Construction Table of Contents.doc

DOC document 24 KB Posted

Attached to
Install new Bosch control panel, and key pads to replace the existing Radionics System equipment for the perimeter security system.
Solicitation number
3PPE-BID-09-001
Issued by

About this file

Table of Contents

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. 3PPE-BID-09-001

Table of Contents

1. Solicitation, offer and Award (SF-1442)…………………………1-2

2. Scope of Work……………………………………………………3-6

3. Itemized Bid Sheet………………………………………………..7

4. Security Requirements..…………………………………………..8-10

5. Representation and Certifications (GSA 3503)………………….11-12

6. FAR 52.219-6 Notice of Total Small Business Set-Aside…………13

7. Solicitation Provisions (GSA 3502)……………………………..14-17

8. Construction Contract Clauses (GSA 3508 ref.)…...……………18-25

9. Labor Standards [Construction Contract] (GSA 3505)……….....26-33

10. 52.219-22 Small Disadvantage Business Status…………….….34

11. 52.232-33 Payment by Electronic Funds Transfer-CCR……….35-36

12. 52.204-6 Data Universal Numbering System (DUNS)…………37

13. 52.212-1 Instructions to Offerors-Commercial Items…………..38-41

14. 52.213-4 Terms and Conditions-Simplified Acquisitions……...42-44

15. Wage Determination PA080005 dtd. 10/03/08…………………45-56

16. Non-Response Memorandum…………………………………..57

File details come from the government source that posted it. Updated .