11-01 TRAFFIC CONTROL PLANS.pdf
PDF 11 MB Posted
- Solicitation number
- US.203796
- Issued by
- Lackawanna County, Wolfdale CDP, Pennsylvania
About this file
This document is a Traffic Control Plan for the Harris Hill Road (T-673) Over Toby Creek structure replacement project, prepared by Benesch for Luzerne County and Kingston Township in Pennsylvania. The plan details temporary traffic control, signage, and signal modifications for a bridge construction project on SR 0309 (Memorial Highway) at the intersection with Harris Hill Road and Church Road. The documents include comprehensive traffic management strategies such as road closures, detour routes, temporary signage, signal phasing diagrams, and emergency vehicle preemption protocols. The plan covers a detailed sequence of traffic control measures, including specific instructions for maintaining traffic flow, installing temporary barriers, and managing intersection movements during construction.
The project involves replacing the existing bridge structure, with a planned closure that will require a 0.6-mile detour route. The traffic control plan includes multiple technical drawings showing signal locations, phasing diagrams, sign fabrication details, and emergency vehicle routing. Specific elements include temporary traffic signals, portable sign posts, signal support relocations, and comprehensive safety measures to manage traffic during construction. The plan is dated April 18, 2023, and provides minute details on signal timing, emergency preemption sequences, and temporary traffic management to minimize disruption to local traffic while ensuring safe construction operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .