Summary of Structural Drawings for Voter Machine Warehouse Elevator Addition
This document comprises structural general notes, typical details, and framing sections prepared by NORR (architecture and engineering firm) for the County of Delaware Department of Public Works in Chester, Pennsylvania. The project involves the installation of a service elevator in an existing two-story commercial warehouse building at 403 East 24th Street. The work includes demolition of portions of existing floors and roof decking, excavation and construction of a new elevator pit with a 12-inch concrete mat slab and concrete pit walls, construction of 8-inch concrete masonry unit (CMU) walls forming the elevator shaft, installation of new floor and roof framing systems, and coordination with elevator manufacturer specifications. The structural scope encompasses foundation work with underpinning of existing wall footings in 3-foot-wide sections spaced 12 feet apart, concrete slab-on-grade construction with vapor barriers and stone fill, and support of new steel angles and masonry at second floor and roof levels. The drawings were issued for bidding on March 4, 2026, with a plan review revision dated April 28, 2026, and reissued for bid on the same date.
The structural design conforms to IBC 2021 (ASCE 7-16) standards with a building code risk category II classification. All concrete work specifies minimum compressive strengths ranging from 3,500 to 5,000 PSI depending on location and exposure conditions, with reinforcement in accordance with ASTM A615 Grade 60 deformed bars. Masonry construction requires normal-weight concrete masonry units with minimum 3,250 PSI net area compressive strength and Type S mortar, with grout achieving minimum 3,000 PSI at 28 days. Steel framing utilizes ASTM A992 W-shapes at 50 KSI yield strength and A325 high-strength bolts. Special inspections are required for structural steel welding, bolting, cast-in-place concrete, masonry construction, and soil and foundation work per IBC Chapter 17 requirements. The contractor bears sole responsibility for temporary bracing, shoring, excavation support systems, underpinning design and execution, site safety compliance, and protection of existing structures and utilities. Shop drawings for structural steel, formwork, concrete mix designs, and delegated design elements (shoring systems, bracing, and concrete formwork) must be submitted and sealed by registered professional engineers for approval prior to fabrication and construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. PROJECT REFERENCES:
1. CODE: WORK SHALL BE EXECUTED IN FULL COMPLIANCE WITH THE APPLICABLE
PROVISIONS OF ALL LAWS, BY-LAWS, STATUTES, ORDINANCES, CODES, RULES,
REGULATIONS, AND LAWFUL ORDERS OF PUBLIC AUTHORIIES BEARING ON THE
PERFORMANCE AND EXECUTION OF THE WORK.
2. PROJECT SPECIFICATIONS: NOTES AND SPECIFICATIONS GIVEN ON THE
STRUCTURAL DRAWINGS ARE EXCERPTS FROM THE RELATING PROJECT
SPECIFICATIONS. THEY ARE NEITHER COMPLETE NOR DO THEY REPLACE THE
CONTRACT SPECIFICATIONS.
3. MATERIAL STANDARDS: REFERENCED STANDARDS OR PUBLICATIONS SHALL
PERTAIN TO MOST CURRENT DATA, STANDARD OR PUBLICATION..
B. TEMPORARY BRACING, SHORING AND METHODS: CONTRACTOR REPONSIBLE FOR THE
DESIGN, ADEQUACY, AND SAFETY OF SHORING, BRACING, OTHER TEMPORARY
SUPPORTS, AND METHODS OF CONSTRUCTION.
1. STABILITY: THE CONTRACTOR SHALL INSURE THE STABILITY OF ALL ELEMENTS
INCLUDING, BUT NOT LIMITED TO EXCAVATION, FLOORS, ROOFS, WALLS,
FOUNDATIONS, AND ADJACENT PROPERTY AS PROJECT CONDITIONS REQUIRE.
THE STRUCTURAL ENGINEER ASSUMES NO RESPONSIBILITY FOR THE STRUCTURE
DURING THE ENTIRE CONSTRUCTION PERIOD. BRACE BASEMENT/PIT WALLS UNTIL
SUPPORTING FLOORS ARE PLACED AND WALL/FLOOR HAS REACHED DESIGN
STRENGTH. BACKFILL BOTH SIDES OF WALLS SIMULTANEOUSLY
2. LOADING: THE BUILDING IS DESIGNED ONLY FOR PERMANENT LOADS APPLIED TO
THE STRUCTURE IN ITS FINAL CONFIGURATION. DO NOT PLACE MATERIAL OR
EQUIPMENT ON FLOORS OR FLOORS IN EXCESS OF THE INDICATED DESIGN LIVE
LOADS, AVOID IMPACT LOADS.
3. SURCHARGE: IN NO CASE SHALL HEAVY EQUIPMENT BE PERMITTED CLOSER THAN
8'-0" FROM ANY FOUNDATION/BASEMENT WALL. IF THE CONTRACTOR DEEMS IT
NECESSARY TO OPERATE SUCH EQUIPMENT CLOSER THAN 8'-0", THE CONTRACTOR
SHALL BE SOLELY RESPONSIBLE AND, AT HIS OWN EXPENSE, PROVIDE ADEQUATE
SUPPORTS OR WALL BRACES TO WITHSTAND THE ADDITIONAL LOADS
SUPERIMPOSED FROM SUCH EQUIPMENT.
4. SITE SAFETY: THE CONTRACTOR SHALL BE SOLEY RESPONSIBLE FOR MAINTAINING
CONDITIONS OF PUBLIC AND WORKER SAFETY DURING EXECUTION OF THE WORK.
THIS SHALL INCLUDE COMPLIANCE WITH ALL OSHA, STATE AND LOCAL
REGULATIONS/LAWS AS WELL AS PREPARING AND FILING A SITE SAFETY PLAN OR
PROVIDING OTHER WRITTEN SAFETY ASSURANCES AS REQUIRED. ALL
CONSTRUCTION METHODS SHALL COMPLY WITH THE REQUIREMENTS OF CHAPTER
33 OF THE IBC, "SAFEGUARDS DURING CONSTRUCTION".
5. DAMAGE: CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY
MEASURES TO PROTECT THE PREMISES INCLUDING EXISTING FACILITIES,
STRUCTURES, AND UTILITY LINES FROM ANY DAMAGE AND REPAIR ALL DAMAGE
CAUSED BY THE CONTRACTOR WITH NEW MATERIALS TO MATCH EXISTING TO THE
SATISFACTION OF THE OWNER, ARCHITECT AND/OR ENGINEER.
C. REVIEW AND COORDINATION:
1. EXISTING CONDITIONS, DIMENSIONS, AND ACCESSIBILITY SHALL BE VERIFIED BY
ALL CONSTRUCTION TRADES IN FIELD, PRIOR TO SHOP DRAWING PREPARATIONS
AND PROCEEDING WITH THE WORK. IF EXISTING CONDITIONS DO NOT PERMIT
EXECUTION OF THE WORK IN ACCORDANCE WITH THE SHOWN DETAILS, THE
CONTRACTOR MUST SUBMIT A SKETCH WITH PROPOSED MODIFICATION.
APPROVAL MUST BE GRANTED BY THE ENGINEER PRIOR TO START OF WORK.
2. CONSTRUCTION DOCUMENTS: THE CONTRACTOR SHALL COORDINATE
STRUCTURAL PLANS, DETAILS AND DIMENSIONS WITH ALL OTHER CONSTRUCTION
DOCUMENTS BEFORE PROCEEDING WITH THE WORK. DISCREPANCIES WITHIN OR
BETWEEN OTHER CONSTRUCTION DOCUMENTS SHALL BE NOTIFIED TO THE
ENGINEER AND ARCHITECT PRIOR TO BID AND EXECUTION OF THE WORK.
• MATERIAL STRENGTHS OR QUANTITIES: IF DISCREPANCIES OCCUR REGARDING
MATERIAL STRENGTHS OR QUANTITIES, HIGHER STRENGTH, AND GREATER
QUANTITY SHALL BE USED.
• DIMENSIONS AND ELEVATIONS SHOWN ON STRUCTURAL DRAWINGS ARE
GENERATED BY OTHER DISCIPLINES, WITH THE EXCEPTION OF DIMENSIONS OF
STRUCTURAL MEMBERS. ANY DIMENSIONS OR ELEVATIONS OMITTED OR NOT
SHOWN ON THE STRUCTURAL DRAWINGS SHOULD BE OBTAINED FROM THE
OTHER TRADE CONSTRUCTION DOCUMENTS.
3. INTENT: ALL DETAILS, SECTIONS, AND NOTES ARE INTEDED TO BE TYPICAL AND
SHALL BE CONSTRUED TO APPLY TO SIMILAR CONDITIONS ELSEWHERE.
4. BID: UNLESS DRAWING IS PART OF THE FULL SET OF DOCUMENTS LABELED
"ISSUED FOR BID," DO NOT CONSIDER IT AS THE BASIS FOR A BID. ALL ESTIMATES
BASED ON OTHER DRAWINGS ARE USED AT THE ESTIMATOR'S SOLE RISK.
5. CHANGES REQUESTED BY THE CONTRACTOR WILL BE DONE AT NO COST TO THE
OWNER. APPROVAL OF CONTRACTOR REQUESTED CHANGES IN NO WAY STATES
OR IMPLIES APPROVAL OF A CHANGE IN SCOPE OR CHANGE IN CONTRACT COST.
THE CONTRACTOR SHALL MAKE NO DEVIATION FROM THE CONTRACT DOCUMENTS
WITHOUT THE PRIOR WRITTEN APPROVAL OF THE ENGINEER OF RECORD.
6. ERRORS: COSTS OF INVESTIGATION AND/OR REDESIGN DUE TO CONTRACTOR
ERRORS WILL BE AT THE CONTRACTORS EXPENSE.
D. SUBMITTALS:
1. REVIEW SCHEDULE: SUBMIT SHOP DRAWINGS FOR REVIEW AT LEAST 14 DAYS (10
WORKING DAYS) BEFORE RETURNED SUBMITTALS WILL BE NEEDED. ANY REVIEW
THAT IS REQUIRED MORE QUICKLY WILL BE AT THE CONTRACTORS EXPENSE.
2. COMPLETENESS: A CONTRACTOR'S STAMP CERTIFYING THAT THEY HAVE VERIFIED
ALL FIELD MEASUREMENTS, CONSTRUCTION CRITERIA, MATERIALS AND SIMILAR
DATA AND HAVE CHECKED EACH DRAWING FOR COMPLETENESS, COORDINATION
AND COMPLIANCE WITH THE CONTRACT DOCUMENTS MUST BE PRESENT ON ALL
SUBMITTALS FOR REVIEW BY THE ENGINEER OF RECORD. IF REVIEWS OF
INCOMPLETE SHOP DRAWINGS/SUBMITTALS ARE REQUIRED, THOSE SUBMITTALS
SHALL BE MARKED AS INCOMPLETE UNTIL THEY BEAR SUCH STAMP FROM THE G.C.
3. ORIGINAL DOCUMENTS: IN NO CASE SHALL THE CONTRACT DOCUMENTS BE
USED/REPRODUCED AS A BASIS FOR SHOP DRAWINGS. SHOP DRAWINGS SHALL BE
ORIGINAL DRAWINGS NOT COPIES OF THE CONTRACT DOCUMENTS.
4. REJECTION: SUBMITTALS NOT MEETING THE CRITERIA LISTED IN THIS SECTION WILL
NOT BE REVIEWED.
5. DELEGATED DESIGN: DELEGATED DESIGNS SHALL CLEARLY INDICATE THE
APPLICABLE CODES, DESIGN CRITERIA, CONNECTION DETAILS, AND LOAD CAPACITY
OF COMPONENTS/SYSTEMS BEING PROVIDED.
a. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND CALCULATIONS SIGNED
AND SEALED BY A STRUCTURAL ENGINEER REGISTERED IN THE STATE OF
CONSTRUCTION FOR THE FOLLOWING:
• SHORING SYSTEMS FOR EXCAVATIONS AND SOIL RETENTION
• TEMPORARY BRACING, ERECTION BRACING
• CONCRETE MIX DESIGNS
• CONCRETE FORMWORK
• PRECAST COMPONENTS
• STEEL GRAVITY SHEAR CONNECTIONS
b. DELEGATED ELEMENTS AND CONNECTIONS SHALL BE ARRANGED SUCH THAT
NO ECCENTRICITIES OR TORSION IS CREATED ON THE PRIMARY STRUCTURE.
ADDITIONAL BRACING TO RESOLVE SUCH FORCE SHALL BE DETAILED BY THE
DELEGATED DESIGNER AND FURNISHED BY THE CONTRACTOR. CONTRACTOR IS
RESPONSIBLE FOR FURNISHING AND INSTALLING EMBED ITEMS AND HARDWARE
AS REQUIRED.
STRUCTURAL NOTES
BUILDING CODE
RISK CATEGORY
FM APPROVED PARAMETERS
IBC 2021 (ASCE 7-16)
II
NO
CODES AND STANDARDS
E. SPECIAL INSPECTIONS (STRUCTURAL):
1. RESPONSIBILITIES:
• THIRD PARTY INSPECTION AGENCY SHALL BE CONTRACTED BY THE OWNER.
• THE CONTRACTOR SHALL BE RESPONSIBLE FOR FILING AND OBTAINING
PERMITS AND SIGN-OFFS FROM THE DEPARTMENT OF BUILDINGS.
• SPECIAL INSPECTIONS AND TESTS, STATEMENTS OF SPECIAL INSPECTIONS,
RESPONSIBILITIES OF CONTRACTORS, SUBMITTALS TO THE BUILDING OFFICIAL
AND STRUCTURAL OBSERVATIONS SHALL MEET THE APPLICABLE
REQUIREMENTS OF IBC CHAPTER 17
2. STATEMENT OF SPECIAL INSPECTIONS: MATERIALS, PROCEDURES AND
WORKMANSHIP OF LISTED STRUCTURAL ELEMENTS SHALL BE VERIFIED FOR
COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS AND APPROVED SUBMITTALS
PER THE CORRESPONDING REFERENCES.
3. INSPECTION DEFINITIONS:
• C - CONTINUOUS: CONSTANT MONITORING OF IDENTIFIED TASKS BY A SPECIAL
INSPECTOR OVER THE DURATION OF PERFORMANCE OF SAID TASKS.
• P - PERIODIC: INTERMITTANTLY INSPECFTED DURING THE COURSE OF EACH
WORK DAY TO INSURE THAT APPLICABLE REQUIREMENTS ARE BEING MET.
OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS AT
CONTRACTOR’S RISK.
A. DEMOLITION OF BUILDINGS SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS:
1. DEMOLITION OF WALLS AND PARTITIONS SHALL PROCEED IN A SYSTEMATIC
MANNER, AND ALL WORK ABOVE EACH TIER OF FLOOR BEAMS SHALL BE
COMPLETED BEFORE ANY OF THE SUPPORTING STRUCTURAL MEMBERS ARE
DISTURBED.
2. STRUCTURAL STEEL, REINFORCED CONCRETE, AND HEAVY TIMBER BUILDINGS, OR
PORTIONS THEREOF, SHALL BE DEMOLISHED COLUMN LENGTH-BY-COLUMN
LENGTH AND TIER-BY-TIER. STRUCTURAL MEMBERS SHALL BE CHAINED OR
LASHED IN PLACE TO PREVENT ANY UNCONTROLLED SWING OR DROP.
3. SKELETON-STEEL: IN BUILDINGS OF "SKELETON-STEEL" CONSTRUCTION, THE
STEEL FRAMING MAY BE LEFT IN PLACE DURING THE DEMOLITION OF MASONRY.
WHERE THIS IS DONE, ALL STEEL BEAMS, GIRDERS, AND SIMILAR STRUCTURAL
SUPPORTS SHALL BE CLEARED OF ALL LOOSE MATERIAL AS THE MASONRY
DEMOLITION PROGRESSES DOWNWARD.
4. MASONRY WALLS INCLUDING BRICK VENEER WALLS, OR OTHER SECTIONS OF
MASONRY, SHALL NOT BE LOOSENED OR PERMITTED TO FALL UPON THE FLOORS
OF THE BUILDING IN SUCH MASSES AS TO EXCEED THE SAFE CARRYING
CAPACITIES OF THE FLOORS OR THE STABILITY OF STRUCTURAL SUPPORTS.
5. STRUCTURAL OR LOAD-SUPPORTING MEMBERS ON ANY FLOOR SHALL NOT BE CUT
OR REMOVED UNTIL ALL STORIES ABOVE SUCH A FLOOR HAVE BEEN DEMOLISHED
AND REMOVED. THIS PROVISION SHALL NOT PROHIBIT THE CUTTING OF FLOOR
BEAMS FOR THE DISPOSAL OF MATERIALS OR FOR THE INSTALLATION OF
EQUIPMENT NECESSARY TO SAFELY COMPLETE THE DEMOLITION, SO LONG AS THE
CUTTING DOES NOT NEGATIVELY IMPACT THE SAFETY OF THE FLOOR SYSTEM
BEING CUT. COORDINATE WITH A LICENSED ENGINEER PRIOR TO CUTTING
WORK/TEMPORARY OPENINGS.
6. CONTRACTOR REVIEW: LAYOUT/FRAMING SHOWN ON DEMO PLANS IS BASED UPON
LIMITED VISUAL INSPECTION OF BUILDING. CONTRACTOR MUST VISIT THE SITE AND
VERIFY EXISTING FRAMING, STUDY EXISTING PHYSICAL CONDITIONS AND REVIEW
DRAWINGS. IT IS CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH
AREA AND TO FULFILL THE INTENT OF THE DESIGN INDICATED BY THE CONTRACT
DOCUMENTS.
B. TEMPORARY SHORING, AS REQUIRED FOR WALL/FRAMING STABILITY, SHALL BE
PROVIDED BY A LICENSED ENGINEER PRIOR TO DEMOLITION. DESIGN DRAWINGS AND
CALCULATIONS FOR ALL SHORING SHALL BE PROVIDED FOR ARCHITECT AND
ENGINEER OF RECORD REVIEW. SUCH SHORING SHALL BE APPLIED IN ANY CASE
WHERE LATERAL BRACING IS BEING REMOVED FROM STANDING FRAMING, NOT
LIMITED TO THE FOLLOWING CONDITIONS:
a. FOUNDATION/BASEMENT WALLS WHERE FLOOR FRAMING/SLABS ARE REMOVED, DEMOLISHED, OR OTHERWISE COMPROMISED SHALL HAVE THE TOP AND BOTTOM
WALL CONTINUOUSLY BRACED AGAINST LATERAL EARTH PRESSURE.
b. LIMIT ON WALL HEIGHTS: NO WALL SECTION, WHICH IS MORE THAN ONE STORY OR
12 FEET (3658 MM) IN HEIGHT, SHALL BE PERMITTED TO STAND ALONE WITHOUT
LATERAL BRACING.
C. COLUMNS/POST FRAMING THAT IS BRACED AT FLOOR LEVELS BY TWO ORTHOGONAL
DIRECTIONS SHALL BE SHORED IF DEMOLITION WORK COMPROMISES EITHER PRIMARY
COLUMN BRACING DIRECTION. THIS IS PARTICULARLY CRITICAL AT MULTI-SPAN
COLUMN CONDITIONS WHERE THE POTENTIAL OF REMOVING FLOOR FRAMING CAN
LEAD TO SIGNIFICANT INCREASES IN THE BUCKLING LENGTH OF THE COLUMN.
D. TEMPORARY PROTECTION: THE CONTRACTOR SHALL BE RESPONSIBLE FOR
PROTECTION OF THE FOLLOWING:
1. ADJACENT OR EXISTING STRUCTURES, SITE IMPROVEMENTS, APPURTENANCES,
AND LANDSCAPING TO REMAIN OR ARE EXPOSED TO BUILDING DEMOLITION
OPERATIONS.
2. PEOPLE AND VEHICULAR TRAFFIC AROUND BUILDING DEMOLITION AREA AND
OCCUPIED PORTIONS OF STRUCTURES AND ADJACENT STRUCTURES.
3. WHERE REQUIRED BY AUTHORITIES HAVING JURISDICTION.
E. SAFETY ZONE SHALL BE MAINTAINED AROUND ALL DEMOLITION AREAS TO PREVENT
NON-AUTHORIZED PERSONS FROM ENTERING THE ZONE. WHERE MECHANICAL
DEMOLITION EQUIPMENT, OTHER THAN HANDHELD DEVICES, IS TO BE USED FOR
DEMOLITION OF THE BUILDING, THE SAFETY ZONE SHALL BE EQUAL TO OR GREATER
THAN HALF THE HEIGHT OF THE BUILDING TO BE DEMOLISHED. SUCH A SAFETY ZONE
MAY BE REDUCED AT A RATE IN RATIO TO THE EXTENT OF DEMOLITION, AS
DEMOLITION OCCURS. FOR EXAMPLE, AT THE TIME 50% OF THE DEMOLITION IS
COMPLETE, THE SAFETY ZONE MAY BE REDUCED BY 50%.
F. MECHANICAL DEMOLITION EQUIPMENT SHALL NOT BE USED WHERE THE STRUCTURE
UNDERGOING DEMOLITION IS PHYSICALLY CONNECTED TO A STRUCTURE NOT BEING
DEMOLISHED.
G. PROTECTED SPACE: ALL WORK SHALL BE DONE IN PROTECTED SPACE. NO DUST OR
DIRT SHALL TRAVEL FROM CONSTRUCTION AREA TO ADJACENT AREAS.
H. POLLUTION CONTROLS: USE WATER SPRINKLING, TEMPORARY ENCLOSURES, AND
OTHER METHODS TO LIMIT DUST AND DIRT FROM SCATTERING OR RISING INTO THE
AIR. COMPLY WITH ALL GOVERNING REGULATION PERTAINING TO ENVIRONETIMENTAL
PROTECTION.
DEMOLITION NOTES:
A. UNDERPINNING NOTES:
1. WORK REQUIREMENTS: ALL FOUNDATIONS & EARTHWORK OPERATIONS SHALL BE
PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING
BUILDING CODE AND ALL LOTS, BUILDINGS, AND SERVICE FACILITIES ADJOINING
THE FOUNDATION AND EARTHWORK AREAS SHALL BE PROTECTED AND
SUPPORTED.
2. INSPECTION: ALL TEST PITS, BORINGS, AND UNDERPINNING OPERATIONS ARE
SUBJECT TO CONTROLLED INSPECTION.
3. SURVEY: THE OWNER SHALL RETAIN A LICENSED SURVEYOR TO SURVEY ALL LOAD
BEARING WALLS, PIERS, AND COLUMNS TO BE UNDERPINNED. THE SURVEYOR
SHALL CHECK THE DATUM OF SUCH STRUCTURAL ELEMENTS PRIOR TO
EXCAVATION AND EVERY TWO WEEKS FOR DURATION OF THE WORK.
4. WATER TABLE: EXCAVATION BELOW THE WATER TABLE SHOULD BE AVOIDED.
DEWATER THE SITE PRIOR TO THE EXCAVATION MAY ONLY PROCEED AFTER
REVIEW BY THE EOR
5. OBSERVATION REPORTING: DURING THE COURSE OF THE UNDERPINNING, THE
CONTRACTOR SHALL MAINTAIN CONTINUAL OBSERVATIONS OF OPERATIONS AND
SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF THE EXISTING
STRUCTURES. SHOULD THE CONTRACTOR BECOME AWARE OF ANY SITUATION
THAT REQUIRES FURTHER INVESTIGATION OR STUDY, SUCH AS CRACKS IN
MASONRY, ADDITIONAL DEFLECTIONS, ANY DISCREPANCY TO DRAWINGS, ETC. THE
ENGINEER SHALL BE NOTIFIED IMMEDIATELY.
6. BEARING: THE UNDERPINNING FOUNDATIONS SHALL BEAR ON SUBGRADE HAVING
BEARING CAPACITY EQUAL TO OR GREATER THAN THE SUBGRADE OF THE
EXISTING FOUNDATION. THE SUBGRADE AT THE LEVEL OF THE EXISTING
FOUNDATION SHALL BE INSPECTED BY A LICENSED PROFESSIONAL ENGINEER
RETAINED BY THE OWNER TO VERIFY THE BEARING CAPACITY, AND DEFICIENCIES
BROUGHT TO THE ATTENTION OF THE EOR
7. CONCRETE STRENGTH: ALL CONCRETE SHALL BE NORMAL WEIGHT CONCRETE
WITH A MINIMUM ULTIMATE COMPRESSIVE STRENGTH OF 4,000 PSI @ 28 DAYS.
8. GROUT/DRY PACK: ALL DRYPACK SHALL BE NON-SHRINK GROUT (ASTM C1107)
WITH A MINIMUM COMPRESSIVE STRENGTH OF 5,000 PSI. ALL DRYPACK SHALL BE
MIXTURE OF 1 PART CEMENT AND 2 PARTS DAMP SAND, WITH 0" SLUMP.
9. PROTECTION: THE CONTRACTOR SHALL SAFEGUARD AND PROTECT ALL
EXCAVATIONS. ALL EXCAVATION PITS SHALL BE BRACED TO PREVENT ANY LOSS
OF SOIL BENEATH ADJOINING PROPERTY.
10. LIFT BRACING: MAXIMUM UNBRACED LIFT HEIGHT IS 4' - 0". FOR DEEP LIFTS,
PROVIDE BRACING FOR EXISTING WALL AND NEW UNDERPINNING. BRACING AND
SHORING TO BE DESIGNED BY THE CONTRACTOR'S MEANS & METHODS ENGINEER.
THE DEPTH OF UNDERPINNING PITS SHALL BE A MAXIMUM OF ONE LIFT.
11. JOINTS: THE LIFT SHALL BE WITHOUT INTERMEDIATE HORIZONTAL CONSTRUCTION
JOINTS (COLD JOINTS). MULTIPLE (VERTICAL) LEVELS OF UNDERPINNING SHALL
NOT BE PERMITTED.
12. WIDTH LIMIT: MAXIMUM UNDERPINNING SECTION WIDTH IS 3' - 0".
13. LAYOUT: PRIOR TO COMMENCING UNDERPINNING, ALL PANELS TO BE LAID OUT
AND MARKED IN SEQUENTIAL NUMBERING ORDER.
14. ORDER: EXCAVATE AND PLACE PANELS "1" FIRST, "2" SECOND, "3" THIRD, AND "4".
15. SPACING: SPACING BETWEEN OPEN UNDERPINNING SECTIONS IS 12 FEET MINIMUM.
16. KEY: PROVIDE 2" DEEP BY 4" WIDE VERTICAL KEY ON BOTH SIDES OF
UNDERPINNING SECTIONS W/ #4 DOWELS @ 18" O.C.
17. SHIMMING/GROUTING: CONSTRUCT UNDERPINNING SECTION WITHIN 2" OF THE
UNDERSIDE OF THE EXISTING FOUNDATION WALL TO ALLOW FOR INSTALLATION OF
DRY PACK MORTAR. TAPERED STEEL SHIMS @ 2' - 0" O.C. MAX. WITH 2" OF DRY
PACK ALL AROUND SHIMS.
18. PLUMBNESS: THE UNDERPINNING SHALL BE INSTALLED IN A MANNER SUCH THAT
THE EXPOSED FACE OF THE CONCRETE IS VERTICAL, U.N.O.
19. LOAD TRANSFER: DO NOT TRANSFER LOAD ONTO UNDERPINNING PIERS UNTIL
CONCRETE POUR HAS REACHED A MINIMUM OF 75% OF ITS 28-DAY COMPRESSIVE
STRENGTH AS CONFIRMED BY CYLINDER TEST.
B. EXISTING WALL UNDERPINNING SEQUENCE:
1. STARTING WITH SEGMENTS "A", ONLY DIG PITS 3' - 0" WIDE, MAXIMUM
SIMUTANEOUSLY PLACING REQUIRED SHEETING AND BRACING (LEAVE MIN. 12' - 0"
OF EXISTING SOIL BETWEEN PITS).
2. CLEAN BOTTOM OF EXISTING FOOTING AND COMPACT SOIL TO 95% OF MAXIMUM
DENSITY IN LIFTS NO GREATER THAN 8". LOSS OF GROUND SHOULD BE KEPT TO A
MINIMUM BY BACKFILLING BEHIND THE BOARDS WHERE AND WHEN POSSIBLE WITH
GROUP PUMPED INTO VOIDS
3. CONTRACTOR SHALL INSTALL ADAQUATE LATERAL BRACNG SYSTEMS TO PREVENT
MOVEMENT IN THE EXISTING STRUCTURES AND IN THE NEW UNDERPINNING
4. POUR NEW CONCRETE UNDERPINNING FOR SEGMENT "1". AFTER CONCRETE
COMPLETES 24 HOURS OF CURING, PLACE STEEL SHIMS AT 2' - 0" O.C. MIN. THEN
PACK SOLID W/ DRYPACK INTO SPACE BETWEEN TOP OF UNDERPINNING AND
BOTTOM OF EXISTING FOOTING, TO TRANSFER LOAD. ENSURE THE BACK OF VOID
IS FORMED SO THAT DRYPACK IS NOT LOST WHEN RAMMED INTO THE GAPS.
5. FOR SEGMENT "2" DIG PITS 3 '- 0" O.C. MAX., WIDE. THEN FOR SEGMENT "2" REPEAT
CONCRETING, CLEANING, STEEL SHIMS, AND DRY PACKING PER NOTE 2, 3, 4.
6. FOR SEGMENT "3" DIG PITS 3' - 0" O.C. MAX., WIDE. THEN FOR SEGMENT "3" REPEAT
CONCRETING, CLEANING, STEEL SHIMS, AND DRY PACKING PER NOTE 2, 3, 4.
7. FOR SEGMENT "4" DIG PITS 3' - 0" O.C. MAX., WIDE. THEN FOR SEGMENT "4" REPEAT
CONCRETING, CLEANING, STEEL SHIMS, AND DRY PACKING PER NOTE 2, 3, 4.
8. UNDERPINNING PITS CLOSER THAN 12' APART SHALL NOT BE EXCAVATED AT THE
SAME TIME.
9. WHERE BOTTOM OF ADJACENT UNDERPINNING PITS ARE AT DIFFERENT
ELEVATIONS, THE DEEPER PIT SHALL BE INSTALLED FIRST.
10. SEQUENCE ORDER IS RESPONSIBILITY OF THE CONTRACTOR, AS IS LAYOUT AND
FIELD VERIFICATION OF ALL DIMENSIONS/CONDITIONS/CONSTRAINTS PRIOR TO
MOBILIZATION.
FOUNDATION UNDERPINNING FOUNDATION NOTES
A. STANDARDS
1. ALL FOUNDATION WORK SHALL CONFORM TO THE APPLICABLE CONCRETE WORK
NOTES.
B. GEOTECHNICAL DATA
1. REFERENCE: FOUNDATIONS HAVE BEEN DESIGNED WITH CONFORMANCE TO THE
GEOTECHNICAL ENGINEERING REPORT INDICATED IN FOUNDATION CRITERIA
TABLE.
2. SITE PREPARATION AND EXCAVATION WORK: SHALL BE PERFORMED IN
ACCORDANCE WITH THE PROJECT GEOTECHNICAL REPORT.
GEOTECHNICAL ENGINEER
BEARING CAPACITY
FOUNDATION CRITERIA
GEOTECH REPORT DATE
FROST DEPTH
N/A
N/A
2,000 PSF
3' - 0"
F. EXCAVATION SUPPORT - INSTALLATION
1. THE CONTRACTOR SHALL INSURE THAT EFFICIENT MEANS ARE PROVIDED TO
PROPERLY TRANSFER EXTERNAL FORCES FROM THE SHEETING AND SHORING TO
THE INTERNAL BRACING.
2. CONDITIONS OF NEARBY STRUCTURES THAT MAY BE AFFECTED BY
CONSTRUCTION ACTIVITIES SHALL BE DOCUMENTED PRIOR TO SHEETING AND/OR
SHORING, AND SHALL BE MONITORED DURING THE CONSTRUCTION.
3. ALL ABUTTING ENDS OF BRACING SHALL BE IN FULL BEARING ACROSS THE ENTIRE
SECTION OF THE MEMBER.
4. BRACING SHALL BE INSTALLED (POSTED AND TIED) SO AS TO PREVENT SPREADING
OR DISTORTION OF THE BRACED FRAMES.
5. BRACING SHALL CLEAR COLUMNS, FLOOR FRAMING ELEMENTS, AND OTHER
PERMANENT WORK.
6. PROPERLY SUPPORT HORIZONTAL WALES TO PREVENT UNACCEPTABLE
MOVEMENT OR OVERTURNING DUE TO THRUSTS FROM THE BRACING.
7. FILLERS AND WEDGES SHALL BE PROVIDED AS REQUIRED, BETWEEN THE
SHEETING AND THE WALES AT THE TIME OF INSTALLATION OF EACH LEVEL OF
BRACING, AND THE BRACING SYSTEM TO BE PROPERLY STRESSED AT ALL TIMES.
8. BRACING SHALL NOT BE CAST INTO PERMANENT CONCRETE, EXCEPT AS
SPECIFICALLY APPROVED BY THE EOR. IN WHICH CASE, THE PROPER KEYS,
CUTOFFS, WATERSTOPS AND WATERPROOFING MUST BE PROVIDED.
9. SHOULD IT BECOME NECESSARY TO MOVE A BRACE, A NEW BRACE SHALL BE
INSTALLED PROPERLY PRIOR TO REMOVAL OF THE ORIGINAL BRACE.
G. EXCAVATION SUPPORT - COMPLETION
1. ALL BRACING SHALL BE MAINTAINED UNTIL STRUCTURAL ELEMENTS ARE RE-
BRACED BY OTHER BRACING OR UNTIL THE PERMANENT FLOOR CONSTRUCTION IS
ABLE TO WITHSTAND THE LATERAL EARTH AND GROUND WATER PRESSURES.
2. SHEETING AND SHORING RETAINING EARTH ON WHICH THE SUPPORT AND/OR
STABILITY OF EXISTING STRUCTURES IS DEPENDENT, MUST BE LEFT IN PLACE AT
THE COMPLETION OF THE WORK, AND SHALL BE STEEL OR CONCRETE.
3. IF WOOD IS USED AS PART OF THE SHEETING, SHORING AND BRACING SYSTEM
NEAR EXISTING STRUCTURES, IT MUST BE REMOVED PRIOR TO THE PLACEMENT OF
BACKFILL OR SHALL BE TREATED WOOD TO PREVENT ROT.
4. IF REQUIRED, REMOVE SHEETING, SHORING AND BRACING IN A MANNER TO AVOID
HARMFUL DISTURBANCE TO UNDERLYING SOILS AND DAMAGE TO BUILDINGS,
STRUCTURES, PAVEMENTS, FACILITIES AND UTILITIES.
5. WHERE SHEETING IS ANCHORED TO THE SOILS IT RETAINS, ALL PRESTRESSED
TIEBACK RODS SHALL BE RELIEVED OF STRESS AT THEIR ANCHORAGES ONCE NEW
WALLS ARE POURED AND ARE SUPPORTED LATERALLY IN A PERMANENT MANNER
BY THE NEW CONSTRUCTION.
C. SHALLOW FOUNDATION
1. VERIFICATION OF BEARING CAPACITY: THE ADEQUACY OF THE BEARING STRATUM
AND ELEVATION AT THE ELEVATOR MAT SLAB SHALL BE INSPECTED AND
APPROVED, IN WRITING, BY A REGISTERED GEOTECHNICAL ENGINEER HIRED BY
THE OWNER PRIOR TO PLACING CONCRETE. WRITTEN APPROVAL SHALL SPECIFY
THAT THE SOIL HAS THE CAPACITY TO SUPPORT THE DESIGNED BEARING
PRESSURE. FOUNDATION SHALL NOT BEAR ON (OR ABOVE) EXISTING FILL
MATERIALS.
D. FOUNDATION PLACEMENT
1. FROST DEPTH: ALL EXTERIOR FOOTINGS SHALL BE PROTECTED FROM FROST BY
EXTENDING BELOW THE FROST DEPTH PER FOUNDATION CRITERIA TABLE.
2. SUBGRADE: ALL FOUNDATION SUBGRADE PREPARATION AND CRUSHED STONE
FILL BLANKETS BENEATH SLAB ON GRADE SHALL COMPLY WITH THE PROJECT'S
GEOTECHNICAL ENGINEER'S RECOMMENDATIONS.
3. DEWATERING: DEWATERING OF THE SITE, INCLUDING METHODS OF DEWATERING
AND CALCULATIONS, DURING CONSTRUCTION IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR. CONTRACTOR SHALL CONTROL SURFACE AND SUBSURFACE
WATER DURING CONSTRUCTION SO THAT THE FOUNDATION WILL BE
CONSTRUCTED ON DRY SOIL/ROCK.
4. FREEZING: NO FOUNDATION SHALL BE PLACED IN WATER OR FROZEN GROUND.
5. BACKFILL
A. AROUND THE EXTERIOR OF WALLS (UNBALANCED) SHALL NOT BE PLACED UNTIL
AFTER THE WALLS ARE SUPPORTED (BRACED) BY THE COMPLETION OF THE
INTERIOR FLOOR SYSTEMS AT BOTH THE BOTTOM AND TOP OF WALL.
B. DO NOT PROCEED WITH BACKFILL UNTIL SEVEN (7) DAYS AT A MINIMUM AFTER
THE COMPLETION OF INTERIOR FLOOR SYSTEM INSTALLATION (CONCRETE)
UNLESS WALLS ARE OTHERWISE TEMPORARILY SHORED/BRACED.
6. BACKFILL SHALL NOT BE PLACED UNTIL AFTER COMPLETION AND INSPECTION OF
WATERPROOFING WHERE APPLICABLE.
7. MATERIAL ACCEPTANCE: ALL UNSUITABLE MATERIALS SHALL BE REMOVED FROM
SUBGRADE AND BACKFILL AREAS AND BACKFILLED WITH ACCEPTABLE FILL
ACCORDING TO THE SPECIFICATIONS AND COMPACTED TO THE SPECIFIED
BEARING CAPACITY
8. REINFORCEMENT CONTINUITY: FOUNDATION WALLS AND FOOTINGS (OR CAPS)
SHALL HAVE REINFORCEMENT KEPT CONTINUOUS THROUGH ELEMENTS SO
ELEMENTS BEHAVE MONOLITHICALLY.
9. CENTERING: ALL FOOTINGS SHALL BE CENTERED DIRECTLY BELOW
COLUMNS/WALLS WHICH THEY SUPPORT UNLESS OTHERWISE NOTED.
E. EXCAVATION SUPPORT - DESIGN AND PLACEMENT
1. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING ALL
EXCAVATION PROCEDURES INCLUDING SHORING, BRACING SHEET PILING,
LAGGING, UNDERPINNING, AND PROTECTION OF ADJACENT PROPERTY,
STRUCTURES, STREETS AND UTILITIES PER LOCAL BUILDING DEPARTMENT
REQUIREMENTS. PROJECT SPECIFIC CALCULATIONS AND SHOP DRAWINGS SHALL
BE PREPARED BY A REGISTERED PROFESSIONAL ENGINEER AND SUBMITTED TO
STRUCTURAL ENGINEER AND GEOTECHNICAL ENGINEER FOR REVIEW.
INSTALLATION SHALL BE PERFORMED BY A SPECIALTY CONTRACTOR.
2. WALLS: PROVIDE ADEQUATE BRACING AND SHORING FOR BASEMENT, RETAINING
AND PIT WALLS. BRACE BASEMENT AND PIT WALLS UNTIL SUPPORTING FLOORS
ABOVE ARE IN PLACE AND HAVE ATTAINED DESIGN STRENGTH. DO NOT BACKFILL
WALLS UNTIL AFTER FLOORS AT THE TOP AND BASE OF THE WALLS ARE IN PLACE.
WHERE BACKFILL IS REQUIRED ON BOTH SIDES OF A WALL, BACKFILL BOTH SIDES
SIMULTANEOUSLY WITH THE GRADE DIFFERENCE NOT TO EXCEED 2'-0" AT ANY
TIME.
3. UNDERCUTTING: IF EXCAVATION DEPTH AT FOOTING PROPOSED IS DEEPER THAN
2H:1V PROJECTED FROM EDGE OF ADJACENT EXISTING OR NEIGHBORING
FOOTING, UNDERPINNING MAY BE REQUIRED. G.C. TO DETERMINE IF
UNDERPINNING IS REQUIRED BEFORE CONSTRUCTION.
4. SURCHARGE: CANTILEVERED AND BASEMENT RETAINING WALLS ARE NOT
DESIGNED FOR SURCHARGE LOADING ASSOCIATED WITH CONSTRUCTION TRAFFIC
BEHIND THE WALL. PROVIDE ADEQUATE TEMPORARY BRACING TO RESIST
LATERAL LOADS ASSOCIATED WITH MEANS AND METHODS OF CONSTRUCTION.
(ASSUMED)
A. STANDARDS
1. ALL ELEVATOR PIT/CORE WORK SHALL CONFORM TO THE APPLICABLE
CONCRETE/MASONRY/STEEL WORK NOTES.
B. PRODUCT DATA
1. SUBMITTALS: CONTRACTOR SHALL SUPPLY ENGINEER OF RECORD SHOP
DRAWINGS INDICATING ELEVATOR ARRANGEMENT, PIT REQUIREMENTS, SUMP
REQUIREMENTS, MAINTENANCE ACCESS, RAIL/CAB/HOIST REACTION
LOCATIONS/MAGNITUDES, WALL OPENING EXTENTS, HOIST BEAM, AND OVER RUN
INFORMATION.
2. BACKUP: GENERAL CONTRACTOR SHALL ACCOUNT FOR COST OF RAIL BACKUP
SUPPORT FOR SHAFT WALL TYPE ELEVATOR CORE CONSTRUCTION.
3. MASONRY WALL LEAVE-OUTS: ELEVATOR CORES HAVE BEEN DESIGNED FOR THE
DOOR OPENINGS INDICATED PER PLAN ONLY. LINTELS AND WALL SEGMENTS ARE
NOT RATED FOR INCREASED OPENINGS UNLESS COORDINATED WITH THE
GENERAL CONTRACTOR PRIOR TO PIT AND WALL FABRICATION. IF ADDITIONAL
CLEAR OPENINGS ARE NEEDED AT ANY LEVEL DUE TO ELEVATOR INSTALLATION
THE ENGINEER OF RECORD MUST BE NOTIFIED OF THE REQUEST AND
WALL/LINTEL/FOOTING MODIFICATIONS WILL BE PROVIDED.
ELEVATOR NOTES
NORR
One Penn Center 1617 JFK Blvd, Suite 1600 Philadelphia, PA 19103 norr.com
ARCH E Title Block - v.2023 - Rev (Sept/23) - Copyright © 2023
Drawing No.
Project No.
Drawing Title
Project
Seal
Design Team
Project Manager
Project Architect Checked
Drawn
Client
Architecture:
Structural:
Mechanical:
Electrical:
A
BD C
This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Architect or Engineer
E
NORR
NORR
NORR
NORR
A u to d e s k D o c s
/D e lC o
V o ti n g M a c h in e W a re h o u s e E le v a to r A d d it io n /I N
-0
S
T i_
D e lc o W a re h o u s e E le v a to rA d d it io n v .r v t
/2
/2
:5
:3
A
M
IN2325-0323-00
S001
GENERAL NOTES
VOTING MACHINE
WAREHOUSE ELEVATOR
ADDITION
COUNTY OF DELAWARE
DEPARTMENT OF PUBLIC
WORKS
403 EAST 24TH STREET, CHESTER, PA 19013
SCD
CES
This drawing has been prepared solely for the use of
COUNTY OF DELAWARE DEPARTMENT OF PUBLIC
WORKS and there are no representations of any kind made by
STRUCTURAL DRAWINGS LIST
SHEET
NUMBER SHEET NAME D
D
C D
S001 GENERAL NOTES X X
S002 GENERAL NOTES CONT'D X X
S100 STRUCTURAL PLANS X X
S200 TYPICAL DETAILS X X
S301 FOUNDATION SECTIONS X X
S302 FRAMING SECTIONS X
STATEMENT OF SPECIAL INSPECTIONS (IBC '21)
REQ'D INSPECTION VERIFICATION AND INSPECTION ITEM IBC 21 REFERENCE TYPE
STEEL
Yes WELDING OF
STEEL
WELDING OF STRUCTURAL STEEL 1705.2 AISC 360 N.5.4,
AWS D1.1
C,P
Yes JOINT DETAILS BRACING AND STIFFENING, MEMBER
LOCATIONS, AND APPLICATIONS OF JOINT
DETAILS AT EACH CONNECTION
1705.2 AISC 360 N.5.7 C
Yes HIGH-STRENGTH
BOLTING
SNUG-TIGHT JOINTS, PRETENSIONSED JOINTS
AND SLIP-CRITICAL JOINTS
1705.2 AISC 360 N.5.6,
RCSC
C,P
CONCRETE
Yes CAST IN PLACE CONCRETE DESIGN MIX, SAMPLING, FORMWORK, PLACEMENT AND MAINTENANCE
1705.3 ACI 318 CH 20,
25, 26
P
Yes POST-INSTALLED
ANCHOR
ANCHORS INSTALLED IN HARDEND CONCRETE 1705.3 ACI 318: 17.8.2 C
MASONRY
Yes MASONRY
CONSTRUCTION
MASONRY CONSTRUCTION, DEPENDING ON
STRUCTURAL OCCUPANCY CATEGORY OF THE
BUILDING OR STRUCTURE
1705.4 ACI 530 C, P
SOILS & FOUNDATION
Yes SUBGRADE EXISTING SITE SOIL CONDITIONS, FILL
PLACEMENT, LOAD BEARING REQUIREMENTS
1705.6, 1804 IBC 1705.6, 1804 P
Yes COMPACTED FILL COMPACTED FILL, MAXIMUM LIFT THICKNESS
PER GEOTECHNICAL REPORT
1705.6, 1804 IBC 1705.6, 1804 C
STRUCTURAL STABILITY
Yes EXCAVATION EXCAVATION, FILLING, SHEETING, SHORING
AND BRACING
1705.6, 1804, 1805, 3304
IBC 1705.6,
1804, 1805, 3304
P
Yes UNDERPINNING UNDERPINNING STRUCTURES 1705.6 IBC 1705.6 P
DATE ISSUED FOR REV
2026.03.04 BIDDING A
2026.04.28 PLAN REVIEW B
2026.04.28 PLAN REVIEW B06 C1818 REISSUED FOR BID
STEEL FRAMING NOTES
A. STANDARDS
1. DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL SHALL BE IN
ACCORDANCE WITH "THE STEEL CONSTRUCTION MANUAL", 15TH EDITION, BY THE
AMERICAN INSTITUTE OF STEEL CONSTRUCTION.
B. SHOP DRAWINGS / SUBMITTALS
1. SHOP DRAWINGS INCLUDING THE FOLLOWINGS SHALL BE SUBMITTED FOR REVIEW
AND APPROVAL PRIOR TO ANY FABRICATION
• COMPLETE DETAILS FOR FABRICATION, ASSEMBLY AND ERECTION.
• A STEEL ERECTION PROCEDURE PREPARED AND SEALED BY A REGISTERED
PROFESSIONAL ENGINEER HIRED BY THE CONTRACTOR. THIS PROCEDURE
MUST INCLUDE THE PROPOSED SURVEY PER STEEL SPECIFICATIONS.
• ANCHOR BOLT PLACEMENT SHALL BE FIELD SURVEYED PRIOR TO COLUMN/
BASE PLATE SHOP DRAWING PREPARATION/SUBMITTAL. SHOP DRAWINGS
SHALL REFLECT INSTALLED ANCHOR BOLT CONDITIONS.
• ALL GRADE CERTIFICATIONS FOR RECORD.
C. MATERIAL INFORMATION
1. MATERIAL SCHEDULE
ELEMENT ASTM YIELD STRENGTH
W-SHAPES, TEES A992 50 KSI
CHANNELS, ANGLES, A36 36 KSI
PLATES AND BARS
HSS (RECT. & SQUARE) A500 Gr. C 50 KSI BOLTS F3125 Gr. A325 92 KSI
WASHERS F436 -
NUTS A563 Gr. B -
2. SHOP PAINT SHALL CONFORM TO SSPC-PS 1.10, PAINT 25, RED IRON OXIDE;
SURFACE PREPARATIONS SHALL CONFORM TO SSPC-SP-3. SURFACES TO RECEIVE
SPRAY ON FIRE PROOFING, SURFACES TO BE ENCASED IN CONCRETE AND
SURFACES OF CONNECTING ELEMENTS IN SLIP-CRITICAL CONNECTIONS SHALL NOT
BE PAINTED. PAINT SHOULD BE MODIFIED AS REQUIRED WITH NO ADDITIONAL COST
TO THE OWNER. FIELD PAINT PER ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS.
3. GALVANIZED STEEL: GALVANIZED STEEL AND ITS CONNECTORS SHALL CONFORM
TO ASTM A123, ASTM A153, ASTM A384 AND THE RECOMMENDATIONS OF THE
"AMERICAN HOT DIP GALVANIZERS ASSOCIATION STANDARD SPECIFICATIONS".
FINISH PIECES SHALL CONFORM TO AISC "MANUAL OF STEEL CONSTRUCTION".
ABRADED, SCRAPED AND FIELD WELDED AREAS SHALL BE TOUCHED UP WITH A
SUITABLE ZINC RICH PAINT.
D. FABRICATION/ERECTION
1. FILLER BEAM SPACING: SHALL BE EQUAL BETWEEN SUPPORTS U.N.O.
2. DECK SUPPORT ANGLES SHALL BE PROVIDED BY THE STRUCTURAL STEEL
CONTRACTOR AS REQUIRED.
3. ANCHOR ROD LAYOUT: RIGID STEEL TEMPLATES FOR ANCHOR ROD INSTALLATION
SHALL BE SUPPLIED BY THE STRUCTURAL STEEL CONTRACTOR
4. GALVANIZED ELEMENTS: HOT-DIP GALVANIZE ALL STEEL LINTELS AND SHELF
ANGLES, DUNNAGE STEEL OR OTHER STEEL EXPOSED TO THE EXTERIOR. STEEL
SURFACES THAT ARE EXPECTED TO CONTACT ALUMINUM SHALL BE PROPERLY
SEPARATED OR TREATED. BOLTS, NUTS, AND WASHERS FOR STEEL PERMANENTLY
EXPOSED TO WEATHER SHALL BE GALVANIZED.
5. TEMPORARY BRACING: CONTRACTOR SHALL PROVIDE ADDITIONAL STEEL, GUYING,
CONNECTIONS, BRACING REQUIRED FOR ERECTION AT NO ADDITIONAL COST.
6. DRAINAGE: PROVIDE HOLES IN ALL STEEL AS REQUIRED TO PREVENT ANY
ACCUMULATION OF WATER DURING ERECTION. ALL PENETRATIONS THROUGH MAIN
MEMBERS SHALL NOT EXCEED 1ӯ AND SHALL BE GROUND SMOOTH. THESE
DRAWINGS MUST BE KEPT CLEAN AND OPEN.
7. THERMAL CUTTING: ALL HOLES AND CUTS SHALL BE SHOWN IN THE SHOP
DRAWINGS AND MADE IN THE SHOP. BURNING OR CUTTING OF HOLES IN
STRUCTURAL STEEL IN THE FIELD IS NOT PERMITTED WITHOUT APPROVAL OF EOR.
8. FIELD ADJUSTABILITY: SPANDREL ANGLE AT PERIMETER EDGE OF FLOOR
SLAB/ROOF SHALL BE ADJUSTABLE. SHIP ANGLE LOOSE AND SET WITH STRING
LINE IN FIELD FOR VERTICAL AND HORIZONTAL ALIGNMENT AFTER STEEL IS FULLY
ERECTED TO A MAXIMUM TOLERANCE OF 1/4" HORIZONTAL PER FLOOR AND MUST
BE SET PLUMB BY STEEL ERECTOR PRIOR TO STUD/CLADDING ERECTION. ANGLE
MUST BE INSTALLED IN ONE LENGTH PER BAY.
9. CANTILEVER BEAMS: ALL STEEL CANTILEVER BEAMS MUST BE PLUM PRIOR TO
COMPLETING MOMENT CONNECTIONS.
10. STIFFENING: PROVIDE WEB STIFFENER PLATES ON BOTH SIDES OF THE WEB FOR
BEAMS AT POINTS OF CONCENTRATED LOADS INCLUDING BEAMS SUPPORTING
COLUMNS OR RUNNING OVER THE TOPS OF COLUMNS. MINIMUM STIFFENER PLATE
THICKNESS SHALL BE 3/8 INCH OR FLANGE THICKNESS OF COLUMN ABOVE OR
BELOW OR BEAM WEB THICKNESS ABOVE OR BELOW, WHICHEVER IS GREATER.
11. CAMBER: BEAMS AND TRUSSES WITHOUT SPECIFIED CAMBER SHALL BE
FABRICATED SO THAT AFTER ERECTION ANY CAMBER DUE TO ROLLING OR SHOP
ASSEMBLY SHALL BE UPWARD. ELEMENTS WITH NATURAL CAMBER SHALL BE
ASSEMBLED UPWARD. PROVIDED ADDITIONAL CAMBERS AS INDICATED PER PLANS.
12. SPLICING: MEMBERS MAY BE SPLICED ONLY WHERE SPECIFICALLY DETAILED ON
APPROVED SHOP DRAWINGS, SUBMIT PROFESSIONAL ENGINEER'S SIGNED AND
SEALED CALCULATIONS WITH THE SPLICE DETAILS. WHERE STEEL MEMBERS ARE
REQUIRED TO BE SPLICED, THE SPLICE SHALL DEVELOP THE FULL STRENGTH OF
THE SECTION. SUCH SPLICES SHOULD NOT INTERFERE WITH ANY ARCHITECTURAL
OR MECHANICAL DESIGN OR CLEARANCES.
13. CONCRETE ENCASED STEEL SHALL BE UNPAINTED ON THE CONTACT SURFACES
AND WRAPPED WITH A MINIMUM WWF6X6-W2.9XW2.9 REINFORCING U.N.O.
E. STEEL CONNECTIONS
1. DETAILS: ALL DETAILS ARE CONCEPTUAL ONLY AND DO NOT INDICATE THE
REQUIRED NUMBER OF BOLTS OR WELD SIZES, U.N.O. REFERENCE DELEGATED
DESIGN SUBMITTALS SECTION UNDER GENERAL NOTES.
2. SHEAR CAPACITY SHALL BE THE LARGEST REACTION VALUE OF THE FOLLOWING:
• HALF OF TOTAL UNIFORM LOAD CAPACITY OF THE BEAM SHAPE FOR THE
SPAN, WITH THE EFFECT OF CONCENTRATED LOADS.
• THE ULTIMATE REACTIONS INDICATED ON PLAN
• 15 KIPS.
3. BOLTED CONNECTIONS:
A. MINIMUM OF TWO (2) 3/4"Ø BOLTS TO BE PROVIDED PER CONNECTION.
B. FLOOR BEAM CONNECTIONS: SHALL BE FULL DEPTH DOUBLE ANGLES WITH
3/4"Ø A325-N BOLTS SPACED AT 3" O.C. AT ALL CONNECTIONS U.N.O
C. BOLT HOLES: OVERSIZED OR VERTICAL SLOT HOLES SHALL NOT BE USED FOR
ANY CONNECTIONS U.N.O. OR APPROVED IN WRITING BY THE E.O.R.
D. JOINT TYPES
a. PRETENTIONED BOLTS SHALL BE PROVIDED PER FIELD TESTING NOTES
SECTION AT FOLLOWING LOCATIONS:
• BEAM-TO-COLUMN MOMENT CONNECTIONS
• BEAM-TO-GIRDER MOMENT CONNECTIONS
• WEB SHEAR CONNECTIONS FOR MOMENT CONNECTIONS
• LATERAL BRACE CONNECTIONS
• COLUMN SPLICES
b. SLIP-CRITICAL BOLTS SHALL BE PROVIDED AT:
• ALL MOMENT CONNECTION FLANGE PLATES
• OVERSIZED HOLES
E. ALL OTHER BOLTS SHALL BE TIGHTENED TO "SNUG TIGHT" CONDITION U.N.O.
4. WELDED CONNECTION: WELDS SHALL CONFORM TO AMERICAN WELDING SOCIETY
(AWS) D1.1.
• ALL WELDING SHALL BE PERFORMED BY AWS CERTIFIED WELDERS.
• ALL WELDED CONNECTIONS SHALL BE E70XX ELECTRODES.
• NO WELD TO BE LESS THAN 1/4” UNLESS NOTED OTHERWISE.
• ALL BUTT AND FULL PENETRATION WELDS SHALL HAVE RUN OFF TABS THAT
SHALL BE REMOVED & GROUND SMOOTH ONLY WHERE NOTED.
• ALL WELD BACK UP BARS SHALL BE REMOVED & GROUND SMOOTH ONLY
WHERE NOTED
• ALL STEEL MARKED AS AESS (ARCHITECTURALLY EXPOSED STRUCTURAL
STEEL) NEEDS TO BE GROUND SMOOTH.
5. PIPE / HSS CONNECTIONS: PIPE OR TUBE COLUMN CONNECTIONS SHALL EMPLOY A
MINIMUM 3/8" THICK, FULL DEPTH, THROUGH-PLATE (KNIFE PLATE).
6. ALTERNATE CONNECTIONS WILL BE ACCEPTED ONLY WITH THE PRIOR APPROVAL
BY THE E.O.R. CONTRACTOR'S BID SHALL ANTICIPATE THE USE OF SPECIFIC
DETAILS SHOWN ON THE DRAWINGS. IN ANY EVENT, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE DESIGN OF SUCH ALTERNATE DETAILS THEY PROPOSE.
F. FIELD TESTING
1. INSPECTIONS: THE STRUCTURAL STEEL FABRICATOR AND ERECTOR SHALL
SCHEDULE ALL WORK TO ALLOW COMPLETION OF INSPECTION AND TESTING
REQUIREMENTS, AND APPLICABLE THIRD PARTY INSPECTION ITEMS.
2. BOLTED CONNECTIONS: COMPONENTS AND FASTENERS IN SLIP CRITICAL
CONNECTIONS, SHALL BE VISUALLY INSPECTED FOR TIGHTNESS PER AISC
SPECIFICATIONS FOR STRUCTURAL JOINTS.
A. ALL SLIP CRITICAL (S.C.) BOLTED CONNECTIONS SHALL BE CHECKED AND
INSPECTED USING ONE OF THE FOLLOWING:
• TURN OF THE NUT
• CALIBRATED WRENCH
• ALTERNATE DESIGN FASTENER
• DIRECT TENSION INDICATOR
B. CHECK 25% OF BOLTS IN EACH NON-SLIP CRITICAL SHEAR CONNECTIONS -
MINIMUM OF (2) - BY CALIBRATED TORQUE WRENCH
3. FIELD WELDED CONNECTIONS SHALL BE TESTED PER ANSI / AWS D1.1, CHAPTER 6.
CONCRETE NOTES
A. CODES / STANDARDS
1. STANDARDS: CONCRETE WORK SHALL COMPLY WITH THE LATEST EDITIONS OF: ACI
301 "SPECIFICATIONS FOR STRUCTURAL CONCRETE BUILDINGS"; ACI 318 "BUILDING
CODE REQUIREMENTS FOR REINFORCED CONCRETE"; AND ACI 315 "ACI DETAIL
MANUAL", AND CRSI "MANUAL OF STANDARD PRACTICE".
2. STEEL: ALL REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO
ASTM A615, GRADE 60 AND DETAILED ACCORDING TO THE ACI MANUAL OF
STANDARD PRACTICE (ACE 315 LATEST EDITION)
• EPOXY COATED BARS SHALL BE COATED CONFORMING TO ASTM A775.
• ALL WELDED WIRE FABRIC (WWF) SHALL CONFORM TO ASTM A1064.
3. GROUT: NON-SHRINK GROUT (NON-METALLIC) CRD-C-621, FACTORY PRE-MIXED
GROUT SHALL BE "MASTERFLOW 713" BY MASTER BUILDERS OR APPROVED EQUAL.
INSTALLATION AND CURING SHALL CONFORM TO SUPPLIER'S REQUIREMENTS. ALL
GROUT SHALL EXPERIENCE NO SHRINKAGE AND HAVE A MAXIMUM OF 4.0%
EXPANSION WHEN TESTED UNDER ASTM C-827 WITH A MINIMUM COMPRESSIVE
STRENGTH OF 5,000 PSI WHEN TESTED PER ASTM C-109. GROUT SHALL HAVE A
MINIMUM INITIAL SET TIME OF 60 MINUTES WHEN TESTED PER ASTM C-191.
4. CURING: CURE CONCRETE IMMEDIATELY AFTER FINISHING PER ACI 301, ACI 305R,
ACI 306R, AND ACI 308.
B. SHOP DRAWINGS / SUBMITTALS
1. SHOP DRAWINGS INCLUDING THE FOLLOWINGS SHALL BE SUBMITTED FOR REVIEW
AND APPROVAL PRIOR TO ANY FABRICATION.
• REINFORCING DETAILS INCLUDING CONCRETE COVER, STEEL SIZES, BEND
TYPES, LAPS AND DIMENSIONS
• LOCATIONS OF ALL ANCHOR BOLTS, CONTROL JOINTS, CURBS, SLAB,
DEPRESSIONS, SLEEVES, INSERTS, BOXES, OPENINGS, ETC.
• LOCATIONS OF ALL CONSTRUCTION JOINTS; ENGINEER MAY REQUIRE
ADDITIONAL REINFORCING AT CONSTRUCTION JOINTS.
2. FORMWORK CALCULATIONS PREPARED AND SEALED, IN WRITING, BY A
REGISTERED PROFESSIONAL ENGINEER HIRED BY THE CONTRACTOR.
3. DESIGN MIXES FOR EACH TYPE AND STRENGTH OF CONCRETE SHALL BE
SUBMITTED BY EITHER LABORATORY TRAIL BATCH OR FIELD METHODS SPECIFIED
IN ACI 301. MIX DESIGNS SHALL BE PREPARED BY AN INDEPENDENT TESTING
FACILITY AND SHALL NOT BE SAME AS USED FOR FIELD TESTING.
4. MASS CONCRETE DEFINED AS A PLACEMENT OF STRUCTURAL CONCRETE WITH A
MINIMUM DIMENSION EQUAL TO OR GREATER THAN 4 FT. THERMAL CONTROL PLAN
SHALL BE PREPARED AND EXECUTED PER SECTION 8 OF ACI 301 AND ACI 207. THE
OWNER’S CONCRETE TESTING LABORATORY IS RESPONSIBLE FOR INSTALLING AND
MONITORING OF THERMOCOUPLES.
5. NO CONCRETE WORK SHALL COMMENCE WITHOUT APPROVED SHOP DRAWINGS.
C. CONCRETE MIX INFORMATION
1. FREEZE-THAW: ALL CONCRETE EXPOSED TO FREEZING AND THAWING SHALL BE
NORMAL WEIGHT (ASTM C33) READY MIX CONCRETE (ASTM C94).
2. CONCRETE STRENGTH & MIX DESIGN: ALL CAST-IN-PLACE CONCRETE SHALL
CONFORM TO THE FOLLOWING: 1” MIN. SLUMP, A/C (AIR CONTENT) BASED ON 3/4"
AGGREGATE, NORMAL WEIGHT UNLESS NOTED OTHERWISE.
LOCATION: f'c @ 28 DAYS A/C MAX W/C
• FOUNDATION WALLS/PIERS 5,000 PSI 6% 0.45
• MAT FOUNDATIONS 4,000 PSI 2% 0.55
• FOOTINGS 3,500 PSI 2% 0.55
• INTERIOR SLAB ON GRADE 3,500 PSI 2% 0.55
• LW SLABS ON METAL DECK 4,000 PSI 4-7% 0.55
2% A/C INDICATES ENTRAPPED AIR IN NON-AIR ENTRAINED CONCRETE.
1. CALCIUM CHLORIDE: NO CALCIUM CHLORIDE SHALL BE USED IN ANY CONCRETE.
A. REINFORCEMENT
1. REINFORCEMENT SHALL NOT BE FIELD CUT, UNLESS OTHERWISE INDICATED.
REINFORCEMENT SHALL BE COLD BENT. HEATING REINFORCEMENT IS
PROHIBITED. RE-BENDING REINFORCING IS PROHIBITED.
2. BAR SUPPORT: PROVIDE BAR SUPPORTS AND SPACERS PER ACI 315 AND CRSI
"MANUAL OF STANDARD PRACTICE." ALL BAR SUPPORTS IN CONTACT WITH
EXPOSED SUBSURFACE SHALL HAVE PLASTIC TIPPED FEET. CONTRACTOR MUST
EXERCISE CARE TO PREVENT EXPOSURE OF TIE WIRED OR OTHER MATERIALS
THAT MAY STAIN EXPOSED CONCRETE. ALL REINFORCEMENT SHALL MAINTAIN
PROPER COVER AND SECURELY HELD IN PLACE DURING CONCRETE PLACEMENT.
3. MINIMUM CONCRETE COVER FOR REINFORCING STEEL SHALL BE AS FOLLOWS,
UNLESS NOTED OTHERWISE:
• ALL CONCRETE PERMANENTLY CAST AGAINST EARTH 3"
• ALL CONCRETE EXPOSED TO EARTH/WEATHER (≥ #6) 2"
• ALL CONCRETE EXPOSED TO EARTH/WEATHER (≤ #5) 1 1/2"
• SLAB ON GRADE (WELDED WIRE FABRIC) 2"
• BEAM STIRRUPS, COLUMN & PIER TIES, NOT EXPOSED 1 1/2"
• SLABS, WALLS & JOISTS, NOT EXPOSED (≤ #11) 3/4"
• CONCRETE ON METAL DECK, NOT EXPOSED 1"
4. WELDED WIRE FABRIC (WWF) SHALL BE PROVIDED IN FLAT SHEETS SUPPORTED ON
CONTINUOUS SLAB BOLSTERS AND LAPPED 1.5 X MESH SPACES OR MINIMUM OF 6".
5. DEVELOPMENT & LAP SPLICE TABLE: ALL LAP SPLICES SHALL BE CLASS "B",
UNLESS NOTED OTHERWISE.
TENSION LAP SPLICE COMPRESSION
BAR CLASS "A" CLASS "B" DOWEL EMBED. LAP SPLICE
1.0*Ld 1.3*Ld 22*db 30*db #3 15 19 9 12 #4 19 27 11 15 #5 25 31 14 19 #6 29 38 17 23 #7 43 55 19 26 #8 48 63 22 30 #9 54 71 25 34 #10 61 80 28 38
TABULATED VALUES ARE BASED ON THE FOLLOWING ASSUMPTIONS
• NORMAL WEIGHT & 4,000 PSI CONCRETE STRENGTH
• A MINIMUM CLEAR COVER AS SHOWN IN GENERAL NOTES.
• A MINIMUM CLEAR SPACING OF 3" BETWEEN ANY BARS.
MULTIPLY THE TABULATED TENSION SPLICE VALUES BY MODIFICATION FACTORS
BELOW AS APPLICABLE FOR OTHER CONCRETE TYPES, STRENGTHS AND
CONDITIONS. MODIFICATION FACTORS ARE CUMULATIVE. TENSION SPLICE LENGTH
SHALL NOT BE LESS THAN 12".
• F'c= 3 ksi, x 1.16
• F'c= 5 ksi, x 0.90
• LIGHT WEIGHT CONCRETE, x1.3
• EPOXY-COATED BARS, x1.5
• CLEAR SPACING < 2*db & CLEAR OVER < db, x1.5
5. COLD JOINTS SHALL BE ROUGHENED TO AN AMPLITUDE OF 1/4 INCH FOR THE
ENTIRE INTERSECTING SURFACE ACCORDING TO ACI RECOMMENDATIONS AND
APPLY A BONDING AGENT AS REQUIRED. DO NOT LOCATE CONSTRUCTION JOINTS
(COLD JOINTS) BELOW TERRAZZO FLOOR FINISHES.
6. WALL JOINTS:
• EXPANSION: WALLS EXCEEDING 90 FEET SHALL CONTAIN EXPANSION JOINTS AT
90 FEET ON CENTERS.
• CONTROL JOINTS: SHALL BE LOCATED AT RECOMMENDED SPACING BELOW, AT
ABRUPT CHANGES IN WALL HEIGHT OR THICKNESS, BUT NOT EXCEEDING 30' - 0"
O.C.
• WALL HEIGHT RECOMMENDED SPACING
• 8 FT OR LESS 3X WALL HEIGHT
• BETWEEN 8 FT AND 12 FT 2X WALL HEIGHT
• 12 FT OR GREATER 1X WALL HEIGHT
• CONSTRUCTION JOINTS: SHALL BE LOCATED AT:
• 60' - 0" O.C. MAXIMUM FOR NON-EXPOSED WALLS
• 30' - 0"' O.C. MAXIMUM FOR EXPOSED WALLS
• NOT LESS THAN 4' - 0" AWAY FROM FACE OF SUPPORTIVE PIER, BUTTRESS
OR WALL OPENINGS.
• CORNERS: JOINTS SHALL BE LOCATED NO FURTHER THAN 15'-0" FROM
CORNERS.
7. HORIZONTAL JOINTS ARE NOT PERMITTED IN BEAMS, WALLS, AND SLABS UNLESS
SPECIFICALLY SHOWN ON THE DRAWINGS OR APPROVED IN WRITING BY THE
ENGINEER PRIOR TO CONSTRUCTION.
G. FORMWORK AND SHORING
1. FORMWORK SHALL CONFORM TO THE LATEST EDITIONS OF ACI SPECIAL
PUBLICATION NO. 4 "FORMWORK FOR CONCRETE" AND ACI 347 "STANDARD
RECOMMENDED PRACTICE FOR CONCRETE FORMWORK".
2. SUBMIT FORMWORK AND SHORING DESIGN AND DETAIL DRAWINGS CERTIFIED BY A
REGISTERED PROFESSIONAL ENGINEER.
3. LOADS GREATER THAN THE DESIGN LIVE LOADS SHALL NOT BE PLACED ON ANY
PART OF THE STRUCTURE.
4. SHORING AND WALL BRACING SHALL REMAIN UNTIL AT MINIMUM 75% OF 28-DAY
DESIGN STRENGTH IS REACHED.
5. UNTIL THE CONCRETE HAS ATTAINED FULL 28-DAY DESIGN STRENGTH AND
VERIFIED BY AN APPROPRIATE ASTM STANDARD TEST METHOD,
• DO NOT REMOVE FORMWORK OR SHORING OF HUNG STRUCTURE BELOW. RE-
SHORE HUNG STRUCTURE AS NEEDED.
• DO NOT REMOVE RE-SHORING.
• DO NOT PLACE FULL DESIGN LOAD ON THE STRUCTURE.
• DO NOT PLACE MASONRY WALLS, PARAPETS, ETC. ON ANY PART OF THE
STRUCTURE.
6. AT LEAST 1 FLOOR SHALL BE FULLY FORMED AND SHORED WITH A MINIMUM OF 3
FLOORS BELOW RE-SHORED AT ANY GIVEN TIME. ADDITIONAL SHORING AND RE-
SHORING SHALL BE PROVIDED AS INDICATED BY THE SHORING DESIGN
REQUIREMENTS.
7. RE-SHORE POSTS SHALL BE PLACED AT THE INTERSECTION OF THE COLUMN AND
MIDDLE STRIP LINES IN EACH DIRECTION, WITH INTERMEDIATE POSTS AS
REQUIRED. VERTICALL ALIGN RE-SHORES TO PROVIDE CONTINUOUS SUPPORT
FROM FLOOR TO FLOOR. RE-SHORES MUST BE SNUG TO SLABS, BUT NOT TIGHT
ENOUGH TO ADD ADDITIONAL LOADS. RE-SHORING SHALL SUPPORT EACH PANEL
INDEPENDENTLY AS IT IS STRIPPED BEFORE REMOVING FORMS FROM ADJACENT
PANELS OR RE-STORES SHALL BE INSTALLED PRIOR TO REMOVAL OF SHORES AND
FORMWORK.
H. FIELD TESTING
1. UNLESS OTHERWISE PER CONTRACT DOCUMENTS, CAST THREE (3) CONCRETE
TEST CYLINDERS (4" DIA x 8" HIGH) FOR EACH 50 CUBIC YARDS OF CONCRETE
PLACED FOR TESTING AT 7, 14 AND 28 DAYS AND ONE SET OF ONE CYLINDER FOR
56 DAY VERIFICATION. ADDITIONAL CYLINDERS MAY BE TAKEN AND TESTED FOR
HIGH EARLY STRENGTH REQUIREMENTS SHOULD THE CONTRACTOR REQUIRE
THEM (IE WALL STRENGTH OR SHORING REMOVAL).
2. AT THE TIME OF CASTING EACH SET OF TEST CYLINDERS, SAMPLE CONCRETE PER
ASTM C172 AND MEASURE THE FOLLOWING AT THE POINT OF CONCRETE
PLACEMENT:
• AMBIENT TEMPERATURE
• CONCRETE TEMPERATURE
• UNIT WEIGHT PER ASTM C-138
• SLUMP PER ASTM C-143
3. AIR CONTENT PER ASTM C-173 OR ATM C-231
4. EVALUATE SLAB FLOOR FLATNESS AND PER ASTM E1155.
5. POST-INSTALLED ANCHORS SHALL BE INSPECTED PER IBC SPECIAL INSPECTION
REQUIREMENTS AND BE CONTINIOUSLY INSPECTED DURING PLACEMENT.
E. POST-INSTALLED ANCHORS
• REBAR: WHEN INSTALLING ANCHORS CONTRACTOR SHALL TAKE MEASURES TO
AVOID DRILLING/CUTTING ANY EXISTING REINFORCEMENT AND DESTRUCTION OF
CONCRETE. HOLES SHALL BE CLEANED PER SUPPLIER REQUIREMENTS PRIOR TO
SETTING/PLACEMENT.
• EXPANSION BOLTS SHALL CONFORM TO HILTI KWIK BOLT TZ OR APPROVED EQUAL
UNLESS NOTED OTHERWISE.
• ADHESIVE ANCHORS SHALL CONFORM TO HILIT HY-200 ADHESIVE ANCHORING
SYSTEM OR APPROVED EQUAL WITH THREADED ROD A193 GRADE B7.
F. PLACEMENT
1. OPENINGS AND PENETRATION LOCATION AND DIMENSIONS SHALL BE VERIFIED
AND COORDINATED BEFORE THE CONCRETE IS POURED. MINIMUM DISTANCE
BETWEEN SLEEVES IS THE GREATER OF SLEEVE DIAMETER OR 6 INCHES.
OPENINGS NOT SHOWN ON STRUCTURAL DRAWINGS REQUIRE APPROVAL FROM
STRUCTURAL ENGINEER IN WRITING PRIOR TO FIELD CUTTING/CORING SINCE
ADDITIONAL REINFORCEMENT MAY BE REQUIRED.
2. CHAMFER: EXPOSED EDGES SHALL BE CHAMFERED 1/2", UNLESS NOTED
OTHERWISE.
3. EMBEDDED ITEMS SHALL BE COORDINATED WITH OTHER TRADE DOCUMENTATION
BY THE CONTRACTOR. NO CONDUITS MAY BE EMBEDDED IN CONCRETE. SET AND
BUILD ANCHOR DEVICES AND EMBEDDED ITEMS REQUIRED FOR OTHER WORK
THAT IS ATTACHED TO OR SUPPORTED BY CAST-IN-PLACE CONCRETE. USE
SETTING DIAGRAMS, TEMPLATES, AND INSTRUCTIONS PROVIDED BY OTHERS FOR
LOCATION AND SETTING.
4. FLOOR SLABS:
a. COORDINATION: CONTRACTOR SHALL COORDINATE DEPRESSIONS FOR FLOOR
FINISHES, FLOOR DRAINS, CURBS, CONCRETE PADS, INSERTS, AND WELDED
PLATES WITH ALL OTHER TRADE DOCUMENTATION.
b. 28-DAY STRENGTH SHALL BE ATTAINED BEFORE POURING ANY TOPPING SLAB, OR BEFORE ANY MASONRY OR CONCRETE WALL IS ERECTED ON TOP.
c. FLATNESS & LEVELNESS OF CONCRETE FLOOR SHALL BE AS FOLLOWS U.N.O.
• SLAB ON GRADE: F(F) 35, F(L) 25, MINIMUM LOCAL F(F)=24, F(L) 18
• ELEVATED FLOOR: F(F) 30
d. THE CONTRACTOR SHALL PROVIDE CORRECTIVE MEASURES TO MEET
REQUIREMENTS FOR ASTM E1155 AND PROJECT SPECIFIC PARTITIONS.
A. CODES / STANDARDS: ALL CONCRETE MASONRY CONSTRUCTION SHALL COMPLY
WITH:
• THE "SPECIFICATION FOR THE DESIGN AND CONSTRUCTION OF LOAD-BEARING
CONCRETE MASONRY" PUBLISHED BY THE NATIONAL CONCRETE MASONRY
ASSOCIATION.
• BUILDING CODE REQUIREMENTS AND SPECIFICATION FOR MASONRY
STRUCTURES”- ACI 530/ASCE 5-05/TMS 402 AND ACI 530.1/ASCE 6-05/TMS 602.
B. SHOP DRAWINGS / SUBMITTALS
1. REFER TO SPECIFICATIONS FOR SUBMITTAL REQUIREMENTS.
C. MATERIAL INFORMATION
1. f 'm PRISM STRENGTH: MASONRY ASSEMBLY SHALL HAVE A NET AREA
COMPRESSIVE STRENGTH (f 'm) OF 2,500 PSI MINIMUM.
2. BLOCK MATERIAL: ALL CONCRETE MASONRY UNITS SHALL BE NORMAL WEIGHT,
GRADE N, COMPLYING WITH ASTM C90. NET AREA COMPRESSIVE STRENGTH OF
INDIVIDUAL CONCRETE MASONRY UNIT SHALL BE 3,250 PSI MINIMUM.
3. MORTAR: MORTAR FOR ALL CONCRETE MASONRY MUST BE TYPE S CEMENT-LIME
MORTAR PER ASTM C270.
4. GROUT: GROUT FOR GROUT FILLED MASONRY SHALL BE A HIGH SLUMP MIX
CONFORMING TO ASTM C476 AND SHALL ATTAIN A MINIMUM COMPRESSIVE
STRENGTH OF 3,000 PSI AT 28 DAYS FROM FIELD OBTAINED TEST CYLINDERS.
5. JOINT REINFORCEMENT: CONCRETE MASONRY UNITS SHALL BE CONSTRUCTED
WITH HORIZONTAL JOINTS REINFORCED WITH HOT-DIPPED GALVANIZED LADDER
TYPE REINFORCEMENT (ASTM A153 CLASS B-2).
6. REINFORCEMENT: SEE CONCRETE NOTES FOR REINFORCING STEEL
REQUIREMENTS, STANDARDS AND SPECIFICATIONS FOR ADDITIONAL NOTES.
PROVIDE LAP SPLICES IN ACCORDANCE WITH THE TYPICAL MASONRY LAP SPLICE
DETAIL FOR ALL REINFORCEMENT.
7. BRICK MASONRY: ALL BRICK MASONRY UNITS SHALL BE GRADE SW PER ASTM C216
WITH A MINIMUM COMPRESSIVE STRENGTH OF 3,000 PSI AND BONDED TOGETHER
WITH TYPE S MORTAR.
D. PLACEMENT: LAY CONCRETE MASONRY UNITS AS FOLLOWS:
A. GROUT SOLID ALL MASONRY BELOW GRADE.
B. GROUT SOLID MINIMUM OF (2) COURSES BELOW ALL BEARING POINTS ON CMU
WALL INCLUDING STAIR STRINGERS, LANDING BEAMS, AND ELEVATOR HOIST AND
DIVIDER BEAMS.
C. WITH FULL BED OF MORTAR COVERAGE ON HORIZONTAL AND VERTICAL FACE
SHELLS FOR HOLLOW MASONRY UNITS/CAVITIES.
D. BED WEBS IN MORTAR IN STARTING COURSE ON FOOTING AND IN ALL COURSES OF
PIERS, COLUMNS AND PILASTERS, AND WHERE ADJACENT TO CELLS OR CAVITIES
TO BE FILLED WITH GROUT.
E. FOR STARTING COURSE ON FOOTING WHERE CELLS ARE NOT GROUTED, SPREAD
OUT FULL MORTAR BED INCLUDING AREAS UNDER CELLS.
F. MAINTAIN JOINT WIDTHS INDICATED, EXCEPT FOR MINOR VARIATIONS REQUIRED TO
MAINTAIN BOND ALIGNMENT. IF NOT INDICATED, LAY WALLS WITH 3/8" JOINTS.
G. USE THE "HIGH LIFT" GROUTING METHOD WITH MAXIMUM LIFT HEIGHTS OF 48".
H. GROUT SHALL BE USED AS FILLING FOR VERTICAL CAVITIES, BOND BEAMS, LINTELS
AND HOLLOW MASONRY UNITS DESIGNATED AS SOLID GROUTED IN THE
DRAWINGS. MORTAR SHALL NOT BE USED TO FILL CELLS.
I. ALL CUTTING OF MASONRY SHALL BE DONE WITH MASONRY SAWS.
J. WALLS SHALL BE PROPERLY BRACED AGAINST LATERAL LOADS UNTIL THE
PERMANENT LATERAL BRACES OR OTHER LATERAL SUPPORT SYSTEMS HAVE BEEN
INSTALLED.
K. CONCRETE MASONRY SHALL BE PROTECTED FROM ABSORBING MOISTURE AND
WATER WHILE AT THE PLANT, DURING SHIPMENT, AND AT THE SITE DURING
CONSTRUCTION.
L. MASONRY FACADE SUSPENDED FROM OR SUPPORTED ON CONCRETE SLABS AND
BEAMS SHALL NOT BE ERECTED UNTIL PERMANENT ALIGNMENT AND ANCHORAGE
OF SHELF ANGLES AND SUSPENDED HARDWARE IS COMPLETED, ALL TEMPORARY
AND PERMANENT BRACING (WHERE REQUIRED) IS INSTALLED AND ALL SHORES
AND RE-SHORES ARE REMOVED. MASONRY SUPPORTED BY STEEL MEMBERS
SHALL NOT BE ERECTED UNTIL PERMANENT ANCHORAGE AND BRACING SYSTEMS
HAVE BEEN INSTALLED.
E. WALL JOINTS
1. PROVIDE VERT. CONTROL JOINTS IN BEARING & NON-LOAD BEARING CONCRETE
MASONRY WALLS AT FOLLOWING:
• SPACED 25' - 0" O.C. MAXIMUM THROUGHOUT LENGTH OF WALL
• AT CHANGES IN WALL HEIGHT OR THICKNESS
• AT PILASTERS, PIERS OR COLUMNS
• ADJACENT TO CORNERS AND INTERSECTIONS (WITHIN 12' - 6")
• AT OPENINGS WITH MASONRY LINTELS AT LEAST 2' - 0" AWAY EA. SIDE
• AT EACH END OF STEEL LINTELS (ABOVE ONLY).
2. CONTROL JOINTS SHALL EXTEND THROUGH ENTIRE WALL THICKNESS FOR FULL
WALL HEIGHT.
3. BOND BEAM REINFORCEMENT TO BE CONTINUOUS, WRAP BARS IN GREASE
COATED WRAP OR PROIVDE JOINT STABILZER ANCHORS.
4. HORIZONTAL JOINT REINFORCEMENT SHALL BE INTERRUPTED.
F. VERTICAL REINFORCEMENT
1. PROVIDE VERTICAL REINFORCEMENT IN GROUTED CELLS AS FOLLOWS:
• MINIMUM WALL REINFORCEMENT OF #4@48" O.C SHALL BE PROVIDED. SEE
DETAILS AND SHEET NOTES FOR INCREASED REINFORCEMENT BASED ON
SPAN/LOADING.
• VERTICAL REINFORCING SHALL BE ANCHORED INTO SUPPORTING SLAB OR
BEAMS BELOW WITH TENSION EMBEDMENT LENGTH.
2. ALL OTHER INTERIOR NON-LOAD BEARING WALLS SHALL BE DETAILED AND
REINFORCED PER THE TYPICAL DETAILS SHEET.
G. HORIZONTAL REINFORCEMENT
1. PROVIDE JOINT REINFORCEMENT AS FOLLOWS:
• 8" CMU: LADDER REINFORCEMENT WITH 9 GAUGE SIDE RODS AND CROSS RODS.
• 12" CMU: LADDER REINFORCEMENT WITH 3/16"Ø SIDE RODS AND 9 GAUGE
CROSS RODS.
2. LOCATIONS: JOINT REINFORCEMENT SHALL BE PROVIDED AT FOLLOWING:
COORDINATE WITH CONTROL JOINT LOCATIONS ON ARCHITECTURAL AND
STRUCTURAL DRAWINGS.
• TYPICAL 16" O.C. CONTINUOUS AT ALL CMU WALLS (U.N.O. AT SHEAR WALLS)
• AT FLOOR OR ROOF: @ 8" O.C. FOR 3 COURSES
• AT PARAPETS: @ 8" O.C.
• AT CORNERS & T INTERSECTIONS: 2' - 8" LONG E.W. @ 8" O.C. REINFORCEMENT
SHALL BE SHOP FABRICATED AND CONTINUOUS AROUND ALL CORNERS AND AT
INTERSECTIONS.
• AT HORIZONTAL JOINTS
3. PLACEMENT:
• REINFORCEMENT SHALL BE…