CONTRACTOR TO V.I.F.
NEW ALUM CLAD WOOD WINDOW
UNITS W/ LOW-E GLAZING - TYPICAL.
REFER TO WINDOW SCHEDULE AND
DETAILS
EXISTING EXTERIOR BRICK TO BE
REPOINTED AND REPAIRED. SEE
STRUCTURAL DRAWINGS FOR EXTENTS
OF BRICK REPAIR.
EXISTING BRICK CORBELING TO BE
REPAIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION.
CONTRACTOR TO V.I.F. SEE STRUC.
DWG'S FOR MORE INFO
EXISTING STONE SILLS TO BE REPAIRED
AS REQUIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION.
CONTRACTOR TO V.I.F.
EXISTING HEADER COURSED BRICK
ARCHED WINDOW HEADS TO BE
REPAIRED AS REQUIRED
NEW ALUM CLAD WOOD WINDOW
UNITS W/ LOW-E GLAZING - TYPICAL.
REFER TO WINDOW SCHEDULE AND
DETAILS
EXISTING STONE SILLS TO BE REPAIRED
WHERE SHOWING SIGNS INCLUDING BUT
NOT LIMITED TO WATER DAMAGE, AGE
RELATED DECAY, CHIPPING, AND/OR
DISRUPTION. CONTRACTOR TO V.I.F.
EXISTING WOOD CORNICE TO BE
REPAIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION.
CONTRACTOR TO V.I.F.
NEW ALUMINUM ENTRANCE DOOR AND
STOREFRONT W/ LOW-E GLAZING
REFER TO DOOR SCHEDULE
REPLACEMENT ALUMINUM ENTRANCE
DOOR AND STOREFRONT W/ LOW-E
GLAZING REFER TO DOOR SCHEDULE
TOOTHE IN NEW BRICK VENEER TO
EXISTING BELOW STOREFRONT AS
SELECTED BY ARCHITECT
TOOTHE IN NEW BRICK VENEER TO
EXISTING BELOW STOREFRONT AS
SELECTED BY ARCHITECT
TOOTHE IN NEW BRICK VENEER TO
EXISTING BELOW STOREFRONT AS
SELECTED BY ARCHITECT
TOOTHE IN NEW BRICK VENEER TO
EXISTING BELOW STOREFRONT AS
SELECTED BY ARCHITECT
REPLACEMENT ALUMINUM
STOREFRONT W/ LOW-E GLAZING
REFER TO DOOR SCHEDULE
REPLACEMENT ALUMINUM
STOREFRONT W/ LOW-E GLAZING
REFER TO DOOR SCHEDULE
REPLACEMENT ALUM CLAD WOOD
WINDOW UNITS W/ LOW-E GLAZING -
TYPICAL. REFER TO WINDOW
SCHEDULE AND DETAILS
EXISTING BRICK JACK ARCHED WINDOW
HEADS TO BE REPAIRED WHERE
SHOWING SIGNS INCLUDING BUT NOT
LIMITED TO WATER DAMAGE, AGE
RELATED DECAY, CHIPPING, AND/OR
DISRUPTION. CONTRACTOR TO V.I.F.
EXISTING WOOD CORNICE TO BE REPAIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION. CONTRACTOR TO V.I.F.
EXISTING EXTERIOR BRICK TO BE
REPOINTED AND REPAIRED. SEE
STRUCTURAL DRAWINGS FOR EXTENTS
OF BRICK REPAIR.
EXISTING EXTERIOR BRICK TO BE
REPOINTED AND REPAIRED. SEE
STRUCTURAL DRAWINGS FOR EXTENTS
OF BRICK REPAIR.
EXISTING ARCHED PARAPET TO BE
REPAIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION TP THE
EXTERIOR BRICK AND RUBBER ROOF
SYSTEM. REMOVE AND REPLACE METAL
COPING. CONTRACTOR TO V.I.F.
METER BOX
EXISTING STONE SILLS TO BE REPAIRED
WHERE SHOWING SIGNS INCLUDING
BUT NOT LIMITED TO WATER DAMAGE,
AGE RELATED DECAY, CHIPPING,
AND/OR DISRUPTION. CONTRACTOR TO
V.I.F.
SF2
11'-8" 11'-8"
A5.01
THIRD FLOOR
SECOND FLOOR
GROUND FLOOR
BASEMENT
ROOF
GENERAL NOTES - EXTERIOR ELEVATIONS
1. CLEAN ALL EXISTING BRICK, SILLS, AND CORNICES.
2. CLEAN, REPOINT, AND REPLACE EXISTING EXTERIOR BRICK.
3. TOOTH-IN NEW BRICK IN AREAS AS INDICATED ON STRUCTURAL DRAWINGS. COLOR, FINISH AND
MORTAR TO MATCH EXISTING BRICK.
4. REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR MORE INFORMATION ON BRICK REPAIRS PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O
PY
RI
GH
T
AL
LO
Y5
A
RC
H
IT
EC
TU
RE
CIVIL:
MEPF:
ARCHITECT:
STRUCTURAL:
ALLOY5
ARCHITECTURE
NOT FOR
CONSTRUCTION
As indicated
8/ 3/
:1
2:
P M
A2 .0
2026.08.03
ZH/JG
RG
22-0047
EXTERIOR ELEVATION
- SOUTH
DUNMORE CARPET
FACTORY
RENOVATIONS
DUNMORE LOFTS @ 105 CORNER STREET
DUNMORE, PA 18512
GPI
SMITH MILLER
ASSOCIATES
designBLD
HOOFTY HOLDINGS
1 E BROAD STREET, BETHLEHEM, PA 18018
1/4" = 1'-0"
1 SOUTH ELEVATION
NO. ISSUE DESCRIPTION DATE
1 EXTERIOR PACKAGE 2023.06.30
2 ISSUE FOR PERMIT 2025.12.23
ELEVATIONS:
GROUND FLOOR
0'-0"
SECOND FLOOR
13'-1 3/8"
THIRD FLOOR
24'-6 1/2"
ROOF
44'-0"
RIDGE
56'-0"
ATTIC
36'-8 1/2"
LOW ROOF
17'-6"
B E
A3.04
B
A3.01
CC
NEW ALUMINUM PARAPET GRAVEL
STOP
NEW ASPHALT ROOF SHINGLES, ICE &
WATER SHIELD MIN. 4-0" FROM EAVES ON
FELT UNDERLAYMENT - TYP.
EXISTING EXTERIOR BRICK TO BE
REPOINTED AND REPAIRED. SEE
STRUCTURAL DRAWINGS FOR EXTENTS
OF BRICK REPAIR.
EXISTING BRICK CORBELING TO BE
REPAIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION.
CONTRACTOR TO V.I.F. SEE STRUC.
DWG'S FOR MORE INFO
EXISTING HEADER COURSED BRICK
ARCHED WINDOW HEADS TO BE
REPAIRED AS REQUIRED
EXISTING STONE SILLS TO BE REPAIRED
AS REQUIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION.
CONTRACTOR TO V.I.F.
NEW SIDING - FIBER CEMENT PLANK OR
APPROVED EQUAL
NEW ALUM CLAD WOOD WINDOW UNITS W/
LOW-E GLAZING - TYPICAL. REFER TO
WINDOW SCHEDULE AND DETAILS
EXISTING EXTERIOR BRICK TO BE
REPOINTED AND REPAIRED. SEE
STRUCTURAL DRAWINGS FOR EXTENTS
OF BRICK REPAIR.
EXISTING EXTERIOR BRICK TO BE
REPOINTED AND REPAIRED. SEE
STRUCTURAL DRAWINGS FOR EXTENTS
OF BRICK REPAIR.
EXISTING ARCHED PARAPET TO BE
REPAIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION TP THE
EXTERIOR BRICK AND RUBBER ROOF
SYSTEM. REMOVE AND REPLACE METAL
COPING. CONTRACTOR TO V.I.F.
NEW ALUMINUM PARAPET GRAVEL
STOP
EXISTING STONE FOUNDATION TO BE REPARIED
AT THIS LOCATION, SEE STRUC. DWG.'S FOR
MORE INFO
EXISTING CEMENT PARGE TO
BE REMOVED. NEW BRICK TO
BE TOOTHED IN.
EXISTING CEMENT PARGE TO
BE REMOVED. NEW BRICK TO
BE TOOTHED IN.
EXISTING BRICK CORBELING TO BE
REPAIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION.
CONTRACTOR TO V.I.F. SEE STRUC.
DWG'S FOR MORE INFO
EXISTING BRICK CORBELING TO BE
REPAIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION.
CONTRACTOR TO V.I.F. SEE STRUC.
DWG'S FOR MORE INFO
EXISTING BRICK CORBELING TO BE
REPAIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION.
CONTRACTOR TO V.I.F. SEE STRUC.
DWG'S FOR MORE INFO
NEW ATTIC GABLE VENTS
NEW WOOD FASCIA - COMPOSITE TRIM
RE-FLASH EXISTING ROOF VENTILATORS
WHERE HOWING SIGNS INCLUDING BUT
NOT LIMITED TO WATER DAMAGE, AGE
RELATED DECAY, CHIPPING, AND/OR
DISRUPTION. CONTRACTOR TO V.I.F
RELOCATED GAS METER
EXTERIOR SIGNAGE ON STEEL SIGN
BACKING. SEE SIGNAGE SCHEDULE
EXTERIOR SIGNAGE ON STEEL SIGN
BACKING. SEE SIGNAGE SCHEDULE
THIRD FLOOR
SECOND FLOOR
GROUND FLOOR
BASEMENT
ROOF
GENERAL NOTES - EXTERIOR ELEVATIONS
1. CLEAN ALL EXISTING BRICK, SILLS, AND CORNICES.
2. CLEAN, REPOINT, AND REPLACE EXISTING EXTERIOR BRICK.
3. TOOTH-IN NEW BRICK IN AREAS AS INDICATED ON STRUCTURAL DRAWINGS. COLOR, FINISH AND
MORTAR TO MATCH EXISTING BRICK.
4. REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR MORE INFORMATION ON BRICK REPAIRS PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O
PY
RI
GH
T
AL
LO
Y5
A
RC
H
IT
EC
TU
RE
CIVIL:
MEPF:
ARCHITECT:
STRUCTURAL:
ALLOY5
ARCHITECTURE
NOT FOR
CONSTRUCTION
As indicated
8/ 3/
:1
2:
P M
A2 .0
2026.08.03
ZH/JG
RG
22-0047
EXTERIOR ELEVATION
- WEST
DUNMORE CARPET
FACTORY
RENOVATIONS
DUNMORE LOFTS @ 105 CORNER STREET
DUNMORE, PA 18512
GPI
SMITH MILLER
ASSOCIATES
designBLD
HOOFTY HOLDINGS
1 E BROAD STREET, BETHLEHEM, PA 18018
1/4" = 1'-0"
1 WEST ELEVATION
NO. ISSUE DESCRIPTION DATE
1 EXTERIOR PACKAGE 2023.06.30
GROUND FLOOR
0'-0"
SECOND FLOOR
13'-1 3/8"
BASEMENT
-10'-0"
THIRD FLOOR
24'-6 1/2"
ROOF
44'-0"
RIDGE
56'-0"
ATTIC
36'-8 1/2"
LOW ROOF
17'-6"
D
A3.03
A
A3.00
C
A3.02
BBB B B B B B B B
C C
BBB B B B B B
B B B B B B B
B B
B B
B B
NEW ALUMINUM PARAPET GRAVEL
STOP
NEW ASPHALT ROOF SHINGLES, ICE &
WATER SHIELD MIN. 4-0" FROM EAVES ON
FELT UNDERLAYMENT - TYP.
EXISTING HEADER COURSED BRICK
ARCHED WINDOW HEADS TO BE
REPAIRED AS REQUIRED
NEW ALUM CLAD WOOD WINDOW
UNITS W/ LOW-E GLAZING - TYPICAL.
REFER TO WINDOW SCHEDULE AND
DETAILS
EXISTING EXTERIOR BRICK TO BE
REPOINTED AND REPAIRED. SEE
STRUCTURAL DRAWINGS FOR EXTENTS
OF BRICK REPAIR.
EXISTING BRICK CORBELING TO BE
REPAIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION.
CONTRACTOR TO V.I.F. SEE STRUC.
DWG'S FOR MORE INFO
EXISTING STONE SILLS TO BE REPAIRED
AS REQUIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION.
CONTRACTOR TO V.I.F.
EXISTING HEADER COURSED BRICK
ARCHED WINDOW HEADS TO BE
REPAIRED AS REQUIRED
NEW ALUM CLAD WOOD WINDOW
UNITS W/ LOW-E GLAZING - TYPICAL.
REFER TO WINDOW SCHEDULE AND
DETAILS
EXISTING STONE SILLS TO BE REPAIRED
AS REQUIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION.
CONTRACTOR TO V.I.F.
CMU INFILL AT EXISTING DOOR OPENING,
SEAL BETWEEN CMU AND EXSITING BRICK,
SEE STRUC. DWG.'S FOR MORE INFO
EXISTING EXTERIOR BRICK TO BE
REPOINTED AND REPAIRED. SEE
STRUCTURAL DRAWINGS FOR EXTENTS
OF BRICK REPAIR.
EXISTING EXTERIOR BRICK TO BE
REPOINTED AND REPAIRED. SEE
STRUCTURAL DRAWINGS FOR EXTENTS
OF BRICK REPAIR.
EXISTING CHAIN LINK FENCE
EXISTING EXTERIOR BRICK TO BE
REPOINTED AND REPAIRED. SEE
STRUCTURAL DRAWINGS FOR EXTENTS
OF BRICK REPAIR.
NEW OVERHEAD ROLLER ACCESS DOOR TO
BASEMENT W/ EGRESS MAN DOOR
EXISTING STONE FOUNDATION TO BE
REPARIED AT THIS LOCATION, SEE
STRUC. DWG.'S FOR MORE INFO
EXISTING STONE FOUNDATION TO BE
REPARIED AT THIS LOCATION, SEE
STRUC. DWG.'S FOR MORE INFO
EXIST. STEEL LINTEL
THIRD FLOOR
SECOND FLOOR
GROUND FLOOR
BASEMENT
ROOF
GENERAL NOTES - EXTERIOR ELEVATIONS
1. CLEAN ALL EXISTING BRICK, SILLS, AND CORNICES.
2. CLEAN, REPOINT, AND REPLACE EXISTING EXTERIOR BRICK.
3. TOOTH-IN NEW BRICK IN AREAS AS INDICATED ON STRUCTURAL DRAWINGS. COLOR, FINISH AND
MORTAR TO MATCH EXISTING BRICK.
4. REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR MORE INFORMATION ON BRICK REPAIRS PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O
PY
RI
GH
T
AL
LO
Y5
A
RC
H
IT
EC
TU
RE
CIVIL:
MEPF:
ARCHITECT:
STRUCTURAL:
ALLOY5
ARCHITECTURE
NOT FOR
CONSTRUCTION
As indicated
8/ 3/
:1
2:
P M
A2 .0
2026.08.03
ZH/JG
RG
22-0047
EXTERIOR ELEVATION
- NORTH
DUNMORE CARPET
FACTORY
RENOVATIONS
DUNMORE LOFTS @ 105 CORNER STREET
DUNMORE, PA 18512
GPI
SMITH MILLER
ASSOCIATES
designBLD
HOOFTY HOLDINGS
1 E BROAD STREET, BETHLEHEM, PA 18018
1/4" = 1'-0"
1 NORTH ELEVATION
NO. ISSUE DESCRIPTION DATE
1 EXTERIOR PACKAGE 2023.06.30
GROUND FLOOR
0'-0"
SECOND FLOOR
13'-1 3/8"
THIRD FLOOR
24'-6 1/2"
ROOF
44'-0"
RIDGE
56'-0"
ATTIC
36'-8 1/2"
LOW ROOF
17'-6"
A B
E
A3.04
B
A3.01
C C
C
NEW ALUMINUM PARAPET GRAVEL
STOP
NEW ASPHALT ROOF SHINGLES, ICE &
WATER SHIELD MIN. 4-0" FROM EAVES ON
FELT UNDERLAYMENT - TYP.
NEW SIDING - FIBER CEMENT PLANK OR
APPROVED EQUAL
EXISTING EXTERIOR BRICK TO BE
REPOINTED AND REPAIRED. SEE
STRUCTURAL DRAWINGS FOR EXTENTS
OF BRICK REPAIR.
EXISTING ARCHED PARAPET TO BE
REPAIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION TP THE
EXTERIOR BRICK AND RUBBER ROOF
SYSTEM. REMOVE AND REPLACE METAL
COPING. CONTRACTOR TO V.I.F.
EXISTING BRICK CORBELING TO BE
REPAIRED WHERE SHOWING SIGNS
INCLUDING BUT NOT LIMITED TO WATER
DAMAGE, AGE RELATED DECAY,
CHIPPING, AND/OR DISRUPTION.
CONTRACTOR TO V.I.F. SEE STRUC.
DWG'S FOR MORE INFO
NEW ATTIC GABLE VENTS
NEW COMPOSITE TRIM FASCIA
RE-FLASH EXISTING ROOF VENTILATORS
WHERE SHOWING SIGNS INCLUDING
BUT NOT LIMITED TO WATER DAMAGE,
AGE RELATED DECAY, CHIPPING,
AND/OR DISRUPTION. CONTRACTOR TO
V.I.F
EXISTING HEADER COURSED BRICK
ARCHED WINDOW HEADS TO BE
REPAIRED AS REQUIRED
EXISTING STONE SILLS TO BE REPAIRED
AS REQUIRED - TYPICAL
NEW ALUM CLAD WOOD WINDOW UNITS W/ LOW-E GLAZING -
TYPICAL. REFER TO WINDOW SCHEDULE AND DETAILS
EXISTING EXTERIOR BRICK TO BE
REPOINTED AND REPAIRED. SEE
STRUCTURAL DRAWINGS FOR EXTENTS
OF BRICK REPAIR.
NEW ALUMINUM PARAPET GRAVEL
STOP
EXISTING STONE FOUNDATION TO BE
REPARIED AT THIS LOCATION, SEE
STRUC. DWG.'S FOR MORE INFO
EXISTING BRICK CORBELING TO BE
REPAIRED WHERE SHOWING SIGNS OF
DAMAGE OR WEAR. SEE STRUC. DWG'S
FOR MORE INFO
INFILL OPENING W/ NEW BRICK
NEW ALUM CLAD WOOD WINDOW
UNITS W/ LOW-E GLAZING - TYPICAL.
REFER TO WINDOW SCHEDULE AND
DETAILS
NEW ALUMINUM STOREFRONT SYSTEM
W/ LOW-E GLAZING
SF4
THIRD FLOOR
SECOND FLOOR
GROUND FLOOR
BASEMENT
ROOF
GENERAL NOTES - EXTERIOR ELEVATIONS
1. CLEAN ALL EXISTING BRICK, SILLS, AND CORNICES.
2. CLEAN, REPOINT, AND REPLACE EXISTING EXTERIOR BRICK.
3. TOOTH-IN NEW BRICK IN AREAS AS INDICATED ON STRUCTURAL DRAWINGS. COLOR, FINISH AND
MORTAR TO MATCH EXISTING BRICK.
4. REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR MORE INFORMATION ON BRICK REPAIRS PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O
PY
RI
GH
T
AL
LO
Y5
A
RC
H
IT
EC
TU
RE
CIVIL:
MEPF:
ARCHITECT:
STRUCTURAL:
ALLOY5
ARCHITECTURE
NOT FOR
CONSTRUCTION
As indicated
8/ 3/
:1
2:
P M
A2 .0
2026.08.03
ZH/JG
RG
22-0047
EXTERIOR ELEVATION
- EAST
DUNMORE CARPET
FACTORY
RENOVATIONS
DUNMORE LOFTS @ 105 CORNER STREET
DUNMORE, PA 18512
GPI
SMITH MILLER
ASSOCIATES
designBLD
HOOFTY HOLDINGS
1 E BROAD STREET, BETHLEHEM, PA 18018
1/4" = 1'-0"
1 EAST ELEVATION
NO. ISSUE DESCRIPTION DATE
1 EXTERIOR PACKAGE 2023.06.30
• Construction Waste Management
All Primes are to comply with procedures to remove waste or demo materials from site for recycling or disposal.
• Prevailing Wage
• This Project is the recipient of the Redevelopment Assistance Capital Program
(RACP) Grant as administered by the Commonwealth of Pennsylvania Office of the
Budget (OB). Bidders are notified that Projects funded by state funds are subject to various qualifications, restrictions, and special requirements.
Please see Specification Section 013300 - Submittal Procedures for steel submit-tal requirements.
IMPORTANT PROJECT INFORMATION
REMINDERS:
QUESTIONS/COMMENTS FROM ATTENDEES?