4-2026-06-18 Delco WarehouseElevatorAddition REVBID S.pdf

PDF 1 MB Posted

Attached to
VOTER MACHINE WAREHOUSE ELEVATOR ADDITION (eDPW-111026) (RE-BID)
Solicitation number
US.257928
Issued by
Delaware County, Pennsylvania

About this file

Summary of Structural Drawings for Voter Machine Warehouse Elevator Addition

This document comprises structural general notes, typical details, and framing sections prepared by NORR (architecture and engineering firm) for the County of Delaware Department of Public Works in Chester, Pennsylvania. The project involves the installation of a service elevator in an existing two-story commercial warehouse building at 403 East 24th Street. The work includes demolition of portions of existing floors and roof decking, excavation and construction of a new elevator pit with a 12-inch concrete mat slab and concrete pit walls, construction of 8-inch concrete masonry unit (CMU) walls forming the elevator shaft, installation of new floor and roof framing systems, and coordination with elevator manufacturer specifications. The structural scope encompasses foundation work with underpinning of existing wall footings in 3-foot-wide sections spaced 12 feet apart, concrete slab-on-grade construction with vapor barriers and stone fill, and support of new steel angles and masonry at second floor and roof levels. The drawings were issued for bidding on March 4, 2026, with a plan review revision dated April 28, 2026, and reissued for bid on the same date.

The structural design conforms to IBC 2021 (ASCE 7-16) standards with a building code risk category II classification. All concrete work specifies minimum compressive strengths ranging from 3,500 to 5,000 PSI depending on location and exposure conditions, with reinforcement in accordance with ASTM A615 Grade 60 deformed bars. Masonry construction requires normal-weight concrete masonry units with minimum 3,250 PSI net area compressive strength and Type S mortar, with grout achieving minimum 3,000 PSI at 28 days. Steel framing utilizes ASTM A992 W-shapes at 50 KSI yield strength and A325 high-strength bolts. Special inspections are required for structural steel welding, bolting, cast-in-place concrete, masonry construction, and soil and foundation work per IBC Chapter 17 requirements. The contractor bears sole responsibility for temporary bracing, shoring, excavation support systems, underpinning design and execution, site safety compliance, and protection of existing structures and utilities. Shop drawings for structural steel, formwork, concrete mix designs, and delegated design elements (shoring systems, bracing, and concrete formwork) must be submitted and sealed by registered professional engineers for approval prior to fabrication and construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. PROJECT REFERENCES:

1. CODE: WORK SHALL BE EXECUTED IN FULL COMPLIANCE WITH THE APPLICABLE

PROVISIONS OF ALL LAWS, BY-LAWS, STATUTES, ORDINANCES, CODES, RULES,

REGULATIONS, AND LAWFUL ORDERS OF PUBLIC AUTHORIIES BEARING ON THE

PERFORMANCE AND EXECUTION OF THE WORK.

2. PROJECT SPECIFICATIONS: NOTES AND SPECIFICATIONS GIVEN ON THE

STRUCTURAL DRAWINGS ARE EXCERPTS FROM THE RELATING PROJECT

SPECIFICATIONS. THEY ARE NEITHER COMPLETE NOR DO THEY REPLACE THE

CONTRACT SPECIFICATIONS.

3. MATERIAL STANDARDS: REFERENCED STANDARDS OR PUBLICATIONS SHALL

PERTAIN TO MOST CURRENT DATA, STANDARD OR PUBLICATION..

B. TEMPORARY BRACING, SHORING AND METHODS: CONTRACTOR REPONSIBLE FOR THE

DESIGN, ADEQUACY, AND SAFETY OF SHORING, BRACING, OTHER TEMPORARY

SUPPORTS, AND METHODS OF CONSTRUCTION.

1. STABILITY: THE CONTRACTOR SHALL INSURE THE STABILITY OF ALL ELEMENTS

INCLUDING, BUT NOT LIMITED TO EXCAVATION, FLOORS, ROOFS, WALLS,

FOUNDATIONS, AND ADJACENT PROPERTY AS PROJECT CONDITIONS REQUIRE.

THE STRUCTURAL ENGINEER ASSUMES NO RESPONSIBILITY FOR THE STRUCTURE

DURING THE ENTIRE CONSTRUCTION PERIOD. BRACE BASEMENT/PIT WALLS UNTIL

SUPPORTING FLOORS ARE PLACED AND WALL/FLOOR HAS REACHED DESIGN

STRENGTH. BACKFILL BOTH SIDES OF WALLS SIMULTANEOUSLY

2. LOADING: THE BUILDING IS DESIGNED ONLY FOR PERMANENT LOADS APPLIED TO

THE STRUCTURE IN ITS FINAL CONFIGURATION. DO NOT PLACE MATERIAL OR

EQUIPMENT ON FLOORS OR FLOORS IN EXCESS OF THE INDICATED DESIGN LIVE

LOADS, AVOID IMPACT LOADS.

3. SURCHARGE: IN NO CASE SHALL HEAVY EQUIPMENT BE PERMITTED CLOSER THAN

8'-0" FROM ANY FOUNDATION/BASEMENT WALL. IF THE CONTRACTOR DEEMS IT

NECESSARY TO OPERATE SUCH EQUIPMENT CLOSER THAN 8'-0", THE CONTRACTOR

SHALL BE SOLELY RESPONSIBLE AND, AT HIS OWN EXPENSE, PROVIDE ADEQUATE

SUPPORTS OR WALL BRACES TO WITHSTAND THE ADDITIONAL LOADS

SUPERIMPOSED FROM SUCH EQUIPMENT.

4. SITE SAFETY: THE CONTRACTOR SHALL BE SOLEY RESPONSIBLE FOR MAINTAINING

CONDITIONS OF PUBLIC AND WORKER SAFETY DURING EXECUTION OF THE WORK.

THIS SHALL INCLUDE COMPLIANCE WITH ALL OSHA, STATE AND LOCAL

REGULATIONS/LAWS AS WELL AS PREPARING AND FILING A SITE SAFETY PLAN OR

PROVIDING OTHER WRITTEN SAFETY ASSURANCES AS REQUIRED. ALL

CONSTRUCTION METHODS SHALL COMPLY WITH THE REQUIREMENTS OF CHAPTER

33 OF THE IBC, "SAFEGUARDS DURING CONSTRUCTION".

5. DAMAGE: CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY

MEASURES TO PROTECT THE PREMISES INCLUDING EXISTING FACILITIES,

STRUCTURES, AND UTILITY LINES FROM ANY DAMAGE AND REPAIR ALL DAMAGE

CAUSED BY THE CONTRACTOR WITH NEW MATERIALS TO MATCH EXISTING TO THE

SATISFACTION OF THE OWNER, ARCHITECT AND/OR ENGINEER.

C. REVIEW AND COORDINATION:

1. EXISTING CONDITIONS, DIMENSIONS, AND ACCESSIBILITY SHALL BE VERIFIED BY

ALL CONSTRUCTION TRADES IN FIELD, PRIOR TO SHOP DRAWING PREPARATIONS

AND PROCEEDING WITH THE WORK. IF EXISTING CONDITIONS DO NOT PERMIT

EXECUTION OF THE WORK IN ACCORDANCE WITH THE SHOWN DETAILS, THE

CONTRACTOR MUST SUBMIT A SKETCH WITH PROPOSED MODIFICATION.

APPROVAL MUST BE GRANTED BY THE ENGINEER PRIOR TO START OF WORK.

2. CONSTRUCTION DOCUMENTS: THE CONTRACTOR SHALL COORDINATE

STRUCTURAL PLANS, DETAILS AND DIMENSIONS WITH ALL OTHER CONSTRUCTION

DOCUMENTS BEFORE PROCEEDING WITH THE WORK. DISCREPANCIES WITHIN OR

BETWEEN OTHER CONSTRUCTION DOCUMENTS SHALL BE NOTIFIED TO THE

ENGINEER AND ARCHITECT PRIOR TO BID AND EXECUTION OF THE WORK.

• MATERIAL STRENGTHS OR QUANTITIES: IF DISCREPANCIES OCCUR REGARDING

MATERIAL STRENGTHS OR QUANTITIES, HIGHER STRENGTH, AND GREATER

QUANTITY SHALL BE USED.

• DIMENSIONS AND ELEVATIONS SHOWN ON STRUCTURAL DRAWINGS ARE

GENERATED BY OTHER DISCIPLINES, WITH THE EXCEPTION OF DIMENSIONS OF

STRUCTURAL MEMBERS. ANY DIMENSIONS OR ELEVATIONS OMITTED OR NOT

SHOWN ON THE STRUCTURAL DRAWINGS SHOULD BE OBTAINED FROM THE

OTHER TRADE CONSTRUCTION DOCUMENTS.

3. INTENT: ALL DETAILS, SECTIONS, AND NOTES ARE INTEDED TO BE TYPICAL AND

SHALL BE CONSTRUED TO APPLY TO SIMILAR CONDITIONS ELSEWHERE.

4. BID: UNLESS DRAWING IS PART OF THE FULL SET OF DOCUMENTS LABELED

"ISSUED FOR BID," DO NOT CONSIDER IT AS THE BASIS FOR A BID. ALL ESTIMATES

BASED ON OTHER DRAWINGS ARE USED AT THE ESTIMATOR'S SOLE RISK.

5. CHANGES REQUESTED BY THE CONTRACTOR WILL BE DONE AT NO COST TO THE

OWNER. APPROVAL OF CONTRACTOR REQUESTED CHANGES IN NO WAY STATES

OR IMPLIES APPROVAL OF A CHANGE IN SCOPE OR CHANGE IN CONTRACT COST.

THE CONTRACTOR SHALL MAKE NO DEVIATION FROM THE CONTRACT DOCUMENTS

WITHOUT THE PRIOR WRITTEN APPROVAL OF THE ENGINEER OF RECORD.

6. ERRORS: COSTS OF INVESTIGATION AND/OR REDESIGN DUE TO CONTRACTOR

ERRORS WILL BE AT THE CONTRACTORS EXPENSE.

D. SUBMITTALS:

1. REVIEW SCHEDULE: SUBMIT SHOP DRAWINGS FOR REVIEW AT LEAST 14 DAYS (10

WORKING DAYS) BEFORE RETURNED SUBMITTALS WILL BE NEEDED. ANY REVIEW

THAT IS REQUIRED MORE QUICKLY WILL BE AT THE CONTRACTORS EXPENSE.

2. COMPLETENESS: A CONTRACTOR'S STAMP CERTIFYING THAT THEY HAVE VERIFIED

ALL FIELD MEASUREMENTS, CONSTRUCTION CRITERIA, MATERIALS AND SIMILAR

DATA AND HAVE CHECKED EACH DRAWING FOR COMPLETENESS, COORDINATION

AND COMPLIANCE WITH THE CONTRACT DOCUMENTS MUST BE PRESENT ON ALL

SUBMITTALS FOR REVIEW BY THE ENGINEER OF RECORD. IF REVIEWS OF

INCOMPLETE SHOP DRAWINGS/SUBMITTALS ARE REQUIRED, THOSE SUBMITTALS

SHALL BE MARKED AS INCOMPLETE UNTIL THEY BEAR SUCH STAMP FROM THE G.C.

3. ORIGINAL DOCUMENTS: IN NO CASE SHALL THE CONTRACT DOCUMENTS BE

USED/REPRODUCED AS A BASIS FOR SHOP DRAWINGS. SHOP DRAWINGS SHALL BE

ORIGINAL DRAWINGS NOT COPIES OF THE CONTRACT DOCUMENTS.

4. REJECTION: SUBMITTALS NOT MEETING THE CRITERIA LISTED IN THIS SECTION WILL

NOT BE REVIEWED.

5. DELEGATED DESIGN: DELEGATED DESIGNS SHALL CLEARLY INDICATE THE

APPLICABLE CODES, DESIGN CRITERIA, CONNECTION DETAILS, AND LOAD CAPACITY

OF COMPONENTS/SYSTEMS BEING PROVIDED.

a. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND CALCULATIONS SIGNED

AND SEALED BY A STRUCTURAL ENGINEER REGISTERED IN THE STATE OF

CONSTRUCTION FOR THE FOLLOWING:

• SHORING SYSTEMS FOR EXCAVATIONS AND SOIL RETENTION

• TEMPORARY BRACING, ERECTION BRACING

• CONCRETE MIX DESIGNS

• CONCRETE FORMWORK

• PRECAST COMPONENTS

• STEEL GRAVITY SHEAR CONNECTIONS

b. DELEGATED ELEMENTS AND CONNECTIONS SHALL BE ARRANGED SUCH THAT

NO ECCENTRICITIES OR TORSION IS CREATED ON THE PRIMARY STRUCTURE.

ADDITIONAL BRACING TO RESOLVE SUCH FORCE SHALL BE DETAILED BY THE

DELEGATED DESIGNER AND FURNISHED BY THE CONTRACTOR. CONTRACTOR IS

RESPONSIBLE FOR FURNISHING AND INSTALLING EMBED ITEMS AND HARDWARE

AS REQUIRED.

STRUCTURAL NOTES

BUILDING CODE

RISK CATEGORY

FM APPROVED PARAMETERS

IBC 2021 (ASCE 7-16)

II

NO

CODES AND STANDARDS

E. SPECIAL INSPECTIONS (STRUCTURAL):

1. RESPONSIBILITIES:

• THIRD PARTY INSPECTION AGENCY SHALL BE CONTRACTED BY THE OWNER.

• THE CONTRACTOR SHALL BE RESPONSIBLE FOR FILING AND OBTAINING

PERMITS AND SIGN-OFFS FROM THE DEPARTMENT OF BUILDINGS.

• SPECIAL INSPECTIONS AND TESTS, STATEMENTS OF SPECIAL INSPECTIONS,

RESPONSIBILITIES OF CONTRACTORS, SUBMITTALS TO THE BUILDING OFFICIAL

AND STRUCTURAL OBSERVATIONS SHALL MEET THE APPLICABLE

REQUIREMENTS OF IBC CHAPTER 17

2. STATEMENT OF SPECIAL INSPECTIONS: MATERIALS, PROCEDURES AND

WORKMANSHIP OF LISTED STRUCTURAL ELEMENTS SHALL BE VERIFIED FOR

COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS AND APPROVED SUBMITTALS

PER THE CORRESPONDING REFERENCES.

3. INSPECTION DEFINITIONS:

• C - CONTINUOUS: CONSTANT MONITORING OF IDENTIFIED TASKS BY A SPECIAL

INSPECTOR OVER THE DURATION OF PERFORMANCE OF SAID TASKS.

• P - PERIODIC: INTERMITTANTLY INSPECFTED DURING THE COURSE OF EACH

WORK DAY TO INSURE THAT APPLICABLE REQUIREMENTS ARE BEING MET.

OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS AT

CONTRACTOR’S RISK.

A. DEMOLITION OF BUILDINGS SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS:

1. DEMOLITION OF WALLS AND PARTITIONS SHALL PROCEED IN A SYSTEMATIC

MANNER, AND ALL WORK ABOVE EACH TIER OF FLOOR BEAMS SHALL BE

COMPLETED BEFORE ANY OF THE SUPPORTING STRUCTURAL MEMBERS ARE

DISTURBED.

2. STRUCTURAL STEEL, REINFORCED CONCRETE, AND HEAVY TIMBER BUILDINGS, OR

PORTIONS THEREOF, SHALL BE DEMOLISHED COLUMN LENGTH-BY-COLUMN

LENGTH AND TIER-BY-TIER. STRUCTURAL MEMBERS SHALL BE CHAINED OR

LASHED IN PLACE TO PREVENT ANY UNCONTROLLED SWING OR DROP.

3. SKELETON-STEEL: IN BUILDINGS OF "SKELETON-STEEL" CONSTRUCTION, THE

STEEL FRAMING MAY BE LEFT IN PLACE DURING THE DEMOLITION OF MASONRY.

WHERE THIS IS DONE, ALL STEEL BEAMS, GIRDERS, AND SIMILAR STRUCTURAL

SUPPORTS SHALL BE CLEARED OF ALL LOOSE MATERIAL AS THE MASONRY

DEMOLITION PROGRESSES DOWNWARD.

4. MASONRY WALLS INCLUDING BRICK VENEER WALLS, OR OTHER SECTIONS OF

MASONRY, SHALL NOT BE LOOSENED OR PERMITTED TO FALL UPON THE FLOORS

OF THE BUILDING IN SUCH MASSES AS TO EXCEED THE SAFE CARRYING

CAPACITIES OF THE FLOORS OR THE STABILITY OF STRUCTURAL SUPPORTS.

5. STRUCTURAL OR LOAD-SUPPORTING MEMBERS ON ANY FLOOR SHALL NOT BE CUT

OR REMOVED UNTIL ALL STORIES ABOVE SUCH A FLOOR HAVE BEEN DEMOLISHED

AND REMOVED. THIS PROVISION SHALL NOT PROHIBIT THE CUTTING OF FLOOR

BEAMS FOR THE DISPOSAL OF MATERIALS OR FOR THE INSTALLATION OF

EQUIPMENT NECESSARY TO SAFELY COMPLETE THE DEMOLITION, SO LONG AS THE

CUTTING DOES NOT NEGATIVELY IMPACT THE SAFETY OF THE FLOOR SYSTEM

BEING CUT. COORDINATE WITH A LICENSED ENGINEER PRIOR TO CUTTING

WORK/TEMPORARY OPENINGS.

6. CONTRACTOR REVIEW: LAYOUT/FRAMING SHOWN ON DEMO PLANS IS BASED UPON

LIMITED VISUAL INSPECTION OF BUILDING. CONTRACTOR MUST VISIT THE SITE AND

VERIFY EXISTING FRAMING, STUDY EXISTING PHYSICAL CONDITIONS AND REVIEW

DRAWINGS. IT IS CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH

AREA AND TO FULFILL THE INTENT OF THE DESIGN INDICATED BY THE CONTRACT

DOCUMENTS.

B. TEMPORARY SHORING, AS REQUIRED FOR WALL/FRAMING STABILITY, SHALL BE

PROVIDED BY A LICENSED ENGINEER PRIOR TO DEMOLITION. DESIGN DRAWINGS AND

CALCULATIONS FOR ALL SHORING SHALL BE PROVIDED FOR ARCHITECT AND

ENGINEER OF RECORD REVIEW. SUCH SHORING SHALL BE APPLIED IN ANY CASE

WHERE LATERAL BRACING IS BEING REMOVED FROM STANDING FRAMING, NOT

LIMITED TO THE FOLLOWING CONDITIONS:

a. FOUNDATION/BASEMENT WALLS WHERE FLOOR FRAMING/SLABS ARE REMOVED, DEMOLISHED, OR OTHERWISE COMPROMISED SHALL HAVE THE TOP AND BOTTOM

WALL CONTINUOUSLY BRACED AGAINST LATERAL EARTH PRESSURE.

b. LIMIT ON WALL HEIGHTS: NO WALL SECTION, WHICH IS MORE THAN ONE STORY OR

12 FEET (3658 MM) IN HEIGHT, SHALL BE PERMITTED TO STAND ALONE WITHOUT

LATERAL BRACING.

C. COLUMNS/POST FRAMING THAT IS BRACED AT FLOOR LEVELS BY TWO ORTHOGONAL

DIRECTIONS SHALL BE SHORED IF DEMOLITION WORK COMPROMISES EITHER PRIMARY

COLUMN BRACING DIRECTION. THIS IS PARTICULARLY CRITICAL AT MULTI-SPAN

COLUMN CONDITIONS WHERE THE POTENTIAL OF REMOVING FLOOR FRAMING CAN

LEAD TO SIGNIFICANT INCREASES IN THE BUCKLING LENGTH OF THE COLUMN.

D. TEMPORARY PROTECTION: THE CONTRACTOR SHALL BE RESPONSIBLE FOR

PROTECTION OF THE FOLLOWING:

1. ADJACENT OR EXISTING STRUCTURES, SITE IMPROVEMENTS, APPURTENANCES,

AND LANDSCAPING TO REMAIN OR ARE EXPOSED TO BUILDING DEMOLITION

OPERATIONS.

2. PEOPLE AND VEHICULAR TRAFFIC AROUND BUILDING DEMOLITION AREA AND

OCCUPIED PORTIONS OF STRUCTURES AND ADJACENT STRUCTURES.

3. WHERE REQUIRED BY AUTHORITIES HAVING JURISDICTION.

E. SAFETY ZONE SHALL BE MAINTAINED AROUND ALL DEMOLITION AREAS TO PREVENT

NON-AUTHORIZED PERSONS FROM ENTERING THE ZONE. WHERE MECHANICAL

DEMOLITION EQUIPMENT, OTHER THAN HANDHELD DEVICES, IS TO BE USED FOR

DEMOLITION OF THE BUILDING, THE SAFETY ZONE SHALL BE EQUAL TO OR GREATER

THAN HALF THE HEIGHT OF THE BUILDING TO BE DEMOLISHED. SUCH A SAFETY ZONE

MAY BE REDUCED AT A RATE IN RATIO TO THE EXTENT OF DEMOLITION, AS

DEMOLITION OCCURS. FOR EXAMPLE, AT THE TIME 50% OF THE DEMOLITION IS

COMPLETE, THE SAFETY ZONE MAY BE REDUCED BY 50%.

F. MECHANICAL DEMOLITION EQUIPMENT SHALL NOT BE USED WHERE THE STRUCTURE

UNDERGOING DEMOLITION IS PHYSICALLY CONNECTED TO A STRUCTURE NOT BEING

DEMOLISHED.

G. PROTECTED SPACE: ALL WORK SHALL BE DONE IN PROTECTED SPACE. NO DUST OR

DIRT SHALL TRAVEL FROM CONSTRUCTION AREA TO ADJACENT AREAS.

H. POLLUTION CONTROLS: USE WATER SPRINKLING, TEMPORARY ENCLOSURES, AND

OTHER METHODS TO LIMIT DUST AND DIRT FROM SCATTERING OR RISING INTO THE

AIR. COMPLY WITH ALL GOVERNING REGULATION PERTAINING TO ENVIRONETIMENTAL

PROTECTION.

DEMOLITION NOTES:

A. UNDERPINNING NOTES:

1. WORK REQUIREMENTS: ALL FOUNDATIONS & EARTHWORK OPERATIONS SHALL BE

PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING

BUILDING CODE AND ALL LOTS, BUILDINGS, AND SERVICE FACILITIES ADJOINING

THE FOUNDATION AND EARTHWORK AREAS SHALL BE PROTECTED AND

SUPPORTED.

2. INSPECTION: ALL TEST PITS, BORINGS, AND UNDERPINNING OPERATIONS ARE

SUBJECT TO CONTROLLED INSPECTION.

3. SURVEY: THE OWNER SHALL RETAIN A LICENSED SURVEYOR TO SURVEY ALL LOAD

BEARING WALLS, PIERS, AND COLUMNS TO BE UNDERPINNED. THE SURVEYOR

SHALL CHECK THE DATUM OF SUCH STRUCTURAL ELEMENTS PRIOR TO

EXCAVATION AND EVERY TWO WEEKS FOR DURATION OF THE WORK.

4. WATER TABLE: EXCAVATION BELOW THE WATER TABLE SHOULD BE AVOIDED.

DEWATER THE SITE PRIOR TO THE EXCAVATION MAY ONLY PROCEED AFTER

REVIEW BY THE EOR

5. OBSERVATION REPORTING: DURING THE COURSE OF THE UNDERPINNING, THE

CONTRACTOR SHALL MAINTAIN CONTINUAL OBSERVATIONS OF OPERATIONS AND

SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF THE EXISTING

STRUCTURES. SHOULD THE CONTRACTOR BECOME AWARE OF ANY SITUATION

THAT REQUIRES FURTHER INVESTIGATION OR STUDY, SUCH AS CRACKS IN

MASONRY, ADDITIONAL DEFLECTIONS, ANY DISCREPANCY TO DRAWINGS, ETC. THE

ENGINEER SHALL BE NOTIFIED IMMEDIATELY.

6. BEARING: THE UNDERPINNING FOUNDATIONS SHALL BEAR ON SUBGRADE HAVING

BEARING CAPACITY EQUAL TO OR GREATER THAN THE SUBGRADE OF THE

EXISTING FOUNDATION. THE SUBGRADE AT THE LEVEL OF THE EXISTING

FOUNDATION SHALL BE INSPECTED BY A LICENSED PROFESSIONAL ENGINEER

RETAINED BY THE OWNER TO VERIFY THE BEARING CAPACITY, AND DEFICIENCIES

BROUGHT TO THE ATTENTION OF THE EOR

7. CONCRETE STRENGTH: ALL CONCRETE SHALL BE NORMAL WEIGHT CONCRETE

WITH A MINIMUM ULTIMATE COMPRESSIVE STRENGTH OF 4,000 PSI @ 28 DAYS.

8. GROUT/DRY PACK: ALL DRYPACK SHALL BE NON-SHRINK GROUT (ASTM C1107)

WITH A MINIMUM COMPRESSIVE STRENGTH OF 5,000 PSI. ALL DRYPACK SHALL BE

MIXTURE OF 1 PART CEMENT AND 2 PARTS DAMP SAND, WITH 0" SLUMP.

9. PROTECTION: THE CONTRACTOR SHALL SAFEGUARD AND PROTECT ALL

EXCAVATIONS. ALL EXCAVATION PITS SHALL BE BRACED TO PREVENT ANY LOSS

OF SOIL BENEATH ADJOINING PROPERTY.

10. LIFT BRACING: MAXIMUM UNBRACED LIFT HEIGHT IS 4' - 0". FOR DEEP LIFTS,

PROVIDE BRACING FOR EXISTING WALL AND NEW UNDERPINNING. BRACING AND

SHORING TO BE DESIGNED BY THE CONTRACTOR'S MEANS & METHODS ENGINEER.

THE DEPTH OF UNDERPINNING PITS SHALL BE A MAXIMUM OF ONE LIFT.

11. JOINTS: THE LIFT SHALL BE WITHOUT INTERMEDIATE HORIZONTAL CONSTRUCTION

JOINTS (COLD JOINTS). MULTIPLE (VERTICAL) LEVELS OF UNDERPINNING SHALL

NOT BE PERMITTED.

12. WIDTH LIMIT: MAXIMUM UNDERPINNING SECTION WIDTH IS 3' - 0".

13. LAYOUT: PRIOR TO COMMENCING UNDERPINNING, ALL PANELS TO BE LAID OUT

AND MARKED IN SEQUENTIAL NUMBERING ORDER.

14. ORDER: EXCAVATE AND PLACE PANELS "1" FIRST, "2" SECOND, "3" THIRD, AND "4".

15. SPACING: SPACING BETWEEN OPEN UNDERPINNING SECTIONS IS 12 FEET MINIMUM.

16. KEY: PROVIDE 2" DEEP BY 4" WIDE VERTICAL KEY ON BOTH SIDES OF

UNDERPINNING SECTIONS W/ #4 DOWELS @ 18" O.C.

17. SHIMMING/GROUTING: CONSTRUCT UNDERPINNING SECTION WITHIN 2" OF THE

UNDERSIDE OF THE EXISTING FOUNDATION WALL TO ALLOW FOR INSTALLATION OF

DRY PACK MORTAR. TAPERED STEEL SHIMS @ 2' - 0" O.C. MAX. WITH 2" OF DRY

PACK ALL AROUND SHIMS.

18. PLUMBNESS: THE UNDERPINNING SHALL BE INSTALLED IN A MANNER SUCH THAT

THE EXPOSED FACE OF THE CONCRETE IS VERTICAL, U.N.O.

19. LOAD TRANSFER: DO NOT TRANSFER LOAD ONTO UNDERPINNING PIERS UNTIL

CONCRETE POUR HAS REACHED A MINIMUM OF 75% OF ITS 28-DAY COMPRESSIVE

STRENGTH AS CONFIRMED BY CYLINDER TEST.

B. EXISTING WALL UNDERPINNING SEQUENCE:

1. STARTING WITH SEGMENTS "A", ONLY DIG PITS 3' - 0" WIDE, MAXIMUM

SIMUTANEOUSLY PLACING REQUIRED SHEETING AND BRACING (LEAVE MIN. 12' - 0"

OF EXISTING SOIL BETWEEN PITS).

2. CLEAN BOTTOM OF EXISTING FOOTING AND COMPACT SOIL TO 95% OF MAXIMUM

DENSITY IN LIFTS NO GREATER THAN 8". LOSS OF GROUND SHOULD BE KEPT TO A

MINIMUM BY BACKFILLING BEHIND THE BOARDS WHERE AND WHEN POSSIBLE WITH

GROUP PUMPED INTO VOIDS

3. CONTRACTOR SHALL INSTALL ADAQUATE LATERAL BRACNG SYSTEMS TO PREVENT

MOVEMENT IN THE EXISTING STRUCTURES AND IN THE NEW UNDERPINNING

4. POUR NEW CONCRETE UNDERPINNING FOR SEGMENT "1". AFTER CONCRETE

COMPLETES 24 HOURS OF CURING, PLACE STEEL SHIMS AT 2' - 0" O.C. MIN. THEN

PACK SOLID W/ DRYPACK INTO SPACE BETWEEN TOP OF UNDERPINNING AND

BOTTOM OF EXISTING FOOTING, TO TRANSFER LOAD. ENSURE THE BACK OF VOID

IS FORMED SO THAT DRYPACK IS NOT LOST WHEN RAMMED INTO THE GAPS.

5. FOR SEGMENT "2" DIG PITS 3 '- 0" O.C. MAX., WIDE. THEN FOR SEGMENT "2" REPEAT

CONCRETING, CLEANING, STEEL SHIMS, AND DRY PACKING PER NOTE 2, 3, 4.

6. FOR SEGMENT "3" DIG PITS 3' - 0" O.C. MAX., WIDE. THEN FOR SEGMENT "3" REPEAT

CONCRETING, CLEANING, STEEL SHIMS, AND DRY PACKING PER NOTE 2, 3, 4.

7. FOR SEGMENT "4" DIG PITS 3' - 0" O.C. MAX., WIDE. THEN FOR SEGMENT "4" REPEAT

CONCRETING, CLEANING, STEEL SHIMS, AND DRY PACKING PER NOTE 2, 3, 4.

8. UNDERPINNING PITS CLOSER THAN 12' APART SHALL NOT BE EXCAVATED AT THE

SAME TIME.

9. WHERE BOTTOM OF ADJACENT UNDERPINNING PITS ARE AT DIFFERENT

ELEVATIONS, THE DEEPER PIT SHALL BE INSTALLED FIRST.

10. SEQUENCE ORDER IS RESPONSIBILITY OF THE CONTRACTOR, AS IS LAYOUT AND

FIELD VERIFICATION OF ALL DIMENSIONS/CONDITIONS/CONSTRAINTS PRIOR TO

MOBILIZATION.

FOUNDATION UNDERPINNING FOUNDATION NOTES

A. STANDARDS

1. ALL FOUNDATION WORK SHALL CONFORM TO THE APPLICABLE CONCRETE WORK

NOTES.

B. GEOTECHNICAL DATA

1. REFERENCE: FOUNDATIONS HAVE BEEN DESIGNED WITH CONFORMANCE TO THE

GEOTECHNICAL ENGINEERING REPORT INDICATED IN FOUNDATION CRITERIA

TABLE.

2. SITE PREPARATION AND EXCAVATION WORK: SHALL BE PERFORMED IN

ACCORDANCE WITH THE PROJECT GEOTECHNICAL REPORT.

GEOTECHNICAL ENGINEER

BEARING CAPACITY

FOUNDATION CRITERIA

GEOTECH REPORT DATE

FROST DEPTH

N/A

N/A

2,000 PSF

3' - 0"

F. EXCAVATION SUPPORT - INSTALLATION

1. THE CONTRACTOR SHALL INSURE THAT EFFICIENT MEANS ARE PROVIDED TO

PROPERLY TRANSFER EXTERNAL FORCES FROM THE SHEETING AND SHORING TO

THE INTERNAL BRACING.

2. CONDITIONS OF NEARBY STRUCTURES THAT MAY BE AFFECTED BY

CONSTRUCTION ACTIVITIES SHALL BE DOCUMENTED PRIOR TO SHEETING AND/OR

SHORING, AND SHALL BE MONITORED DURING THE CONSTRUCTION.

3. ALL ABUTTING ENDS OF BRACING SHALL BE IN FULL BEARING ACROSS THE ENTIRE

SECTION OF THE MEMBER.

4. BRACING SHALL BE INSTALLED (POSTED AND TIED) SO AS TO PREVENT SPREADING

OR DISTORTION OF THE BRACED FRAMES.

5. BRACING SHALL CLEAR COLUMNS, FLOOR FRAMING ELEMENTS, AND OTHER

PERMANENT WORK.

6. PROPERLY SUPPORT HORIZONTAL WALES TO PREVENT UNACCEPTABLE

MOVEMENT OR OVERTURNING DUE TO THRUSTS FROM THE BRACING.

7. FILLERS AND WEDGES SHALL BE PROVIDED AS REQUIRED, BETWEEN THE

SHEETING AND THE WALES AT THE TIME OF INSTALLATION OF EACH LEVEL OF

BRACING, AND THE BRACING SYSTEM TO BE PROPERLY STRESSED AT ALL TIMES.

8. BRACING SHALL NOT BE CAST INTO PERMANENT CONCRETE, EXCEPT AS

SPECIFICALLY APPROVED BY THE EOR. IN WHICH CASE, THE PROPER KEYS,

CUTOFFS, WATERSTOPS AND WATERPROOFING MUST BE PROVIDED.

9. SHOULD IT BECOME NECESSARY TO MOVE A BRACE, A NEW BRACE SHALL BE

INSTALLED PROPERLY PRIOR TO REMOVAL OF THE ORIGINAL BRACE.

G. EXCAVATION SUPPORT - COMPLETION

1. ALL BRACING SHALL BE MAINTAINED UNTIL STRUCTURAL ELEMENTS ARE RE-

BRACED BY OTHER BRACING OR UNTIL THE PERMANENT FLOOR CONSTRUCTION IS

ABLE TO WITHSTAND THE LATERAL EARTH AND GROUND WATER PRESSURES.

2. SHEETING AND SHORING RETAINING EARTH ON WHICH THE SUPPORT AND/OR

STABILITY OF EXISTING STRUCTURES IS DEPENDENT, MUST BE LEFT IN PLACE AT

THE COMPLETION OF THE WORK, AND SHALL BE STEEL OR CONCRETE.

3. IF WOOD IS USED AS PART OF THE SHEETING, SHORING AND BRACING SYSTEM

NEAR EXISTING STRUCTURES, IT MUST BE REMOVED PRIOR TO THE PLACEMENT OF

BACKFILL OR SHALL BE TREATED WOOD TO PREVENT ROT.

4. IF REQUIRED, REMOVE SHEETING, SHORING AND BRACING IN A MANNER TO AVOID

HARMFUL DISTURBANCE TO UNDERLYING SOILS AND DAMAGE TO BUILDINGS,

STRUCTURES, PAVEMENTS, FACILITIES AND UTILITIES.

5. WHERE SHEETING IS ANCHORED TO THE SOILS IT RETAINS, ALL PRESTRESSED

TIEBACK RODS SHALL BE RELIEVED OF STRESS AT THEIR ANCHORAGES ONCE NEW

WALLS ARE POURED AND ARE SUPPORTED LATERALLY IN A PERMANENT MANNER

BY THE NEW CONSTRUCTION.

C. SHALLOW FOUNDATION

1. VERIFICATION OF BEARING CAPACITY: THE ADEQUACY OF THE BEARING STRATUM

AND ELEVATION AT THE ELEVATOR MAT SLAB SHALL BE INSPECTED AND

APPROVED, IN WRITING, BY A REGISTERED GEOTECHNICAL ENGINEER HIRED BY

THE OWNER PRIOR TO PLACING CONCRETE. WRITTEN APPROVAL SHALL SPECIFY

THAT THE SOIL HAS THE CAPACITY TO SUPPORT THE DESIGNED BEARING

PRESSURE. FOUNDATION SHALL NOT BEAR ON (OR ABOVE) EXISTING FILL

MATERIALS.

D. FOUNDATION PLACEMENT

1. FROST DEPTH: ALL EXTERIOR FOOTINGS SHALL BE PROTECTED FROM FROST BY

EXTENDING BELOW THE FROST DEPTH PER FOUNDATION CRITERIA TABLE.

2. SUBGRADE: ALL FOUNDATION SUBGRADE PREPARATION AND CRUSHED STONE

FILL BLANKETS BENEATH SLAB ON GRADE SHALL COMPLY WITH THE PROJECT'S

GEOTECHNICAL ENGINEER'S RECOMMENDATIONS.

3. DEWATERING: DEWATERING OF THE SITE, INCLUDING METHODS OF DEWATERING

AND CALCULATIONS, DURING CONSTRUCTION IS THE SOLE RESPONSIBILITY OF THE

CONTRACTOR. CONTRACTOR SHALL CONTROL SURFACE AND SUBSURFACE

WATER DURING CONSTRUCTION SO THAT THE FOUNDATION WILL BE

CONSTRUCTED ON DRY SOIL/ROCK.

4. FREEZING: NO FOUNDATION SHALL BE PLACED IN WATER OR FROZEN GROUND.

5. BACKFILL

A. AROUND THE EXTERIOR OF WALLS (UNBALANCED) SHALL NOT BE PLACED UNTIL

AFTER THE WALLS ARE SUPPORTED (BRACED) BY THE COMPLETION OF THE

INTERIOR FLOOR SYSTEMS AT BOTH THE BOTTOM AND TOP OF WALL.

B. DO NOT PROCEED WITH BACKFILL UNTIL SEVEN (7) DAYS AT A MINIMUM AFTER

THE COMPLETION OF INTERIOR FLOOR SYSTEM INSTALLATION (CONCRETE)

UNLESS WALLS ARE OTHERWISE TEMPORARILY SHORED/BRACED.

6. BACKFILL SHALL NOT BE PLACED UNTIL AFTER COMPLETION AND INSPECTION OF

WATERPROOFING WHERE APPLICABLE.

7. MATERIAL ACCEPTANCE: ALL UNSUITABLE MATERIALS SHALL BE REMOVED FROM

SUBGRADE AND BACKFILL AREAS AND BACKFILLED WITH ACCEPTABLE FILL

ACCORDING TO THE SPECIFICATIONS AND COMPACTED TO THE SPECIFIED

BEARING CAPACITY

8. REINFORCEMENT CONTINUITY: FOUNDATION WALLS AND FOOTINGS (OR CAPS)

SHALL HAVE REINFORCEMENT KEPT CONTINUOUS THROUGH ELEMENTS SO

ELEMENTS BEHAVE MONOLITHICALLY.

9. CENTERING: ALL FOOTINGS SHALL BE CENTERED DIRECTLY BELOW

COLUMNS/WALLS WHICH THEY SUPPORT UNLESS OTHERWISE NOTED.

E. EXCAVATION SUPPORT - DESIGN AND PLACEMENT

1. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING ALL

EXCAVATION PROCEDURES INCLUDING SHORING, BRACING SHEET PILING,

LAGGING, UNDERPINNING, AND PROTECTION OF ADJACENT PROPERTY,

STRUCTURES, STREETS AND UTILITIES PER LOCAL BUILDING DEPARTMENT

REQUIREMENTS. PROJECT SPECIFIC CALCULATIONS AND SHOP DRAWINGS SHALL

BE PREPARED BY A REGISTERED PROFESSIONAL ENGINEER AND SUBMITTED TO

STRUCTURAL ENGINEER AND GEOTECHNICAL ENGINEER FOR REVIEW.

INSTALLATION SHALL BE PERFORMED BY A SPECIALTY CONTRACTOR.

2. WALLS: PROVIDE ADEQUATE BRACING AND SHORING FOR BASEMENT, RETAINING

AND PIT WALLS. BRACE BASEMENT AND PIT WALLS UNTIL SUPPORTING FLOORS

ABOVE ARE IN PLACE AND HAVE ATTAINED DESIGN STRENGTH. DO NOT BACKFILL

WALLS UNTIL AFTER FLOORS AT THE TOP AND BASE OF THE WALLS ARE IN PLACE.

WHERE BACKFILL IS REQUIRED ON BOTH SIDES OF A WALL, BACKFILL BOTH SIDES

SIMULTANEOUSLY WITH THE GRADE DIFFERENCE NOT TO EXCEED 2'-0" AT ANY

TIME.

3. UNDERCUTTING: IF EXCAVATION DEPTH AT FOOTING PROPOSED IS DEEPER THAN

2H:1V PROJECTED FROM EDGE OF ADJACENT EXISTING OR NEIGHBORING

FOOTING, UNDERPINNING MAY BE REQUIRED. G.C. TO DETERMINE IF

UNDERPINNING IS REQUIRED BEFORE CONSTRUCTION.

4. SURCHARGE: CANTILEVERED AND BASEMENT RETAINING WALLS ARE NOT

DESIGNED FOR SURCHARGE LOADING ASSOCIATED WITH CONSTRUCTION TRAFFIC

BEHIND THE WALL. PROVIDE ADEQUATE TEMPORARY BRACING TO RESIST

LATERAL LOADS ASSOCIATED WITH MEANS AND METHODS OF CONSTRUCTION.

(ASSUMED)

A. STANDARDS

1. ALL ELEVATOR PIT/CORE WORK SHALL CONFORM TO THE APPLICABLE

CONCRETE/MASONRY/STEEL WORK NOTES.

B. PRODUCT DATA

1. SUBMITTALS: CONTRACTOR SHALL SUPPLY ENGINEER OF RECORD SHOP

DRAWINGS INDICATING ELEVATOR ARRANGEMENT, PIT REQUIREMENTS, SUMP

REQUIREMENTS, MAINTENANCE ACCESS, RAIL/CAB/HOIST REACTION

LOCATIONS/MAGNITUDES, WALL OPENING EXTENTS, HOIST BEAM, AND OVER RUN

INFORMATION.

2. BACKUP: GENERAL CONTRACTOR SHALL ACCOUNT FOR COST OF RAIL BACKUP

SUPPORT FOR SHAFT WALL TYPE ELEVATOR CORE CONSTRUCTION.

3. MASONRY WALL LEAVE-OUTS: ELEVATOR CORES HAVE BEEN DESIGNED FOR THE

DOOR OPENINGS INDICATED PER PLAN ONLY. LINTELS AND WALL SEGMENTS ARE

NOT RATED FOR INCREASED OPENINGS UNLESS COORDINATED WITH THE

GENERAL CONTRACTOR PRIOR TO PIT AND WALL FABRICATION. IF ADDITIONAL

CLEAR OPENINGS ARE NEEDED AT ANY LEVEL DUE TO ELEVATOR INSTALLATION

THE ENGINEER OF RECORD MUST BE NOTIFIED OF THE REQUEST AND

WALL/LINTEL/FOOTING MODIFICATIONS WILL BE PROVIDED.

ELEVATOR NOTES

NORR

One Penn Center 1617 JFK Blvd, Suite 1600 Philadelphia, PA 19103 norr.com

ARCH E Title Block - v.2023 - Rev (Sept/23) - Copyright © 2023

Drawing No.

Project No.

Drawing Title

Project

Seal

Design Team

Project Manager

Project Architect Checked

Drawn

Client

Architecture:

Structural:

Mechanical:

Electrical:

A

BD C

This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Architect or Engineer

E

NORR

NORR

NORR

NORR

A u to d e s k D o c s

/D e lC o

V o ti n g M a c h in e W a re h o u s e E le v a to r A d d it io n /I N

-0

S

T i_

D e lc o W a re h o u s e E le v a to rA d d it io n v .r v t

/2

/2

:5

:3

A

M

IN2325-0323-00

S001

GENERAL NOTES

VOTING MACHINE

WAREHOUSE ELEVATOR

ADDITION

COUNTY OF DELAWARE

DEPARTMENT OF PUBLIC

WORKS

403 EAST 24TH STREET, CHESTER, PA 19013

SCD

CES

This drawing has been prepared solely for the use of

COUNTY OF DELAWARE DEPARTMENT OF PUBLIC

WORKS and there are no representations of any kind made by

STRUCTURAL DRAWINGS LIST

SHEET

NUMBER SHEET NAME D

D

C D

S001 GENERAL NOTES X X

S002 GENERAL NOTES CONT'D X X

S100 STRUCTURAL PLANS X X

S200 TYPICAL DETAILS X X

S301 FOUNDATION SECTIONS X X

S302 FRAMING SECTIONS X

STATEMENT OF SPECIAL INSPECTIONS (IBC '21)

REQ'D INSPECTION VERIFICATION AND INSPECTION ITEM IBC 21 REFERENCE TYPE

STEEL

Yes WELDING OF

STEEL

WELDING OF STRUCTURAL STEEL 1705.2 AISC 360 N.5.4,

AWS D1.1

C,P

Yes JOINT DETAILS BRACING AND STIFFENING, MEMBER

LOCATIONS, AND APPLICATIONS OF JOINT

DETAILS AT EACH CONNECTION

1705.2 AISC 360 N.5.7 C

Yes HIGH-STRENGTH

BOLTING

SNUG-TIGHT JOINTS, PRETENSIONSED JOINTS

AND SLIP-CRITICAL JOINTS

1705.2 AISC 360 N.5.6,

RCSC

C,P

CONCRETE

Yes CAST IN PLACE CONCRETE DESIGN MIX, SAMPLING, FORMWORK, PLACEMENT AND MAINTENANCE

1705.3 ACI 318 CH 20,

25, 26

P

Yes POST-INSTALLED

ANCHOR

ANCHORS INSTALLED IN HARDEND CONCRETE 1705.3 ACI 318: 17.8.2 C

MASONRY

Yes MASONRY

CONSTRUCTION

MASONRY CONSTRUCTION, DEPENDING ON

STRUCTURAL OCCUPANCY CATEGORY OF THE

BUILDING OR STRUCTURE

1705.4 ACI 530 C, P

SOILS & FOUNDATION

Yes SUBGRADE EXISTING SITE SOIL CONDITIONS, FILL

PLACEMENT, LOAD BEARING REQUIREMENTS

1705.6, 1804 IBC 1705.6, 1804 P

Yes COMPACTED FILL COMPACTED FILL, MAXIMUM LIFT THICKNESS

PER GEOTECHNICAL REPORT

1705.6, 1804 IBC 1705.6, 1804 C

STRUCTURAL STABILITY

Yes EXCAVATION EXCAVATION, FILLING, SHEETING, SHORING

AND BRACING

1705.6, 1804, 1805, 3304

IBC 1705.6,

1804, 1805, 3304

P

Yes UNDERPINNING UNDERPINNING STRUCTURES 1705.6 IBC 1705.6 P

DATE ISSUED FOR REV

2026.03.04 BIDDING A

2026.04.28 PLAN REVIEW B

2026.04.28 PLAN REVIEW B06 C1818 REISSUED FOR BID

STEEL FRAMING NOTES

A. STANDARDS

1. DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL SHALL BE IN

ACCORDANCE WITH "THE STEEL CONSTRUCTION MANUAL", 15TH EDITION, BY THE

AMERICAN INSTITUTE OF STEEL CONSTRUCTION.

B. SHOP DRAWINGS / SUBMITTALS

1. SHOP DRAWINGS INCLUDING THE FOLLOWINGS SHALL BE SUBMITTED FOR REVIEW

AND APPROVAL PRIOR TO ANY FABRICATION

• COMPLETE DETAILS FOR FABRICATION, ASSEMBLY AND ERECTION.

• A STEEL ERECTION PROCEDURE PREPARED AND SEALED BY A REGISTERED

PROFESSIONAL ENGINEER HIRED BY THE CONTRACTOR. THIS PROCEDURE

MUST INCLUDE THE PROPOSED SURVEY PER STEEL SPECIFICATIONS.

• ANCHOR BOLT PLACEMENT SHALL BE FIELD SURVEYED PRIOR TO COLUMN/

BASE PLATE SHOP DRAWING PREPARATION/SUBMITTAL. SHOP DRAWINGS

SHALL REFLECT INSTALLED ANCHOR BOLT CONDITIONS.

• ALL GRADE CERTIFICATIONS FOR RECORD.

C. MATERIAL INFORMATION

1. MATERIAL SCHEDULE

ELEMENT ASTM YIELD STRENGTH

W-SHAPES, TEES A992 50 KSI

CHANNELS, ANGLES, A36 36 KSI

PLATES AND BARS

HSS (RECT. & SQUARE) A500 Gr. C 50 KSI BOLTS F3125 Gr. A325 92 KSI

WASHERS F436 -

NUTS A563 Gr. B -

2. SHOP PAINT SHALL CONFORM TO SSPC-PS 1.10, PAINT 25, RED IRON OXIDE;

SURFACE PREPARATIONS SHALL CONFORM TO SSPC-SP-3. SURFACES TO RECEIVE

SPRAY ON FIRE PROOFING, SURFACES TO BE ENCASED IN CONCRETE AND

SURFACES OF CONNECTING ELEMENTS IN SLIP-CRITICAL CONNECTIONS SHALL NOT

BE PAINTED. PAINT SHOULD BE MODIFIED AS REQUIRED WITH NO ADDITIONAL COST

TO THE OWNER. FIELD PAINT PER ARCHITECTURAL DRAWINGS AND

SPECIFICATIONS.

3. GALVANIZED STEEL: GALVANIZED STEEL AND ITS CONNECTORS SHALL CONFORM

TO ASTM A123, ASTM A153, ASTM A384 AND THE RECOMMENDATIONS OF THE

"AMERICAN HOT DIP GALVANIZERS ASSOCIATION STANDARD SPECIFICATIONS".

FINISH PIECES SHALL CONFORM TO AISC "MANUAL OF STEEL CONSTRUCTION".

ABRADED, SCRAPED AND FIELD WELDED AREAS SHALL BE TOUCHED UP WITH A

SUITABLE ZINC RICH PAINT.

D. FABRICATION/ERECTION

1. FILLER BEAM SPACING: SHALL BE EQUAL BETWEEN SUPPORTS U.N.O.

2. DECK SUPPORT ANGLES SHALL BE PROVIDED BY THE STRUCTURAL STEEL

CONTRACTOR AS REQUIRED.

3. ANCHOR ROD LAYOUT: RIGID STEEL TEMPLATES FOR ANCHOR ROD INSTALLATION

SHALL BE SUPPLIED BY THE STRUCTURAL STEEL CONTRACTOR

4. GALVANIZED ELEMENTS: HOT-DIP GALVANIZE ALL STEEL LINTELS AND SHELF

ANGLES, DUNNAGE STEEL OR OTHER STEEL EXPOSED TO THE EXTERIOR. STEEL

SURFACES THAT ARE EXPECTED TO CONTACT ALUMINUM SHALL BE PROPERLY

SEPARATED OR TREATED. BOLTS, NUTS, AND WASHERS FOR STEEL PERMANENTLY

EXPOSED TO WEATHER SHALL BE GALVANIZED.

5. TEMPORARY BRACING: CONTRACTOR SHALL PROVIDE ADDITIONAL STEEL, GUYING,

CONNECTIONS, BRACING REQUIRED FOR ERECTION AT NO ADDITIONAL COST.

6. DRAINAGE: PROVIDE HOLES IN ALL STEEL AS REQUIRED TO PREVENT ANY

ACCUMULATION OF WATER DURING ERECTION. ALL PENETRATIONS THROUGH MAIN

MEMBERS SHALL NOT EXCEED 1ӯ AND SHALL BE GROUND SMOOTH. THESE

DRAWINGS MUST BE KEPT CLEAN AND OPEN.

7. THERMAL CUTTING: ALL HOLES AND CUTS SHALL BE SHOWN IN THE SHOP

DRAWINGS AND MADE IN THE SHOP. BURNING OR CUTTING OF HOLES IN

STRUCTURAL STEEL IN THE FIELD IS NOT PERMITTED WITHOUT APPROVAL OF EOR.

8. FIELD ADJUSTABILITY: SPANDREL ANGLE AT PERIMETER EDGE OF FLOOR

SLAB/ROOF SHALL BE ADJUSTABLE. SHIP ANGLE LOOSE AND SET WITH STRING

LINE IN FIELD FOR VERTICAL AND HORIZONTAL ALIGNMENT AFTER STEEL IS FULLY

ERECTED TO A MAXIMUM TOLERANCE OF 1/4" HORIZONTAL PER FLOOR AND MUST

BE SET PLUMB BY STEEL ERECTOR PRIOR TO STUD/CLADDING ERECTION. ANGLE

MUST BE INSTALLED IN ONE LENGTH PER BAY.

9. CANTILEVER BEAMS: ALL STEEL CANTILEVER BEAMS MUST BE PLUM PRIOR TO

COMPLETING MOMENT CONNECTIONS.

10. STIFFENING: PROVIDE WEB STIFFENER PLATES ON BOTH SIDES OF THE WEB FOR

BEAMS AT POINTS OF CONCENTRATED LOADS INCLUDING BEAMS SUPPORTING

COLUMNS OR RUNNING OVER THE TOPS OF COLUMNS. MINIMUM STIFFENER PLATE

THICKNESS SHALL BE 3/8 INCH OR FLANGE THICKNESS OF COLUMN ABOVE OR

BELOW OR BEAM WEB THICKNESS ABOVE OR BELOW, WHICHEVER IS GREATER.

11. CAMBER: BEAMS AND TRUSSES WITHOUT SPECIFIED CAMBER SHALL BE

FABRICATED SO THAT AFTER ERECTION ANY CAMBER DUE TO ROLLING OR SHOP

ASSEMBLY SHALL BE UPWARD. ELEMENTS WITH NATURAL CAMBER SHALL BE

ASSEMBLED UPWARD. PROVIDED ADDITIONAL CAMBERS AS INDICATED PER PLANS.

12. SPLICING: MEMBERS MAY BE SPLICED ONLY WHERE SPECIFICALLY DETAILED ON

APPROVED SHOP DRAWINGS, SUBMIT PROFESSIONAL ENGINEER'S SIGNED AND

SEALED CALCULATIONS WITH THE SPLICE DETAILS. WHERE STEEL MEMBERS ARE

REQUIRED TO BE SPLICED, THE SPLICE SHALL DEVELOP THE FULL STRENGTH OF

THE SECTION. SUCH SPLICES SHOULD NOT INTERFERE WITH ANY ARCHITECTURAL

OR MECHANICAL DESIGN OR CLEARANCES.

13. CONCRETE ENCASED STEEL SHALL BE UNPAINTED ON THE CONTACT SURFACES

AND WRAPPED WITH A MINIMUM WWF6X6-W2.9XW2.9 REINFORCING U.N.O.

E. STEEL CONNECTIONS

1. DETAILS: ALL DETAILS ARE CONCEPTUAL ONLY AND DO NOT INDICATE THE

REQUIRED NUMBER OF BOLTS OR WELD SIZES, U.N.O. REFERENCE DELEGATED

DESIGN SUBMITTALS SECTION UNDER GENERAL NOTES.

2. SHEAR CAPACITY SHALL BE THE LARGEST REACTION VALUE OF THE FOLLOWING:

• HALF OF TOTAL UNIFORM LOAD CAPACITY OF THE BEAM SHAPE FOR THE

SPAN, WITH THE EFFECT OF CONCENTRATED LOADS.

• THE ULTIMATE REACTIONS INDICATED ON PLAN

• 15 KIPS.

3. BOLTED CONNECTIONS:

A. MINIMUM OF TWO (2) 3/4"Ø BOLTS TO BE PROVIDED PER CONNECTION.

B. FLOOR BEAM CONNECTIONS: SHALL BE FULL DEPTH DOUBLE ANGLES WITH

3/4"Ø A325-N BOLTS SPACED AT 3" O.C. AT ALL CONNECTIONS U.N.O

C. BOLT HOLES: OVERSIZED OR VERTICAL SLOT HOLES SHALL NOT BE USED FOR

ANY CONNECTIONS U.N.O. OR APPROVED IN WRITING BY THE E.O.R.

D. JOINT TYPES

a. PRETENTIONED BOLTS SHALL BE PROVIDED PER FIELD TESTING NOTES

SECTION AT FOLLOWING LOCATIONS:

• BEAM-TO-COLUMN MOMENT CONNECTIONS

• BEAM-TO-GIRDER MOMENT CONNECTIONS

• WEB SHEAR CONNECTIONS FOR MOMENT CONNECTIONS

• LATERAL BRACE CONNECTIONS

• COLUMN SPLICES

b. SLIP-CRITICAL BOLTS SHALL BE PROVIDED AT:

• ALL MOMENT CONNECTION FLANGE PLATES

• OVERSIZED HOLES

E. ALL OTHER BOLTS SHALL BE TIGHTENED TO "SNUG TIGHT" CONDITION U.N.O.

4. WELDED CONNECTION: WELDS SHALL CONFORM TO AMERICAN WELDING SOCIETY

(AWS) D1.1.

• ALL WELDING SHALL BE PERFORMED BY AWS CERTIFIED WELDERS.

• ALL WELDED CONNECTIONS SHALL BE E70XX ELECTRODES.

• NO WELD TO BE LESS THAN 1/4” UNLESS NOTED OTHERWISE.

• ALL BUTT AND FULL PENETRATION WELDS SHALL HAVE RUN OFF TABS THAT

SHALL BE REMOVED & GROUND SMOOTH ONLY WHERE NOTED.

• ALL WELD BACK UP BARS SHALL BE REMOVED & GROUND SMOOTH ONLY

WHERE NOTED

• ALL STEEL MARKED AS AESS (ARCHITECTURALLY EXPOSED STRUCTURAL

STEEL) NEEDS TO BE GROUND SMOOTH.

5. PIPE / HSS CONNECTIONS: PIPE OR TUBE COLUMN CONNECTIONS SHALL EMPLOY A

MINIMUM 3/8" THICK, FULL DEPTH, THROUGH-PLATE (KNIFE PLATE).

6. ALTERNATE CONNECTIONS WILL BE ACCEPTED ONLY WITH THE PRIOR APPROVAL

BY THE E.O.R. CONTRACTOR'S BID SHALL ANTICIPATE THE USE OF SPECIFIC

DETAILS SHOWN ON THE DRAWINGS. IN ANY EVENT, THE CONTRACTOR SHALL BE

RESPONSIBLE FOR THE DESIGN OF SUCH ALTERNATE DETAILS THEY PROPOSE.

F. FIELD TESTING

1. INSPECTIONS: THE STRUCTURAL STEEL FABRICATOR AND ERECTOR SHALL

SCHEDULE ALL WORK TO ALLOW COMPLETION OF INSPECTION AND TESTING

REQUIREMENTS, AND APPLICABLE THIRD PARTY INSPECTION ITEMS.

2. BOLTED CONNECTIONS: COMPONENTS AND FASTENERS IN SLIP CRITICAL

CONNECTIONS, SHALL BE VISUALLY INSPECTED FOR TIGHTNESS PER AISC

SPECIFICATIONS FOR STRUCTURAL JOINTS.

A. ALL SLIP CRITICAL (S.C.) BOLTED CONNECTIONS SHALL BE CHECKED AND

INSPECTED USING ONE OF THE FOLLOWING:

• TURN OF THE NUT

• CALIBRATED WRENCH

• ALTERNATE DESIGN FASTENER

• DIRECT TENSION INDICATOR

B. CHECK 25% OF BOLTS IN EACH NON-SLIP CRITICAL SHEAR CONNECTIONS -

MINIMUM OF (2) - BY CALIBRATED TORQUE WRENCH

3. FIELD WELDED CONNECTIONS SHALL BE TESTED PER ANSI / AWS D1.1, CHAPTER 6.

CONCRETE NOTES

A. CODES / STANDARDS

1. STANDARDS: CONCRETE WORK SHALL COMPLY WITH THE LATEST EDITIONS OF: ACI

301 "SPECIFICATIONS FOR STRUCTURAL CONCRETE BUILDINGS"; ACI 318 "BUILDING

CODE REQUIREMENTS FOR REINFORCED CONCRETE"; AND ACI 315 "ACI DETAIL

MANUAL", AND CRSI "MANUAL OF STANDARD PRACTICE".

2. STEEL: ALL REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO

ASTM A615, GRADE 60 AND DETAILED ACCORDING TO THE ACI MANUAL OF

STANDARD PRACTICE (ACE 315 LATEST EDITION)

• EPOXY COATED BARS SHALL BE COATED CONFORMING TO ASTM A775.

• ALL WELDED WIRE FABRIC (WWF) SHALL CONFORM TO ASTM A1064.

3. GROUT: NON-SHRINK GROUT (NON-METALLIC) CRD-C-621, FACTORY PRE-MIXED

GROUT SHALL BE "MASTERFLOW 713" BY MASTER BUILDERS OR APPROVED EQUAL.

INSTALLATION AND CURING SHALL CONFORM TO SUPPLIER'S REQUIREMENTS. ALL

GROUT SHALL EXPERIENCE NO SHRINKAGE AND HAVE A MAXIMUM OF 4.0%

EXPANSION WHEN TESTED UNDER ASTM C-827 WITH A MINIMUM COMPRESSIVE

STRENGTH OF 5,000 PSI WHEN TESTED PER ASTM C-109. GROUT SHALL HAVE A

MINIMUM INITIAL SET TIME OF 60 MINUTES WHEN TESTED PER ASTM C-191.

4. CURING: CURE CONCRETE IMMEDIATELY AFTER FINISHING PER ACI 301, ACI 305R,

ACI 306R, AND ACI 308.

B. SHOP DRAWINGS / SUBMITTALS

1. SHOP DRAWINGS INCLUDING THE FOLLOWINGS SHALL BE SUBMITTED FOR REVIEW

AND APPROVAL PRIOR TO ANY FABRICATION.

• REINFORCING DETAILS INCLUDING CONCRETE COVER, STEEL SIZES, BEND

TYPES, LAPS AND DIMENSIONS

• LOCATIONS OF ALL ANCHOR BOLTS, CONTROL JOINTS, CURBS, SLAB,

DEPRESSIONS, SLEEVES, INSERTS, BOXES, OPENINGS, ETC.

• LOCATIONS OF ALL CONSTRUCTION JOINTS; ENGINEER MAY REQUIRE

ADDITIONAL REINFORCING AT CONSTRUCTION JOINTS.

2. FORMWORK CALCULATIONS PREPARED AND SEALED, IN WRITING, BY A

REGISTERED PROFESSIONAL ENGINEER HIRED BY THE CONTRACTOR.

3. DESIGN MIXES FOR EACH TYPE AND STRENGTH OF CONCRETE SHALL BE

SUBMITTED BY EITHER LABORATORY TRAIL BATCH OR FIELD METHODS SPECIFIED

IN ACI 301. MIX DESIGNS SHALL BE PREPARED BY AN INDEPENDENT TESTING

FACILITY AND SHALL NOT BE SAME AS USED FOR FIELD TESTING.

4. MASS CONCRETE DEFINED AS A PLACEMENT OF STRUCTURAL CONCRETE WITH A

MINIMUM DIMENSION EQUAL TO OR GREATER THAN 4 FT. THERMAL CONTROL PLAN

SHALL BE PREPARED AND EXECUTED PER SECTION 8 OF ACI 301 AND ACI 207. THE

OWNER’S CONCRETE TESTING LABORATORY IS RESPONSIBLE FOR INSTALLING AND

MONITORING OF THERMOCOUPLES.

5. NO CONCRETE WORK SHALL COMMENCE WITHOUT APPROVED SHOP DRAWINGS.

C. CONCRETE MIX INFORMATION

1. FREEZE-THAW: ALL CONCRETE EXPOSED TO FREEZING AND THAWING SHALL BE

NORMAL WEIGHT (ASTM C33) READY MIX CONCRETE (ASTM C94).

2. CONCRETE STRENGTH & MIX DESIGN: ALL CAST-IN-PLACE CONCRETE SHALL

CONFORM TO THE FOLLOWING: 1” MIN. SLUMP, A/C (AIR CONTENT) BASED ON 3/4"

AGGREGATE, NORMAL WEIGHT UNLESS NOTED OTHERWISE.

LOCATION: f'c @ 28 DAYS A/C MAX W/C

• FOUNDATION WALLS/PIERS 5,000 PSI 6% 0.45

• MAT FOUNDATIONS 4,000 PSI 2% 0.55

• FOOTINGS 3,500 PSI 2% 0.55

• INTERIOR SLAB ON GRADE 3,500 PSI 2% 0.55

• LW SLABS ON METAL DECK 4,000 PSI 4-7% 0.55

2% A/C INDICATES ENTRAPPED AIR IN NON-AIR ENTRAINED CONCRETE.

1. CALCIUM CHLORIDE: NO CALCIUM CHLORIDE SHALL BE USED IN ANY CONCRETE.

A. REINFORCEMENT

1. REINFORCEMENT SHALL NOT BE FIELD CUT, UNLESS OTHERWISE INDICATED.

REINFORCEMENT SHALL BE COLD BENT. HEATING REINFORCEMENT IS

PROHIBITED. RE-BENDING REINFORCING IS PROHIBITED.

2. BAR SUPPORT: PROVIDE BAR SUPPORTS AND SPACERS PER ACI 315 AND CRSI

"MANUAL OF STANDARD PRACTICE." ALL BAR SUPPORTS IN CONTACT WITH

EXPOSED SUBSURFACE SHALL HAVE PLASTIC TIPPED FEET. CONTRACTOR MUST

EXERCISE CARE TO PREVENT EXPOSURE OF TIE WIRED OR OTHER MATERIALS

THAT MAY STAIN EXPOSED CONCRETE. ALL REINFORCEMENT SHALL MAINTAIN

PROPER COVER AND SECURELY HELD IN PLACE DURING CONCRETE PLACEMENT.

3. MINIMUM CONCRETE COVER FOR REINFORCING STEEL SHALL BE AS FOLLOWS,

UNLESS NOTED OTHERWISE:

• ALL CONCRETE PERMANENTLY CAST AGAINST EARTH 3"

• ALL CONCRETE EXPOSED TO EARTH/WEATHER (≥ #6) 2"

• ALL CONCRETE EXPOSED TO EARTH/WEATHER (≤ #5) 1 1/2"

• SLAB ON GRADE (WELDED WIRE FABRIC) 2"

• BEAM STIRRUPS, COLUMN & PIER TIES, NOT EXPOSED 1 1/2"

• SLABS, WALLS & JOISTS, NOT EXPOSED (≤ #11) 3/4"

• CONCRETE ON METAL DECK, NOT EXPOSED 1"

4. WELDED WIRE FABRIC (WWF) SHALL BE PROVIDED IN FLAT SHEETS SUPPORTED ON

CONTINUOUS SLAB BOLSTERS AND LAPPED 1.5 X MESH SPACES OR MINIMUM OF 6".

5. DEVELOPMENT & LAP SPLICE TABLE: ALL LAP SPLICES SHALL BE CLASS "B",

UNLESS NOTED OTHERWISE.

TENSION LAP SPLICE COMPRESSION

BAR CLASS "A" CLASS "B" DOWEL EMBED. LAP SPLICE

1.0*Ld 1.3*Ld 22*db 30*db #3 15 19 9 12 #4 19 27 11 15 #5 25 31 14 19 #6 29 38 17 23 #7 43 55 19 26 #8 48 63 22 30 #9 54 71 25 34 #10 61 80 28 38

TABULATED VALUES ARE BASED ON THE FOLLOWING ASSUMPTIONS

• NORMAL WEIGHT & 4,000 PSI CONCRETE STRENGTH

• A MINIMUM CLEAR COVER AS SHOWN IN GENERAL NOTES.

• A MINIMUM CLEAR SPACING OF 3" BETWEEN ANY BARS.

MULTIPLY THE TABULATED TENSION SPLICE VALUES BY MODIFICATION FACTORS

BELOW AS APPLICABLE FOR OTHER CONCRETE TYPES, STRENGTHS AND

CONDITIONS. MODIFICATION FACTORS ARE CUMULATIVE. TENSION SPLICE LENGTH

SHALL NOT BE LESS THAN 12".

• F'c= 3 ksi, x 1.16

• F'c= 5 ksi, x 0.90

• LIGHT WEIGHT CONCRETE, x1.3

• EPOXY-COATED BARS, x1.5

• CLEAR SPACING < 2*db & CLEAR OVER < db, x1.5

5. COLD JOINTS SHALL BE ROUGHENED TO AN AMPLITUDE OF 1/4 INCH FOR THE

ENTIRE INTERSECTING SURFACE ACCORDING TO ACI RECOMMENDATIONS AND

APPLY A BONDING AGENT AS REQUIRED. DO NOT LOCATE CONSTRUCTION JOINTS

(COLD JOINTS) BELOW TERRAZZO FLOOR FINISHES.

6. WALL JOINTS:

• EXPANSION: WALLS EXCEEDING 90 FEET SHALL CONTAIN EXPANSION JOINTS AT

90 FEET ON CENTERS.

• CONTROL JOINTS: SHALL BE LOCATED AT RECOMMENDED SPACING BELOW, AT

ABRUPT CHANGES IN WALL HEIGHT OR THICKNESS, BUT NOT EXCEEDING 30' - 0"

O.C.

• WALL HEIGHT RECOMMENDED SPACING

• 8 FT OR LESS 3X WALL HEIGHT

• BETWEEN 8 FT AND 12 FT 2X WALL HEIGHT

• 12 FT OR GREATER 1X WALL HEIGHT

• CONSTRUCTION JOINTS: SHALL BE LOCATED AT:

• 60' - 0" O.C. MAXIMUM FOR NON-EXPOSED WALLS

• 30' - 0"' O.C. MAXIMUM FOR EXPOSED WALLS

• NOT LESS THAN 4' - 0" AWAY FROM FACE OF SUPPORTIVE PIER, BUTTRESS

OR WALL OPENINGS.

• CORNERS: JOINTS SHALL BE LOCATED NO FURTHER THAN 15'-0" FROM

CORNERS.

7. HORIZONTAL JOINTS ARE NOT PERMITTED IN BEAMS, WALLS, AND SLABS UNLESS

SPECIFICALLY SHOWN ON THE DRAWINGS OR APPROVED IN WRITING BY THE

ENGINEER PRIOR TO CONSTRUCTION.

G. FORMWORK AND SHORING

1. FORMWORK SHALL CONFORM TO THE LATEST EDITIONS OF ACI SPECIAL

PUBLICATION NO. 4 "FORMWORK FOR CONCRETE" AND ACI 347 "STANDARD

RECOMMENDED PRACTICE FOR CONCRETE FORMWORK".

2. SUBMIT FORMWORK AND SHORING DESIGN AND DETAIL DRAWINGS CERTIFIED BY A

REGISTERED PROFESSIONAL ENGINEER.

3. LOADS GREATER THAN THE DESIGN LIVE LOADS SHALL NOT BE PLACED ON ANY

PART OF THE STRUCTURE.

4. SHORING AND WALL BRACING SHALL REMAIN UNTIL AT MINIMUM 75% OF 28-DAY

DESIGN STRENGTH IS REACHED.

5. UNTIL THE CONCRETE HAS ATTAINED FULL 28-DAY DESIGN STRENGTH AND

VERIFIED BY AN APPROPRIATE ASTM STANDARD TEST METHOD,

• DO NOT REMOVE FORMWORK OR SHORING OF HUNG STRUCTURE BELOW. RE-

SHORE HUNG STRUCTURE AS NEEDED.

• DO NOT REMOVE RE-SHORING.

• DO NOT PLACE FULL DESIGN LOAD ON THE STRUCTURE.

• DO NOT PLACE MASONRY WALLS, PARAPETS, ETC. ON ANY PART OF THE

STRUCTURE.

6. AT LEAST 1 FLOOR SHALL BE FULLY FORMED AND SHORED WITH A MINIMUM OF 3

FLOORS BELOW RE-SHORED AT ANY GIVEN TIME. ADDITIONAL SHORING AND RE-

SHORING SHALL BE PROVIDED AS INDICATED BY THE SHORING DESIGN

REQUIREMENTS.

7. RE-SHORE POSTS SHALL BE PLACED AT THE INTERSECTION OF THE COLUMN AND

MIDDLE STRIP LINES IN EACH DIRECTION, WITH INTERMEDIATE POSTS AS

REQUIRED. VERTICALL ALIGN RE-SHORES TO PROVIDE CONTINUOUS SUPPORT

FROM FLOOR TO FLOOR. RE-SHORES MUST BE SNUG TO SLABS, BUT NOT TIGHT

ENOUGH TO ADD ADDITIONAL LOADS. RE-SHORING SHALL SUPPORT EACH PANEL

INDEPENDENTLY AS IT IS STRIPPED BEFORE REMOVING FORMS FROM ADJACENT

PANELS OR RE-STORES SHALL BE INSTALLED PRIOR TO REMOVAL OF SHORES AND

FORMWORK.

H. FIELD TESTING

1. UNLESS OTHERWISE PER CONTRACT DOCUMENTS, CAST THREE (3) CONCRETE

TEST CYLINDERS (4" DIA x 8" HIGH) FOR EACH 50 CUBIC YARDS OF CONCRETE

PLACED FOR TESTING AT 7, 14 AND 28 DAYS AND ONE SET OF ONE CYLINDER FOR

56 DAY VERIFICATION. ADDITIONAL CYLINDERS MAY BE TAKEN AND TESTED FOR

HIGH EARLY STRENGTH REQUIREMENTS SHOULD THE CONTRACTOR REQUIRE

THEM (IE WALL STRENGTH OR SHORING REMOVAL).

2. AT THE TIME OF CASTING EACH SET OF TEST CYLINDERS, SAMPLE CONCRETE PER

ASTM C172 AND MEASURE THE FOLLOWING AT THE POINT OF CONCRETE

PLACEMENT:

• AMBIENT TEMPERATURE

• CONCRETE TEMPERATURE

• UNIT WEIGHT PER ASTM C-138

• SLUMP PER ASTM C-143

3. AIR CONTENT PER ASTM C-173 OR ATM C-231

4. EVALUATE SLAB FLOOR FLATNESS AND PER ASTM E1155.

5. POST-INSTALLED ANCHORS SHALL BE INSPECTED PER IBC SPECIAL INSPECTION

REQUIREMENTS AND BE CONTINIOUSLY INSPECTED DURING PLACEMENT.

E. POST-INSTALLED ANCHORS

• REBAR: WHEN INSTALLING ANCHORS CONTRACTOR SHALL TAKE MEASURES TO

AVOID DRILLING/CUTTING ANY EXISTING REINFORCEMENT AND DESTRUCTION OF

CONCRETE. HOLES SHALL BE CLEANED PER SUPPLIER REQUIREMENTS PRIOR TO

SETTING/PLACEMENT.

• EXPANSION BOLTS SHALL CONFORM TO HILTI KWIK BOLT TZ OR APPROVED EQUAL

UNLESS NOTED OTHERWISE.

• ADHESIVE ANCHORS SHALL CONFORM TO HILIT HY-200 ADHESIVE ANCHORING

SYSTEM OR APPROVED EQUAL WITH THREADED ROD A193 GRADE B7.

F. PLACEMENT

1. OPENINGS AND PENETRATION LOCATION AND DIMENSIONS SHALL BE VERIFIED

AND COORDINATED BEFORE THE CONCRETE IS POURED. MINIMUM DISTANCE

BETWEEN SLEEVES IS THE GREATER OF SLEEVE DIAMETER OR 6 INCHES.

OPENINGS NOT SHOWN ON STRUCTURAL DRAWINGS REQUIRE APPROVAL FROM

STRUCTURAL ENGINEER IN WRITING PRIOR TO FIELD CUTTING/CORING SINCE

ADDITIONAL REINFORCEMENT MAY BE REQUIRED.

2. CHAMFER: EXPOSED EDGES SHALL BE CHAMFERED 1/2", UNLESS NOTED

OTHERWISE.

3. EMBEDDED ITEMS SHALL BE COORDINATED WITH OTHER TRADE DOCUMENTATION

BY THE CONTRACTOR. NO CONDUITS MAY BE EMBEDDED IN CONCRETE. SET AND

BUILD ANCHOR DEVICES AND EMBEDDED ITEMS REQUIRED FOR OTHER WORK

THAT IS ATTACHED TO OR SUPPORTED BY CAST-IN-PLACE CONCRETE. USE

SETTING DIAGRAMS, TEMPLATES, AND INSTRUCTIONS PROVIDED BY OTHERS FOR

LOCATION AND SETTING.

4. FLOOR SLABS:

a. COORDINATION: CONTRACTOR SHALL COORDINATE DEPRESSIONS FOR FLOOR

FINISHES, FLOOR DRAINS, CURBS, CONCRETE PADS, INSERTS, AND WELDED

PLATES WITH ALL OTHER TRADE DOCUMENTATION.

b. 28-DAY STRENGTH SHALL BE ATTAINED BEFORE POURING ANY TOPPING SLAB, OR BEFORE ANY MASONRY OR CONCRETE WALL IS ERECTED ON TOP.

c. FLATNESS & LEVELNESS OF CONCRETE FLOOR SHALL BE AS FOLLOWS U.N.O.

• SLAB ON GRADE: F(F) 35, F(L) 25, MINIMUM LOCAL F(F)=24, F(L) 18

• ELEVATED FLOOR: F(F) 30

d. THE CONTRACTOR SHALL PROVIDE CORRECTIVE MEASURES TO MEET

REQUIREMENTS FOR ASTM E1155 AND PROJECT SPECIFIC PARTITIONS.

A. CODES / STANDARDS: ALL CONCRETE MASONRY CONSTRUCTION SHALL COMPLY

WITH:

• THE "SPECIFICATION FOR THE DESIGN AND CONSTRUCTION OF LOAD-BEARING

CONCRETE MASONRY" PUBLISHED BY THE NATIONAL CONCRETE MASONRY

ASSOCIATION.

• BUILDING CODE REQUIREMENTS AND SPECIFICATION FOR MASONRY

STRUCTURES”- ACI 530/ASCE 5-05/TMS 402 AND ACI 530.1/ASCE 6-05/TMS 602.

B. SHOP DRAWINGS / SUBMITTALS

1. REFER TO SPECIFICATIONS FOR SUBMITTAL REQUIREMENTS.

C. MATERIAL INFORMATION

1. f 'm PRISM STRENGTH: MASONRY ASSEMBLY SHALL HAVE A NET AREA

COMPRESSIVE STRENGTH (f 'm) OF 2,500 PSI MINIMUM.

2. BLOCK MATERIAL: ALL CONCRETE MASONRY UNITS SHALL BE NORMAL WEIGHT,

GRADE N, COMPLYING WITH ASTM C90. NET AREA COMPRESSIVE STRENGTH OF

INDIVIDUAL CONCRETE MASONRY UNIT SHALL BE 3,250 PSI MINIMUM.

3. MORTAR: MORTAR FOR ALL CONCRETE MASONRY MUST BE TYPE S CEMENT-LIME

MORTAR PER ASTM C270.

4. GROUT: GROUT FOR GROUT FILLED MASONRY SHALL BE A HIGH SLUMP MIX

CONFORMING TO ASTM C476 AND SHALL ATTAIN A MINIMUM COMPRESSIVE

STRENGTH OF 3,000 PSI AT 28 DAYS FROM FIELD OBTAINED TEST CYLINDERS.

5. JOINT REINFORCEMENT: CONCRETE MASONRY UNITS SHALL BE CONSTRUCTED

WITH HORIZONTAL JOINTS REINFORCED WITH HOT-DIPPED GALVANIZED LADDER

TYPE REINFORCEMENT (ASTM A153 CLASS B-2).

6. REINFORCEMENT: SEE CONCRETE NOTES FOR REINFORCING STEEL

REQUIREMENTS, STANDARDS AND SPECIFICATIONS FOR ADDITIONAL NOTES.

PROVIDE LAP SPLICES IN ACCORDANCE WITH THE TYPICAL MASONRY LAP SPLICE

DETAIL FOR ALL REINFORCEMENT.

7. BRICK MASONRY: ALL BRICK MASONRY UNITS SHALL BE GRADE SW PER ASTM C216

WITH A MINIMUM COMPRESSIVE STRENGTH OF 3,000 PSI AND BONDED TOGETHER

WITH TYPE S MORTAR.

D. PLACEMENT: LAY CONCRETE MASONRY UNITS AS FOLLOWS:

A. GROUT SOLID ALL MASONRY BELOW GRADE.

B. GROUT SOLID MINIMUM OF (2) COURSES BELOW ALL BEARING POINTS ON CMU

WALL INCLUDING STAIR STRINGERS, LANDING BEAMS, AND ELEVATOR HOIST AND

DIVIDER BEAMS.

C. WITH FULL BED OF MORTAR COVERAGE ON HORIZONTAL AND VERTICAL FACE

SHELLS FOR HOLLOW MASONRY UNITS/CAVITIES.

D. BED WEBS IN MORTAR IN STARTING COURSE ON FOOTING AND IN ALL COURSES OF

PIERS, COLUMNS AND PILASTERS, AND WHERE ADJACENT TO CELLS OR CAVITIES

TO BE FILLED WITH GROUT.

E. FOR STARTING COURSE ON FOOTING WHERE CELLS ARE NOT GROUTED, SPREAD

OUT FULL MORTAR BED INCLUDING AREAS UNDER CELLS.

F. MAINTAIN JOINT WIDTHS INDICATED, EXCEPT FOR MINOR VARIATIONS REQUIRED TO

MAINTAIN BOND ALIGNMENT. IF NOT INDICATED, LAY WALLS WITH 3/8" JOINTS.

G. USE THE "HIGH LIFT" GROUTING METHOD WITH MAXIMUM LIFT HEIGHTS OF 48".

H. GROUT SHALL BE USED AS FILLING FOR VERTICAL CAVITIES, BOND BEAMS, LINTELS

AND HOLLOW MASONRY UNITS DESIGNATED AS SOLID GROUTED IN THE

DRAWINGS. MORTAR SHALL NOT BE USED TO FILL CELLS.

I. ALL CUTTING OF MASONRY SHALL BE DONE WITH MASONRY SAWS.

J. WALLS SHALL BE PROPERLY BRACED AGAINST LATERAL LOADS UNTIL THE

PERMANENT LATERAL BRACES OR OTHER LATERAL SUPPORT SYSTEMS HAVE BEEN

INSTALLED.

K. CONCRETE MASONRY SHALL BE PROTECTED FROM ABSORBING MOISTURE AND

WATER WHILE AT THE PLANT, DURING SHIPMENT, AND AT THE SITE DURING

CONSTRUCTION.

L. MASONRY FACADE SUSPENDED FROM OR SUPPORTED ON CONCRETE SLABS AND

BEAMS SHALL NOT BE ERECTED UNTIL PERMANENT ALIGNMENT AND ANCHORAGE

OF SHELF ANGLES AND SUSPENDED HARDWARE IS COMPLETED, ALL TEMPORARY

AND PERMANENT BRACING (WHERE REQUIRED) IS INSTALLED AND ALL SHORES

AND RE-SHORES ARE REMOVED. MASONRY SUPPORTED BY STEEL MEMBERS

SHALL NOT BE ERECTED UNTIL PERMANENT ANCHORAGE AND BRACING SYSTEMS

HAVE BEEN INSTALLED.

E. WALL JOINTS

1. PROVIDE VERT. CONTROL JOINTS IN BEARING & NON-LOAD BEARING CONCRETE

MASONRY WALLS AT FOLLOWING:

• SPACED 25' - 0" O.C. MAXIMUM THROUGHOUT LENGTH OF WALL

• AT CHANGES IN WALL HEIGHT OR THICKNESS

• AT PILASTERS, PIERS OR COLUMNS

• ADJACENT TO CORNERS AND INTERSECTIONS (WITHIN 12' - 6")

• AT OPENINGS WITH MASONRY LINTELS AT LEAST 2' - 0" AWAY EA. SIDE

• AT EACH END OF STEEL LINTELS (ABOVE ONLY).

2. CONTROL JOINTS SHALL EXTEND THROUGH ENTIRE WALL THICKNESS FOR FULL

WALL HEIGHT.

3. BOND BEAM REINFORCEMENT TO BE CONTINUOUS, WRAP BARS IN GREASE

COATED WRAP OR PROIVDE JOINT STABILZER ANCHORS.

4. HORIZONTAL JOINT REINFORCEMENT SHALL BE INTERRUPTED.

F. VERTICAL REINFORCEMENT

1. PROVIDE VERTICAL REINFORCEMENT IN GROUTED CELLS AS FOLLOWS:

• MINIMUM WALL REINFORCEMENT OF #4@48" O.C SHALL BE PROVIDED. SEE

DETAILS AND SHEET NOTES FOR INCREASED REINFORCEMENT BASED ON

SPAN/LOADING.

• VERTICAL REINFORCING SHALL BE ANCHORED INTO SUPPORTING SLAB OR

BEAMS BELOW WITH TENSION EMBEDMENT LENGTH.

2. ALL OTHER INTERIOR NON-LOAD BEARING WALLS SHALL BE DETAILED AND

REINFORCED PER THE TYPICAL DETAILS SHEET.

G. HORIZONTAL REINFORCEMENT

1. PROVIDE JOINT REINFORCEMENT AS FOLLOWS:

• 8" CMU: LADDER REINFORCEMENT WITH 9 GAUGE SIDE RODS AND CROSS RODS.

• 12" CMU: LADDER REINFORCEMENT WITH 3/16"Ø SIDE RODS AND 9 GAUGE

CROSS RODS.

2. LOCATIONS: JOINT REINFORCEMENT SHALL BE PROVIDED AT FOLLOWING:

COORDINATE WITH CONTROL JOINT LOCATIONS ON ARCHITECTURAL AND

STRUCTURAL DRAWINGS.

• TYPICAL 16" O.C. CONTINUOUS AT ALL CMU WALLS (U.N.O. AT SHEAR WALLS)

• AT FLOOR OR ROOF: @ 8" O.C. FOR 3 COURSES

• AT PARAPETS: @ 8" O.C.

• AT CORNERS & T INTERSECTIONS: 2' - 8" LONG E.W. @ 8" O.C. REINFORCEMENT

SHALL BE SHOP FABRICATED AND CONTINUOUS AROUND ALL CORNERS AND AT

INTERSECTIONS.

• AT HORIZONTAL JOINTS

3. PLACEMENT:

• REINFORCEMENT SHALL BE…