This document is a technical drawing depicting a Pump Floor Plan for new work at a scale of ½"=1'-0". The plan illustrates a piping system configuration featuring two 4-inch diameter pumps positioned vertically with approximately 4 inches of spacing between them. The system includes 4-inch piping runs extending horizontally from the pumps, with multiple isolation valves (check valves indicated by X symbols) integrated throughout the circuit. A float switch with metering pipe location is positioned at the top of the assembly. The right side of the plan shows a connection to an existing 6-inch master gate valve through a 4-inch pipe reducer and coresized linkseal fitting. The overall layout appears designed for a recirculation or fluid handling system within a confined pump room space, with dimensions indicating approximately 31'4" in one direction and 18'4" in another. The schematic designates "R" markers at key connection points and includes piping specifications necessary for construction and installation purposes.
drawing one
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3c2_drawing two.pdf | ||
| 3c3_drawing three.pdf | ||
| 3c4_drawing four.pdf | ||
| 12f_70Z03926QCGA00009_RFQ_SF1449.pdf | ||
| 12f_Combined Synopsis Solicitation_Sewage Line Bypass.pdf | ||
| 3c_Performance Work Statement PWS Temp Sewer Line.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .