These are detailed engineering design drawings for a 70"x70"x48" concrete Pad/Vault produced by Utility Concrete Products, LLC. The technical specifications include concrete with 5,000 p.s.i. strength at 28 days, ASTM A-615 Grade 60 black rebar, and specific structural features such as eight 1" ferrule open coil inserts with bolts for lifting, three 1" hot-dipped galvanized pulling irons, and two rolls of 1"x14.5' butyl rubber joint sealant. The drawings provide comprehensive views including front, rear, left, and right elevations, pad and vault plan views, and rebar placement details, with a custom top opening configured per switch compartments. The total weight is specified as 4,385# for the pad and 5,850# for the vault, with a structural tolerance of 1/4". The document was issued for production on 09/06/2019 and drawn by R. Rodriguez.

View the file

Other files

File Type Posted
Amendment 03 to RFP NO. 375074GMKLB.pdf PDF
Exhibit Y - Image_0299.jpg JPG image
Exhibit AA - Specification Bulletin 662A-31.pdf PDF
Amendment 02 to RFP NO. 375074GMKLB.pdf PDF
Exhibit X - Instructions for Access-Request-form-for-Business-Visitors.pdf PDF
Amendment 01 to RFP NO. 375074GMK.pdf PDF
1.0 RFP Instructions to Offerors_Giese Road Substation Feeder 24 Backfeed FINAL.pdf PDF
Exhibit E - 013300_Submittals_FermiForward (3).pdf PDF
Exhibit H - 16121 - Medium Voltage Cable v2.pdf PDF
Exhibit I - 16125 - 15KV Cable Installation v2.pdf PDF
Exhibit K - 16950 - Testing Electrical Systems r1.pdf PDF
Exhibit N - SF1413-23a.pdf PDF
Exhibit P -Price Proposal Form 20251205.pdf PDF
Exhibit Q - SARC_Subcontractor Annual RepsCerts Rev 7.pdf PDF
Exhibit S - Bond Bid FL-41.pdf PDF
Exhibit C - 010010_General_Requirements_3_2025_FFDG_.pdf PDF
Exhibit F-014100_Quality_Requirements_-_March_2025.pdf PDF
Exhibit T - FL-42 (Rev 1.25) - Payment Bond.pdf PDF
Exhbit A - SOW_Feeder_24_backup_rework - rev 3.pdf PDF
Exhibit G - 16100 - Ductbank.pdf PDF
Exhibit J - 16450 - GROUNDING AND BONDING v2.pdf PDF
Exhibit M - 2025 Construction Insurance Requirements.pdf PDF
Exhibit O - Fermilab Subcontractor Injury and Illness Data Questionnaire.pdf PDF
Exhibit R - PUR-466_Proposal Certifications_r5_10.14.25.pdf PDF
Exhibit U - FL-40 - Performance Bond.pdf PDF
1.0 RFP Instructions to Offerors_Giese Road Substation Feeder 24 Backfeed.pdf PDF
Exhibit B - Drawings - Giese Road Substation Feeder 24 Backfeed.pdf PDF
Exhibit D - 013100_ESH_Requirements_04-2025_FFDG (1).pdf PDF
Exhibit L - FFDG General Terms and Conditions for Construction.pdf PDF
Exhibit V - WDIL20250011 Heavy and Highway.pdf PDF
Exhibit W - Sample Subcontract.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The contents of these drawings are the property of Utility Concrete Products, LLC and are proprietary and confidential.

These documents shall not be disseminated for any other use, without the written consent of Utility Concrete Products, LLC.

If you receive these drawings in error, return to sender without reading, copying, or disclosing the contents.

CL

2" OPENING11

HAND TOOLED

ROUNDED EDGES

TYP.

1"

1'-5"

3'-0"

1'-0"

1'-0" 6"

1'-0"

7"

2'-11"

6"

LIGHT BROOM

FINISH

8"

1'-3"

5'-10"

4'-6" 8" 8"

5'-10" 4'-6"

8"

8"

3'-10" 1'-0" 1'-0"

3'-11"

FRONT ELEVATION

REAR

L E

F T

FRONT

REAR ELEVATION

PLAN VIEW

R

IG

H T

LEFT ELEVATION

70"x70"x48"

9.

75-150PV-WIN

REVISION:

SHEET NUMBER:

NONER. RODRIGUEZ

STRUCTURE INFORMATION:

DRAWN BY: SCALE:

ISSUED FOR09/06/19 R.R.

APPROVED BY:

ISSUED FOR:

PAD: 4,385#

PAD / VAULT

PRODUCTION

09/06/2019

UCP #

PROJECT INFORMATION:

CURRENT ISSUE DATE:

ACCOUNT MANAGER:

DATE: BY:DESC.

PRODUCTION

REV.:

NOTES:

CONCRETE: 5,000 p.s.i. @ 28 DAYS 5%-8% ENTRAINED AIR.1.

REBAR: ASTM A-615, GRADE 60, BLACK BAR.2.

(8) 1"x5-5/8" FERRULE OPEN COIL INSERTS W/ BOLTS FOR3.

LIFTING (LADS-FER-15580CIFG).

(3) 1" HOT DIPPED GALVANIZED PULLING IRON, I-BOLT TYPE.4.

(2 ROLLS) 1"x14.5'/roll BUTYL RUBBER JOINT SEALANT.5.

LIGHT BROOM FINISH ON TOP OF PAD.6.

HAND TOOLED ROUNDED EDGES ON TOP OF PAD.7.

STRUCTURE TOLERANCE= 1/4".8.

WEIGHT: VAULT: 5,850#

2495 W. Bungalow Rd. - Morris, IL 60450 Phone:(815)416-1000 - Fax:(815)416-1100 www.utilityconcrete.com

75-150PV-VAULT-WIN

75-150PVNED-PAD

SEE PLAN VIEW)

PULLING IRON

(TYPICAL LOCATION

FOR THREE ELEVATIONS, JOINT TAPE

1'-6" 1'-0" 1'-0" 6"

1'-0"

7"

1'-5"

TYP.

8"

TYP.

1"

TYP.

1'-5"

1'-0"

7"

11"

6"

FERRULE OPEN COIL

INSERTS W/ BOLTS

8"

TYP.

TYP.

1'-0" 6"

1'-0"

7"

1'-5"

1'-2" 1"

TYP.

8" 10

4'-0"

3'-6"

10"

1'-51

7"

TYP.

mpintozzi Callout

CUSTOM TOP WITH OPENNIG PER S&C SWITCH COMPARTMENTS.

75-150PV-WIN 70''x70''x48'' Pad-Vault PROD
1

File details come from the government source that posted it. Updated .