Reference C - Question 112 - 067 165-M-301 MECHANICAL SECTIONS AND ENLARGED.pdf

PDF 283 KB Posted

Attached to
Y1GZ--Construct Replacement Warehouse Prescott VAMC (Minor Construction) Federal contract opportunity
Solicitation number
36E77620R0043
Issued by
Department of Veterans Affairs Headquarters

About this file

This document provides details for a federal contract opportunity to construct a replacement warehouse at the Northern Arizona VA Health Care System in Prescott, Arizona. The project involves building a new approximately 10,930 square foot conditioned storage warehouse to replace outdated facilities and provide efficient loading, unloading, and storage to support supply chain logistics. The site work will include nearly 30,000 square feet of paving and over 5,000 square feet of hardscape. The Department of Veterans Affairs will issue a Request for Proposal as a total Service-Disabled Veteran-Owned Small Business set-aside, with proposals due on or around July 27, 2020. The period of performance is approximately 360 calendar days. The magnitude of construction is estimated between $5,000,000 to $10,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to Y1GZ--Construct Replacement Warehouse Prescott VAMC (Minor Construction), newest first.
File Type Posted
36E77620R0043 0006.docx DOCX document
Technical Questions Tracking Sheet - 09-14-2020.pdf PDF
36E77620R0043 0005.docx DOCX document
1395.26_Revised Roof Slope Sketch.pdf PDF
Telecom Specs1.pdf PDF
Monitoring and Discovery Protocol.pdf PDF
Technical Questions Tracking Sheet - 09-09-2020.pdf PDF
Construction Wage Rates - Yavapai - 08-21-2020.pdf PDF
Item 70 response_Drawing-Montage Commercial Classic.pdf PDF
07 43 00 Wall and Roof Panels.pdf PDF
36E77620R0043 0004.docx DOCX document
10 26 00 Wall Protection.pdf PDF
Item 81 response_Fire-rated Ceiling Assembly Detail.pdf PDF
Item 69 response_Drawing-Montage Commercial Classic Gate.pdf PDF
1395.26 Construct Replacement Warehouse_ASI 002 Narrative.pdf PDF
01 00 00 - General Requirements.pdf PDF
Reference E - Question 113 - DIV 13 SPECIAL CONSTRUCTION.pdf PDF
S05 - Technical Questions Tracking Sheet TO BE PUBLISHED 9-4.pdf PDF
36E77620R0043 0003.docx DOCX document
Reference D - Question 113 - 026 165-SA-001 STRUCTURAL GENERAL NOTES.pdf PDF
Technical Questions Tracking Sheet 36E77620R0043.pdf PDF
36E77620R0043 0002.docx DOCX document
36E77620R0043 - SITE VISIT SIGN IN SHEET - 08-11-2020.pdf PDF
36E77620R0043 0001.docx DOCX document
Attachment 15 - Construction Wage Rates - Yavapai - 06-05-2020.pdf PDF
Copy of Attachment 14 - Division Price Breakdown.xlsx XLSX spreadsheet
Attachment 7 - F Drawings.pdf PDF
Attachment 12 - T Drawings.pdf PDF
Attachment 10 - P Drawings.pdf PDF
Attachment 16 - Contractor Safety _ Env Record Form.docx DOCX document
Attachment 11 - S Drawings.pdf PDF
Attachment 13 - Warehouse Building Soils Report.pdf PDF
Attachment 8 - G Drawings.pdf PDF
Attachment 1 - Volume 01 Specifications REV.pdf PDF
Attachment 9 - M Drawings.pdf PDF
Attachment 4 - A Drawings.pdf PDF
Attachment 3 - Volume 03 Specifications REV.pdf PDF
Attachment 5 - C Drawings Part II.pdf PDF
Attachment 6 - E Drawings.pdf PDF
Attachment 2 - Volume 02 Specifications.pdf PDF
36E77620R0043.docx DOCX document
Attachment 5 - C Drawings Part I.pdf PDF
Attachment 17 - Prescott Site Map.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEVEL 1

0' - 0"

ROOF

36' - 0"

ARU

AC

DISCHARGE PLENUM

DX COOLING COIL

INDUCED DRAFT FAN

GAS BURNER

SUPPLY FAN

PREFILTER 2

INTAKE PLENUM / PREFILTER 1

LEVEL 1

0' - 0"

MEZZANINE T.O.C.

18' - 0"

ROOF EAVE

36' - 0"

CLEANOUT COVER

WITH DRAIN PLUG

NOTES:

1. WEIGHT OF STACK MUST BE SUPPORTED FROM

FLOOR OR BUILDING STRUCTURE. DO NOT SUPPORT

STACK FROM INDUCED DRAFT FAN.

2. RECOMMENDED STACK MATERIAL IS 14 GA. SERIES

STAINLESS STEEL, CONTINUOUSLY BUTT WELDED

EXHAUST STACK.

3. REFER TO MANUFACTURERS RECOMMENDATIONS

FOR STACK AND CAP SIZES.

1 2 3

116"x26" OA

MECH

WH-1

AHU

EG-2

"ø

R A

"x

S A

4 5

B

C

RG-1RG-1

12"x6" EA

OA DUCT DOWN FROM INTAKE

HOOD ON ROOF ABOVE

10"ø EA

10"Ø TRANSFER AIR

14"x14" RA

RETURN AIR PLENUM BELOW AHU.

COORDINATE SIZE WITH AHU OVERALL

DIMENSIONS. PROVIDE SUPPORT

FROM FLOOR, DO NOT USE RETURN

AIR DUCTWORK FOR SUPPORT.

12"Ø FLUE UP

THROUGH ROOF

(2) 12" Ø COMBUSTION

AIR DUCTS THROUGH

ROOF. MOUNT ONE AT

1'-0" AFF, AND THE

OTHER AT 1'-0" BELOW

THE CEILING.

DRAWING NUMBER

VA PROJECT NUMBER

DATE

PROJECT TITLE

BUILDING NUMBER

PROJECT LOCATION

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08-6231

Office of Construction and Facilities Management

Dwg.

CONSULTANT INFORMATION

STRUCTURAL / CIVIL ENGINEER

F

H2B, INC.

1225 N. LOOP WEST, SUITE 900

HOUSTON, TX 77008

(713) 864-2900

SHEET TITLE

ARCHITECT

FULLY SPRINKLERED

PROJECT PHASE

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

U.S. Department of Veteran Affairs

F

E

D

C

B

A

E

D

C

B

A

COMMISSIONING

GLHN ARCHITECTS & ENGINEERS, INC.

2939 E. BROADWAY BLVD

TUCSON, AZ 85716

(520) 881-4546

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 W. 161ST STREET

OLATHE, KS 66062

(913) 829-8650

CONSTRUCT REPLACEMENT WAREHOUSEMECHANICAL SECTIONS AND

ENLARGED PLANS

01/06/2020 JRM CSC

500 AZ-89, PRESCOTT, AZ 86301

165-M-301

649-414

BID DOCUMENTS

SCALE = 1/4" = 1'-0"1

MECHANICAL HVAC SECTION - ARU ELEVATION

GENERAL NOTES:

1. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S REPRESENTATIVE.

2. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING

CONDITIIONS BEFORE THE START OF WORK.

3. SCHEDULE WORK TO MINIMIZE DISRUPTION OF SERVICES TO EXISTING FACILITIES.

4. SEE SHEET 165-GI-001 FOR ADDITIONAL INFORMATION WITH REGARDS TO SCHEDULING AND

PHASING REQUIREMENTS.

SCALE = 1/4" = 1'-0"2

ENLARGED MECHANICAL ROOM 113 PLAN

Revision # Date

Owner Highlight

File details come from the government source that posted it. Updated .