4-007959 Chap5BidDocs Fillable.pdf
PDF 248 KB Posted
- Solicitation number
- JH27-1
- Issued by
- Cache County, Utah
About this file
This is a bid documents package for the Sowbelly Gulch Project Reclamation Construction issued by the State of Utah Division of Purchasing in coordination with the Division of Oil, Gas and Mining. The project involves the closure of one abandoned coal mine, maintenance of four previously closed abandoned mines, and revegetation of disturbed areas at abandoned coal mines located in Carbon County, Utah. The work consists of specific reclamation tasks including block wall maintenance, native stone wall installation, backfill operations, concrete custom work, and revegetation activities across multiple site locations identified by tag numbers. Contractors must attend a mandatory pre-bid meeting and site visit at coordinates 39.699968, -110.921501. The contract completion timeline is 14 calendar days after receipt of Notice to Proceed, with a hard deadline of August 31, 2026. Weather-related delays may be granted at the Owner's discretion. The work is anticipated to result in a single contract award to the lowest cost responsive and responsible bidder.
Bidders must submit comprehensive documentation including contractor licensing information for Utah, Davis-Bacon Act wage determinations with worker classifications, detailed construction procedures and equipment lists, laboratory reports for concrete ingredients, drainage control and stream protection plans, revegetation supplier information, and specifications for specialized work such as urea silicate foam mine closures. The bid schedule includes seven primary work items with estimated quantities ranging from 1 to 41 cubic yards, and bidders must provide unit prices for potential quantity variations exceeding 15 percent. The engineers' estimate is $35,000.00. All successful bidders and subcontractors must comply with Surface Mining Control and Reclamation Act requirements and pass Applicant/Violator System eligibility checks through the U.S. Office of Surface Mining Reclamation and Enforcement. Apparent low bidders must submit the AML Contractor Information Form within 24 hours of bid opening for AVS review. Bidders must identify all subcontractors with contracts exceeding $5,000 (for prime bids under $250,000) or $25,000 (for prime bids of $250,000 or more) and declare any minority or woman business enterprise status for federal reporting purposes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-007959 specs complete.pdf | ||
| 1-Vendor Prerequisites - IFB Agency.pdf | ||
| 6-007959 Chap7 Maps.pdf | ||
| 2-007959 BidSchedule.xlsx | XLSX spreadsheet | |
| 5-007959 Chap6 StdMineClosDwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION SPECIFICATIONS
Sowbelly Gulch Project
Reclamation Construction
Carbon County, Utah
Summer 2026
Chapter 5: BID DOCUMENTS
Supplemental Bid Information Bidder's Proposed Subcontractors, Suppliers & Vendors List Minority and Woman Business Enterprise Representation Applicant/Violator System Eligibility Check Summary Bid Schedule Bid Schedule Required Submittals
Note:
These bid documents have been formatted as a fillable PDF form. Depending on your version of Adobe Acrobat (or Reader), fields to complete will be highlighted (or click the "Highlight Fields" button). Mandatory fields are outlined in color. Text fields are open-ended; scroll bars will appear if content exceeds the size of the box.
For the Bid Schedule, use the Excel spreadsheet provided separately. It has formulas to automatically calculate subtotals and totals. These fields cannot be overwritten.
The Excel spreadsheet provides the necessary supporting bid detail. No other cost data are needed in the PDF bid documents file.
When completed, save and upload the files as instructed.
5: 1
Supplemental Bid Information
Name of Bidder:
COMPLETION TIME:
I/We guarantee to complete the WORK within 14 calendar days after receipt of Notice to Proceed, should I/we be the successful bidder.
LICENSING:
CONTRACTOR's License Number for Utah:
License Classification(s):
Expiration Date:
Copy of license must be enclosed with hard copy bid or uploaded with electronic bid.
Type of Organization:
(Corporation, Co-Partnership, Individual, etc.)
AVS CERTIFICATION:
If applicable, the CONTRACTOR shall certify that all reclamation fees or civil penalty assessments required by the provision of the Surface Mining Control and Reclamation Act of 1977, P.L. 95-87, 30 U.S.C. Sec 1201 et seq., have been paid. Provided further, this certification requirement shall also apply to all Subcontractors utilized by the successful bidders.
5: 2
Bidder's Proposed Subcontractors, Suppliers & Vendors List Sowbelly Gulch Project
We submit the following list of first-tier subcontractors, suppliers and vendors for OWNER approval.
We recognize this list as binding on us, and acknowledge OWNER'S right to reject any or all subcontractors, suppliers or vendors listed or unlisted which the OWNER feels are unqualified to do the work.
SUBCONTRACTOR CONTRACT
AMOUNT
STATE
CONTRACTOR'S
LICENSE NO
LICENSE
LIMIT
Excavation:
Concrete Fabrication:
Masonry:
Revegetation:
Trucking/Transport:
Urea Silicate Foam Installation:
Other:
Other:
Other:
lkwoodruff Cross-Out
5: 3
BIDDER'S PROPOSED SUBCONTRACTORS, SUPPLIERS & VENDORS LIST
SUPPLIER/VENDOR AMOUNT PRODUCT
Ready-Mix:
Cement/Block:
Steel:
Urea Silicate Foam Supplies:
Seed:
Other:
Other:
By submitting a bid under this solicitation, we certify that:
1. This list includes all subcontractors, suppliers and vendors whose bids exceed $5,000 (for prime contractor bids less than $250,000) or $25,000 (for prime contractor bids of $250,000 or more).
2. Where we have listed "Self" it is our intent to perform said work and that we generally and regularly perform that type of work and are appropriately licensed.
3. Any approved change in sub-bidders, suppliers or vendors which results in a lower contract price for sub-bid work shall accordingly reduce the total sum of the prime contract.
Note: Failure to submit this form properly completed and signed may be grounds for OWNER'S refusal to enter into a written CONTRACT with BIDDER. Action will be taken against BIDDER'S bid bond or cashier's check as deemed appropriate by OWNER. Timely notice of unacceptable subcontractors, suppliers or vendors will be given to the BIDDER. Reporting of subcontractors may be required for conformance with 63A-5-208 UCA.
5: 4
Minority and Woman Business Enterprise Representation Sowbelly Gulch Project
The offeror represents that it [_]is [_]is not a minority business enterprise.
A minority business enterprise is defined as a concern that:
1) is at least 51 percent owned by one or more individuals who are socially and economically disadvantaged, or a publicly owned business having at least 51 percent of its stock owned by one or more individuals who are socially and economically disadvantaged individuals; and
2) has its management and daily business controlled by one or more such individuals.
Qualified groups. The offeror shall presume that socially and economically disadvantaged individuals include Black Americans, Hispanic American, Native Americans, Asian-Pacific American, Asian-Indian Americans, and other individuals found to be qualified by the Small Business Administration under 13 CFR 124.l.
The offeror represents that it [_]is [_]is not a woman business enterprise.
A woman business enterprise is defined as a concern that:
1) is at least 51 percent owned by one or more women, or a publicly owned business having at least 51 percent of its stock owned by one or more women; and
2) has its management and daily business controlled by one or more of the women owners.
Business firms that are 51 percent owned by minorities or women, but are in fact managed and operated by non-minority individuals do not qualify as minority or woman business enterprises.
The offeror represents that the following proposed subcontractor(s) is (are) a minority or woman business enterprise:
This information is requested for Federal reporting purposes only.
Minority/woman status has no bearing on the selection of a contractor.
5: 5
Applicant/Violator System Eligibility Check
(Data to be submitted after Bid Opening)
Federal regulations (30 CFR 874.16) effective July 1, 1994, require all successful bidders on contracts funded through Title IV of the Surface Mining Control and Reclamation Act (SMCRA) of 1977 to be eligible under 30 CFR 773.15(b)(1) to receive a permit to conduct surface coal mining operations. In general, this means that the Utah Abandoned Mine Reclamation Program may not hire a contractor who is or whose company is associated with a coal mine operator with outstanding unabated violations under SMCRA. The regulations further require that contractor eligibility be confirmed by the Applicant/Violator System (AVS) at the U.S. Office of Surface Mining Reclamation and Enforcement (OSMRE). Compliance checks are also required for all subcontractors.
To comply with these rules, the apparent low bidder must provide the Division of Oil, Gas and Mining with information on the ownership and control of the firm for AVS review. A bidder must receive a recommendation of "Issue" or "Conditional Issue" from the OSM AVS office to be awarded the contract.
The apparent low bidder shall submit to DOGM within 24 hours (excluding weekends and holidays) of the bid opening a completed copy of the "AML Contractor Information Form." This form is used to provide, correct, or update your company’s ownership and control information in OSMRE’s AVS database. DOGM will provide forms for these submissions (a facsimile is provided in Chapter 2).
DOGM will submit the ownership and control information to OSMRE for AVS review. OSMRE's review will be completed within 72 hours if the ownership and control data entry is complete.
The following information is required for the "AML Contractor Information Form":
● Contractor's identity (name, address, telephone, fax, e-mail address, tax payer ID number).
● Contractor's legal structure (sole proprietorship, partnership, corporation).
● Identities (name, address, telephone, title, % ownership, dates with the company) of every officer, general partner, shareholder (≥10% voting stock), director, or other controlling entity.
● All of the above information for any subcontractor.
5: 7
Summary Bid Schedule
Bid Item Lump Sum Amount
RECLAMATION CONSTRUCTION SUBTOTAL
(carried over from Detailed Bid Schedule) $
MOBILIZATION/DEMOBILIZATION
INSURANCE $
BONDS (see note below) $
TOTAL CONTRACT BID PRICE $
Variation in Contract Bond Rate: %
TOTAL CONTRACT BID PRICE WRITTEN:
By submitting a bid under this solicitation, I/we acknowledge that I/we have examined the site conditions and have made the measurements and evaluations necessary to plan and bid the
WORK.
Notes:
The total contract bid price entered here MUST match the total bid price entered in the item section on Purchasing’s online bid form. If the amounts are different, the bid price entered in the item section of the online bid form will be considered the correct bid and will be considered the official bid to be evaluated with other bids received.
The "Variation in Quantity Unit Price" on the Bid Schedule will be used for adjustments to the CONTRACT amount where the actual WORK quantity varies by more than 15% from the estimated quantity listed in the Bid Schedule (see Supplemental General Condition No. 26: Variation in Estimated Quantities). The "Variation in Quantity Unit Price" will also be used as the basis for determining costs for tasks not currently specified in the WORK that may be added in the future by change order.
Award of CONTRACT will be based on the base "Bid Price." Contractors are cautioned to submit accurate unit prices for any variations in quantities. Verified quantities can go either up or down from the original estimated quantities. If a unit price appears high at the time of any change order, the OWNER reserves the right to negotiate that unit price down to a reasonable amount regardless of the unit prices quoted in this section.
The "Variation in Contract Bond Rate" will be used to adjust the Lump Sum Amount for bonds when the CONTRACT amount changes (see Section 0200, Part 5.01.D).
5: 8
Bid Schedule
Site ID/Tag No Specified Closure Estimated Quantity
Bid Price Amount
Variation in Quantity
Unit Price
4130909HO011 BLOCK WALL
MAINTENANCE 1 cy $ $ /cy
4130909HO016 NATIVE STONE
WALL 8 sf $ $ /cy
4130909HO022 BACKFILL
(MACHINE) 41 cy $ $
4130916HO002 BLOCK WALL
MAINTENANCE 8 cf $ $
4131002VO002 CONCRETE
CUSTOM 24 cy (FOAM) $ $ /sf
4131002VO002 CONCRETE
CUSTOM
2.5 cy
(CONCRETE) $ $
4131002VO002 CONCRETE
CUSTOM
9 cy
(BACKFILL) $ $
SUBTOTAL
(Carry over to Mine Closure Summary) $
Note: Sites are listed here in the same sequence as they are listed in the Mine Closure Schedule in Appendix A, that is, sorted by tag number. Sites with no mine closure specified ("Closure Method" listed as "None" in Appendix A) are not included in the Bid Sheets.
Note: Revegetation is required at mine closure locations, but is considered incidental to the mine closure task. Costs for revegetation of mine closure locations should be incorporated into the mine closure bid. No separate bidding or payment will be made for mine closure revegetation.
Revegetation is a separate bid and payment item only at the sites scheduled for site grading and earthwork and itemized on the Bid Schedule.
Note: Estimated quantities for site grading and earthwork are based on the volume of mine dump material to be buried and do not reflect the total volume of material that must be moved in order to bury the dump (burial pit excavation, cover material stockpiling, dump grading, cover material spreading).
Note: If a unit price appears to be excessive based on the market, OWNER reserves the right to negotiate that unit price for any change order. Otherwise the unit prices will be as bid.
5: 9
Required Submittals
Provide the requested information in the space provided.
Instructions to Bidders, Item 5: Contractor’s License Enter the license number, class, and expiration date in the spaces provided on the Supplemental Bid Information form. Also attach a copy of the license as instructed elsewhere in this document.
Chapter 2: Davis-Bacon Act Wage Determination – Worker Classification CONTRACTOR shall submit with the Bid the worker classification of all workers I.E.
Laborers, Operators etc. CONTRACTOR shall specify any classifications that are not listed on the wage determination.
Section 0230: Access Improvement
1.02 The CONTRACTOR shall submit with the Bid a description of access improvements to be performed at each site and shall not deviate from this plan without the written approval of the OWNER.
Section 0250: Mine Closures
1.02 A. CONTRACTOR shall submit with the Bid a list of equipment to be used to complete this section of the WORK.
1.02 B. CONTRACTOR shall submit with the Bid the proposed construction procedures in writing.
5: 10
Section 0251: Cast-In-Place Concrete
1.02 A. 1. CONTRACTOR shall submit with the Bid laboratory reports indicating that the supplier's concrete ingredients meet requirements specified.
0280: Drainage Control & Stream Protection
1.02 A. CONTRACTOR shall submit with the Bid the schedule and plan for implementing drainage control measures and for utilizing riprap, gabion mattress, or a combination of systems in accordance with these Specifications and Drawings. If a combination of systems is planned, specific locations for each item shall be identified. Also included shall be specifications of riprap or gabion mattress fill material if supplied as import, and specifications for gabion mattress to be used.
1.02 B. The CONTRACTOR shall submit with the Bid a description of and location of stream protection measures to be used at each site.
1.02 C. CONTRACTOR shall submit with the Bid the location of borrow areas intended for riprap unless otherwise specified in Section 0300: Specific Site Requirements, or the Drawings.
1.02 D. CONTRACTOR shall submit with the Bid the specifications for materials and installation if either culverts or bridges are proposed for use.
5: 11
Section 0290: Revegetation
1.02 A. CONTRACTOR shall submit with the Bid the names of one seed supplier, and alternate, to be used for the seed mixtures required by these specifications.
1.02 B. CONTRACTOR shall submit with the Bid a written description indicating equipment to be used to perform the work required in this section.
Section 0310: Urea Silicate Foam Mine Closures
1.02 CONTRACTOR shall submit with the Bid the proposed construction procedures, including a description of the form materials to be used and the foam application equipment or method.
| Name of Bidder: |
| Type of Organization: |
| Contractor License Number: |
| License Classification: |
| Expiration Date: |
| Lic Limit Mas: |
| Subcontractor Exc: |
| Amount Exc: |
| Lic No Exc: |
| Lic Limit Exc: |
| Amount Conc: |
| Lic No Conc: |
| Lic Limit Conc: |
| Amount Mas: |
| Lic No Mas: |
| Subcontractor Conc: |
| Subcontractor Mas: |
| Subcontractor Reveg: |
| Lic Limit OT3: |
| Amount Reveg: |
| Lic No Reveg: |
| Lic Limit Reveg: |
| Subcontractor TT: |
| Amount TT: |
| Lic No TT: |
| Lic Limit TT: |
| Subcontractor PUF: |
| Lic No PUF: |
| Lic Limit PUF: |
| Subcontractor OT1: |
| Lic No OT1: |
| Lic Limit OT1: |
| Subcontractor OT2: |
| Lic No OT2: |
| Lic Limit OT2: |
| Subcontractor OT3: |
| Amount OT3: |
| Lic No OT3: |
| Supplier/Vendor RM: |
| Product OT2: |
| Amount RM: |
| Product RM: |
| Supplier/Vendor CB: |
| Amount CB: |
| Product CB: |
| Supplier/Vendor St: |
| Amount St: |
| Product St: |
| Supplier/Vendor PUF: |
| Amount PUF: |
| Product PUF: |
| Supplier/Vendor Seed: |
| Amount Seed: |
| Product Seed: |
| Supplier/Vendor OT1: |
| Amount OT1: |
| Product OT1: |
| Supplier/Vendor OT2: |
| Amount OT2: |
| Amount Supplier/Vendor OT1: |
| Amount Supplier/Vendor OT2: |
| Min/Wom Subcontractor 2: |
| Minority: Off |
| Woman: Off |
| Min/Wom Subcontractor 1: |
| Chapter 2 Davis-Bacon Act Wage Determination-Worker Classification: |
| Section 0230 1: |
| 02 Submittal: |
| Secton 0250 1: |
| 02: |
| A: |
| Submittal: |
| Section 0250 1: |
| 02: |
| B: |
| Submittal: |
| Section 0251 1: |
| 02: |
| A: |
| 1: |
| Submittal: |
| Section 0280 1: |
| 02: |
| A: |
| Submittal: |
| C: |
| Submittal: |
| B: |
| Submittal: |
| D: |
| Submittal: |
| Section 0290 1: |
| 02: |
| A: |
| Submittal: |
| B: |
| Submittal: |
| Section 0310 1: |
| 02 : |
| A: |
| Submittal: |
Supplier/Vendor Amount PUF:
File details come from the government source that posted it. Updated .