3c3_drawing three.pdf

PDF 77 KB Posted

Attached to
Temporary Sewer Line at Coast Guard Academy
Solicitation number
70Z03926QCGA00009
Issued by

About this file

This is a technical architectural drawing depicting a Pump Floor Plan for demolition work. The schematic, drawn at a scale of 1/2"=1'-0", illustrates the layout and configuration of pump equipment and associated piping systems. Key components shown include an 8" beam structure, a bar screen, a sluice gate removal concrete trough, an inlet pipe (3.25"), an overflow pipe (6"), a 6" discharge pipe with elevation at 0'±2.0", and an existing MIT gate valve (V.I.V.). The drawing also indicates conduit work to be exposed on the wall and dimension references ranging from approximately 5'6" to 16'8" in various directions. The plan provides detailed spatial relationships and elevations necessary for the demolition project, including the removal of existing pump infrastructure and associated components at what appears to be a water treatment or management facility.

drawing three

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .