4-04 Pricing Sheet.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- North 31st Street Water and Sewer Extension
- Solicitation number
- Bid #52-02-25
- Issued by
- Bell County, Texas
About this file
This document is a detailed Bid Schedule (Exhibit A) for the City of Temple, Texas, specifically for the North 31st Street Water and Sewer Extension Project. The project involves approximately 880 linear feet of water main and 140 linear feet of sanitary sewer with an aerial crossing along North 31st Street, north of Calhoun Avenue. The bid schedule encompasses 30 line items covering various construction activities including site preparation, mobilization, utility work, pavement restoration, water main installation, sewer main installation, fire hydrant assemblies, connections to existing mains, and required testing.
The bid schedule presents a comprehensive pricing structure with estimated quantities for each project component, with all line items currently showing zero dollar amounts. The project involves detailed water infrastructure work, including 8" PVC water main installation, 16" steel pipe encasement, gate valves, fittings, fire hydrant assemblies, and sanitary sewer main installation. Additional requirements include trench safety plans, storm water pollution prevention plans, traffic control, utility potholing, and comprehensive testing in compliance with TCEQ and City of Temple requirements. The document provides a structured approach to bidding that covers every aspect of the water and sewer extension project, from initial site preparation to final testing and connection.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Tabs
EXHIBIT “A”
BID SCHEDULE
CITY OF TEMPLE, TEXAS
N. 31st Street Water and Sewer Extension Project Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount
| 1) | 9 | STA | Furnish and install all materials, labor, overhead, and profit required to provide Preparation of Right-of-Way and Site Clearing, including but not limited to; miscellaneous demolition; fence removal and/or replacement; site signage and utility adjustment, removal, and replacement; existing utility and structure verification, bracing, and/or protection; landscaping, irrigation, and/or grass sod removal and replacement; DVD and/or Digital copies of Video Recording of site pre-construction; per project specifications and details, complete in place per station. | $ - 0 | $ - 0 |
| 2) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide Mobilization, Bonds, Permits and Insurance, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 3) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide and implement a Traffic Control Plan, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 4) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide and implement a Trench Safety Plan, signed and sealed by Registered Professional Engineer Licensed in the State of Texas, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 5) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide and implement a Storm Water Pollution Prevention Plan, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 6) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to Pothole, Excavate and Locate Existing Utilities, at locations shown on plans, per project specifications, notes and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 7) | 24 | SY | Furnish and install all materials, labor, overhead, and profit required to saw cut, remove, and replace existing Reinforced Concrete Pavement Section, at locations shown on plans, per project specifications, notes and details, complete in place per square yard. | $ - 0 | $ - 0 |
| 8) | 30 | SY | Furnish and install all materials, labor, overhead, and profit required to saw cut, remove, and replace existing HMAC Pavement Section, at locations shown on plans, per project specifications, notes and details, complete in place per square yard. | $ - 0 | $ - 0 |
| Item No. | Estimated Quantity | Unit | Description of Item | Unit Price in Figures | Total Amount |
| 9) | 20 | LF | Furnish and install all materials, labor, overhead, and profit required to saw cut, remove, and replace existing Reinforced Concrete Curb and Gutter, at locations shown on plans, per project specifications, notes and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 10) | 2 | EA | Furnish and install all materials, labor, overhead, and profit required to provide Connection to Existing Water Main, including but not limited to; thrust blocking, Mega-Lug Joint Restraint, and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 11) | 750 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 8” PVC C900 DR18 Water Main, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, and thrust blocking, at locations shown on plans, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 12) | 175 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 8” PVC C900 DR18 Water Main with Restrained Joints, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, and thrust blocking, at locations shown on plans, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 13) | 40 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 16” Steel Pipe Encasement via Open Cut, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, at locations shown on plans, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 14) | 135 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 16” Steel Pipe Encasement via Bore, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, at locations shown on plans, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 15) | 4 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 8”x8” MJ Tee, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 16) | 3 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 8”x6” MJ Tee, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount
| 17) | 12 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 8” MJ Gate Valve, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 18) | 3 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 6” MJ Gate Valve, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 19) | 3 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 8"x6" MJ Reducer, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 20) | 4 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 8" MJ Plug, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 21) | 9 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 8" MJ 45 degree bend, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 22) | 3 | EA | Furnish and install all materials, labor overhead, and profit required to provide new Standard Fire Hydrant Assembly, including but not limited to; saw cut, removal, and replacement of existing pavement sections, miscellaneous fittings, tees, gate valves, piping, trenching, backfill, and embedment, thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equal, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 23) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide ALL WATER MAIN TESTING per TCEQ and City of Temple Requirements and Contract Documents, complete in place per lump sum. | $ - 0 | $ - 0 |
Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount
| 24) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide Sanitary Sewer ByPass Pumping, per project specifications, construction plans, notes and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 25) | 2 | EA | Furnish and install all materials, labor, overhead, and profit required to provide Connection to Existing Sanitary Sewer Main, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 26) | 2 | EA | Furnish and install all materials, labor, overhead, and profit required to provide new 4’ Diameter Precast Eccentric Concrete Manhole, with a City of Temple Approved Heavy Duty 32” Ring and Lid Assembly, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 27) | 100 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 8” PVC SDR 26 Sanitary Sewer Main, at locations shown on plans, including but not limited to, dewatering, backfill, embedment, trenching, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 28) | 40 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 8” PVC SDR 26 Sanitary Sewer Main with Restrained Joints, at locations shown on plans, including but not limited to, dewatering, backfill, embedment, trenching, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 29) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide new Aerial Sanitary Sewer Crossing, at locations shown on plans, including but not limited to, bypass pumping, sawcut, steel pipe encasement, temporary piping, bracing, concrete rip rap, reinforced concrete footings, etc., per project specifications, notes and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 30) | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide ALL SANITARY SEWER TESTING per TCEQ and City of Temple Requirements and Contract Documents, complete in place per lump sum. | $ - 0 | $ - 0 |
| Total Bid North 31st Street Water and Sewer Extension Project | $ - 0 |