4-00 ROADWAY PLANS.pdf

PDF 3 MB Posted

Attached to
Luzerne County - Harris Hill Road Bridge (CB26305) Replacement (30895.11)
Solicitation number
US.203796
Issued by
Lackawanna County, Wolfdale CDP, Pennsylvania

About this file

These documents are engineering and design plans for the Harris Hill Road Structure (CB26305) Rehabilitation project, prepared by Alfred Benesch & Company for Kingston Township in Luzerne County, Pennsylvania. The project involves replacing a bridge over Toby Creek on Harris Hill Road (T-783), with a new single span composite prestressed concrete bulb-tee beam bridge. The proposed structure will have a hydraulic opening of 750 square feet, an out-to-out width of 37'-4", a roadway width of 34' curb to curb, a minimum underclearance of 21'-7", and a span length of 54'-6". The project is scheduled for September 2025 and includes roadway reconstruction, grading, typical section modifications, and traffic control.

The project documents indicate a comprehensive rehabilitation that includes replacing the existing stacked stone and concrete arch culvert with a modern bridge structure. The design incorporates detailed topographical and hydraulic assessments, with analysis of 25-year and 100-year flood risks, showing a drainage area of 11 square miles. The engineering plans specify precise road profile changes, asphalt mixture designs (Superpave), and include provisions for utility relocations involving entities such as UGI Utilities, Pennsylvania American Water, and Frontier Communications. The project will maintain the current 25 mph speed limit and includes considerations for pedestrian and bicycle safety, with specific signage and road markings planned.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCATION MAP

MILE 1/2 SCALE : 1" =

GENERAL NOTES

ROADWAY PLAN

Drawing Index

Drawing No. Title

1 COVER SHEET

PROJECT LOCATION

6 PROFILE

P L

O T

T E

D

F I

L E

N A

M E

Y

P o t t s v i l l e

S

H a r r i s

H i l l

R o a d

B

R

E n g

D o c s

R o a d w a y

C o v e r d g n

D e f a u l t

O P

E R

A T

O R

D-9012 CADD (02-90) REVISED (05-97)

gBarwicki 09\23\2025 10:58:1230895.11

Pennsylvania One Call System Serial Number excavation

10 business days prior to the start of than 3 business days nor more than

Dial 8-1-1 or 1-800-242-1776 not less

570-622-4055

Pottsville, Pennsylvania 17901

400 One Norwegian Plaza

Alfred Benesch & Company design information, or any part thereof, is strictly prohibited, except by written permission of this firm.

the property of Alfred Benesch & Company. Use, reuse, reproduction or modification of this plan or

Copyright 2025, of Alfred Benesch & Company. All rights reserved. This plan and design content is

PREPARED BY:

PROJECT MANAGER DATE

PROJECT

30895.11

1 6

DRAWING NO.

OF

20251772579

REHABILITATION

HARRIS HILL ROAD STRUCTURE (CB26305)

Kingston Township, Luzerne County, Pennsylvania

TYPICAL SECTIONS

P E

N

N S Y L V

A

N

I A

C O

M

M O

NW EALT

H

O

F

REGISTERED

PROFESSIONAL

ENGINEER

PE075322

RYAN T. FASNACHT

Drawing No. Title

1-8

1-7 E&S CONTROL PLANS

STRUCTURE PLANS

SUPPLEMENTAL DRAWINGS

1-34

TRAFFIC CONTROL PLANS

1-1 RIGHT-OF-WAY PLAN

2-3

5 GRADING PLAN

2-3

(FOR INFORMATION ONLY)

EXISTING TRAFFIC SIGNAL PERMIT PLAN (HARRIS HILL RD)

2-3

(FOR INFORMATION ONLY)

EXISTING TRAFFIC SIGNAL PERMIT PLAN (CARVERTON RD)

FINAL TRAFFIC SIGNAL PERMIT PLAN (HARRIS HILL RD)

September 2025

1-4

1-9

(FOR INFORMATION ONLY)

UGI HARRIS HILL GAS MAIN REPLACEMENT PLANS (CD-C)

(FOR INFORMATION ONLY)

UGI HARRIS HILL BRIDGE PIPE SUPPORT PLANS (CD-1)

WSL GJB 2 6

GENERAL NOTES

GENERAL NOTES

UTILITY NOTES

UTILITY NOTES (CONT)

ON THE DRAWINGS.

FIELD EXCAVATION HAS BEEN PERFORMED. AVAILABLE SURFACE INFORMATION IS INDICATED

THAT ALL UNDERGROUND INSTALLATION OR STRUCTURES ARE SHOWN ON THE PLANS. NO

PRESENT UNDERGROUND UTILITY INSTALLATION OR STRUCTURES SHOWN ON THE PLANS, OR

REPRESENT, WARRANT OR ASSURE EITHER THE ACCURACY OF THE LOCATION OF THE

UTILITIES LISTED ABOVE. ALFRED BENESCH & COMPANY DOES NOT GUARANTEE,

WITH INFORMATION THAT HAS BEEN PROVIDED TO ALFRED BENESCH & COMPANY FROM THE

WARNING! EXISTING UTILITIES, AS SHOWN ON THESE DRAWINGS, ARE IN ACCORDANCE

TRAFFIC CONTROL

RIGHT-OF-WAY NOTES

PURPLE - NON-POTABLE WATER, IRRIGATION OR SLURRY LINES

WHITE - PROPOSED EXCAVATION

GREEN - SEWERS AND DRAIN LINES

BLUE - POTABLE WATER

ORANGE - COMMUNICATION, ALARM OR SIGNAL LINES, CABLES OR CONDUIT

YELLOW - GAS, OIL, STEAM, PETROLEUM OR GASEOUS MATERIALS

RED - ELECTRIC POWER LINES, CABLES, CONDUIT AND LIGHTING CODES

ACCORDANCE WITH UNIFORM COLOR CODES. KNOW THEM!

ACT 187 OF 1996 STANDARDIZES THE COLOR-MARKING OF UNDERGROUND UTILITIES IN

SERIAL NO.: 20251772579

THIS PROJECT HAS A SERIAL NUMBER REGISTERED WITH THE ONE CALL SYSTEM, INC. USE IT!

REQUIREMENTS APPLY ANYWHERE IN THE COMMONWEALTH OF PENNSYLVANIA.

MORE THAN 90 WORKING DAYS NOTICE WHEN ENGAGED IN THE DESIGN PHASE. THESE

DEMOLISH. ACT NO. 187 REQUIRES DESIGNERS TO GIVE NO LESS THAN 10 WORKING DAYS NOR

DITCH, DRILL, DRIVE-IN, GRADE, PLOW-IN, PULL-IN, RIP, SCRAPE, TRENCH, TUNNEL OR

EARTH (WITH OR WITHOUT EXPLOSIVES), ANCHOR, AUGER, BACKFILL, BLAST, BORE, DIG,

WORKING DAYS NOTICE FROM EXCAVATORS/DEMOLITION CONTRACTORS WHO ARE ABOUT TO MOVE

PROTECTION LAW, REQUIRES NO LESS THAN 3 WORKING DAYS NOTICE NOR MORE THAN 10

PENNSYLVANIA ACT NO. ACT 287 OF 1974 AS AMENDED, THE UNDERGROUND UTILITY LINE

1-800-242-1776

PENNSYLVANIA ONE CALL SYSTEM, INC.

STOP-CALL BEFORE YOU DIG!

STRUCTURES ARE SHOWN.

AND PROVIDE FOR THEIR PROTECTION. THE COUNTY DOES NOT GUARANTEE THAT ALL SUBSURFACE

SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY AND ALLOW FOR THEIR LOCATIONS

EXISTING UTILITIES ARE SHOWN IN ACCORDANCE WITH THE BEST AVAILABLE INFORMATION. IT

PUBLICATION 408 SECTION 105.17 FOR CONSTRUCTION LOADING LIMITS.

EXISTING BRIDGE WEIGHT LIMIT IS 10 TONS, EXCEPT COMBINTIONS 15 TONS. SEE PENNDOT

COST TO THE COUNTY, IF APPROVED BY THE ENGINEER.

A HIGHER CLASS CONCRETE MAY BE SUBSTITUTED FOR A LOWER CLASS CONCRETE AT NO ADDITIONAL

REPLACED AT NO COST TO THE COUNTY.

INCURRED DURING CONSTRUCTION, AS DETERMINED BY THE ENGINEER, ARE TO BE REPAIRED AND/OR

STRUCTURE AND ITS COMPONENTS THROUGHOUT THE DURATION OF THE CONTRACT. ANY DAMAGES

CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND THE INTEGRITY OF THE

CONTRACTOR.

LAYOUT, ORIENTATION, AND ELEVATION OF ALL IMPROVEMENTS IS THE RESPONSIBILITY OF THE

THICKNESS, AND STABILIZATION REQUIREMENTS.

BY THE ENGINEER. REFER TO THE E&S PLANS AND SPECIFICATIONS FOR TOPSOIL PLACEMENT, DISTURBED AS PART OF THE PROJECT ACCORDING TO DRAWINGS, SPECIFICATIONS AND AS DIRECTED

PROVIDE AND PLACE TOPSOIL, PLACE SEEDING AND SOIL SUPPLEMENTS AND STABILIZE ALL AREAS

ALL DIMENSIONS SHOWN ARE HORIZONTAL EXCEPT AS NOTED.

ANSI/AWS/D1.1-2002 FOR WELDING NOT COVERED IN ANSI/AASHTO/AWS/D1.5-2002.

ANSI, AASHTO/AWS/D1.5 BRIDGE WELDING CODE 1996 AND THE CONTRACT SPECIAL PROVISIONS. USE

PROVIDE MATERIALS AND PERFORM WORK IN ACCORDANCE WITH PENNDOT SPECIFICATIONS, PUB. 408, THE SPEED LIMIT ON HARRIS HILL ROAD IS 25 MPH.

VERTICAL CONTROL IS BASED ON NORTH AMERICAN DATUM 1988.

HORIZONTAL CONTROL IS BASED ON PA STATE PLANE COORDINATE SYSTEM (NORTH ZONE) NAD83.

MUST VERIFY AND APPROVE ANY ADJUSTMENTS MADE.

REFINE LOCATIONS & GRADES IN THE FIELD TO MEET CONSTRUCTION REQUIREMENTS. THE ENGINEER

THE COUNTY RESERVES THE RIGHT TO ELIMINATE ANY OR ALL OF THIS WORK.

TRANSPORTATION SPECIFICATIONS PUB. 408, IN ITS LATEST REVISION.

PENNDOT SPECIFICATIONS SHALL MEAN COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF

THE OWNER.

PLAN LOCATIONS AND DIMENSIONS SHALL BE STRICTLY ADHERED TO UNLESS OTHERWISE DIRECTED BY

MAINTAINED DURING ALL PHASES OF CONSTRUCTION.

ALL REQUIRED SOIL EROSION AND SEDIMENTATION CONTROLS SHALL BE PROVIDED, INSTALLED AND

THEIR ORIGINAL CONDITION AS DIRECTED BY THE ENGINEER AT NO ADDITIONAL COST TO THE OWNER.

ALL AREAS DISTURBED OUTSIDE THE LIMITS OF CONSTRUCTION SHALL BE REPAIRED OR REPLACED TO

CHECKED AND VERIFIED IN THE FIELD BY THE CONTRACTOR.

PRIOR TO BIDDING AND CONSTRUCTION, ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE

REQUIRED FEES.

CONSTRUCTION OF THIS SITE. THE CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS AND PAY THE

THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS APPLICABLE TO

STREAM. PROVIDE CONTROLS PER E&S PLANS.

WHEN EXCAVATIONS ARE MADE ABOVE STRUCTURE, DO NOT ALLOW SILT LADEN WATER TO ENTER

COMMISSION.

TOWNSHIP, LUZERNE CONSERVATION DISTRICT, PADEP, FEMA/PEMA, AND PA FISH AND BOAT

THIS PROJECT IS SUBJECT TO INSPECTION BY LUZERNE COUNTY AND/OR THEIR DESIGNEES, KINGSTON

CONSTRUCTION AND DEMOLITION WASTES NEED TO BE DISPOSED OF AT AN APPROVED SITE.

dfritzges@kingstontownship.com

DONALD FRITZGES

SHAVERTOWN, PA 18708

180 E CENTER STREET

KINGSTON TOWNSHIP

michael.navich@ftr.com

MICHAEL NAVICH

WILKES-BARRE, PA 18702-7025

300 E LAIRD STREET

FRONTIER COMMUNICATIONS OF PA INC.

SHAVERTOWN, PA 18708-9603

101 MEMORIAL HWY

DALLAS AREA MUNICIPAL AUTHORITY

LIST OF UTILITIES:

kseris@ugi.com

KIM SERIS

WILKES-BARRE, PA 18711

1 UGI CENTER

UGI UTILITIES LANCASTER

jboecker@ugi.com

JEREMY BOECKER

EDWARDSVILLE, PA 18704

20 VINE STREET

UGI UTILITIES INC

mark.baloh@amwater.com

MARK BALOH

SCRANTON, PA 18507

2699 STAFFORD AVE

PENNSYLVANIA AMERICAN WATER

P E

N

N S Y L V

A

N

I A

C O

M

M O

REGISTERED

PROFESSIONAL

ENGINEER

PE075322

RYAN T. FASNACHT

RTF

NORTH EAST

COORDINATES

POINT

CONTROL

TYPE

BEYOND TWO DECIMAL PLACES.

PURPOSES ONLY AND DO NOT IMPLY PRECISION

FOUR PLACE COORDINATES ARE FOR COMPUTATIONAL

SUMMARY OF PROJECT COORDINATES

SUMMARY OF PROJECT COORDINATES

BEYOND TWO DECIMAL PLACES.

PURPOSES ONLY AND DO NOT IMPLY PRECISION

FOUR PLACE COORDINATES ARE FOR COMPUTATIONAL

COMBINED GRID FACTOR = 0.9999209

(NORTH ZONE-NAD83-2011)(KEYNET-VRS)

BASED ON PENNSYLVANIA STATE PLANE COORDINATE SYSTEM

DRILL HOLE

IRON PIN

419548.6636

420364.9145

2467857.0666

2467561.2937

ELEVATION

897.75

894.71

POINT

COORDINATES

NORTH EAST

STATION BEARING

PC

PI

PC

PI

PC

PI

323+47.68 POB/PT 418949.0849 2468775.4060

326+22.54 419032.8773 2468513.6256

328+66.04 419107.1087 2468281.7151

N72°15'03"W

330+99.39

330+99.17

PT EQ BAK

PT EQ AHD

419283.2897 2468113.6289

332+34.80 419381.4196 2468020.0076

334+93.28 419568.4379 2467841.5819

N43°39'11"W

PT EQ BAK

PT EQ AHD

337+39.67

337+39.43

419819.9068 2467781.7908

339+98.59 420072.0389 2467721.8420

342+01.59 420269.5321 2467674.8846

N13°22'29"W

PT/POE344+02.53 420449.5776 2467581.1177 N27°30'37"W

19+50.22 POB 419594.5440 2467866.5620

22+75.00 POE 419835.1427 2468084.7236

N42°12'00"E

S U

R V

Y

C

N S

T R

S R

ROUTE

C O

N S

T R

S U

R V

A D

H A

R R I

S

SR 0309 SURVEY & CONSTR �

PT EQ STA 330+99.17 AHD

PT EQ STA 330+99.39 BAK=

PC STA 326+22.54

E= 30.54'

R= 955.37'

L= 476.85'

T= 243.50'

PI STA 328+66.04

SR 0309 SURVEY & CONSTR �

PT EQ STA 337+39.43 AHD

PT EQ STA 337+39.67 BAK=

PC STA 332+34.80

E= 34.35'

R= 955.37'

L= 504.87'

T= 258.48'

PI STA 334+93.28

SR 0309 SURVEY & CONSTR �

PT STA 344+02.53

PC STA 339+98.59

E= 12.54'

R= 1637.28'

L= 403.94'

T= 203.00'

PI STA 342+01.59

LIST OF SEGMENT EQUALITIES

SEG 0711 OFFSET 1161

SR 0309 SEG 0710 OFFSET 1143

=STA 335+20.00

LIST OF STATION EQUALITIES

SR 0309 SURVEY & CONSRT � PT EQ STA 337+39.67 BAK = PT EQ STA 337+39.43 AHD

SR 0309 SURVEY & CONSTR � PT EQ STA 330+99.39 BAK = PT EQ STA 330+99.17 AHD

COMBINED GRID FACTOR = 0.9999209

(NORTH ZONE-NAD83-2011)(KEYNET-VRS)

BASED ON PENNSYLVANIA STATE PLANE COORDINATE SYSTEM

THE FOLLOWING ENTITIES OWN PROPERTY ADJACENT TO THE PROJECT SITE:

THE TOWNSHIP.

CONNECTED TO THE TOWNSHIP'S PIPE OR DITCH WITHOUT ADVANCED WRITTEN APPROVAL BY

STRUCTURE OF ANY KIND MAY BE ERECTED IN THE AREA, NOR MAY ANY PIPE OR DITCH BE

AREA WHICH IS NOT DETRIMENTAL TO THE NECESSARY FLOW OF WATER. HOWEVER, NO

EASEMENT SHALL NOT PREVENT THE PROPERTY OWNER FROM MAKING LEGAL USE OF THE

REPAIR, RECONSTRUCTION AND ALTERATION OF HIGHWAY DRAINAGE FACILITIES. THE

DRAINAGE EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, MAINTENANCE,

RELINQUISHED IN WRITING BY THE COUNTY.

THE CONSTRUCTION OF WORK INDICATED BY THE PLANS IS COMPLETED, UNLESS SOONER

DURING THE CONSTRUCTION OF THE PROJECT. THE EASEMENT IS REQUIRED ONLY UNTIL

TEMPORARY CONSTRUCTION EASEMENT. AN EASEMENT TO USE THE LAND AS NECESSARY

TEMPORARY WORK WITHIN TEMPORARY CONSTRUCTION EASEMENTS.

CONTRACTOR MUST KEEP ALL PERMANENT WORK WITHIN EXISTING RIGHT-OF-WAY AND ALL

MAP #35 F8S5-2-4A

MAP #35 F8S4-5-3A

ANTHRACITE SCENIC TRAILS ASSOCIATION

KEITH A. HUNTER

PROJECT.

PROJECT CONTRACT FOR ADDITIONAL INFORMATION PERTAINING TO THIS

EXISTING PERMANENT TRAFFIC SIGNALS (4 OR MORE APPROACHES), WITHIN THE

DURING CONSRUCTION AND ITEM 015527-001 - TEMPORARY MODIFICATIONS TO

REFER TO ITEM 015526-001 - MAINTENANCE AND PROTECTION OF TRAFFIC

COORDINATE IMPACTS TO TRAFFIC WITH ADJACENT PROPERTY OWNERS.

UTILIZE ALL APPLICABLE PATA FIGURES WHEN IMPACTING TRAFFIC PATTERNS.

TRAFFIC CONTROL SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

ACCORDANCE WITH PENNDOT PUB 213 AND THE TRAFFIC CONTROL PLAN.

PROVIDE TRAFFIC CONTROLS TO DETOUR HARRIS HILL ROAD (T-783) IN

MAP #35-F9S3-4-1

Unknown

30895.11 Y:\Pottsville\30800S\30895.11_Harris_Hill_Road_BR\Eng_Docs\Roadway\02_GenNotes.dgn (Default)gBarwicki 09\23\2025 10:58:30

Sheet No.: OF Drawn: Designed: Checked:

Rev Date By Chk'd Description

Scale: AS NOTED Date: Project No.: 30895.11

570-622-4055

Pottsville, Pennsylvania 17901

400 One Norwegian Plaza

Alfred Benesch & Company

Kingston Township, Luzerne County, Pennsylvania

CB26305 STRUCTURE REPLACEMENT

OVER TOBY CREEK

HARRIS HILL ROAD (T-783)

12/05/2023reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.

Copyright 2025, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, WSL JAH 3 6

SUBBASE 6" DEPTH (NO. 2A)

VARIES

NTS

GROUND

ORIGINAL

TYPICAL SECTION HARRIS HILL RD

24'-4" TO 11'-0"

TYPICAL SECTIONS

4'-0" 8'-0"11'-0"

HARRIS HILL RD CONTR �

TO 2.0%

MATCH EXISTING

VARIES

TO 2.0%

MATCH EXISTING

VARIES

STA 20+00.00 TO STA 20+40.00

SUBBASE 6" DEPTH (NO. 2A)

NTS

TYPICAL SECTION HARRIS HILL RD

4'-0" 8'-0"11'-0"

HARRIS HILL RD CONTR �

11'-0"

2.0% 2.0%

STA 20+99.25 TO STA 21+50.00

STA 20+40.00 TO STA 20+43.25

GROUND

ORIGINAL

SUBBASE 6" DEPTH (NO. 2A)

NTS

TYPICAL SECTION HARRIS HILL RD

11'-0"

HARRIS HILL RD CONTR �

STA 21+50.00 TO STA 21+79.00

8'-0" TO 0'-0"

VARIES

2.0% 2.0%

VARIES

2.0% TO EXISTING 2.0% TO EXISTING

VARIES

11'-0" TO 10'-2"

VARIES

4'-0" TO 3'-7"

VARIES

SUPPLEMENTS (TYP)

SEEDING AND SOIL

GROUND

ORIGINAL

SUPPLEMENTS (TYP)

SEEDING AND SOIL

GROUND

ORIGINAL

SUPPLEMENTS (TYP)

SEEDING AND SOIL

GROUND

ORIGINAL

SUPPLEMENTS (TYP)

SEEDING AND SOIL

SUPPLEMENTS (TYP)

SEEDING AND SOIL

GROUND

ORIGINAL

2.0%

TO

4.0 %

VARIES

2.0%

TO

2.6 %

VARIES

2.0%

2:

1 2:1

2:1

2:

TO

1.

5:

VARI

ES

1.

5:

RTF

P E

N

N S Y L V

A

N

I A

C O

M

M O

REGISTERED

PROFESSIONAL

ENGINEER

PE075322

RYAN T. FASNACHT

W/4 DY/4 W/4 W/4 DY/4 W/4

W/4

4" DEPTH

<0.3 MILLION ESALS, 25.0 MM MIX,

BASE COURSE, PG 64S-22,

SUPERPAVE ASPHALT MIXTURE DESIGN,

4" DEPTH

<0.3 MILLION ESALS, 25.0 MM MIX,

BASE COURSE, PG 64S-22,

SUPERPAVE ASPHALT MIXTURE DESIGN,

4" DEPTH

<0.3 MILLION ESALS, 25.0 MM MIX,

BASE COURSE, PG 64S-22,

SUPERPAVE ASPHALT MIXTURE DESIGN,

1 1/2" DEPTH, SRL-L

<0.3 MILLION ESALS, 9.5 MM MIX,

WEARING COURSE, PG 64S-22,

SUPERPAVE ASPHALT MIXTURE DESIGN,

1 1/2" DEPTH, SRL-L

<0.3 MILLION ESALS, 9.5 MM MIX,

WEARING COURSE, PG 64S-22,

SUPERPAVE ASPHALT MIXTURE DESIGN,

1 1/2" DEPTH, SRL-L

<0.3 MILLION ESALS, 9.5 MM MIX,

WEARING COURSE, PG 64S-22,

SUPERPAVE ASPHALT MIXTURE DESIGN,

(TYP)

(INCIDENTAL TO SUBBASE 6" DEPTH )

SHOULDER BACKUP (NO. 2A)

(TYP)

(INCIDENTAL TO SUBBASE 6" DEPTH )

SHOULDER BACKUP (NO. 2A)

(TYP)

(INCIDENTAL TO SUBBASE 6" DEPTH )

SHOULDER BACKUP (NO. 2A)

(TYP)

(INCIDENTAL TO SUBBASE 6" DEPTH )

SHOULDER BACKUP (NO. 2A)

(TYP)

(INCIDENTAL TO SUBBASE 6" DEPTH )

SHOULDER BACKUP (NO. 2A)

ASPHALT TACK COAT (INCIDENTAL WEARING COURSE) ASPHALT TACK COAT (INCIDENTAL TO WEARING COURSE)

ASPHALT TACK COAT (INCIDENTAL TO WEARING COURSE)

END STA 21+76.68

8" PLAIN CONCRETE CURB

START STA 21+26.75

8" PLAIN CONCRETE CURB

30895.11 Y:\Pottsville\30800S\30895.11_Harris_Hill_Road_BR\Eng_Docs\Roadway\03_TypSection.dgn (Default)gBarwicki 09\23\2025 10:58:31

Sheet No.: OF Drawn: Designed: Checked:

Rev Date By Chk'd Description

Scale: AS NOTED Date: Project No.: 30895.11

570-622-4055

Pottsville, Pennsylvania 17901

400 One Norwegian Plaza

Alfred Benesch & Company

Kingston Township, Luzerne County, Pennsylvania

CB26305 STRUCTURE REPLACEMENT

OVER TOBY CREEK

HARRIS HILL ROAD (T-783)

12/05/2023reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.

Copyright 2025, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, CP NO 3

BM "A"

MH20 21 22

30895.11 Y:\Pottsville\30800S\30895.11_Harris_Hill_Road_BR\Eng_Docs\Roadway\04_PL01.dgn (Default)gBarwicki 09\23\2025 10:58:34

Sheet No.: OF Drawn: Designed: Checked:

Rev Date By Chk'd Description

Scale: AS NOTED Date: Project No.: 30895.11

570-622-4055

Pottsville, Pennsylvania 17901

400 One Norwegian Plaza

Alfred Benesch & Company

Kingston Township, Luzerne County, Pennsylvania

CB26305 STRUCTURE REPLACEMENT

OVER TOBY CREEK

HARRIS HILL ROAD (T-783)

12/05/2023reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.

Copyright 2025, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, 0 2010 FEET

NOTES:

4 6

ROADWAY PLAN

BEGIN FULL DEPTH PVMT

EXISTING STRUCTURE PROPOSED STRUCTURE

HYDRAULIC OPENING = 380 SF

OUT TO OUT WIDTH = 34.0'�

UNDERCLEARANCE = 24'-0"

CLEAR SPAN = 18.0'�

SKEW = 90°

STACKED STONE AND CONCRETE ARCH CULVERT

HARRIS HILL ROAD

S R

M E

M O

R I

G H

W A

Y

H E

L L

E

G

O V

A D

- GUIDE RAIL

- LEGAL RIGHT-OF-WAY

- FLOW DIRECTION

- EDGE OF STREAM

LEGEND

JAH ANB RTF

P E

N

N S Y L V

A

N

I A

C O

M

M O

REGISTERED

PROFESSIONAL

ENGINEER

PE075322

RYAN T. FASNACHT

STA 21+79.00

- PROPOSED PIPE

P

B

T

A

R R

D

P

A

R

G M

E N

T

F S

E T

R

G M

E N

T

F S

E T

KEITH A. HUNTER

78'

+45

55.00'

+44 55.00'

+23.00

78'

+76

27.00'

+74

16.5'

+44

16.5'

+79.00

16.5'

+83

85'

+07

UGI POLE # 49932-41963

RR SPIKE FND IN

35'LT STA 20+28

BM "A" ELEV 894.43'

19'

+73

16.5'

+64

T O

E E

K

SURVEY & CONSTR �

HARRIS HILL RD

27.00'

+23.00

R

R

TERMINAL SECTION, SINGLE

77'

+60

27'

+83

23.00'

+79.00

23'

+47

23'

+27

MAP #35 F8S4-5-3A

TRAILS ASSOCIATION

ANTHRACITE SCENIC

66'

+15

71'

+34

24'

+62

23.00'

+63

CROSSWALK

GAS LINE MARKER

BRIDGE WEIGHT LIMIT 10 TONS

CLEARANCE

INVERT=875.21'

15" CMP

LIMIT 10 TONS

BRIDGE WEIGHT

CLEARANCE

SHARE THE ROAD

TO PEDESTRIAN

BICYCLE YIELD

15" RCP

INVERT (N)=901.41'

15" RCP

INVERT (E)=901.43'

TOP=903.66'

INLET=4 X 2.20

N

S T

R

S U

R V

R

CLEARANCE

GAS LINE MARKER

B A

K

M

U N

T A

A I

L

W/24"

DY/4"

DY/4"

W/4"

W/4"

W/4"

W/4"

+32.28

+18.17

+58

26'

+58

+05.29

24.16'

+15.70

29.31'

+17.93

27.07'

+00.00

19.90'

+00.00

- REQUIRED RIGHT-OF-WAY

CTCO CS/44

METER POLE

UGI 49951-41971

BEGIN HIGHWAY OCCUPANCY PERMIT LIMITS

STA 334+39.47 SR 0309

SR 0309 SEGMENT 0710 OFFSET 1062 =

STA 336+11.81 SR 0309

SR 0309 SEGMENT 0710 OFFSET 1235 =

END HIGHWAY OCCUPANCY PERMIT LIMITS

END W/4" LT

END FULL DEPTH PVMT@ 4' C TO C

INSTALL W/24"

+84

PED CROSSING

SIGNS

(24"X18")

& W11-15P

(30"X30")

W11-15

INSTALL

UGI 49936-41956

R=23'

R=15'

R=13'

R=17'

R=15'

R=15'

(REMOVE AND RESET)

(REMOVE & RESET)

PENNDOT RIGHT-OF-WAY.

SEE MPT PLANS FOR TRAFFIC CONTROL WORK ITEMS LOCATED IN

RIGHT-OF-WAY AND PROPERTY LINES ARE APPROXIMATE.

STRUCTURE AS DIRECTED BY THE ENGINEER IN THE FIELD.

REQUIREMENTS AND INSTALLED AT THE FOUR CORNERS OF THE

EACH: OM-3L & OM-3R) ARE TO BE INSTALLED AS PER PUB 236

FOUR (4) POST MOUNTED SIGNS, TYPE B CLEARANCE MARKERS (2

FOR TOWNSHIP ROAD

LEGAL RIGHT-OF-WAY LINE

ROAD

FOR TOWNSHIP

LINE

RIGHT-OF-WAY

LEGAL

F

W N

S H

P

A D

L E

G

G H

T

O F

W

N E

EASEMENT

TEMPORARY CONSTRUCTION

EASEMENT

TEMPORARY CONSTRUCTION

BEGIN FULL DEPTH PVMT

END STRUCTURE

STA 20+99.33

IN 2

IN 1

STA 20+43.17

BEGIN STRUCTURE

END FULL DEPTH PVMT

500 FT

INV(OUT) = 884.00

END SECTION

WITH IN 2)

(REMOVE & REPLACE

18"

(REMOVE)

EASEMENT

DRAINAGE

REQUIRED

C TO C)

W/24" @ 4'

(REPLACE

BEGIN DY/4"

END DY/4"

+43.00

+43.00

END W/4"

+42.00

STA 20+00.00, 12.26'RT

(24"X18") SIGNS)

& W11-15P

W11-15 (30"X30")

(REPLACE WITH

L E

G

G H

T

O F

W

FOR TOWNSHIP ROAD

RIGHT-OF-WAY LINE

REQUIRED

FOR TOWNSHIP ROAD

RIGHT-OF-WAY LINE

REQUIRED

L E

G

G H T

O F

W A

Y

L I

MAP #35 F9S3-4-1

UNKNOWN

(REMOVED BY OTHERS)

(REMOVED BY OTHERS)

UNITED METHODIST CHURCH

(REMOVED BY OTHERS)

(REMOVED BY OTHERS)

(REMOVED BY OTHERS)

(REMOVED BY OTHERS)

TO OWNER)

(REMOVE-RETURN

NO PARKING

BACK MTN TRAIL

BIKE RT LEFT

(REMOVE-RETURN TO OWNER)

INV(OUT) = 902.48 (SW)

TG = 906.76

HEIGHT </=10'

STANDARD INLET BOX

AND BICYCLE SAFE GRATE

BICYCLE SAFE GRATE

UNIT, 8" CURB AND

TYP C CONCRETE TOP

STA 21+71.75, 13.91 LT

IN 1

INV(OUT) = 899.38 (NW)

INV(IN) = 899.58 (NE)

TG = 904.15

HEIGHT </=10'

STANDARD INLET BOX

BICYCLE SAFE GRATE

UNIT 8" CURB AND

TYP C CONCRETE TOP

STA 21+39.00, 14.73 LT

IN 2

T Y

P E

S

T Y

P E

S C

END TRANS

APPROACH

(REMOVE-RETURN TO OWNER)

TYPE 31-SC

12.5' 25.0'

TYPE 31-S

(REMOVE-RETURN TO OWNER)

DELINEATORS (TYP) 3 REMAINING

E N

D

T R

A N S

T Y

P E

S

P E

S

T R

A N

S I

T I

U I

I

L

E X I

S T I

P E

END TRANS

APPROACH

T Y

P E

S

P E

S

T R

A N

S I

T I

U I

I

L

E X I

S T I

P E

8" PLAIN CONCRETE CURB

50'

BRIDGE WEIGHT LIMIT 10 TONS

(REMOVE-RETURN TO OWNER)

SECTION, SINGLE

TERMINAL

MAP #35 F8S5-2-4A

TRAILS ASSOCIATION

ANTHRACITE SCENIC

CURB TRANSITION

3'-0" SLOPED TOP

(REMOVE AND RESET)

(REMOVE-RETURN TO OWNER)

INVERT=900.38'

15" RCP

COMMUNICATIONS CONDUIT

BY CONTRACTOR)

(TO BE TEMPORARILY SUPPORTEDUGI 49932-41963

S C

A P P R

O A C

H

E N

D

T R

A N S

NO PARKING

BACK MTN TRAIL

BIKE RT LEFT

- PROPOSED SIGN

S C

A P

HYDRAULIC OPENING = 750 SF

OUT-TO-OUT WIDTH = 37'-4•"

ROADWAY WIDTH = 34'-0" CURB TO CURB

MIN. UNDERCLEARANCE = 21'-7"

SPAN LENGTH = 54'-6" � TO � BRG

SKEW = 90°

PA BULB-TEE BEAM BRIDGE

SINGLE SPAN COMPOSITE P/S CONCRETE

N 42°12'00" E

MH

20 21 22

30895.11 Y:\Pottsville\30800S\30895.11_Harris_Hill_Road_BR\Eng_Docs\Roadway\05_Grading_PL01.dgn (Default)gBarwicki 09\23\2025 10:58:35

Sheet No.: OF Drawn: Designed: Checked:

Rev Date By Chk'd Description

Scale: AS NOTED Date: Project No.: 30895.11

570-622-4055

Pottsville, Pennsylvania 17901

400 One Norwegian Plaza

Alfred Benesch & Company

Kingston Township, Luzerne County, Pennsylvania

CB26305 STRUCTURE REPLACEMENT

OVER TOBY CREEK

HARRIS HILL ROAD (T-783)

12/05/2023reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.

Copyright 2025, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, P E

N

N S Y L V

A

N

I A

C O

M

M O

REGISTERED

PROFESSIONAL

SURVEYOR

LAND

SU-31436-E

EDWARD J. STEFANOWICZ

0 2010 FEET

5 6

GRADING PLAN

BEGIN FULL DEPTH PVMT

HARRIS HILL ROAD

S R

M E

M O

R I

G H

W A

Y

H E

L L

E

O V

A D

- GUIDE RAIL

- LEGAL RIGHT-OF-WAY

- FLOW DIRECTION

- EDGE OF STREAM

LEGEND

JAH ANB RTF

P E

N

N S Y L V

A

N

I A

C O

M

M O

REGISTERED

PROFESSIONAL

ENGINEER

PE075322

RYAN T. FASNACHT

STA 21+79.00

END FULL DEPTH PVMT

- PROPOSED PIPE

RR SPIKE IN 18" MAPLE

36'LT STA 21+60

BM "B" ELEV 903.31'

P

A

R R

P

A

R

G M

E N

T

F S

E T

R

G M

E N

T

F S

E T

KEITH A. HUNTER

FOR TOWNSHIP ROAD

LEGAL RIGHT-OF-WAY LINE

ROAD

FOR TOWNSHIP

LINE

RIGHT-OF-WAY

LEGAL

F

W N

S H

A D

L E

G

G H

T

O F

W

N E

EASEMENT

TEMPORARY CONSTRUCTION

L E

G

G H

T

O F

W

FOR TOWNSHIP ROAD

RIGHT-OF-WAY LINE

REQUIRED

UGI POLE # 49932-41963

RR SPIKE FND IN

35'LT STA 20+28

BM "A" ELEV 894.43'

FOR TOWNSHIP ROAD

RIGHT-OF-WAY LINE

REQUIRED

T O

E E

K

L E

G

G H T

O F

W A

Y

L I

EASEMENT

TEMPORARY CONSTRUCTION

BEGIN FULL DEPTH PVMT

END STRUCTURE

STA 20+99.33 SURVEY & CONSTR �

HARRIS HILL RD

IN 2

IN 1

STA 20+43.17

BEGIN STRUCTURE

END FULL DEPTH PVMT

MAP #35 F8S4-5-3A

TRAILS ASSOCIATION

ANTHRACITE SCENIC

66'

+15

71'

+34

18"

INVERT=875.21'

15" CMP

EASEMENT

DRAINAGE

REQUIRED

N

S T

R

S U

R V

R

B A

K

M

U N

T A

A I

L

MAP #35 F8S5-2-4A

TRAILS ASSOCIATION

ANTHRACITE SCENIC

STA 20+00.00, 12.26'RT

- REQUIRED RIGHT-OF-WAY

- PROPOSED CONTOUR

- EXISTING CONTOUR

SECTION

END

BM "B"

BM "A"

MAP #35 F9S3-4-1

UNKNOWN

HORIZONTAL

VERTICAL

SCALE

0 4020 FEET

0 84 FEET

870DATUM:

G

G

G

G

G

G

G G

PVI STA 20+37.00

ELEV 896.69

VC 23.00'

MO -0.15'

SSD 212'

PVI STA 21+58.00

PVI STA 21+79.00

ROADWAY PROFILE

ELEV 889.08

100-YR

ELEV 889.05

100-YR

ELEV 882.34

25-YR

ELEV 882.33

25-YR

P

V C

P V

T 7.

P V I

7.

7.

STA 21+79.00

STA 20+00.00

BEGIN FULL DEPTH PVMT

END FULL DEPTH PVMT

STA 21+43.17

BEGIN STRUCTURE

END FULL DEPTH PVMT

STA 20+99.33

BEGIN FULL DEPTH PVMT

END STRUCTURE

JAH JAH RTF 66

P E

N

N S Y L V

A

N

I A

C O

M

M O

REGISTERED

PROFESSIONAL

ENGINEER

PE075322

RYAN T. FASNACHT

NO CURVE

ELEV 905.89

NO CURVE

ELEV 907.52

CREEK, RT

TOBY

CREEK, LT

TOBY

EXISTING HYDRAULIC DATA

PROPOSED HYDRAULIC DATA

ELEV = 889.05

VELOCITY = 5.58FPS

MAGNITUDE = 3390 CFS

ASSESSMENT:

100 YR FLOOD RISK

ELEV = 882.33

VELOCITY = 6.95 FPS

FREQUENCY = 25 YR

MAGNITUDE = 1750

DESIGN FLOOD:

DRAINAGE AREA = 11 SQ MI

ELEV = 889.08

VELOCITY = 5.56 FPS

MAGNITUDE = 3390 CFS

ASSESSMENT:

100 YR FLOOD RISK

ELEV = 882.34

VELOCITY = 6.94 FPS

FREQUENCY = 25 YR

MAGNITUDE = 1750 CFS

DESIGN FLOOD:

DRAINAGE AREA = 11 SQ MI

R-4 (TYP)

CHOKED WITH

ROCK, R-8

EL 884.0 (TYP)

TO REMAIN

ARCH WALL

EXISTING

AS NEEDED

IN EX. SCOUR HOLES,

CONC. UNDERPINNING

884.00

INV (OUT) =

END SECTION

6.

HARRIS HILL RD PROFILE

30895.11 Y:\Pottsville\30800S\30895.11_Harris_Hill_Road_BR\Eng_Docs\Roadway\06_PR01.dgn (Default)gBarwicki 09\23\2025 10:58:36

Sheet No.: OF Drawn: Designed: Checked:

Rev Date By Chk'd Description

Scale: AS NOTED Date: Project No.: 30895.11

570-622-4055

Pottsville, Pennsylvania 17901

400 One Norwegian Plaza

Alfred Benesch & Company

Kingston Township, Luzerne County, Pennsylvania

CB26305 STRUCTURE REPLACEMENT

OVER TOBY CREEK

HARRIS HILL ROAD (T-783)

12/05/2023reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.

Copyright 2025, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, INV(OUT) = 899.38 (NW)

INV(IN) = 899.58 (NE)

TG = 904.15

HEIGHT </=10'

STANDARD INLET BOX

8" CURB AND BICYCLE SAFE GRATE

TYPE C CONCRETE TOP UNIT,

STA 21+39.00, 14.73 LT

IN 2

.0 0%

.9

8'

OF

1.0 0%8.3

5'

OF 1

8"

INV(OUT) = 902.48 (SW)

TG = 906.76

HEIGHT </=10'

STANDARD INLET BOX

8" CURB AND BICYCLE SAFE GRATE

TYPE C CONCRETE TOP UNIT,

STA 21+71.75, 13.91 LT

IN 1

01_Cover
02_GenNotes
03_TypSection
04_PL01
05_Grading_PL01
06_PR01

File details come from the government source that posted it. Updated .