Reference C - Question 112 - 067 165-M-301 MECHANICAL SECTIONS AND ENLARGED.pdf
PDF 283 KB Posted
- Attached to
- Y1GZ--Construct Replacement Warehouse Prescott VAMC (Minor Construction) Federal contract opportunity
- Solicitation number
- 36E77620R0043
About this file
This document provides details for a federal contract opportunity to construct a replacement warehouse at the Northern Arizona VA Health Care System in Prescott, Arizona. The project involves building a new approximately 10,930 square foot conditioned storage warehouse to replace outdated facilities and provide efficient loading, unloading, and storage to support supply chain logistics. The site work will include nearly 30,000 square feet of paving and over 5,000 square feet of hardscape. The Department of Veterans Affairs will issue a Request for Proposal as a total Service-Disabled Veteran-Owned Small Business set-aside, with proposals due on or around July 27, 2020. The period of performance is approximately 360 calendar days. The magnitude of construction is estimated between $5,000,000 to $10,000,000.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEVEL 1
0' - 0"
ROOF
36' - 0"
ARU
AC
DISCHARGE PLENUM
DX COOLING COIL
INDUCED DRAFT FAN
GAS BURNER
SUPPLY FAN
PREFILTER 2
INTAKE PLENUM / PREFILTER 1
LEVEL 1
0' - 0"
MEZZANINE T.O.C.
18' - 0"
ROOF EAVE
36' - 0"
CLEANOUT COVER
WITH DRAIN PLUG
NOTES:
1. WEIGHT OF STACK MUST BE SUPPORTED FROM
FLOOR OR BUILDING STRUCTURE. DO NOT SUPPORT
STACK FROM INDUCED DRAFT FAN.
2. RECOMMENDED STACK MATERIAL IS 14 GA. SERIES
STAINLESS STEEL, CONTINUOUSLY BUTT WELDED
EXHAUST STACK.
3. REFER TO MANUFACTURERS RECOMMENDATIONS
FOR STACK AND CAP SIZES.
1 2 3
116"x26" OA
MECH
WH-1
AHU
EG-2
"ø
R A
"x
S A
4 5
B
C
RG-1RG-1
12"x6" EA
OA DUCT DOWN FROM INTAKE
HOOD ON ROOF ABOVE
10"ø EA
10"Ø TRANSFER AIR
14"x14" RA
RETURN AIR PLENUM BELOW AHU.
COORDINATE SIZE WITH AHU OVERALL
DIMENSIONS. PROVIDE SUPPORT
FROM FLOOR, DO NOT USE RETURN
AIR DUCTWORK FOR SUPPORT.
12"Ø FLUE UP
THROUGH ROOF
(2) 12" Ø COMBUSTION
AIR DUCTS THROUGH
ROOF. MOUNT ONE AT
1'-0" AFF, AND THE
OTHER AT 1'-0" BELOW
THE CEILING.
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
STRUCTURAL / CIVIL ENGINEER
F
H2B, INC.
1225 N. LOOP WEST, SUITE 900
HOUSTON, TX 77008
(713) 864-2900
SHEET TITLE
ARCHITECT
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
COMMISSIONING
GLHN ARCHITECTS & ENGINEERS, INC.
2939 E. BROADWAY BLVD
TUCSON, AZ 85716
(520) 881-4546
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 W. 161ST STREET
OLATHE, KS 66062
(913) 829-8650
CONSTRUCT REPLACEMENT WAREHOUSEMECHANICAL SECTIONS AND
ENLARGED PLANS
01/06/2020 JRM CSC
500 AZ-89, PRESCOTT, AZ 86301
165-M-301
649-414
BID DOCUMENTS
SCALE = 1/4" = 1'-0"1
MECHANICAL HVAC SECTION - ARU ELEVATION
GENERAL NOTES:
1. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S REPRESENTATIVE.
2. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING
CONDITIIONS BEFORE THE START OF WORK.
3. SCHEDULE WORK TO MINIMIZE DISRUPTION OF SERVICES TO EXISTING FACILITIES.
4. SEE SHEET 165-GI-001 FOR ADDITIONAL INFORMATION WITH REGARDS TO SCHEDULING AND
PHASING REQUIREMENTS.
SCALE = 1/4" = 1'-0"2
ENLARGED MECHANICAL ROOM 113 PLAN
Revision # Date
Owner Highlight