3829942_PWS.pdf

PDF 469 KB Posted

Attached to
F100-PW-220 Sprayring Manifold Assemblies
Solicitation number
FA812124R0019
Issued by

About this file

This is a Performance Work Statement (PWS) for F100-PW-220/220E Augmentor Spray Manifold Assemblies repair and overhaul services for Tinker Air Force Base. The PWS establishes minimum work requirements to return various NSN/part number combinations of these assemblies to serviceable condition, including parts 4085199, 4073225, 4073225U, and 4089329. The contractor must perform disassembly, cleaning, inspection, corrosion control, modification, testing, and preservation services in accordance with specified technical orders and quality standards.

Key requirements include: maintaining ISO-9001 quality system standards, investigating and responding to Product Quality Deficiency Reports within specified timeframes, meeting delivery schedules per contract terms, and providing proper handling/storage of government assets. The contractor must complete initial production evaluation requirements before beginning production work. The PWS includes surge provisions for supporting increased demands during emergencies or wartime scenarios. The work is classified as mission essential and requires continued support during crises. The contractor must also implement supply chain risk management controls, maintain cybersecurity protections, and disclose any foreign ownership/influence. No government furnished material will be provided - the contractor must furnish all materials, support equipment, tools and test equipment.

View the file

Other files

File Type Posted
Special Packaging Instructions.pdf PDF
DID5.pdf PDF
DID4.pdf PDF
Solicitation FA812124R0019.pdf PDF
JA_Redacted.pdf PDF
3773877_TRNSPDATA_REPORT.pdf PDF
DID3.pdf PDF
DID2.pdf PDF
DID1.pdf PDF
3782637_CDRL1_REPORT.pdf PDF
3773881_PKGRQMT_REPORT.pdf PDF
3445321_ITMDESC_REPORT.pdf PDF
DID6.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

For

F100-PW-220/220E Augmentor Spray Manifold Assemblies

FILE NUMBER: PR# FD20302300388

REV. 0

DATE: 16 DEC 2022

PREPARING ORGANIZATION:

AFLCMC/LPSBE

TINKER AFB OK 73145-3030

Warning –this document contains technical data whose export is restricted by the arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401, et seq. violation of these export‐control laws is subject to severe criminal penalties.

Dissemination of this document is controlled under DoD Directive 5230.25

PR FD20302300388 Page 2 of 41

TABLE OF CONTENTS Page

SECTION I

1.1 DATA

1.2 SECURITY

1.3 QUALITY

1.4 DELIVERY SCHEDULES

1.5 CONDEMNATION AND OVERHAUL

1.6 HANDLING

1.7 INVENTORY

1.8 PRESERVATION

1.9 RECEIPT/HANDLING OF PQDR EXHIBITS

1.10 GENERAL WORK REQUIREMENTS

1.11 SPECIFIC WORK REQUIREMENTS

1.12 APPLICABLE TECHNICAL ORDERS

1.13 APPLICABLE DIRECTIVES

1.14 APPLICABLE DOCUMENTS

1.15 MISSION ESSENTIAL SERVICES

1.15 SURGE ……………………………………………………………………………………………………………………………….16

1.16 SAFETY AND HEALTH

SECTION II

2.1 SERVICE SUMMARY REQUIREMENTS…………………………………………………………………………………19

2.2 CONTRACTOR PERFORMANCE EVALUATION

SECTION III………………………………………………………………………………………………………………………………………….20

3.1 GOVERNMENT PROPERTY

APPENDIX 1

A1.1 ACRONYMS

APPENDIX 2

A2.1 NOTES

APPENDIX 3

A3.1 PRODUCT VERIFICATION AUDIT PROCEDURES

A3.2 TERMS EXPLAINED

A3.3 RESPONSIBILITIES

A3.4 AUDIT PROCEDURES

A3.5 AUDIT RESULTS

APPENDIX 4

A4.1 CAV CFM REPORTING REQUIREMENTS

A4.2 SCRM Supply Chain Risk Management ………………………………………………………………………………………37

PR FD20302300388 Page 3 of 41

SECTION I

DESCRIPTION OF SERVICES

This PWS establishes the minimum work requirements to return F100-PW-220/220E Augmentor Spray Manifold Assemblies listed below by National Stock Numbers (NSN) and Part Numbers (P/N) to a serviceable but not like new condition. F100-PW-220/220E Augmentor Spray Manifold Assemblies received by the contractor, as set forth in this contract shall be overhauled, modified, tested, prepared for storage and shipped in accordance with (IAW) the requirements in this PWS and the contract.

NOUN PART NUMBER NSN APPLICABLE

TO

NO. 4 Augmentor Spray Manifold Assemblies

INPUT 4085199 2915-01-471-3480 6J28-2-3

INPUT 4073225 2915-01-334-7068 6J28-2-3

INPUT 4073225U 2915-01-344-7068 6J28-2-3

INPUT 4089329 2915-01-659-5074 6J28-2-3

OUTPUT 4089329 2915-01-659-5074 6J28-2-3

Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal correspondence.

PR FD20302300388 Page 4 of 41

1.1 DATA

1.1.1 Reporting Requirements

1.1.1.1 Product Quality Deficiency Report (PQDR – SF 368): The contractor shall prepare a PQDR on all design and quality control (material) deficiencies found IAW the procedures of TO 00-35D-54. Applicable portions of TO 00-35D-54 relative to quality defects will apply. The contractor shall hold exhibits of reported deficient items pending disposition from the ACO representative. Report preparation, distribution, holding and tagging of exhibits shall be IAW TO 00-35D-54. The contractor shall furnish an information copy of the SF 368 to USAF F100 Engineering Source Authority listed in TO 2J-F100-13-1, WP 600 00.

1.1.1.2 TO System Publication Improvement Report (AFTO Form 22): The contractor shall prepare a PIR when an error or improvement changes the meaning of the instructions or information contained in technical directives and will prevent the adequate performance intended. The contractor shall accomplish a PIR IAW TO 00-5-1 and submit one copy to AFLCMC/ENR. Minor discrepancies of non- technical nature such as improper sequence of pages, typographical errors, transportation errors, misspelled words, etc., shall not be reported. The contractor shall report omissions of pertinent technical data, correction of overhaul procedures in TOs, or desired changes to TO data shall likewise use the AFTO Form 22.

1.1.1.3 Teardown Deficiency Report (TDR): A TDR shall be accomplished on any

PQDR exhibit received for investigation. The report shall be completed IAW the procedures established on DD Form 1423 as set forth in the contract.

1.1.2 Other Records, Forms and Reports

1.1.2.1 The contractor shall make available to the appropriate ACO representative the required information to enable him to review and/or verify monthly production status reports on end items and to enable him to complete his records or to complete such other reports as may be required.

1.1.2.2 CAV AF End Item Production Report (End Item Activity Report): The report shall be completed IAW the procedures established on DD Form 1423, as set forth in the contract and the Appendix 2.

1.1.2.3 CEMS Reporting: N/A Note: The -220/220E Augmentor Spray Manifold

Assemblies are not serialized tracked parts, and therefore, CEMS reporting is not required in this contract.

PR FD20302300388 Page 5 of 41

1.1.2.4 Completed DD Form 1574 Serviceable Tags are required IAW MIL-STD- 129R, paragraph 5.2.21.a.

1.1.2.5 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields in the Service Contract Report (SCR) at www.sam.gov.

1.1.2.5.1Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year.

Contractors may direct questions to the SAM.gov service desk (https://www.fsd.gov/fsd-gov/home.do).”

Reporting Period: Contractors are required to input data by 31 October of each year.

Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

User Guide: Data for Air Force service requirements must be input at www.sam.gov. A quick start user guide is available at on the SAM.gov website at https://www.fsd.gov/sys_attachment.do?sys_id=95849fed1be769100ca4a97ae5 4bcbba.

1.1.3 Technical Data

1.1.3.1 TOs listed in this specification are the basic directives to be used in accomplishing the overhaul requirements of the contract.

1.1.3.2 TO illustrated parts breakdowns (IPBs) listed in this PWS shall be used in the part replacement requirements of the contract. Replacement parts shall conform to the configurations stipulated in the applicable TO IPB as supplemented by other applicable directives and instructions in this PWS. Part replacement shall be confined to those parts determined to be required to produce a serviceable end item.

1.1.3.3 Directives listed in paragraphs 1.11, 1.12, 1.13 & 1.14 and instructions provided throughout this PWS shall be adhered to, thus obtaining the highest

PR FD20302300388 Page 6 of 41 possible quality of workmanship and to maintain acceptable quality standards.

1.1.3.4 Instructions listed in this PWS as “Changes” or “Revisions” to a TO represent publication changes to the Technical Order System and shall be complied with.

The sub-paragraphs contain the location of changes as designated and the deletion, change or addition of technical information to be accomplished.

1.1.3.5 In the event of a conflict between the instructions in this PWS and the applicable technical directive, the following order of override precedence applies (descending order): 1) this PWS, 2) the end item TO, 3) other technical directives.

1.2 SECURITY

PR FD20302300388 Page 7 of 41

1.2.1 Contractor’s Security Controls: Equipment and materials covered by this PWS are not classified.

1.3 QUALITY

1.3.1 The contractor shall provide and utilize an inspection/quality system IAW ISO - 9001.

1.3.2 The contractor shall investigate, take corrective action if necessary, and reply to user initiated PQDR forwarded to them by the ACO. This applies to all PQDRs submitted against products overhauled by the contractor and/or their subcontractor or vendors. Sufficient priority shall be given to PQDR investigation to allow timely corrective action and to meet requirements of TO 00-35D-54 and the CDRL.

1.3.3 No defective parts shall be delivered to the Government.

1.3.4 The contractor shall allow quality assurance reviews by DCMA representative at the site of repair for each end item generated under the terms of this contract.

1.4 DELIVERY SCHEDULES

1.4.1 The delivery schedules shall be IAW the contract delivery schedules.

1.5 CONDEMNATION AND OVERHAUL

1.5.1 Contractor’s Scrap Procedures: The contractor shall prepare and submit to the Government Property Administrator (GPA) for approval, a written plan that sets forth procedures for handling scrap materials. These procedures shall include the requirements stipulated in the Federal Acquisition Regulation (FAR) 45.1, titled “General”. Disposition of condemned parts containing critical alloys and/or precious metals shall by IAW TO 00-25-113, 00-25-153-F100-ENG and FAR 45.6 titled “Reporting, Reutilization, and Disposal”.

1.5.2 Condemnation: The contractor without written approval of the ACO or his representative shall not condemn End Items.

1.5.2.1 End Items determined by the contractor and verified by the ACO to be beyond economical overhaul shall be disposed of as directed by the ACO in writing.

1.5.2.2 Parts, which have been condemned as a result of NDI methods, other inspection methods, or for other reasons, shall be mutilated to the extent necessary to ensure that purchasers of scrap are unable to overhaul the item for possible resale or reuse. All documents and tags pertinent to such condemned parts authorized for transfer to disposal shall bear a certificate to the effect that all required mutilation has been accomplished and meets DEMIL directive requirements.

PR FD20302300388 Page 8 of 41

1.5.2.3 The serial number and part number of any life-limited item, which is condemned, must be transmitted to F100 Engineering Source Authority listed in TO 2J-F100-13-1, WP 600 00.

1.5.3 Overhaul: End Items determined to be beyond repair shall not be overhauled by the contractor unless authorized in writing by the ACO.

1.6 HANDLING

1.6.1 The contractor shall have physical custody of end items and parts received at their facility and shall be responsible for their constant care during such custody.

1.6.1.1 CEMS Reporting: Note: The F100-PW-220/220E Augmentor Spray Manifold

Assemblies are not a serialized tracked part, and therefore, CEMS reporting is not required in this contract.

1.7 INVENTORY

1.7.1 Each end item shall be inspected by the contractor upon receipt to determine its condition and to ensure that its item identification corresponds to that shown on the contract schedule. Non-conforming end items shall be reported to the appropriate ACO representative.

1.8 PRESERVATION

1.8.1 Preservation inspection of end items is not required upon receipt. Adequacy of preservation will be determined when the item is placed in work and if found deficient shall be reported to the appropriate ACO representative.

1.8.2 All Government assets shall be stored in an enclosed and covered area and shall be adequately protected against loss by fire, theft, and physical damage by the elements. Government owned items and parts shall not be co-mingled with non- Government owned property.

1.9 RECEIPT/HANDLING OF PQDR EXHIBITS

1.9.1 Any exhibit received for the purpose of an investigation into the cause of a material or a quality deficiency shall be kept separated from normal overhaul assets until the investigation is completed. The contractor shall provide the exhibit receipt date through the ACO with the F100 Engineering Source Authority listed in TO 2J-

F100-53-1, WP 600 00.

PR FD20302300388 Page 9 of 41

1.10 GENERAL WORK REQUIREMENTS

1.10.1 The instructions for the overhaul of items stipulated in this PWS shall be performed IAW the applicable T.O.s and the below exceptions.

1.10.1.1 The contractor is authorized to inspect per part drawing and part QAD (Quality

Assurance Document).

1.10.2 The contractor shall use protective equipment to protect items from damage as they are processed through the plant. Special protection shall be placed over the machined surfaces of end items.

1.10.3 The contractor shall inspect the various disassembled components or part of the end item to determine if further overhaul is needed. Subsequent overhaul shall be accomplished IAW the applicable portion of the applicable overhaul technical order and supplementary instructions specified herein.

1.10.4 The contractor shall rework all reparable parts so that they are capable of meeting the serviceable requirements of this PWS.

1.10.5 The contractor shall continue to use all parts and assemblies determined serviceable and appropriate as a result of inspections and checks, except as specified in this

PWS.

1.10.6 The contractor shall replace condemned parts of the end item with like serviceable parts that are listed in the applicable technical order IPB unless otherwise specified in or within this PWS. Replacement parts must be purchased from a USAF qualified source.

1.10.7 When overhaul kits are available for the overhaul of an end item, such kits shall be used IAW the applicable technical order and changes thereto or the specific instructions contained in this PWS.

1.10.8 Where the contractor is directed to hold an item for Air Force Life Cycle

Management Center disposition by any cited publication herein or be any statement made within this PWS, such items shall be reported to the ACO through the GPA for disposition.

1.10.9 Overhaul, to the maximum extent, is desired when such overhaul is economically feasible. The contractor is encouraged to submit new or improved overhaul procedures to the Government whenever practical. Procedures may be submitted on an AFTO Form 22 as specified in this PWS or by any other means authorized under this contract. This does not preclude the contractor’s submission of overhaul procedures, which are not economically feasible, when such overhauls are advantageous to the Government.

PR FD20302300388 Page 10 of 41

1.10.10 All of the contractor’s operators of special processes, such as X-ray, radiography machines, Fluorescent Penetrate and Magnetic Particle Inspection Equipment, as well as welders and moralizers, shall be qualified and certified for operation IAW applicable military specifications when listed in the PWS.

1.10.11 Fit and tolerance limits shall be IAW applicable overhaul TO/contractor’s processes and procedures unless otherwise specified.

1.10.12 Fluids, oil, greases and compounds shall conform to and be used as directed in the overhaul TO and instructions contained in this PWS.

1.11 SPECIFIC WORK REQUIREMENTS

1.11.1 Removal

1.11.1.1 Not Applicable.

1.11.2 Disassembly

1.11.2.1 Disassemble F100-PW-220/220E Augmentor Spray Manifold Assemblies to the extent necessary to accomplish thorough internal cleaning and complete inspection of all parts to accomplish the work IAW TO 6J28-2-3.

1.11.3 Cleaning

1.11.3.1 F100-PW-220/220E Augmentor Spray Manifold Assemblies shall be cleaned

IAW TO 2J-F100-13-5, WP 304 00, TO 2-1-111, and TO 6J28-2-3 as applicable.

1.11.3.2 The contractor shall ensure that cleaning and preserving materials meet the requirements specified in TO 2J-F100-13-1, TO 2-1-111, or TO 6J28-2-3 and that such materials are properly used during application.

1.11.4 Inspection

1.11.4.1 Inspection of F100-PW-220/220E Augmentor Spray Manifold Assemblies shall be accomplished IAW TO 6J28-2-3.

1.11.5 Corrosion Control

1.11.5.1 The corrosion control of F100-PW-220/220E Augmentor Spray Manifold Assemblies during overhaul and storage shall be accomplished IAW TO 2-1- 111 and TO 6J28-2-3 whichever is applicable.

1.11.6 Modification and Overhaul

PR FD20302300388 Page 11 of 41

1.11.6.1 Modification and Overhaul of F100-PW-220/220E Augmentor Spray Manifold Assemblies shall be accomplished IAW TO 6J28-2-3.

1.11.6.2 The contractor shall identify all overhauled F100-PW-220/220E Augmentor Spray

Manifold Assemblies with the contractor’s CAGE IAW MIL-STD-130N.

1.11.7 Installation

1.11.7.1 Not applicable.

1.11.8 Test and Government Acceptance

1.11.8.1 Inspect, test, and check each overhauled item IAW TO 2-1-111 and TO 6J28-2-3.

1.11.8.2 The Government shall accomplish acceptance.

1.11.9 Product Verification Audit (PVA)

1.11.9.1 Overhauled items shall be subject to PVA if requested by the government.

1.11.9.2 To perform PVA, the government shall be permitted to select at random such quantities of items as may be necessary to determine quality of workmanship and materials.

1.11.9.3 After notification by the ACO that a PVA is required, the contractor shall follow the procedures of Appendix 3 - Product Verification Audit Procedures.

1.11.10 Technical Publication Compliance

1.11.10.1 Compliance with all TOs, Directives, Government Specifications, Drawings, etc., listed herein is mandatory, unless otherwise specified in this PWS, when:

1.11.10.1.1 They have not been previously accomplished

1.11.10.1.2 They are pertinent to the end item.

1.11.10.1.3 They prescribe Air Force Policies, use of materials and procedures for overhaul.

1.11.10.2 For solicitation purposes, the contractor may contact USAF F100 Engineering

Source Authority for instructions for viewing or purchasing technical data required for maintenance of this contract. Upon contract award, the contractor shall establish and maintain a TO distribution account IAW TO 00-5-1; and be placed on initial distribution for one copy each of the TOs and TCTOs listed in

PR FD20302300388 Page 12 of 41 this PWS. The contractor shall contact the TOMA office at AFLCMC.

LPSAA.TOMA@us.af.mil within five (5) working days after contract award for guidance in obtaining a TODO account. Once the contractor’s TODO account is in operation, the contractor shall maintain all TOs and TCTOs and other technical directives listed in the PWS in an updated and current status IAW TO 00-5-1. The contractor is required to comply with the latest dated TO; TCTO and other technical directives issued and will be contractually covered during the time the work is accomplished. For example, an item already in work will continue to be worked under the existing contractual scope of work until such time that the latest TO revisions can be negotiated as to price and scheduled incorporation. The contractor shall submit a monthly review of changes to TOs, TCTOs, and other applicable directives received during that period. However, if a change is received that has a cost impact greater than 10% and/or is critical to safety of flight, the contractor shall notify the ACO within ten (10) calendar days of receipt of that change and also shall provide the cost impact with his backup data. The contractor shall not begin working with new publication until authorization has been granted by the ACO/PCO.

1.11.10.3 Copies of other Air Force publications required in the performance of work outlined in this PWS will be requisitioned through the ACO. Submit requests to appropriate ACO representative for review. TO 00-5-1 provides an explanation of the Technical Order System and for pertinent distribution, requisition and storage information.

1.11.10.4 In the event a follow-on contract is awarded to this contract, the “Package

File” at the contract facility as of the end of the previous contract will be applicable to the follow-on contract and will be updated through amendments to the new PWS of the new contract. This procedure will ensure continuity of the publication data from one contract to another.

1.11.11 Initial Production Evaluation (IPE)

1.11.11.1 Repaired and Overhauled items shall be subject to an IPE if the contractor has not overhauled or repaired these items successfully within the last three years.

1.11.11.2 The IPE will be composed of two parts, a Site Visit and then a Repair Demonstration. The contractor will have a 45 day period from contract award to complete the Site Visit. After the site visit the DCMA QAR will have 10 calendar days to complete the site visit Survey and perform an exit briefing with the contractor and the IPE Team. If necessary the contractor shall have 30 calendar days from the Site Visit exit briefing to correct any critical or major deficiencies. Upon approval of the Site Visit Survey by the ESA the contractor will be notified in writing by the ACO. After notification of a successful Site Visit Survey by the ACO the contractor will have a 75 day period to perform the Repair Demonstration part of the IPE. Upon completion of the Repair

PR FD20302300388 Page 13 of 41

Demonstration and submission of the Repair Demonstration Report the ESA will have 30 calendar days to review the report. If necessary the contractor will have 30 calendar days to correct any critical or major deficiencies after the ESA review of the Repair Demonstration Report. Upon a successful Repair Demonstration and approval of the Repair Demonstration Report by the ESA the PCO will notify the contractor of the results. At this time the ESA will provide a letter to show that the contractor has been unconditionally approved to repair the contract items.

1.11.11.3 Repair and Overhaul of production items will not commence until the contractor has successfully passed the IPE and received the unconditional approval letter from the ESA. If the contractor cannot pass the Site Visit or the Repair Demonstration in the time periods allotted this constitutes contract cancellation.

1.11.11.4 To perform IPE, the government shall be permitted to select at random such quantities of items as may be necessary to determine quality of workmanship and materials. The ESA may waive parts of the IPE as it deems appropriate.

1.11.11.5 To perform the IPE, the contractor will follow the procedures of Appendix 4 –

Initial Production Evaluation (IPE) Procedures.

1.12 APPLICABLE TECHNICAL ORDERS

This is a preliminary list of Technical Orders. The contractor is responsible for ensuring they are using the latest edition.

TECH ORDER BASIC CG CHANGE

NUMBER DATE NO DATE SHORT TITLE

00-5-1-WA-1

14 JUN 16

AF TECH ORDER SYSTEM

00-5-15-WA-1 22 SEP 14 14 Feb 16 TIME COMPLIANCE TECH

ORDER SYSTEM

00-20-1-WA-1 11 JUL 16 PREV MAINT PROG

00-20-2-WA-1 15 MAR 16 MAINT DATA COLLECTION SYS

00-20-3-WA-1 15 AUG 15 MAINT PROC OF REPARABLE

PROP

PR FD20302300388 Page 14 of 41

00-25-113-F100—

ENG-WA-1

1 AUG 88 51 15 Mar 17 CRITICAL ALLOY AND

PRECIOUS METAL

00-35D-54-WA-1 1 SEP 15 MATERIAL DEF REPORT &

INVEST SYSTEM

33B-1-1-WA-1 1 OCT 16 NONDESTRUCTIVE INSP.

METHODS

2-1-111-WA-1 15 FEB 90 70 1 Apr 18 STAND MAINT PROCEDURES

2J-F100-9-WA-1 1 NOV 95 63 15 Dec 17 NONDESTRUCTIVE INSPECTION

2J-F100-94-WA-1 1 MAY 92 63 1 Apr 18 IPB SUPPORT EQUIPMENT

2J-F100-13-1-WA-1 15 Jan 19 MAINT INSTR-DEPOT

2J-F100-13-2-WA-1 15 Jan 19 MAINT INSTR – DEPOT OCM

2J-F100-13-5-WA-1 15 Jan 19 MAINT INSTR – DEPOT ENGINE

6J28-2-3-WA-1 15 APR 16 OVERHAUL INSTRUCTIONS

WITH IPB AUGMENTOR SPRAY

MANIFOLD

33B-1-1-WA-1 NON-DESTRUCTIVE INSP

METHODS, BASIC THEORY

2J-F100-24-WA-1 15 Jan 19 IPB F100-PW-220/220E

33D4-6-731-1 15 JAN 95 1 30 MAY 97 OPERATION & MAINT FLOW

MODULE, MANIFOLD

1.13 APPLICABLE DIRECTIVES

AIR FORCE

INSTRUCTION

CHANGE DATE

TITLE

AFI 21-101

21 MAY 15

MAINT MGMT OF

AIRCRAFT

AFI 21-118 21 NOV 14 IMP AERO EQUIP

RELIABILITY &

MAINTAINABILITY

AFI 61-204

DISSEMINATING

SCIENTIFICAND

TECHNICAL INFORMATION

PR FD20302300388 Page 15 of 41

MILITARY STANDARDS CHANGE DATE TITLE

MIL-STD-129P

18 FEB 14

U.S. MILITARY MARKING

FOR SHIPMENT AND

STORAGE

MIL-STD-130N 16 NOV 12 ID MARKING OF U.S.

MILITARY PROP

INTERNATIONAL ORGANIZATION FOR STANDARIZATION (ISO)

ISO - 9001

15 SEP 15

QUALITY MGMT SYSTEMS –

REQUIREMENTS – 3RD EDITION

ISO - 10012 MEASUREMENT

MANAGEMENT SYSTEMS –

REQUIREMENTS for

DEPARTMENT OF DEFENSE (DoD)

JOINT AERONAUTICAL 4 AUG 05 EXHIBIT H: UNIVERSAL

LOGISTICS COMMANDERS/ VENDOR SITE SURVEY

AVIATION CRITICAL SAFETY CHECKLIST

1.14 APPLICABLE DOCUMENTS

1.14.1 LPF-QR-001: BASIC TECHNICAL DATA REQUIREMENTS FOR

FRACTURE CRITICAL AND DURABILITY CRITICAL PARTS

1.14.2 LPF-QR-002: CONDITIONS OF WAIVER FOR FRACTURE CRITICAL

AND DURABILITY CRITICAL PARTS

1.14.3 LPF-QAR-001: GENERAL QUALITY ASSURANCE DOCUMENTS FOR F100

ENGINE FC/DC BREAKOUT COMPONENTS

1.14.4 LPF-QAR-002: CHANGE PROCEDURES FOR PROCESS

CONTROL DOCUMENTS

1.14.5 LPF-QAR-004: GENERAL QUALITY ASSURANCE REQUIREMENTS FOR

F100 ENGINE COMPONENTS

1.14.6 LPF-QAR-005: QUALITY LETTER OF INSTRUCTION FOR F100-

100/200/220/220E AUGMENTOR SPRAYRING MANIFOLD ASSEMBLIES

PR FD20302300388 Page 16 of 41

1.14.7 LPF-QAR-006: LPFR QUALITY ASSURANCE REQUIREMENTS

FOR PRODUCT VERIFICATION AUDIT (PVA) TEST PLANS AND

REPORTS

1.14.8 LPF-QPR-004: LPFR QUALITY PLAN REQUIREMENTS FOR

WELDED ASSEMBLIES

1.14.9 LPF-QPR-007: LPFR QUALITY PLAN REQUIREMENTS FOR

PLASMA SPRAYED COATINGS

1.14.10 LPF-QPR-009: LPFR QUALITY PLAN REQUIREMENTS FOR

VACUUM BRAZED ASSEMBLIES

1.14.11 LPF-QPR-016: LPFR QUALITY PLAN REQUIREMENTS FOR

DURABILITY CRITICAL PARTS

1.14.12 LPF-QPR-018: LPFR QUALITY PLAN REQUIREMENTS

FOR NONDESTRUCTIVE INSPECTION

1.14.13 EI FOR RQR-1: GENERIC ENGINEERING INSTRUCTIONS

FOR OVERHAUL OF F100 PARTS IN RQR-1

1.15 MISSION ESSENTIAL SERVICES This requirement has been determined to be essential and does require continued support during a crisis as defined in DFARS 252.237-7023.

1.15. SURGE:

1.15.1. In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or national emergency (also known as surge, reference DFARS 217.208-70 and DFARS 252.217-7001) and invokes surge: The contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements. The contractor is required to provide the Government a surge plan. A CDRL and DID are associated with the surge requirement. After being notified of the surge demand in writing, the contractor may see additional orders and/or will see the priority status elevated on current orders. The contractor may do one or more of the following to fill the demand:

1.15.2. The contractor will maintain level of safety stock of components to draw from to perform additional repairs.

1.15.3. Add additional shifts to increase production within the contractor and with suppliers.

1.15.4. The contractor will work with the various manufacturing sites and their supply chain to expedite production. The contractor will be notified in advance of, and be given the

PR FD20302300388 Page 17 of 41 opportunity to negotiate; any expedite charges that might apply at the time of surge.

Contractual requirements for production of this contract are addressed in Part I. The schedule and surge requirements will be on a best-effort basis.

1.15.5. Surge plans have four basic phases (assessment, execution, sustainment, and exit/termination) and the plan associated with the surged items requested need to address those phases. The Government will provide, in writing, the items on contract that are requested to be surged. That will include the item, the quantity, and timeline with respect to delivery schedule with estimated termination dates when known.

1.15.6. contractors will provide a plan that includes the identified surge items, how they are going to meet the requirement, timeline to implement the plan, ability to sustain the surge through termination, identify any limiting factors or supply chain risks that will impact current surge production and future requirements for identified items.

1.16 SAFETY AND HEALTH

1.16.1 While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Government Representative (GR), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 during the execution of the contract.

1.16.1.1 Mishap notifications shall contain, as a minimum, the following information:

1.16.1.1.1 Contract, Contract Number, Name and Title of Person(s) Reporting

1.16.1.1.2 Date, Time and exact location of accident/incident

1.16.1.1.3 Brief Narrative of accident/incident, if known

1.16.1.1.4 Cause of accident/incident, if known

1.16.1.1.5 Estimated cost of accident/incident (material and labor to repair/replace)

1.16.1.1.6 Nomenclature of equipment and personnel involved in accident/incident

1.16.1.1.7 Corrective actions (taken or proposed)

PR FD20302300388 Page 18 of 41

1.17.1.1.8 Other pertinent information

1.16.1.2 If requested by designated GR, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

PR FD20302300388 Page 19 of 41

SECTION II

SERVICE SUMMARY

The contractor service requirements are summarized into performance objectives that relate directly to the mission essential items. The performance threshold describes the minimum acceptable levels of service for each requirement. The contractor shall be aware that the absence contract requirement from the service summary does not detract from its enforceability nor limit the rights or remedies of the government under any other provision of the contract. The government will use the surveillance methods contained in the Surveillance Plan to evaluate the Contractor’s performance for the performance objectives listed below. In the event the performance objective is not met, the Contractor will be given a reasonable time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action in accordance with the performance threshold(s). In cases where the Contractor fails to implement corrective action, the PCO will take appropriate measures.

NOTE: For those requirements listed in Section II, Service Summary, the Surveillance Plan will follow the methods of surveillance specified in the Surveillance Plan. The Surveillance Plan is authorization for the Government’s PCO to participate in the administration of this contract.

2.1 SERVICE SUMMARY REQUIREMENTS

2.1.1 The contractor shall ensure the performance objectives and performance thresholds identified in table 2-1 of this PWS are achieved as follows:

Table 2-1 Performance

Objective Reference Paragraph

Performance Threshold

SS-1 Quality: PWS # 1.3.3 No defective parts shall be delivered to the Government.

SS-2 Delivery Performance:

PWS # 1.4.1 The contractor shall meet the delivery schedule

2.2 CONTRACTOR PERFORMANCE EVALUATION

2.2.1 The contractor shall be aware that the evaluation of performance will occur when the Program Manager evaluates the services of the contractor to determine whether or not it meets the performance measures of the contract.

PR FD20302300388 Page 20 of 41

2.2.1.1 SS-1: The contractor’s failure to meet the requirements for this item shall result in the possibility of a poor rating under the Contractor Performance Assessment Review (CPAR) and remedies as allowed under Federal Acquisition Regulation (FAR) 52.246-4 Inspection of Services-Fixed Price.

2.2.1.2 SS-2: The contractor’s failure to meet this requirement shall result in a negative CPAR rating and remedies as allowed under FAR 52.246-4 Inspection of Services- Fixed Price.

PR FD20302300388 Page 21 of 41

SECTION III

GOVERNMENT

PROPERTY

3.1 GOVERNMENT PROPERTY

3.1.1 Contractor shall furnish all material, support equipment, tools, test equipment and services. Government Furnish Material shall not be provided.

PR FD20302300388 Page 22 of 41

A1.1 ACRONY MS

APPENDIX 1

ACO Administrative Contracting Officer AFLCMC Air Force Life Cycle Maintenance Center AFMC Air Force Material Command ALC Air Logistics Center CAGE Contractor and Government Entity CAO Contract Administration Office CEMS Comprehensive Engine Management System DOD Department of Defense EC Engineering Change ESA Engineering Source Authority (AFLCMC/LPSAAB) FAR Federal Acquisition Regulation GFM Government Furnished Material GFP Government Furnished Property GPA Government Property Administrator IAW In Accordance With IPE Initial Production Evaluation IPB Illustrated Parts Breakdown MRB Material Review Board NDI Nondestructive Inspection OEM Original Equipment Manufacturer PCO Procurement Contracting Officer PIR Publication Improvement Report PQDR Product Quality Deficiency Report PVA Product Verification Audit PWS Performance Work Statement QAD Quality Assurance Document QAR Quality Assurance Representative QCD Quality Control Deficiency SAR Source Approval Request SL Salvage Layout SR Service Remanufacture TO Technical Order USAF United States Air Force WP Work Package

PR FD20302300388 Page 23 of 41

APPENDIX 2

A2.1 NOT ES

A2.1.1 The contractor is authorized to establish and convene a Material Review Board (MRB) to evaluate and determine disposition on non-conforming material or parts. Board members shall consist of representatives from the Contractor’s Quality Production Control, Engineering (Industrial, Product Support or Design) and the Government QAR. The MRB shall be convened when the contractor identifies non- conformance of material or parts during and after assembly. The MRB is not authorized to violate any TO limit. When MRB action is required on material or parts during and after assembly, the contractor shall provide information, to include part number, serial number and statement of non-conformance and corrective action taken, to AFLCMC/LPSAA via email within (5) working days after approval of the MRB.

PR FD20302300388 Page 24 of 41

APPENDIX 3

A3.1 PRODUCT VERIFICATION AUDIT PROCEDURES

A3.1.1 This attachment contains procedures and instructions for contractual accomplishment of Product Verification Audits (PVAs). This attachment does not supersede instructions contained in the contract overhaul work requirements or other contractual provisions. In instances of conflict, the latter applies. The contractual issuance of this attachment and performance of PVAs does not relieve the contractor of the responsibility for maintaining a Quality Control System that will assure productions of items that conform to contractual requirements. PVAs are management tools used to independently evaluate and validate the conformance of an overhauled item and contractor compliance to contractual requirements as well as the adequacy of the Government's contractually stipulated requirements.

A3.2 TERMS EXPLAINED

A3.2.1 PVA. The physical examination, functional testing and complete disassembly of an item to determine conformance to contractual requirements as well as adequacy of the contractual requirements which may require in excess of the original contractor overhaul effort. The audit includes correction of defects, reassembly, retesting, repackaging, remarking, update of records and correction of contractual requirements as required.

A3.2.2 Cognizant Quality Assurance Element. The DOD contract administration service element having direct responsibility for implementing the Government Quality Assurance Program at the contractor's plant.

A3.2.3 Overhaul Work Requirement. Any contract instrument, TO, drawing, specification or directive which contains instructions and requirements for overhaul and rehabilitation of a reparable/unserviceable item.

A3.2.4 Procedural Deficiency. A deficiency which is noted during the audit and which results from either:

A3.2.4.1 Failure by contractor to establish processes/procedures in conformity with contractual requirements; or, A3.2.4.2 Failure by contractor to follow established processes or procedures.

A3.3 RESPONSIBILITIES

A3.3.1 The Contractor shall:

A3.3.1.1 Perform audit functions under the surveillance of the cognizant DOD CAO and

PR FD20302300388 Page 25 of 41

Air Force Life Cycle Maintenance Center (AFLCMC) representative(s).

A3.3.1.2 Provide technical personnel, tooling, measuring/test equipment, work areas, forms and clerical assistance, as required, to perform the PVA.

A3.3.2 The Cognizant DOD QAR shall:

A3.3.2.1 Be designated as audit team chairman, unless otherwise directed by the Procuring

Contracting Officer (PCO).

A3.3.2.2 Schedule the product verification audit and select the item(s) to be audited.

A3.3.2.3 Notify the PCO and the contractor when the PVA will begin. Notification shall be provided at least 15 working days prior to the audit date. Scheduled audits may be waived by the PCO on a case-by-case basis.

A3.4 AUDIT PROCEDURES

A3.4.1 Classifying Defects. Defects observed in the audited item(s) will be classified according to the following:

A3.4.1.1 Category I - Critical Defect. Defect that judgment and experience indicates likely to result in hazardous/unsafe conditions for individuals using, maintaining or depending upon the product; or a defect that judgment and experience indicates is likely to prevent performance of the tactical function of a major end item such as an aircraft, engine communication system, surveillance system or major part thereof. Critical defects are furthered identified as follows:

A3.4.1.1.1 Category IA - Defect attributable to the contractor's failure to comply with contractual requirements.

A3.4.1.1.2 Category IB - Defect not attributable to contractor's failure to comply with contractual requirements such as a design deficiency, inadequate or omitted requirement or defective Government Furnished Property (GFP).

A3.4.1.2 Category II - Major Defect. Defect other than critical that is likely to result in failure or reduce materially the usability of unit or product for its intended purpose. Major defects are further identified as follows:

A3.4.1.2.1 Category IIA - Defect attributable to the contractor's failure to comply with

PR FD20302300388 Page 26 of 41

A3.4.1.2.2 Category IIB - Defect not attributable to contractor's failure to comply with contractual requirements such as a design deficiency, inadequate or omitted requirements or defective GFP.

A3.4.1.3 Category III - Minor Defect. Defect that is not likely to reduce materially the usability of the unit or product for its intended purposes or is a departure from established standards having little bearing on the effective use or operation of the unit. Minor defects are further identified as follows:

A3.4.1.3.1 Category IIIA - Defect attributable to the contractor's failure to comply with

A3.4.1.3.2 Category IIIB - Defect not attributable to the contractor.

A3.4.1.4 Category IV - Defect caused during accomplishment of the audit disassembly or inspection process which would not have occurred had the contractor exercised proper care of the audit item, i.e., improper handling, improper disassembly technique.

A3.4.1.5 Procedural Defect – Reference paragraph A3.2.4.

A3.4.2 Scheduling/Frequency

A3.4.2.1 During the initial production phase, one of the first five items may be audited. The frequency for performing subsequent audits will be as specified in the schedule of the contract or by the PCO.

A3.4.2.2 The contractor may be directed by the PCO to extend or increase the frequency of the audits or to increase or decrease the scope thereof pursuant to the "changes" clause of the contract.

A3.4.2.3 Like or similar items may be grouped for audit purposes when the concurrence of the

PCO or his designated representative has been obtained.

A3.4.3 Inspection and Test

A3.4.3.1 Audit candidates shall be randomly selected by the Cognizant DOD QAR from all items currently available. It shall be the responsibility of the ACO to assure that an adequate number of items from which a random selection can be made are on hand at the time of the audit. Selection, except as specified in paragraph A3.4.3.2 below, shall be made from items which have been accepted by the Government but have not been shipped.

A3.4.3.2 The first five items of the initial production phase shall be set aside after having been tendered by the contractor as in conformity with the contract and inspected

PR FD20302300388 Page 27 of 41 by the Government and not rejected for failure to comply with contractual requirements. Upon completing the testing and disassembly portion of the audit of the selected candidate and if no Category I or II defects are found during the audit, the other four items will be accepted by the Government. In any Category I or II defect is found in the audit candidate, the contractor shall satisfy the Government that such defect does not exist in the other four items prior to Government acceptance thereof. The audit candidate shall be accepted by the Government upon compliance with paragraph A3.4.4.6 below.

A3.4.3.3 The items selected for audit shall be inspected for adherence to preservation, packing, packaging and marking requirements prior to removal from the shipping container.

A visual inspection and functional test shall be performed prior to disassembly.

A3.4.3.4 Disassembly shall be performed in a secure area accessible only to audit participants.

Normally, audit participation will be limited to specified contractor production and quality control personnel, the Cognizant DOD QAR and AFLCMC personnel.

A3.4.3.5 Visual inspection, dimensional checks (such as backlash, end clearance and running clearance) and non-destructive testing will be accomplished during and after disassembly IAW applicable technical directives. Audit findings will be recorded for comparison with contractual requirements and the contractor's production/inspection records. Measuring and test equipment shall be reviewed for current calibration prior to use.

A3.4.3.6 Applicable accessories and components will be functionally tested and inspected to contractual specifications. This action may require disassembly in excess of the original contractor effort as determined necessary by the Government.

A3.4.4 Corrective Actions

A3.4.4.1 In the event a critical or major defect is observed, Government acceptance of further production will be withheld until the Government has either inspected other items for the observed defect(s) or has received suitable evidence from the contractor that the cause of such defect(s) has been corrected and the defect does not exist in other items. In the case where there is a probability of such defect existing in previously shipped items, the contractor shall promptly advise the Government of the identity and destination of such previously shipped items.

A3.4.4.2 When Category IA, IIA or IIIA defects are found, the contractor shall implement measures in the overhaul process which will preclude recurrence.

A3.4.4.3 When Category IB, IIB or IIIB defects are found, actions will be taken as directed by the Government pursuant to the contract.

PR FD20302300388 Page 28 of 41

A3.4.4.4 When Category IV defects are noted, the contractor shall take those actions necessary to preclude recurrence.

A3.4.4.5 When Procedural Deficiencies are noted, the contractor shall take those actions necessary to correct the procedures or operations concerned.

A3.4.4.6 Upon completion of the audit, all defects attributable to failure to comply with contractual requirements or attributable to the performance of the PVA shall be corrected. All noted defects shall be corrected and the item assembled and functionally tested IAW applicable overhaul specifications including preservation, packing, packaging, marking and update of records.

A3.4.4.7 After the audit is completed, the DOD QAR shall conduct a critique attended by contractor personnel and AFLCMC representative(s). Findings, classifications and corrective actions shall be discussed and determination of defect cause(s) established (e.g. workmanship, tooling, technical requirements, etc.). The contractor shall take immediate action to correct and preclude recurrence of all defects or deficiencies attributable to failure to comply with contractual requirements, subject to the provisions of paragraph A3.5.1.10 below.

A3.5 AUDIT RESULTS

A3.5.1 The quality office of the CAO activity shall prepare and forward to the responsible

PCO the finalized audit findings within 10 working days after completion of the audit. Finalized findings will contain the following information:

A3.5.1.1 Name and address of the contractor.

A3.5.1.2 Contract number.

A3.5.1.3 Descriptive noun, Federal Stock Number, part number and serial number of the item audited.

A3.5.1.4 Summary of total defects.

A3.5.1.4.1 Category IA

A3.5.1.4.2 Category IB

A3.5.1.4.3 Category

IIA A3.5.1.4.4 Category

IIB

PR FD20302300388 Page 29 of 41

A3.5.1.4.5 Category IIIA

A3.5.1.4.6 Category IIIB

A3.5.1.4.7 Category IV

A3.5.1.5 A complete listing of audit findings.

A3.5.1.6 A description of defects listed by category (commencing with critical). The defective item will be identified by part number and standard nomenclature.

A3.5.1.7 Cause(s) for each noted defect.

A3.5.1.8 Corrective action(s) taken on each classified defect attributable to failure to comply with contractual requirements, or a projected target date for completion when not otherwise immediately corrected.

A3.5.1.9 Procedural deficiencies noted and the corrective actions applied.

A3.5.1.10 The signature of the DOD QA participants, contractor management personnel and

AFLCMC representative(s). Non-concurrence with the findings shall be specifically annotated in the vicinity of the applicable signatures. Non- concurrence by the contractor as to the existence or classification of a defect or as to whether or not a defect is attributable to failure to comply with contractual requirements shall be subject to the procedures set forth in the clause entitled "Dispute."

PR FD20302300388 Page 30 of 41

APPENDIX 4

Commercial Asset Visibility Air Force

A4.1 CAV AF REPORTING REQUIREMENTS

The purpose of this attachment is to provide Contract Depot Maintenance (CDM) guidance for contractor technical responsibilities and reporting requirements of the CAV AF system. CAV AF is the mandated primary system of record for providing daily status of all Government owned assets located at contractor repair facilities. Reporting within

CAV AF is not limited to end items subject to repair but includes assets stored within a contractor Inventory Control

Point (ICP). CAV AF system down‐time will be identified on the CAV AF home page banner. Contractors are responsible for ensuring the most current Contractor User Guides are utilized by their assigned reporters.

NOTE:

Contractor User’s Guide can be accessed from the CAV AF homepage.

CAV AF FAMILIARIZATION TRAINING:

1. Familiarization training for CAV AF reporting can be requested by the contractor via the applicable ICP CAV AF system administrator (SA). For assistance, guidance, general questions or specific contract transactional reporting requirements can be addressed to the CAV AF contract monitor (CM). ICP CAV AF (SA and/or CM) points of contact

(See Contractor Responsibility Item #4).

CONTRACTOR RESPONSIBILITY:

1. Contractor shall ensure asset record in CAV AF is an accurate reflection of physical assets on hand at all times.

This shall be accomplished via CAV AF reporting daily and/or within one (1) business day of a maintenance action occurrence IAW the applicable CAV AF CDRL.

NOTE:

A valid PKI is required prior to accomplishing # 2 and #3 of contractor responsibilities

PR FD20302300388 Page 31 of 41

2. Each CAV AF reporter shall submit a completed System Authorization Access Request, DD Form 2875, per instructions within 10 days after contract award date. All DD Form 2875(s) shall be digitally signed. There must be two CAV AF reporters assigned to ensure contractual reporting requirements do not experience a lapse in reporting coverage.

3. Reporter(s) shall complete initial and refresher (as required) DoD Information Assurance (IA) Cyberawareness

Challenge training and submit a course completion certificate with the completed DD Form 2875.

a. Reporter(s) can access IA training on the CyberAwareness Challenge website, using the following website:

https://iase.disa.eta/cyberchallenge/launchPage.htm

b. Department of Defense Employees section

c. click hyperlink; “Launch New CyberAwareness Challenge Department of Defense Version”

d. First time CAV AF Reporter(s) will email initial IA CyberAwareness Challenge course completion certificates, AF Form 4394, AF User Agreement Statement, and completed DD Form 2875 to point of contact at applicable ICP (see item #4).

e. All follow on refresher course completion certificates shall be completed before lapse in certification occurs and will be emailed to respective ICP identified in paragraph 4a, 4b, and 4c below.

f. Cyber Awareness Challenge course completions are a contractual requirement and the contractor must comply. Contact your loca CAV AF SA if you experience technical difficulties.

4. Reporters requiring the default password or password resets should contact their applicable ICP CAV AF System

Administrator POC listed below:

a. Robins AFB, GA, call (478) 327-6602 or 327-6603, or send email request to:

406scms.cav.af.ar@us.af.mil

b. Hill AFB, UT, call (801) 586-3736, or send email request to:

420scms.cdm@us.af.mil

c. Tinker AFB, OK, call (405) 739-3229, or send email request to:

420.scms.tinker.cdm.workflow@us.af.mil

5. To access the CAV AF system, contractor and subcontractor reporters shall follow “initial log‐in procedures” as prescribed within the Contractors User’s Guide.

PR FD20302300388 Page 32 of 41

6. Contractor shall ensure accountability of all Government Furnished Property (GFP) within their Enterprise Resource Planning (ERP) or Commercial Off-the-Shelf (COTS) system, which must be reported accurately for same GFP records within CAV AF at all times.

7. Contractual Induction-at-Risk of end items is prohibited on all repair contracts.

8. Contract/Delivery Order Closure Disposition– Government will provide disposition instructions to contractor’s reporter.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .