3c3_drawing three.pdf
PDF 77 KB Posted
- Attached to
- Temporary Sewer Line at Coast Guard Academy
- Solicitation number
- 70Z03926QCGA00009
About this file
This is a technical architectural drawing depicting a Pump Floor Plan for demolition work. The schematic, drawn at a scale of 1/2"=1'-0", illustrates the layout and configuration of pump equipment and associated piping systems. Key components shown include an 8" beam structure, a bar screen, a sluice gate removal concrete trough, an inlet pipe (3.25"), an overflow pipe (6"), a 6" discharge pipe with elevation at 0'±2.0", and an existing MIT gate valve (V.I.V.). The drawing also indicates conduit work to be exposed on the wall and dimension references ranging from approximately 5'6" to 16'8" in various directions. The plan provides detailed spatial relationships and elevations necessary for the demolition project, including the removal of existing pump infrastructure and associated components at what appears to be a water treatment or management facility.
drawing three
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3c4_drawing four.pdf | ||
| 12f_70Z03926QCGA00009_RFQ_SF1449.pdf | ||
| 12f_Combined Synopsis Solicitation_Sewage Line Bypass.pdf | ||
| 3c_Performance Work Statement PWS Temp Sewer Line.docx | DOCX document | |
| 3c1_drawing one.pdf | ||
| 3c2_drawing two.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .