This is a Statement of Work (SOW) for the renovation of the Tracy Hall Unaccompanied Personnel Housing Recreation Room at USCG Sector San Diego, Building C, located at 2170 N. Harbor Drive, San Diego, CA 92101. The approximately 1,066 square-foot military barracks recreation room requires comprehensive renovations across three areas: the kitchen, janitorial closet, and bathroom, using standard commercial-grade prefabricated materials and fixtures. The renovation must be completed within 45 calendar days of the Notice to Proceed and during standard work hours of Monday through Friday, 0730 to 1600 hours, excluding federal holidays.
The kitchen scope includes demolition of existing cabinets and island (without disturbing asbestos-containing ceiling materials), installation of approximately 15 linear feet of high-durability wood cabinets, a commercial-grade undercounter ice machine (50-80 lbs daily capacity), a prefabricated commercial kitchen island (6-8 feet), a ductless or wall-vented exhaust fan with no ceiling penetrations, 10-12 lockable metal or laminate storage cubbies, four additional GFI electrical outlets, reinstallation of existing appliances, and a new stainless steel sink and faucet. The janitorial closet requires adjustable wire shelving and installation of a localized plumbing clean-out line for the adjacent bathroom. Bathroom work involves demolition of moisture-damaged drywall and existing vanity, replacement with mold-resistant greenboard and finish work, and installation of a new standard 36-inch prefabricated wood vanity with integrated sink and plumbing connections. A critical constraint prohibits any disturbance of the ceiling drywall system containing 2% Chrysotile asbestos, as identified in the AESS hazard survey (Job No. 26-092). All work must comply with applicable codes including the National Electrical Code, Uniform Plumbing Code, California Building Code, OSHA regulations, and Coast Guard standards. Contractors must submit product data sheets, warranty information, paint and finish samples, and an Activity Hazard Analysis and Accident Prevention Plan prior to commencing work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CABINETS AND COUNTER TOP TO BE REPLACED.jpg | JPG image | |
| CORRODED PIPE JANITORIAL CLOSET IMAGE.jpeg | JPEG file | |
| VANITY PHOTO 2.jpg | JPG image | |
| VANITY TO BE REPLACED DRYWALL HOLE TO BE REPLACED.jpg | JPG image | |
| CENTER ISLAND COUNTERTOP.jpeg | JPEG file | |
| WIDE VIEW OF KITCHEN REC ROOM.jpg | JPG image | |
| DAVIS BACON WAGE DETERMINATIONS FOR SAN DIEGO CALIFORNIA FOR BUILDING CONSTRUCTION.pdf | ||
| SOW Sector SD Tracy Hall UPH Rec Room_Edits.docx | DOCX document | |
| USCG Sector San Diego - Lead ACM Survey Report.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Tracy Hall UPH Rec Room Renovations
1.0 Project Details
· Location: USCG Sector San Diego, Building C (Tracy Hall Unaccompanied Personnel Housing), 2170 N. Harbor Drive, San Diego, CA 92101
· Facility Type: Military Barracks Recreation Room (Approx. 1,066 SQFT)
· Technical POC: CWO Justin Critcher
· Justin.D.Critcher@uscg.mil
· (206) 815-2361
· Contracting Officer: Ryan H. King
· Ryan.h.king2@uscg.mil
· (619) 943-5924
2.0 Background and Objectives
The Coast Guard requires the renovation of the Tracy Hall (Building C) UPH Recreation Room to improve the quality of life, comfort, and utility of the space for active-duty personnel stationed at Sector San Diego. The current space has outdated cabinetry, worn-out furnishings, damaged drywall, and inadequate storage. The objective of this contract is to renovate the kitchen, janitorial closet, and bathroom to a professional, standard commercial-grade finish utilizing cost-effective prefabricated fixtures.
3.0 Site Conditions & Hazardous Materials Summary
An Asbestos and Lead Survey was conducted for this facility by Advantage Environmental & Safety Services (AESS), Job No. 26-092, dated August 3, 2026. A copy of this report will be provided to the Contractor. The key findings for Building C (Tracy Hall UPH Rec Room) are as follows:
· Asbestos: Chrysotile asbestos was detected at 2% in Sample 071526-CGSD-12 within the texture/taping mud/drywall system on the Building C Main Rec Room ceiling. This material is classified as Asbestos-Containing Material (ACM). No asbestos was detected in other tested areas of Building C (including the walls, janitor closet, or nursing room floors/walls).
· Lead: No lead was detected above the laboratory reporting limits in Building C.
3.1 No Disturbance of Asbestos-Containing Materials (ACM) Allowed
· The Contractor is strictly prohibited from disturbing, drilling, cutting, sanding, or impacting the ceiling drywall system of Building C (which contains 2% Chrysotile asbestos).
· All work under this contract must be designed and executed to avoid any contact or interaction with the ceiling ACM drywall. No asbestos abatement is authorized or planned under this contract.
4.0 Scope of Work
The Contractor shall provide all labor, materials, equipment, transportation, and supervision necessary to complete the following renovation tasks using standard, commercial-grade prefabricated materials:
4.1 Rec Room Kitchen Renovations
· Demolition: Demolish and properly dispose of existing kitchen cabinets, countertops, and island. All demolition must be executed without disturbing the ceiling’s ACM. Remove or protect all appliances for reinstall.
· Cabinetry: Purchase and install approximately 15 linear feet of standard, off-the-shelf high-durability wood kitchen cabinets with soft-close hardware. Custom millwork is not authorized.
· Ice Machine: Supply and install a commercial-grade undercounter ice machine (approx. 50-80 lbs daily production capacity), tapping into adjacent water supply lines, shutoff valves, and drain connections to minimize structural plumbing alterations. If a standalone is more effective (see photos of space), please provide quote for install and acquisition of a unit.
· Kitchen Island: Procure and install a new standard, prefabricated commercial kitchen island (approx. 6-8 feet) with a durable surface countertop. If out of budget, refinish of current countertop will be acceptable. Custom slab fabrication is not authorized.
· Range Exhaust Fan: Install new ductless or wall-vented exhaust fan (no ceiling penetrations permitted. Will be a horizontal cut through the brick wall out to the side.
· Personal Storage: Install standard, pre-assembled lockable metal or laminate cubbies/lockers (minimum 10-12 units) for residents to store personal kitchen items.
· Electrical Upgrades: Install 4 additional dedicated GFI outlets to support kitchen appliances. To minimize costs and structural impact, the Contractor shall tap into existing adjacent circuits where permitted by the National Electrical Code (NEC), avoiding long-distance conduit home-runs back to the main electrical panel.
· Appliances: Reinstall existing appliances.
· Install a New Sink & Faucet, if possible, a single basin, barnyard style stainless steel type.
4.2 Janitorial Closet
· Shelving: Supply and install standard, off-the-shelf adjustable wire shelving and storage racks for cleaning supplies.
· Drain Clean-Out: Install a localized plumbing clean-out line for the adjacent bathroom/main drain line to facilitate maintenance (corroded pipe)
4.4 Bathroom (behind janitorial room)
· Drywall Repair & Vanity Replacement: Demolish mold- or moisture-damaged drywall. Do not disturb suspected asbestos containing materials. Replace with mold-resistant greenboard drywall, tape, mud, sand, texture, and paint to match adjacent surfaces. Demolish existing bathroom vanity; supply and install a new standard, all-in-one prefabricated 36-inch wood vanity with integrated solid surface top and sink, commercial faucet, and all new plumbing trim and connections.
5.0 General Work Requirements
· 5.1 Work Hours: Monday through Friday, 0730 to 1600 hours, excluding federal holidays. Any off-hours work must be requested in writing 48 hours in advance and approved by the Contracting Officer's Representative (COR).
· 5.2 Security & Access: All contractor personnel must clear background checks and obtain base access badges from Sector San Diego Security.
· 5.3 Clean-up: The Contractor shall maintain a clean and safe work site daily. All demolition debris must be disposed of off-base in accordance with state and federal regulations.
· 5.4 Unexpected Hazardous Materials Protocol: If, during the performance of work under this contract, the contractor encounters any previously unidentified material that is suspected to be hazardous outside of the areas already documented in the provided survey report (AESS Job No. 26-092), the contractor shall:
1. Immediately halt work in the affected area and secure the immediate vicinity.
2. Implement appropriate local controls to isolate the area.
3. Notify the Unit Point of Contact (POC) and the Contracting Officer (KO) verbally within four (4) hours, followed by written notification within twenty-four (24) hours.
4. Do not resume work in the affected area until the material has been formally tested, characterized, and certified safe, or until proper abatement is completed and the Contracting Officer issues written authorization to proceed.
6.0 Applicable Codes, Regulations, and Standards
All work must comply with local, state, and federal codes, including:
· National Electrical Code (NEC)
· Uniform Plumbing Code (UPC)
· California Building Code (CBC)
· OSHA Safety Regulations (29 CFR 1926)
· Coast Guard LOGCOM guidance and Civil Engineering standards
· FAR Clauses Applied:
· FAR 52.236-2: Differing Site Conditions
· FAR 52.236-3: Site Investigation and Conditions Affecting the Work
· FAR 52.222-6: Construction Wage Rate Requirements (Davis-Bacon Act prevailing wages for San Diego County, CA)
7.0 Period of Performance (PoP)
All work shall be begin within 45 calendar days from the issuance of the written Notice to Proceed (NTP).
8.0 Submittals
Prior to purchasing materials or commencing work, the Contractor must submit for Government approval:
1. Product data sheets and manufacturer warranty info for: Cabinetry, Ice Machine, Prefabricated Island, Exhaust Fan, Bathroom Vanity.
2. Paint color and cabinet finish samples.
3. Activity Hazard Analysis (AHA) & Accident Prevention Plan (APP) explicitly detailing how the crew will avoid disturbing the ACM ceiling.