3c2_drawing two.pdf

PDF 97 KB Posted

Attached to
Temporary Sewer Line at Coast Guard Academy
Solicitation number
70Z03926QCGA00009
Issued by

About this file

This document is a set of architectural/engineering drawings depicting construction sections and details for what appears to be a demolition or renovation project. Section A-A shows a demolition plan at a scale of 1/2"=1'-0", while Section B-1 displays new work details at a scale of 3/4"=1'-0". The drawings illustrate structural elements including floor systems, existing penetrations to be filled with waterproof grout, drainage systems, pump and float switch installations, discharge elevation details, and various mechanical connections and piping configurations. Key notations reference filling existing penetrations with waterproof grout and specify components such as sump pit sumps, discharge piping, and structural supports. The drawings appear to be technical specifications for a pump installation or water management system within an existing structure, with careful attention to waterproofing and proper drainage implementation. This is a technical drawing package rather than a solicitation document or contracting instrument.

drawing two

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .