3-2026-06-18 Delco WarehouseElevatorAddition REVBID ME.pdf
PDF 644 KB Posted
- Solicitation number
- US.257928
- Issued by
- Delaware County, Pennsylvania
About this file
This document is a set of architectural and engineering drawings prepared by NORR for the County of Delaware, Pennsylvania Department of Public Works, specifically for the Voter Machine Warehouse Elevator Addition project located at 403 East 24th Street in Chester, PA. The project involves the installation of a service elevator to an existing two-story commercial warehouse building, classified as an Alteration Level II. The scope of work includes fire protection system modifications (sprinkler and standpipe systems), mechanical system installations (heating water supply and return piping, unit heaters, transfer fan, and sump pump), and related demolition of existing systems. The fire protection work requires compliance with NFPA 13 and NFPA 14 standards, with quick-response type sprinklers throughout the building. The mechanical work includes new hydronic piping at 1-1/2 inches with 2-inch fiberglass insulation, a transfer fan unit (TF-1) rated at 350 CFM, and a sump pump system (SP-1) for the elevator pit. A pre-bid conference is scheduled for October 20, 2026, at 11:00 AM, with invitations to bid (ITB) responses due November 10, 2026, at 11:00 AM via PennBid.
The contract documents indicate that all contractors must obtain approval of shop drawings from the owner's insurance carrier and the authority having jurisdiction prior to installation. The fire protection contractor bears sole responsibility for securing these approvals, with system pressure testing conducted at 200 PSI for 2 hours in the presence of the authority having jurisdiction. All work must comply with applicable NFPA standards, Pennsylvania Fire Safety Code, OSHA safety requirements, and local codes. The mechanical contractor must provide two filter changes prior to grand opening and coordinate all work with the structural, electrical, and fire protection trades. The contractor is responsible for obtaining necessary permits and paying all related fees, and all materials, equipment, and workmanship are guaranteed for one year after final acceptance. No specific pricing terms, set-asides, incumbent information, or funding sources are identified in these technical drawings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DSP
SPR/WSP
WSP
FDC
FPTH
SPR
F
TS
GENERAL NOTES
LEGEND
1. THESE GENERAL NOTES ARE APPLICABLE TO ALL FIRE PROTECTION DRAWINGS.
2. CONTRACTOR SHALL SUBMIT (2) SEPARATE HYDRAULIC CALCULATIONS.THE FIRST
CALCULATION IS FOR FIRE PUMP & SPRINKLER SYSTEM. THE SECOND IS FOR THE STANDPIPE
SYSTEM FROM THE FDC TO THE MOST REMOTE FHV COMPLYING WITH NFPA-14 (100PSI).
4.
THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND SHOW THE GENERAL INTENT OF
WORK. SEE DETAILS, RISERS, AND SPECIFICATION FOR ADDITIONAL INFORMATION. THE
CONTRACTOR IS RESPONSIBLE FOR A COMPLETE SYSTEM FOR FULL BUILDING COVERAGE.
ADDITIONAL SRINKLERS AND PIPING MAY BE REQUIRED TO ACCOMMODATE CONDITIONS SUCH
AS SOFFITS, DUCTWORK, STRUCTURE, LIGHTING, EQUIPMENT, BOOK STACKS, ETC. THE
CONTRACTOR SHALL PROVIDE A COMPLETE SPRINKLER INSTALLATION IN CONFORMANCE WITH
NFPA 13, NFPA 14, FEDERAL AND STATE CODES AND THEIR APPLICABLE SUPPLEMENTS, AND
THE REQUIREMENTS OF THE OFFICE OF THE STATE FIRE MARSHAL.
5.
REFER TO NFPA 13 FOR EXACT SPACING, DENSITY, AND LOCATION REQUIREMENTS.
CONTRACTOR SHALL INSTALL QUICK RESPONSE TYPE SPRINKLER IN ENTIRE BUILDING. USE OF
EXTENDED COVERAGE, QUICK RESPONSE, TYPE SPRINKLER MAY BE USED WITH THE APPROVAL
OF THE AUTHORITY HAVING JURISDICTION.
6.
SPRINKLERS IN FINISHED LAYIN TILE CEILING AREAS SHALL ALWAYS BE LOCATED IN THE
CENTER OF CEILING TILES UNLESS INDICATED OTHERWISE.
7.
REVIEW THE ARCHITECTURAL REFLECTED CEILING, ELEVATION AND SECTION PLANS AS PART
OF THIS CONTRACT FOR ADDITIONAL INFORMATION SUCH AS CEILING HEIGHTS, TYPES, SOFFITS
AND OR OTHER DEVICE LOCATIONS.
8.
REVIEW THE ELECTRICAL DIVISION DRAWINGS AND COORDINATE THE FIRE PROTECTION
WORK WITH LOCATIONS OF LIGHT, AND CEILING MOUNTED DEVICES WHICH MAY INTERFERE
WITH SPRINKLER LOCATIONS OR SPRAY PATTERNS.
9.
REVIEW THE HVAC DIVISION DRAWINGS AND COORDINATE THE FIRE PROTECTION WORK WITH
LOCATIONS OF CEILING MOUNTED DEVICES SUCH AS DIFFUSERS, GRILLS, REGISTERS, AND
ALSO THE LOCATIONS OF HEAT PRODUCING EQUIPMENT AND DUCTWORK REQUIRING
SPRINKLER PROTECTION BELOW IT.
14.
15.
16.
FIRE SERVICE PIPING
EXISTING SIDE WALL TYPE SPRINKLER
PENDENT TYPE SPRINKLER
CONCEALLED SIDE WALL SPRINKLER
DOUBLE CHECK DETECTOR ASSEMBLY (DCDA)
DRY TYPE SPRINKLER
FIRE DEPARTMENT CONNECTION
CONCEALLED TYPE PENDENT SPRINKLER
UPRIGHT TYPE SPRINKLER PIPE DROP
PIPE UP OR DOWN
SPRINKLER PIPING
FIRE PUMP TEST HEADER PIPING
FIRE DEPARTMENT CONNECTION PIPING
COMBINATION SPRINKLER / STANDPIPE
CAPPED OUTLET
CHECK VALVE
BACKFLOW PREVENTION DEVICE
PRESSURE GAUGE
PIPE BREAK
WATER TIGHT PIPE SLEEVE
CONTROL VALVE W/ SUPERVIRORY SWITCH. VALVE GATE BALL
REMOVE EXISTING SPRINKLER
WET STANDPIPE
DRY STANDPIPE
SIDE WALL TYPE SPRINKLER
EXISTING SPRINKLER
FIRE HOSE VALVE
FIRE PROTECTION CONSTRUCTION PROCEDURES
1. IT IS SOLELY THE FIRE PROTECTION CONTRACTOR'S RESPONSIBILITY TO OBTAIN APPROVAL OF
SHOP DRAWINGS FROM THE OWNERS INSURANCE CARRIER AND THE AUTHORITY HAVING
JURISDICTION. ANY INSTALLATION OF THE SPRINKLER SYSTEM WITHOUT APPROVED PLANS
SHALL BE AT THE SOLE RISK AND EXPENSE OF THE CONTRACTOR.
2. THE FIRE PROTECTION CONTRACTOR MUST CONTACT THE OWNERS CONSTRUCTION
COORDINATOR AND REQUEST WHENEVER THE SPRINKLER MAIN IS TO BE ISOLATED AND/OR
DRAINED. THIS PROCEDURE MUST BE ADHERED TO WHEN PRESSURE TESTING AND/OR PLACING
ANY PORTION OF SYSTEM IN OR OUT OF SERVICE.
3. THE OWNER'S CONSTRUCTION COORDINATOR AND THE AUTHORITY HAVING JURISDICTION
SHALL WITNESS ALL SYSTEM PRESSURE TESTS. CONTRACTOR MAKING THE TEST SHALL
PROVIDE 24 HOURS NOTICE TO ALL REQUIRED TO BE IN ATTENDANCE.
4. ALL WORK SHALL MEET THE REQUIREMENTS OF NFPA STANDARDS. INSTALLATION
PROCEDURES SHALL COMPLY WITH THE SAFETY RULES OF OSHA AND THE STATE OF
PENNSYLVANIA FIRE SAFETY CODE.
5. THE FIRE PROTECTION CONTRACTOR MUST PROVIDE A FIRE WATCH WHENEVER ANY WELDING
IS DONE WITHIN THE AREA BEING WORKED, DURING THE WIELDING OPERATION, AND FOR ONE
HOUR AFTER WELDING IS COMPLETE.
6. NO STOCK OF FURNISHINGS SHALL BE ALLOWED IN THE AREAS BEING WORKED UNTIL THE
ENTIRE SYSTEM IS COMPLETED IN ACCORDANCE WITH THE ABOVE NOTES AND APPROVED BY
THE AUTHORITY HAVING JURISDICTION.
7. PROVIDE A MATERIAL TEST AND CERTIFICATION FORM TO THE AUTHORITY HAVING
JURISDICTION AND OWNER'S INSURANCE CARRIER SO AS TO CERTIFY THAT THE SPRINKLER
SYSTEM WAS INSTALLED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, SPECIFICATIONS,
FEDERAL, STATE, AND LOCAL CODES AND PROCEDURES.
8. UPON COMPLETION OF SYSTEM INSTALLATION, PERFORM A HYDROSTATIC TEST ON ALL PIPING
AND ATTACHED APPURTENANCES IN THE PRESENCE OF AN AUTHORITY HAVING JURISDICTION.
THE SYSTEM SHALL BE HYDROSTATIC ALLY TESTED AT A PRESSURE OF 200 PSI AND SHALL
MAINTAIN THAT PRESSURE WITHOUT LOSS FOR 2 HOURS. TEST FAILURE SHALL BE DETERMINED
BY A DROP IN GAUGE PRESSURE OR VISUAL LEAKAGE. THE TEST PRESSURE SHALL READ FROM
A GAUGE LOCATED AT THE LOWEST ELEVATION POINT OF THE SYSTEM OR PORTION BEING
TESTED. ALL TESTING THE SYSTEM SHALL BE IN ACCORDANCE WITH NFPA 13 AND NFPA 25.
9. CONSTRUCTION PHASING OF THE PROJECT, THE EXISTING AREAS OF FIRE PROTECTION MUST
BE MAINTAINED. THE FIRE PROTECTION CONTRACTOR IS TO PROVIDE SERVICE TO THESE
AREAS FROM THE NEW FIRE PROTECTION SERVICE AS REQUIRED.
ABBREVIATIONS
LOW PRESSURE SWITCHLPS
PRESSURE SWITCHPS
PIV
PRFHV
NIC
POST INDICATOR VAVLE
PRESSURE REDUCING FIRE HOSE VALVE
NOT IN CONTRACT
JOCKEY PUMP CONTROLLER
JP
JPC
IT
JOCKEY PUMP
INTERMEDIATE TEMPERATUR (SPRINKLER)
HT
GPM
G
FPTH
GALLONS PER MINUTE
HIGH TEMPERATURE (SPRINKLER)
CAGE GUARD (SPRINKLER)
FIRE PUMP TEST HEADER
FIRE HOSE VALVE CABINET
FIRE VALVE CABINET
FHVC
FVC
FPC
FHV
FHR
FHC
FIRE PUMP CONTROLLER
FIRE HOSE VALVE
FIRE HOSE COBINET
FIRE HOSE RACK WITH HOSE
FDC
FS
FP
ELEV
FIRE DEPARTMENT CONNECTION
FLOW SWITCH
ELEVATION
FIRE PUMP
EC
DCVA
CTE
BFP
EXTENDED COVERAGE (SPRINKLER)
DOUBLE CHECK VALVE ASSEMBLY
CONNECT TO EXISTING
BACKFLOW PREVENTOR
ATS
AFF
AUTOMATIC TRANSFER SWITCH (FIRE PUMP)
ABOVE FINISHED FLOOR
POUNDS PER SQUARE INCHPSI
VERIFY IN FIELDVIF
TS
TYP
SV
TAMPER SWITCH
TYPICAL
SUPERVISORY VALVE
(E) EXISTING
WET STANDPIPEWSP
PIPING TO BE REMOVED(R)
AREA
SYSTEM TYPE
DENSITY
SPKR. TEMP MAX SF/HD
MIN. AREA
HAZARD
SPRINKLER SYSTEM DESIGN CRITERIA SYMBOLS
AREA OF
SCOPE
SYSTEM TYPE
DESIGNMDENSITY
GPM/SQ.FT.
SPRINKLER
ACTIVATION
TEMPERATURE
HAZARD
CLASSIFICATION
REMOTE
DESIGN AREA
MAXIMUM
SQ.FT. /
SPRINKLER
3.
MAKE PROVISIONS FOR DRAINING THE ENTIRE SYSTEM PER NFPA 13.
10. UNOCCUPIED SPACES WITHOUT CEILINGS SHALL BE PROVIDED WITH UPRIGHT SPRINKLERS.
11. SPRINKLERS SHALL BE INSTALLED UNDER FIXED OBSTRUCTIONS OVER 4 FEET (1.2M) WIDE
PER NFPA 13. THE CONTRACTOR SHALL VERIFY ALL DUCTWORK DIMENSIONS IN THE FIELD AND
INSTALL SPRINKLERS AS REQUIRED.
12.
13.
VERIFY THE DISTANCE BETWEEN CEILING AND BOTTOM OF STRUCTURAL BEAMS IN ALL AREAS
WITH REFLECTIVE CEILINGS.
ALL HORIZONTAL PIPING SHALL BE LOCATED ABOVE THE CEILING OR IN SOFFIT SPACES
UNLESS NOTED OTHERWISE.
VERIFY AND COORDINATE VALVE IDENTIFICATION REQUIREMENTS WITH OWNER STANDARDS
IN THE FIELD.
THE SPRINKLER EQUIPMENT ROOM AND FIRE PROTECTION EQUIPMENT COMPONENTS (E.G.
VALVES, PIPING, TAMPER SWITCHES, FLOW ALARMS, ECT..) SHALL REQUIRE PROPER
IDENTIFICATION AS PER THE REQUIREMENT OF NFPA13.
THE SUBMISSION OF AUTOMATIC FIRE SUPPRESSION (SPRINKLER) SYSTEM SHOP DRAWINGS
(E.G. INFORMATION RELATIVE TO SPRINKLERS, FITTINGS, CHECK VALVES, EXPOSURE TO
HAZARDS, EXTENT OF SYSTEM COVERAGE, SUPPRESSION SYSTEM DESIGN CRITERIA, WATER
SUPPLY SOURCE, SUPPLY AND EXTINGUISHING AGENTS, LOCATION AND METHOD OF
OPERATION FOR DETECTION AND ALARM DEVICES,ECT. ) SHALL BE REQUIRED FOR REVIEW AND
EVALUATION AS PER IBC, 2009: THE STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
(NFPA-13) AND THE HUD MAP CHAPTER 5 GUIDELINES.
EXTENT OF DEMOLITION NEW CONNECTION SYMBOL
CL
THREADED SUPPORT ROD
PIPE
CLEVIS HANGER
BEAM CLAMP
TYPICAL
NUT AND
WASHER
TYPICAL
METAL CHANNEL
STRUT
METAL DECKING
STRUCTURAL STEEL OR
OPEN WEB STEEL
JOINTS
(TYPICAL)
C-CLAMP TOP BEAM
FOR PIPING 3" &
SMALLER
C-CLAMP FOR
PIPING
3" & SMALLER
SIDE BEAM
CLAMP
DOUBLE SIDED BEAM
CLAMP
HANGER ROD -
TYPICAL
(SEE NOTE 1)
EQUIPMENT PROVIDE MIN. 3/8" DIA. HANGER ROD
(REFER TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS).
NOTES:
PIPE HANGER DETAIL
NTS
BRANCH LINE
NIPPLE
NEW CEILING
DROP NIPPLE
COVER PLATE
REDUCER
SPRINKLER HEAD
CONCEALED SPRINKLER TYPE DETAIL
NTS
AS PER
NFPA 13
UPRIGHT SPRINKLER
BRANCH TEE
UPRIGHT SPRINKLER DETAIL
NTS
NORR
One Penn Center 1617 JFK Blvd, Suite 1600 Philadelphia, PA 19103 norr.com
ARCH E Title Block - v.2023 - Rev (Sept/23) - Copyright © 2023
Drawing No.
Project No.
Drawing Title
Project
Seal
Design Team
Project Manager
Project Architect Checked
Drawn
Client
Architecture:
Structural:
Mechanical:
Electrical:
A
BD C
This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Architect or Engineer
E
NORR
NORR
NORR
NORR
A u to d e s k D o c s
/D e lC o
V o ti n g M a c h in e W a re h o u s e E le v a to r A d d it io n /I N
-0
M
E i_
D e lc o W a re h o u s e E le v a to rA d d it io n v .r v t
/2
/2
:5 :1
A
M
IN2325-0323
FP00-01
COVER SHEET
VOTING MACHINE
WAREHOUSE ELEVATOR
ADDITION
COUNTY OF DELAWARE
DEPARTMENT OF PUBLIC
WORKS
403 EAST 24TH STREET, CHESTER, PA 19013
105 W 3RD ST, MEDIA, PA 19063
BM
ZHOP
SO
This drawing has been prepared solely for the use of
COUNTY OF DELAWARE DEPARTMENT OF PUBLIC
WORKS and there are no representations of any kind made by NORR to any party with whom NORR has not entered into a contract.
FIRE PROTECTION SHEET LIST
FP00-01 COVER SHEET
FP20-01 OVERALL FIRE PROTECTION PLAN - FIRST FLOOR
FP20-02 OVERALL FIRE PROTECTION PLAN -SECOND
FLOOR
DATE ISSUED FOR REV
2026.03.04 BIDDING A
2026.04.28 PLAN REVIEW B
2026.04.28 PLAN REVIEW B06 C1818 REISSUED FOR BID
D D
C C
B B
A A
2.5
2.5
3.5
3.5
4.5
4.5
C.7 C.7
D D
C C
B B
A A
2.5
2.5
3.5
3.5
4.5
4.5
C.7 C.7
NEW ELEVATOR
SHAFT
EXISTING STREET
LEVEL VOTING
MACHINES
STORAGE AREA
EXISTING MID LEVEL
VOTING MACHINES
STORAGE AREA
EXISTING OFFICE
(N.I.C.)
EXISTING LUNCH
ROOM (N.I.C.)
EXISTING CORRIDOR
(N.I.C.)
EXISTING TOILET
(N.I.C.)
SYSTEM TYPE
AREA
DENSITY (GPM/SQ.FT.)
SPRINKLER TEMP. MAXIMUM SQ.FT./ SPR
DESIGN AREA (SQ.FT.)
HAZARD
WAREHOUSE
WET LIGHT
0.10
155 255
CONTRACTOR SHALL MODIFY SPRINKLER
HEAD DROPS AS NEEDED FOR NEW
ELEVATOR LOCATION. CONTRACTOR SHALL
ADD HEADS TO MAINTAIN COVERAGE
(E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD
(E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD
(E) UPRIGHT HEAD (E)HEAD
TO BE
DEMO
(E) UPRIGHT HEAD (E) UPRIGHT HEAD
(E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD
(E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD
CONTRACTOR SHALL REMOVE
SPRINKLER PIPING AND HEAD
AS INDICATED. CAP END OF PIPE.
END DEMO HERE
(E )F
P W
(E )F
P W
(E )F
P W
(E )F
P W
(E )F
P W
(E )F
P W
(E )F
P W
(E )F
P W
(E )F
P W
(E )F
P W
(E )F
P W
(E )F
P W
D E
M O
P
IP
E
(E )F
P W
(E )F
P W
(E )F
P W
(E )F
P W
NORR
One Penn Center 1617 JFK Blvd, Suite 1600 Philadelphia, PA 19103 norr.com
ARCH E Title Block - v.2023 - Rev (Sept/23) - Copyright © 2023
KEY PLAN
Drawing No.
Project No.
Drawing Title
Project
Seal
Design Team
Project Manager
Project Architect Checked
Drawn
Client
Architecture:
Structural:
Mechanical:
Electrical:
A
BD C
This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Architect or Engineer
E
NORR
NORR
NORR
NORR
A u to d e s k D o c s
/D e lC o
V o ti n g M a c h in e W a re h o u s e E le v a to r A d d it io n /I N
-0
M
E i_
D e lc o W a re h o u s e E le v a to rA d d it io n v .r v t
/2
/2
:5 :2
A
M
IN2325-0323
FP20-01
OVERALL FIRE
PROTECTION PLAN - FIRST
FLOOR
VOTING MACHINE
WAREHOUSE ELEVATOR
ADDITION
COUNTY OF DELAWARE
DEPARTMENT OF PUBLIC
WORKS
403 EAST 24TH STREET, CHESTER, PA 19013
105 W 3RD ST, MEDIA, PA 19063
BM
ZHOP
SO
This drawing has been prepared solely for the use of
COUNTY OF DELAWARE DEPARTMENT OF PUBLIC
WORKS and there are no representations of any kind made by NORR to any party with whom NORR has not entered into a contract.
SCALE: 3/16" = 1'-0"
OVERALL FIRE PROTECTION PLAN -FIRST FLOOR
DATE ISSUED FOR REV
2026.03.04 BIDDING A
FE-4
FE-4
FE-4
D D
C C
B B
A A
2.5
2.5
3.5
3.5
4.5
4.5
C.7 C.7
D D
C C
B B
A A
2.5
2.5
3.5
3.5
4.5
4.5
C.7 C.7
(E) UPRIGHT
HEAD
(E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD
(E) UPRIGHT
HEAD
(E) UPRIGHT HEAD (E) UPRIGHT HEAD
(E) UPRIGHT
HEAD
(E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD
(E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD
CONTRACTOR SHALL REMOVE
SPRINKLER PIPING AND HEAD
AS INDICATED. CAP END OF PIPE.
(E)HEAD
TO BE
DEMO
/2 "ø
F P
(E
P
IP
E
T O
B E
D E
M O
(E )F
P W
(E )F
P W
(E )F
P W
(E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD (E) UPRIGHT HEAD
(E )F
P W
(E )F
P W
(E )F
P W
(E )F
P W
(E )F
P W
(E )F
P W
WOMENS TOILET
MENS TOILET
OFFICE
UNASSIGNED AREA
VOTING MACHINES
STORAGE AREA
VOTING MACHINES
STORAGE AREA
NEW UPRIGHT HEAD
NEW ELEVATOR
SHAFT
NORR
One Penn Center 1617 JFK Blvd, Suite 1600 Philadelphia, PA 19103 norr.com
ARCH E Title Block - v.2023 - Rev (Sept/23) - Copyright © 2023
KEY PLAN
Drawing No.
Project No.
Drawing Title
Project
Seal
Design Team
Project Manager
Project Architect Checked
Drawn
Client
Architecture:
Structural:
Mechanical:
Electrical:
A
BD C
This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Architect or Engineer
E
NORR
NORR
NORR
NORR
A u to d e s k D o c s
/D e lC o
V o ti n g M a c h in e W a re h o u s e E le v a to r A d d it io n /I N
-0
M
E i_
D e lc o W a re h o u s e E le v a to rA d d it io n v .r v t
/2
/2
:5 :2
A
M
IN2325-0323
FP20-02
OVERALL FIRE
PROTECTION PLAN
-SECOND FLOOR
VOTING MACHINE
WAREHOUSE ELEVATOR
ADDITION
COUNTY OF DELAWARE
DEPARTMENT OF PUBLIC
WORKS
403 EAST 24TH STREET, CHESTER, PA 19013
105 W 3RD ST, MEDIA, PA 19063
BM
ZHOP
SO
This drawing has been prepared solely for the use of
COUNTY OF DELAWARE DEPARTMENT OF PUBLIC
WORKS and there are no representations of any kind made by NORR to any party with whom NORR has not entered into a contract.
SCALE: 3/16" = 1'-0"
FIRE PROTECTION PLAN - LEVEL 2
DATE ISSUED FOR REV
2026.03.04 BIDDING A
S
CO
W
VB
FM
H
RS
P
T
TS
HWS
M.X
S/R
M.X
CALL OUT SYMBOLS
SUPPLY OR RETURN AIR RISER DESIGNATION
FOR CONTINUATION
REFER TO DRAWINGS (XXX)
SYMBOL DESIGNATES ASSOCIATED
SYSTEM OR SERVICE (ie LPS)
DIFFUSER, GRILLE, REGISTER LETTER
ALTERNATE CFM LOCATION
DESIGN CFM
DESIGNATOR
A(200)
(200)
DETAIL DESIGNATION
PIPING SYSTEM RISER DESIGNATION
SECTION DESIGNATION
SHEET NUMBER
SHEET NUMBER
REMOTE TEMPEATURE SENSOR
REVISION NUMBER
REVISION CLOUD
SMOKE DETECTOR
OR HUMIDISTAT
STATIC PRESSURE SENSOR
RETURN/EXHAUST AIR FLOW
HUMIDITY SENSOR
THERMOSTAT
SUPPLY AIR FLOW
TEMPERATURE SENSOR
CONNECT TO EXISTING
LIMIT OF REMOVAL
SUPPLY LINES (CHWS, HWS, CWS, ETC...)
RETURN LINES (CHWR, HWR, CWR, ETC...)
REDUCER (ECCENTRIC-FLAT ON BOTTOM OR FLAT ON TOP)
STRAINER WITH HOSE BIBB & CAP (GATE VALVE FOR STEAM)
UNION OR FLANGE (AS INDICATED BY PIPE SIZE - SEE SPEC.)
PITCH PIPE DOWN IN DIRECTION OF FLOW
DROP (DOUBLE LINE - PLAN VIEW)
PITCH PIPE UP IN DIRECTION OF FLOW
CLEAN-OUT FOR CONDENSATE DRAIN
RISE (DOUBLE LINE - PLAN VIEW)
DROP (SINGLE LINE - PLAN VIEW)
RISE (SINGLE LINE - PLAN VIEW)
PIPE BREAK (DOUBLE LINE)
"TD" THERMODYNAMIC
PUMPED CONDENSATE
STEAM PIPING
REFRIGERANT PIPING
HOT WATER PIPING
CHILLED WATER PIPING
CONDENSATE DRAIN PIPING
CONDENSER WATER PIPING
"T" THERMOSTATIC
"F&T" FLOAT & THERMOSTATIC
"IB" INVERTED BUCKET
DIRECTION OF FLOW IN PIPE
STEAM TRAP:
PIPE BREAK (SINGLE LINE)
WATER METER DIAL TYPE
DIRT LEG
TOP TAKEOFF
BOTTOM TAKEOFF
VALVE IN VERTICAL
CHWS
UP
DN
HWS
PC
LPS
CWS
R
D
"XX"
AUTOMATIC AIR VENT WITH ISOLATION VALVE
REFER TO SPECIFICATIONS FOR BODY STYLE
PRESSURE GAUGE WITH GAUGE CLOCK
BLIND FLANGE
END CAP
ANCHOR
PRESSURE/TEMPERATURE WELL
THERMOSTATIC AIR VENT
REDUCER (CONCENTRIC)
EXPANSION JOINT
PIPE GUIDE
FLEXIBLE CONNECTION
MANUAL AIR VENT
STRAINER
VACUUM BREAKER
THERMOMETER
M
PT
COMBINATION FLOWMETER/SHUT OFF/BALANCING VALVE
VALVE WITH MEMORY STOP; REFER TO SPEC FOR BODY STYLE
TWO WAY AUTOMATIC CONTROL VALVE, TWO POSITION ACTUATOR
THREE WAY AUTOMATIC CONTROL VALVE, TWO POSITION ACTUATOR
AUTOMATIC FLOW CONTROL VALVE (PRESSURE INDEPENDENT)
TWO WAY AUTOMATIC CONTROL VALVE, MODULATING ACTUATOR
THREE WAY AUTOMATIC CONTROL VALVE, MODULATING ACTUATOR
VALVE WITH HOSE BIBB, CAP & CHAIN (DRAIN VALVES)
VALVE; REFER TO SPECIFICATIONS FOR BODY STYLE
FLOW MEASURING DEVICE
FLOW SWITCH
SAFTEY RELIEF VALVE
BALANCING VALVE
PRESSURE REDUCING VALVE
CHECK VALVE
PIPING
(CIRCUIT SETTER)
HYDRONIC SYSTEM SPECIFIC ABBREVIATIONS
EXPANSION TANK
ENTERING WATER TEMPERATURE
HOSE BIBB CONN W/CHAINED CAP
HOT WATER
COOLING WATER RETURN
COOLING WATER SUPPLY
COOLING TOWER BLOW DOWN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
DRAIN OFF VALVE
CHILLED WATER
COOLING TOWER
COMPRESSION TANK
AIR SEPARATOR
AUTOMATIC AIR VENT
CHILLER
CHWS
DOV
EWT
HW
ET
HB
CWS
CTBD
CTK
CWR
CR
CS
CT
AAV
CHW
CHWR
AS
CH
HOT WATER SUPPLY
PRIMARY CHILLED WATER SUPPLY
PRIMARY CHILLED WATER RETURN
NET POSITIVE SUCTION HEAD
LEAVING WATER TEMPERATURE
PLATE HEAT EXCHANGER
HOT WATER RETURN
MANUAL AIR VENT
PCHWS
PCHWR
PHX
P
MAV
NPSH
LWT
PUMP
HWR
HWS
LEGEND NOTES:
PROJECT NOTES:
HVAC GENERAL NOTES
THIS SHEET IS A GENERAL LIST OF SYMBOLS AND ABBREVIATIONS AND SHALL BE USED AS A DICTIONARY TO DEFINE ITEMS INDICATED ON DRAWINGS. NOT ALL SYMBOLS OR ABBREVIATIONS ARE NECESSARILY
USED ON THIS PROJECT.EXHAUST
GENERAL CONTRACTOR
GALLONS PER MINUTE
GALLONS PER HOUR
GYPSUM WALL BOARD
HEAT EXCHANGER
HORSEPOWER
HEIGHT
FINNED TUBE RADIATION
FEET PER SECOND
FLOW CONTROL VALVE
FEET PER MINUTE
GALVANIZED
GALLONS
FURNISHED
FLEXIBLE
FIRE PROTECTION
DRY BULB TEMPERATURE
ELECTRIC CABINET UNIT HEATER
ENTERING AIR TEMPERATURE
DIRECT DIGITAL CONTROL
ENTERING
EQUIPMENT
ELEVATION
ELECTRICAL
EFFICIENCY
DRAWING
DIMENSION
DIAMETER
CABINET UNIT HEATER
CORRIDOR
CONTRACTOR
CUBIC FEET
COLUMN
CONCRETE
CLEAN-OUT
CEILING FAN
CENTERLINE
CEILING
BRITISH THERMAL UNIT PER HOUR
BRITISH THERMAL UNIT
BELOW FINISHED FLOOR
BRAKE HORSEPOWER
BASEMENT
BUILDING
BOILER
BOTTOM OF PIPE
BOTTOM OF DUCT
GC
HR HOUR
HZ
HX
HERTZ
GWB
HP
H
HD
GPM
GPH
HEAD
FT/SEC
GAL
GALV
G
FURN
FT
GAS
FEET
FLEX
FPM
FLR
FP
FCV
FTR
FLOOR
EXH
ENT
EQUIP
ELEV
ELEC
ECUH
EA
EFF
EAT
DWG
DIM
DN
DIA
EACH
DOWN
CO
DB
DDC
CUH
D DRAIN
CONTR
CORR
CUF
COL
CONC
BTU
CLG
CF
CL
BTUH
BLR
BOD
BSMT
BOP
BLDG
BFF
BHP
W/O WITHOUT
WET BULB TEMPERATURE
WATER GAUGEWG
WB
VARIABLE FREQUENCY DRIVE
REVOLUTIONS PER MINUTE
VENT THROUGH ROOF
UNIT HEATER
TOP OF DUCT
TOP OF PIPE
TEMPERATURE
STAINLESS STEEL
STANDARD
SPECIFICATIONS
SQUARE FEET
RELATIVE HUMIDITY
UH
W/
VTR
W
VFD
VEL
V
WIDTH
WITH
VENT
VELOCITY
TOD
TYP
TOP
TEMP
TYPICAL
STDBY
SUP
SS
STD
SQFT
SQ
STANDBY
SUPPLY
SQUARE
SPECS
RH
RM
RPM
ROOM
POUNDS PER SQUARE INCH GAUGE
POUNDS PER SQUARE INCH ABSOLUTE
POUNDS PER CUBIC FOOT
POLYVINYL CHLORIDE
PLUMBING
PRESSURE
PRESSURE DROP
OUTLET VELOCITY
OPEN DRIP PROOF
OUTSIDE DIAMETER
NOT TO SCALE
NOT IN CONTRACT
NOISE CRITERIA
NOT APPLICABLE
OCTAVE BAND
REQD
RET
PVC
PSIG
PSIA
REQUIRED
RETURN
PD
PRESS
PLBG
PH
OV
PCF
PHASE
ODP
OD
NTS
OB
NIC
NOM
NC
N/A
NOMINAL
BUILDING AUTOMATION SYSTEM
AIR SEPARATOR
AVERAGE
ABOVE FINISHED GRADE
AUTOMATIC TEMPERATURE CONTROL
ABOVE FINISHED FLOOR
AUTOMATIC CONTROL VALVE
DEGREES FAHRENHEIT
ARCHITECT
ACCESS PANEL
ACCESS DOOR
DEGREES CELSIUS
DIAMETER
AFF
AVG
BAS
AS
ARCH
ATC
AP
AFG
ACV
AD
°F °C
THOUSAND BRITISH THERMAL UNITS / Hr.
MOTOR CONTROL CENTER
GENERIC HVAC ABBREVIATIONS
MECHANICAL
MAKEUP WATER
MEZZANINE
MANUFACTURER
MINIMUM CIRCUIT AMPS
ONE THOUSAND
LINEAR FEET
KILOVOLT AMPERE
INSULATION
INSIDE DIAMETER
LB POUND
MCC
MTD
MU
MIN
MECH
MEZZ
MFR
MOUNTED
MINIMUM
MAX
MBH
MCA
LVG
LF
M
MAXIMUM
LEAVING
KVA
KW
L
INSUL
ID
IN
LENGTH
KILOWATT
INCHES
ELECTRIC UNIT HEATEREUH
EXISTING TO BE REMOVED(ER)
(E) EXISTING
(RE) RELOCATED EXISTING
LD LINEAR DIFFUSER
NEW(N)
INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALL UNITS PLUMB AND LEVEL, FIRMLY ANCHORED IN LOCATIONS INDICATED, AND MAINTAIN MANUFACTURER'S
RECOMMENDED CLEARANCES.
ALL MATERIAL SHALL BE SUBMITTED TO THE A/E VERIFYING IT IS ADEQUATE FOR INSTALLATION PER THE SPECIFICATIONS AND DRAWING. VERIFY DIMENSIONS AND CLEARANCES AT BUILDING BEFORE COMMENCING
WORK.
MECHANICAL CONTRACTOR SHALL PROVIDE TWO FILTER CHANGES PRIOR TO GRAND OPENING.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE ACTUAL LOCATION OF EXISTING
STRUCTURAL MEMBERS AND COORDINATE INSTALLATION OF THE EQUIPMENTS ACCORDINGLY.
THE CONTRACTOR SHALL FULFILL ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS AND SHALL COMPLETE THE IMPROVEMENTS SHOWN ON THE DRAWINGS. ALL SYSTEMS SHALL BE FINISHED, TESTED, AND BALANCED, ADJUSTED, AND PROVEN FULLY OPERATIONAL AND USEABLE.
EXCEPT WHERE SPECIFICALLY SHOWN OR SPECIFIED OTHERWISE, EXISTING WORK IS TO REMAIN.
WHERE PIPES, CONTROL DEVICES AND WIRING WHICH ARE TO REMAIN IN-SERVICE ARE DISCONNECTED FOR THE REMOVAL OR RELOCATION OF EQUIPMENT OR BECAUSE OF BUILDING ALTERATIONS, THEY SHALL BE RE-
CONNECTED.
TRANSITION RECTANGULAR DUCTWORK ON BOTTOM AND SIDES. MAINTAIN TOP OF DUCTWORK LEVEL AND
AS HIGH AS POSSIBLE. PROVIDE VOLUME DAMPER AT EACH BRANCH DUCTWORK.
CONTRACTOR SHALL COORDINATE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT WITH THE
ELECTRICAL CONTRACTOR PRIOR TO ORDERING.
MOUNT THERMOSTATS AND FAN SWITCHES WHERE INDICATED ON PLANS 48" AFF UNLESS NOTED
OTHERWISE.
COORDINATE DUCTWORK AND PIPING WITH PLUMBING, FIRE PROTECTION AND ELECTRICAL.
MAKE OFFSETS AND TRANSITIONS TO COORDINATE WITH OTHER TRADES WITHOUT ADDITIONAL EXPENSE TO
THE OWNER.
PROVIDE FIRE DAMPERS OR FIRE SMOKE DAMPERS WHERE INDICATED ON THE PLANS. PROVIDE DUCT ACCESS PANELS FOR SERIVCING AND COORDINATE WITH ARCHITECT FOR WALL OR CEILING ACCESS PANEL
LOCATIONS.
EXACT LOCATIONS OF ALL CEILING AIR DEVICES SHALL BE COORDINATED WITH LIGHT FIXTURES, SPRINKLER HEADS AND OTHER CEILING MOUNTED FIXTURES AT JOB SITE. REFER TO ARCHITECTURAL REFLECTED
CEILING PLAN.
THE SCOPE OF WORK SHALL INCLUDE PROVIDING ALL WORK INDICATED, AND COORDINATION
WITH ALL TRADES. SCOPE OF WORK IS INDICATED ON THE CONTRACT DOCUMENTS INCLUDING
THE DRAWINGS AND THE SPECIFICATIONS, WHICH ARE COMPLIMENTARY. WORK INDICATED IN
ANY CONTRACT DOCUMENT SHALL BE CONSIDERED PART OF THE SCOPE OF WORK. IN
GENERAL, WORK REQUIREMENTS ARE NOT INDICATED IN BOTH DOCUMENTS. WHERE
DOCUMENTS CONFLICT WITHIN THEMSELVES OR WITH CODES AND REGULATIONS, PROVIDE
THE HIGHER QUANTITY AND QUALITY AND FOLLOW THE STRICTER REQUIREMENTS.
ALL MOUNTING HEIGHTS ARE TO BOTTOM UNLESS OTHERWISE INDICATED.
IF EXACT MOUNTING OR RACEWAY ROUTINGS ARE NOT INDICATED (LOCATION OR HEIGHT)
COORDINATE WITH OTHER TRADES AND REQUEST CLARIFICATION PRIOR TO ROUGHING, OR
INSTALLATION.
A
T
BALL VALVE; REFER TO SPEC FOR BODY STYLE
LEGEND
STORM PIPE STORM
PART 1 - GENERAL
1.1 SCOPE OF WORK
A. PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY FOR
THE INSTALLATION OF A COMPLETE PLUMBING SYSTEMS AS
INDICATED ON DRAWINGS.
1.2 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
DIVISION 1 SPECIFICATION SECTIONS, APPLY TO THIS DRAWING
SPECIFICATIONS.
1.3 REGULATIONS
A. ENTIRE INSTALLATION, INCLUDING MATERIALS, EQUIPMENT AND
WORKMANSHIP, SHALL CONFORM WITH ALL APPLICABLE LAWS,
CODES AND REGULATIONS OF MUNICIPAL, STATE AND FEDERAL
AUTHORITIES.
B. THE CONTRACTOR SHALL MAKE TESTS FOR ACCEPTANCE AND
APPROVAL AS REQUIRED BY THE CODE AND THE OWNER'S
REPRESENTATIVE.
1.4 PERMITS
A. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS,
APPROVALS AND PAY ALL RELATED FEES AS REQUIRED BY THE LOCAL
MUNICIPALITY.
1.5 PROTECTION
A. EFFECTIVELY PROTECT ALL MATERIALS AND EQUIPMENT FROM DUST,
DIRT, AND DAMAGE UNTIL FINAL ACCEPTANCE.
1.6 SAFETY
A. DURING CONSTRUCTION, THE CONTRACTOR(S) SHALL BE
RESPONSIBLE FOR PROVIDING ALL HIS EMPLOYEES WITH SAFE AND
HEALTHFUL WORKING CONDITIONS AS PRESCRIBED IN THE "SAFETY
AND HEALTH REGULATIONS FOR CONSTRUCTION" OF THE
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION OF THE U.S.
DEPARTMENT OF LABOR.
1.7 GUARANTEE
A. ALL MATERIALS, EQUIPMENT, AND WORKMANSHIP SHALL BE
GUARANTEED IN WRITING FOR ONE (1) YEAR AFTER FINAL
ACCEPTANCE BY OWNER.
1.8 COORDINATION
A. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR(S) TO VERIFY
FIELD CONDITIONS AT THE SITE AND NOTIFY THE OWNER'S
REPRESENTATIVE OF ANY DISCREPANCIES.
B. ANY CHANGES AND/OR MODIFICATIONS MUST BE REVIEWED AND
APPROVED BY OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION.
1.9 SHOP DRAWINGS
A. THE CONTRACTOR(S) SHALL SUBMIT THE REQUIRED COPIES OF SHOP
DRAWINGS FOR ALL SYSTEM COMPONENTS TO OWNER'S
REPRESENTATIVE FOR APPROVAL.
B. PROVIDE A STAMP ON EACH SUBMITTAL INDICATING CONTRACTOR'S
REVIEW AND APPROVAL IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS.
1.10 DRAWINGS
A. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE EXTENT, GENERAL
CHARACTER AND LOCATION OF THE WORK INCLUDED. OFFSETS OR
CHANGES IN DIRECTION TO AVOID STRUCTURAL OR OTHER
INTERFERENCES, AND WORK INDICATED BUT HAVING MINOR DETAILS
OBVIOUSLY OMITTED SHALL BE PROVIDED WITHOUT EXTRA COST.
B. FINAL PIPING CONNECTIONS TO FIXTURES, EQUIPMENT, PIPING BY
OTHERS, ETC., WHERE NOT SPECIFICALLY SHOWN, SHALL BE
NCLUDED AT NO ADDITIONAL COST.
1.11 RECORD DRAWINGS
A. DURING CONSTRUCTION, THE CONTRACTOR(S) SHALL MAINTAIN A
RECORD SET OF INSTALLATION PRINTS. RECORD ON THESE PRINTS
ALL DEVIATIONS FROM THE CONTRACT DRAWINGS IN SIZES,
LOCATIONS, AND DETAILS.
B. AT THE COMPLETION OF THE WORK, THE CONTRACTOR SHALL
FORWARD THESE PRINTS TO OWNER.
1.12 GENERAL REQUIREMENTS
A. THE CONTRACTOR(S) SHALL FIELD COORDINATE WITH MECHANICAL,
ELECTRICAL CONTRACTORS.
B. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS.
C. CONTRACTOR(S) SHALL PROVIDE ALL ITEMS, ASSEMBLIES, FITTINGS,
SUPPLIES, AND ACCESSORIES REQUIRED FOR THE INSTALLATION OF
THEIR WORK.
D. FURNISH AND INSTALL SUITABLE AND SUBSTANTIAL HANGERS AND
SUPPORTS FOR ALL HORIZONTAL AND VERTICAL PIPING. HANGERS
MAY BE DIRECTLY MOUNTED TO BEAMS OF BUILDING CONSTRUCTION.
THE INTENTION IS TO PROVIDE SUPPORTS WHICH IN EACH CASE
SHALL BE AMPLY STRONG AND RIGID FOR THE LOAD BUT WHICH
SHALL NOT WEAKEN OR UNDULY STRESS THE BUILDING
CONSTRUCTION.
E. THE CONTRACTOR(S) SHALL BE RESPONSIBLE FOR ALL CUTTING AND
PATCHING REQUIRED FOR THE INSTALLATION OF THEIR RESPECTIVE
WORK.
F. DEMOLITION SHALL INCLUDE COMPLETE REMOVAL OF EXISTING
PLUMBING SYSTEMS OR BRANCH PIPING INDICATED. CAP WASTE
PIPING AND WATER PIPING BEHIND WALLS, BELOW FLOORS OR OUT
OF VIEW. WORK IN THE CEILING SPACE BELOW THE FLOOR FOR
REMOVAL OF WATER AND WASTE PIPING SHALL BE COORDINATED
WITH THE BUILDING MANAGER OR OWNER.
PLUMBING SPECIFICATIONS
NORR
One Penn Center 1617 JFK Blvd, Suite 1600 Philadelphia, PA 19103 norr.com
ARCH E Title Block - v.2023 - Rev (Sept/23) - Copyright © 2023
Drawing No.
Project No.
Drawing Title
Project
Seal
Design Team
Project Manager
Project Architect Checked
Drawn
Client
Architecture:
Structural:
Mechanical:
Electrical:
A
BD C
This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Architect or Engineer
E
NORR
NORR
NORR
NORR
A u to d e s k D o c s
/D e lC o
V o ti n g M a c h in e W a re h o u s e E le v a to r A d d it io n /I N
-0
M
E i_
D e lc o W a re h o u s e E le v a to rA d d it io n v .r v t
/2
/2
:5 :2
A
M
IN2325-0323
M00-01
MECHANICAL COVER
SHEET
VOTING MACHINE
WAREHOUSE ELEVATOR
ADDITION
COUNTY OF DELAWARE
DEPARTMENT OF PUBLIC
WORKS
403 EAST 24TH STREET, CHESTER, PA 19013
105 W 3RD ST, MEDIA, PA 19063
BM
ZHOP
SO
This drawing has been prepared solely for the use of
COUNTY OF DELAWARE DEPARTMENT OF PUBLIC
WORKS and there are no representations of any kind made by NORR to any party with whom NORR has not entered into a contract.
MECHANICAL SHEET LIST
M00-01 MECHANICAL COVER SHEET
M03-01 SCHEDULES AND DETAILS
MD20-01 OVERALL MECHANICAL DEMOLITION PLAN -FIRST
FLOOR
M20-01 OVERALL MECHANICAL PLAN - FIRST FLOOR
M20-02 OVERALL MECHANICAL PLAN -SECOND FLOOR
DATE ISSUED FOR REV
2026.03.04 BIDDING A
PLUMBING EQUIPMENT SCHEDULE
SYMBOL DESCRIPTION BASIS OF DESIGN SYSTEM DESIGN CAPICTY ELECTRICAL
CHARACTERISTICS
REMARKS
ELEVATOR
SHAFT
24x24x24STEEL GRATEBASIN WITH
LEVEL
LEVELTURN ON
TURN-OFF
BASIN COVER
1-1/2" COPPER PIPING
PERFORATED
MIN. 4'-0"
SUMP PIT
ELEVATOR
5"
ABOVE
FLOOR
STEEL PULL
PUMP CABLE
CABLE HOOK
EMERGENCY
POWER GROUNDED
WALL RECEPTACLE
GRADE
BASEMENT
SP-1 SUMP PUMP ZOELLER 940-0013 OIL GUARD SYSTEM
10.5 AMPS
115/1/60
PUMP 153, 50 GPM AT 20 FT TDH
3600 RPM, 1/2 HP
SCHEDULE/
SERVICE SIZE MATERIAL
TYPETYPE
INSULATION
THICK
REMARKS
SANITARY AND VENT PIPING ALL CAST IRON -SERVICE WEIGHT - -
PIPE MATERIAL SCHEDULE
UNIT NO. SERVICE
AIR FLOW
(CFM)
(ON/OFF)
EXTERNAL
STATIC
PRESSURE
TF-1 ELEVATOR
CONTROL RM
TRANSFER FAN SCHEDULE
PROVIDE UNIT MOUNTED SPEED CONTROLLER AND STANDARD DISCONNECT.
NOTES:
1.
2.
UNIT TO BE INSTALLED LEVEL. ALL STARTERS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTOR.
3. FAN SHALL OPERATE VIA LINE VOLTAGE THERMOSTAT SET FOR 80 DEGREES
POWER FAN WEIGHT
ROOF OR
WALL CAP
MANUFACTURER & MODEL NOTESHORSEPOWER
0.375"350 208/1 55 LBS WALL COOK 12XW32D17 1, 2, 31/8 HP
DISCONNECT SWITCH: FURNISHED
BY
MECHANICAL CONTRACTOR OR FAN
MANUFACTURER
VARIABLE SPEED CONTROLLER
MARK
WITH THE "AS BALANCED POSITION"
(DIRECT DRIVE UNITS)
INTEGRAL BACKDRAFT DAMPER
FAN
HANGER
SUPPORTS:
1" X 22 GA, DO NOT
SUPPORT FROM
CEILING.
CEILING
ADJUSTABLE CLEVIS HANGER
TYPE 1 IN SPECIFICATIONS
MAXIMUM PIPE SUPPORT SPACING, FEET
NOM. SIZE 3
PIPE
THRU 3/4 1 1.25
6 FT 6
1.5 2
106 10
2.5 4 5 6 8
INSULATION SHIELD
PROVIDE HIGH COMPRESSIVE
HANGER ROD
10 10 10 10 10 10
COPPER PIPE ONLY
AT HANGER
STRENGTH INSULATION INSERT
BLOCKS UNDER INSULATION
SHIELD
MAXIMUM PIPE SUPPORT SPACING, FEET
NOM. SIZE 3
PIPE
THRU 3/4 1 1.25
12 FT
1.5 2
2.5 4 5 6 8
STEEL PIPE PIPE ONLY
12 12 12 12 12 12121212
PIPE
HANGER
NTS
PIPE HANGER DETAIL
NTS
TRANSFER FAN DETAIL
NTS
ELEVATOR SUMP PUMP DETAIL
FCO CLEAN OUT JAY R. SMITH MODEL #4313
NORR
One Penn Center 1617 JFK Blvd, Suite 1600 Philadelphia, PA 19103 norr.com
ARCH E Title Block - v.2023 - Rev (Sept/23) - Copyright © 2023
Drawing No.
Project No.
Drawing Title
Project
Seal
Design Team
Project Manager
Project Architect Checked
Drawn
Client
Architecture:
Structural:
Mechanical:
Electrical:
A
BD C
This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Architect or Engineer
E
NORR
NORR
NORR
NORR
A u to d e s k D o c s
/D e lC o
V o ti n g M a c h in e W a re h o u s e E le v a to r A d d it io n /I N
-0
M
E i_
D e lc o W a re h o u s e E le v a to rA d d it io n v .r v t
/2
/2
:5 :2
A
M
IN2325-0323
M03-01
SCHEDULES AND DETAILS
VOTING MACHINE
WAREHOUSE ELEVATOR
ADDITION
COUNTY OF DELAWARE
DEPARTMENT OF PUBLIC
WORKS
403 EAST 24TH STREET, CHESTER, PA 19013
105 W 3RD ST, MEDIA, PA 19063
BM
ZHOP
SO
This drawing has been prepared solely for the use of
COUNTY OF DELAWARE DEPARTMENT OF PUBLIC
WORKS and there are no representations of any kind made by NORR to any party with whom NORR has not entered into a contract.
DATE ISSUED FOR REV
2026.03.04 BIDDING A
D D
C C
B B
A A
2.5
2.5
3.5
3.5
4.5
4.5
C.7 C.7
CONTRACTOR SHALL REMOVE EXISTING
PIPING LOCATED IN PROPOSED ELEVATOR
SHAFT LOCATION.
EXISTING STREET
LEVEL VOTING
MACHINES
STORAGE AREA
EXISTING MID LEVEL
VOTING MACHINES
STORAGE AREA
EXISTING OFFICE
(N.I.C.)
EXISTING LUNCH
ROOM (N.I.C.)
EXISTING CORRIDOR
(N.I.C.)
EXISTING TOILET
(N.I.C.)
(E)1-1/2" SUPPLY AND
RETURN UP
(E) 1-1/2" SUPPLY AND
RETURN UP
(E) 1-1/2" SUPPLY
AND RETURN UP
(E) 1-1/2" SUPPLY AND
RETURN UP
(E) 1-1/2" HWS/R UP
(E) HWS/R UP
(E)1-1/2" SUPPLY
AND RETURN UP
(E) UH
(E) UH
(E) UH
(E) UH (E) UH
(E) UH
(E) HYDRONIC SUPPLY AND RETURN PIPES
(E) HYDRONIC SUPPLY AND RETURN PIPES
(E) HYDRONIC SUPPLY AND RETURN PIPES
(E) HWS/R PIPES (TYPICAL)
NORR
One Penn Center 1617 JFK Blvd, Suite 1600 Philadelphia, PA 19103 norr.com
ARCH E Title Block - v.2023 - Rev (Sept/23) - Copyright © 2023
KEY PLAN
Drawing No.
Project No.
Drawing Title
Project
Seal
Design Team
Project Manager
Project Architect Checked
Drawn
Client
Architecture:
Structural:
Mechanical:
Electrical:
A
BD C
This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Architect or Engineer
E
NORR
NORR
NORR
NORR
A u to d e s k D o c s
/D e lC o
V o ti n g M a c h in e W a re h o u s e E le v a to r A d d it io n /I N
-0
M
E i_
D e lc o W a re h o u s e E le v a to rA d d it io n v .r v t
/2
/2
:5 :2
A
M
IN2325-0323
MD20-01
OVERALL MECHANICAL
DEMOLITION PLAN -FIRST
FLOOR
VOTING MACHINE
WAREHOUSE ELEVATOR
ADDITION
COUNTY OF DELAWARE
DEPARTMENT OF PUBLIC
WORKS
403 EAST 24TH STREET, CHESTER, PA 19013
105 W 3RD ST, MEDIA, PA 19063
BM
ZHOP
SO
This drawing has been prepared solely for the use of
COUNTY OF DELAWARE DEPARTMENT OF PUBLIC
WORKS and there are no representations of any kind made by NORR to any party with whom NORR has not entered into a contract.
SCALE: 3/16" = 1'-0"
OVERALL MECHANICA DEMOLITIONL PLAN -FIRST FLOOR
DATE ISSUED FOR REV
2026.03.04 BIDDING A
D D
C C
B B
A A
2.5
2.5
3.5
3.5
4.5
4.5
C.7 C.7
NEW ELEVATOR
SHAFT
SP-1
(E)1-1/2" SUPPLY AND
RETURN UP
(E) 1-1/2" SUPPLY AND
RETURN UP
(E) UH
(E) UH
(E) UH
(E) UH
(E) UH (E) UH
(E) 1-1/2" SUPPLY
AND RETURN UP
(E) 1-1/2" SUPPLY AND
RETURN UP
(E) 4" SAN FROM ABOVE (E) 4" SAN DOWN
(E) 4" STORM
FROM ROOF
(E) 1-1/2" SUPPLY AND
RETURN UP (E) 1-1/2" SUPPLY AND
RETURN UP
CO
CO 2"ø
"ø
(E)1-1/2" SUPPLY
AND RETURN UP
CONNECT TO TOP
OF STORM PIPE.
PROVIDE INDIRECT
CONNECTION
PROVIDE NEW 1-1/2" HEATING
WATER SUPPLY AND RETURN.
PROVIDE 2" PREFORMED FIBERGLASS
INSULATION WITH ASJ JACKET.
EXISTING OFFICE
(N.I.C.)
EXISTING LUNCH
ROOM (N.I.C.)
EXISTING STREET
LEVEL VOTING
MACHINES
STORAGE AREA
EXISTING MID LEVEL
VOTING MACHINES
STORAGE AREA
EXISTING CORRIDOR
(N.I.C.)
EXISTING TOILET
(N.I.C.)
S T
O R
M
STORM
(E) HYDRONIC SUPPLY AND RETURN PIPES
(E) HYDRONIC SUPPLY AND RETURN PIPES
(E) HYDRONIC SUPPLY AND RETURN PIPES
(E )R
E T
U R
N
T Y
P
(E )S
U P
P L
Y
T Y
P
(E) HYDRONIC RETURN PIPE
(E) HYDRONIC SUPPLY PIPE
(E
H Y
D R
O N
IC
R
E T
U R
N P
IP
E(E
H
Y D
R O
N
IC
S U
P P
L Y
P
IP
E
(E) HYDRONIC RETURN PIPE
(E) HYDRONIC SUPPLY PIPE
(E
H Y
D R
O N
IC
R
E T
U R
N P
IP
E
(E
H Y
D R
O N
IC
S
U P
P L
Y P
IP
E
2" PIPE COMES UP FROM
SUMP PUMP
2" PIPE WILL RUN
UNDERNEATH SUPPLY
AND RETURN PIPES
NORR
One Penn Center 1617 JFK Blvd, Suite 1600 Philadelphia, PA 19103 norr.com
ARCH E Title Block - v.2023 - Rev (Sept/23) - Copyright © 2023
KEY PLAN
Drawing No.
Project No.
Drawing Title
Project
Seal
Design Team
Project Manager
Project Architect Checked
Drawn
Client
Architecture:
Structural:
Mechanical:
Electrical:
A
BD C
This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Architect or Engineer
E
NORR
NORR
NORR
NORR
A u to d e s k D o c s
/D e lC o
V o ti n g M a c h in e W a re h o u s e E le v a to r A d d it io n /I N
-0
M
E i_
D e lc o W a re h o u s e E le v a to rA d d it io n v .r v t
/2
/2
:5 :2
A
M
IN2325-0323
M20-01
OVERALL MECHANICAL
PLAN - FIRST FLOOR
VOTING MACHINE
WAREHOUSE ELEVATOR
ADDITION
COUNTY OF DELAWARE
DEPARTMENT OF PUBLIC
WORKS
403 EAST 24TH STREET, CHESTER, PA 19013
105 W 3RD ST, MEDIA, PA 19063
BM
ZHOP
SO
This drawing has been prepared solely for the use of
COUNTY OF DELAWARE DEPARTMENT OF PUBLIC
WORKS and there are no representations of any kind made by NORR to any party with whom NORR has not entered into a contract.
SCALE: 3/16" = 1'-0"M20-01
OVERALL MECHANICAL PLAN -FIRST FLOOR1
DATE ISSUED FOR REV
2026.03.04 BIDDING A
D D
C C
B B
A A
2.5
2.5
3.5
3.5
4.5
4.5
C.7 C.7
NEW ELEVATOR
SHAFT
FDFD
10X10 TRANFER DUCT
WITH FIRE DAMPER.
COVER OPENING WITH
WIRE MESH.
10X10 TRANFER DUCT
WITH FIRE DAMPER.
COVER OPENING WITH
WIRE MESH.
TF-1
(E) UH
(E) UH
(E) UH
(E) UH
(E) UH
(E) UH
(E) UH(E) UH
1-1/2" SUPPLY AND
RETURN UP FROM BELOW
(E) 1-1/2" SUPPLY AND
RETURN UP FROM BELOW
(E) 1-1/2" SUPPLY
AND RETURN UP
FROM BELOW
(E) 1-1/2" SUPPLY AND
RETURN UP FROM BELOW
(E) 1-1/2" SUPPLY AND
RETURN UP FROM BELOW
(E) 1-1/2" SUPPLY AND
RETURN UP FROM BELOW
(E)1-1/2" SUPPLY
AND RETURN UP
FROM BELOW
WOMENS TOILET
OFFICE
UNASSIGNED AREA
MENS TOILET
VOTING MACHINES
STORAGE AREA
VOTING MACHINES
STORAGE AREA
(E)RD(E)RD
(E)RD(E)RD
(E)RD
(E)RD
PROVIDE 2" PREFORMED
FIBERGLASS INSULATION
WITH ASJ JACKET.
NEW REMOTE
CONTROL CLOSET
VOTING MACHINES
STORAGE AREA
NORR
One Penn Center 1617 JFK Blvd, Suite 1600 Philadelphia, PA 19103 norr.com
ARCH E Title Block - v.2023 - Rev (Sept/23) - Copyright © 2023
KEY PLAN
Drawing No.
Project No.
Drawing Title
Project
Seal
Design Team
Project Manager
Project Architect Checked
Drawn
Client
Architecture:
Structural:
Mechanical:
Electrical:
A
BD C
This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Architect or Engineer
E
NORR
NORR
NORR
NORR
A u to d e s k D o c s
/D e lC o
V o ti n g M a c h in e W a re h o u s e E le v a to r A d d it io n /I N
-0
M
E i_
D e lc o W a re h o u s e E le v a to rA d d it io n v .r v t
/2
/2
:5 :2
A
M
IN2325-0323
M20-02
OVERALL MECHANICAL
PLAN -SECOND FLOOR
VOTING MACHINE
WAREHOUSE ELEVATOR
ADDITION
COUNTY OF DELAWARE
DEPARTMENT OF PUBLIC
WORKS
403 EAST 24TH STREET, CHESTER, PA 19013
105 W 3RD ST, MEDIA, PA 19063
BM
ZHOP
SO
This drawing has been prepared solely for the use of
COUNTY OF DELAWARE DEPARTMENT OF PUBLIC
WORKS and there are no representations of any kind made by NORR to any party with whom NORR has not entered into a contract.
SCALE: 3/16" = 1'-0"
OVERALL MECHANICAL PLAN - SECOND FLOOR
DATE ISSUED FOR REV
2026.03.04 BIDDING A
| Sheets |
| FP00-01 - COVER SHEET |
| FP20-01 - OVERALL FIRE PROTECTION PLAN - FIRST FLOOR |
| FP20-02 - OVERALL FIRE PROTECTION PLAN -SECOND FLOOR |
| M00-01 - MECHANICAL COVER SHEET |
| M03-01 - SCHEDULES AND DETAILS |
| MD20-01 - OVERALL MECHANICAL DEMOLITION PLAN -FIRST FLOOR |
| M20-01 - OVERALL MECHANICAL PLAN - FIRST FLOOR |
| M20-02 - OVERALL MECHANICAL PLAN -SECOND FLOOR |
File details come from the government source that posted it. Updated .