1395.26 Construct Replacement Warehouse_ASI 002 Narrative.pdf

PDF 56 KB Posted

Attached to
Y1GZ--Construct Replacement Warehouse Prescott VAMC (Minor Construction) Federal contract opportunity
Solicitation number
36E77620R0043
Issued by
Department of Veterans Affairs Headquarters

About this file

This document provides details for a federal construction contract opportunity to build a replacement warehouse for the Department of Veterans Affairs Northern Arizona VA Health Care System in Prescott, Arizona. The project involves constructing a new approximately 10,930 square foot single story warehouse on an area of nearly 30,000 square feet that has been paved for tractor trailer loading and employee parking. An additional over 5,000 square feet of hardscape will be provided for a recycling storage area, forklift access, and two wheelchair access ramps. The solicitation for the design-bid-build project will be issued as a Request for Proposal to all Service-Disabled Veteran-Owned Small Businesses. The contract value is estimated between $5,000,000 and $10,000,000 and the period of performance is approximately 360 calendar days from notice to proceed. The applicable North American Industry Classification System code is 236220 and size standard is $39.5 million.

View the file

Other files for this federal contract opportunity

Other files attached to Y1GZ--Construct Replacement Warehouse Prescott VAMC (Minor Construction), newest first.
File Type Posted
36E77620R0043 0006.docx DOCX document
Technical Questions Tracking Sheet - 09-14-2020.pdf PDF
Monitoring and Discovery Protocol.pdf PDF
1395.26_Revised Roof Slope Sketch.pdf PDF
Telecom Specs1.pdf PDF
36E77620R0043 0005.docx DOCX document
Technical Questions Tracking Sheet - 09-09-2020.pdf PDF
Construction Wage Rates - Yavapai - 08-21-2020.pdf PDF
10 26 00 Wall Protection.pdf PDF
Item 81 response_Fire-rated Ceiling Assembly Detail.pdf PDF
36E77620R0043 0004.docx DOCX document
Item 70 response_Drawing-Montage Commercial Classic.pdf PDF
07 43 00 Wall and Roof Panels.pdf PDF
Item 69 response_Drawing-Montage Commercial Classic Gate.pdf PDF
01 00 00 - General Requirements.pdf PDF
S05 - Technical Questions Tracking Sheet TO BE PUBLISHED 9-4.pdf PDF
36E77620R0043 0003.docx DOCX document
Reference C - Question 112 - 067 165-M-301 MECHANICAL SECTIONS AND ENLARGED.pdf PDF
Reference E - Question 113 - DIV 13 SPECIAL CONSTRUCTION.pdf PDF
Reference D - Question 113 - 026 165-SA-001 STRUCTURAL GENERAL NOTES.pdf PDF
Technical Questions Tracking Sheet 36E77620R0043.pdf PDF
36E77620R0043 0002.docx DOCX document
36E77620R0043 - SITE VISIT SIGN IN SHEET - 08-11-2020.pdf PDF
36E77620R0043 0001.docx DOCX document
Attachment 16 - Contractor Safety _ Env Record Form.docx DOCX document
Attachment 11 - S Drawings.pdf PDF
Attachment 12 - T Drawings.pdf PDF
Attachment 10 - P Drawings.pdf PDF
Attachment 15 - Construction Wage Rates - Yavapai - 06-05-2020.pdf PDF
Copy of Attachment 14 - Division Price Breakdown.xlsx XLSX spreadsheet
Attachment 7 - F Drawings.pdf PDF
Attachment 13 - Warehouse Building Soils Report.pdf PDF
Attachment 5 - C Drawings Part II.pdf PDF
Attachment 6 - E Drawings.pdf PDF
Attachment 1 - Volume 01 Specifications REV.pdf PDF
Attachment 9 - M Drawings.pdf PDF
Attachment 4 - A Drawings.pdf PDF
Attachment 3 - Volume 03 Specifications REV.pdf PDF
Attachment 8 - G Drawings.pdf PDF
Attachment 2 - Volume 02 Specifications.pdf PDF
36E77620R0043.docx DOCX document
Attachment 5 - C Drawings Part I.pdf PDF
Attachment 17 - Prescott Site Map.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASI 002 - Narrative

PROJECT NAME: Construct Replacement Warehouse

SPUR PROJ. NO.: 1395.26

SUBJECT: ASI 002 – Prebid RFIs DATE: August 27, 2020

SPECIFICATIONS

Section 01 00 00 General Requirements

1. Edited and re-issued to provide last 3 pages omitted from Bid Specifications.

Section 07 43 00 Metal Wall and Roof Panels

1. Edited and re-issued to include characteristics and requirements for roof panels.

Section 10 26 00 Wall and Door Protection

1. Issued to include characteristics and requirements for wall protection and corner guards shown on the drawings.

ADDITIONAL INFORMATION:

Response to Prebid RFI Item 69 and 70 - Fence and Gate at outdoor recycling area

1. PDF_Drawing-Montage Commercial Classic

2. PDF_Drawing-Montage Commercial Classic Gate

a. Recycling Area fence detail & gate detail omitted from Bid Drawings

Response to Prebid RFI Item 81 - Fire-rated ceiling

1. PDF_Fire-rated Ceiling Assembly Detail

a. Detail of fire-rated gypsum board ceiling assembly at interior areas omitted from Bid Drawings

File details come from the government source that posted it. Updated .