Attachment 10 - P Drawings.pdf
PDF 6 MB Posted
- Attached to
- Y1GZ--Construct Replacement Warehouse Prescott VAMC (Minor Construction) Federal contract opportunity
- Solicitation number
- 36E77620R0043
About this file
This document provides details for a federal contract opportunity to construct a replacement warehouse at the Northern Arizona VA Health Care System in Prescott, Arizona. The Department of Veterans Affairs seeks to award a firm-fixed-price contract valued between $5-10 million for the design and construction of a new approximately 10,930 square foot warehouse facility. The project includes site work such as paving and hardscaping. The solicitation will be issued as a request for proposal open only to Service-Disabled Veteran-Owned Small Businesses, with a NAICS code of 236220 and size standard of $39.5 million. The period of performance is 360 calendar days from notice to proceed. All questions must be submitted in writing by July 27, 2020, the anticipated date for solicitation issuance.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MA
MV
CO
EV
VE
AI
FOV
FOR
FOS
FP
LPG
NPW
NO
O
N
G
MPG
G
MPG
CA
CD
ACD
V
VBG
VBF
AV
AW
AW
ST
OST
GW
GW
S
W
ID
SPD
T
T
SCW
WS
IW
140°
S
W
ST
CAP
AV
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
IS LOCATED.
ORAL EVACUATION
LABORATORY VACUUM
LABORATORY AIR
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
INDUSTRIAL AIR
LA
LV
OA
IA
TWR
TWS
FILTERED COLD WATERFCW
FUEL OIL DISCHARGEFOD
ANCHOR
CONNECTION - SIDE
ECCENTRIC REDUCER
CONNECTION - BOTTOM, 45° OR 90°
CONNECTION - TOP, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
RISE OR DROP IN PIPE
STRAINER
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
FLOOR DRAIN (FD), SIZE & TYPE
ROOF DRAIN (RD), SIZE & TYPE
FLOOR SINK (FS), SIZE & TYPE
NATURAL GAS BELOW GRADE (G)
SUMP OR SEWAGE PUMP DISCHARGE (SPD)
CONDENSATE DRAIN (CD)
INDIRECT DRAIN (ID)
NATURAL GAS (G)
NITROUS OXIDE (NO)
LIQUIFIED PETROLEUM GAS (LPG)
FIRE PROTECTION (FP)
WATER SERVICE (WS)
COMPRESSED AIR (CA)
NITROGEN (N)
MEDICAL AIR (MA)
OXYGEN (O)
DOMESTIC HOT WATER RECIRC.
SOIL PIPING - ABOVE FLOOR (S)
SOIL PIPING - BELOW FLOOR (S)
STORM DRAIN - ABOVE FLOOR (ST)
STORM DRAIN - BELOW FLOOR (ST)
ACID WASTE - ABOVE FLOOR (AW)
ACID WASTE - BELOW FLOOR (AW)
DOMESTIC COLD WATER
DOMESTIC HOT WATER
140° DOMESTIC HOT WATER (140°)
WASTE PIPING - ABOVE FLOOR (W)
WASTE PIPING - BELOW FLOOR (W)
GREASE WASTE - ABOVE FLOOR (GW)
GREASE WASTE - BELOW FLOOR (GW)
SOFTENED COLD WATER (SCW)
ACID VENT (AV)
VENT PIPING (V)
HOSE BIBB (HB)
NONFREEZE WALL HYDRANT (NW)
WALL CLEANOUT (WCO)
FLOOR CLEANOUT (FCO)
EXTERIOR CLEANOUT (ECO)
THERMOSTATIC MIXING VALVE
BACKFLOW PREVENTER
OVERFLOW STORM DRAIN - ABOVE FLOOR (OST)
NON POTABLE WATER (NPW)
FUEL OIL SUPPLY (FOS)
FUEL OIL RETURN (FOR)
FUEL OIL VENT (FOV)
AUXILIARY CONDENSATE DRAIN (ACD)
VENT BELOW GRADE (VBG)
VENT BELOW FLOOR (VBF)
CARBON DIOXIDE (CO)
MEDICAL VACUUM (MV)
EVACUATION (EV)
MEDICAL VACUUM EXHAUST (VE)
MEDICAL AIR INTAKE (AI)
TRAP PRIMER LINE (T)
WATER METER
MEDIUM PRESSURE NATURAL GAS (MPG)
MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)
ELBOW DOWN WITH SHUT-OFF VALVE (SOV)
TEE DOWN WITH SHUT-OFF VALVE (SOV)
TEE UP WITH SHUT-OFF VALVE (SOV)
RECIRCULATION PUMP
DIRECTION OF FLOW
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE REMOVED
FLANGE CONNECTION
CLEANOUT
ELBOW DOWN
ELBOW UP
TEE DOWN
ELBOW UP WITH SHUT-OFF VALVE (SOV)
TEE UP
UNION
THERMOMETER
PRESSURE GAUGE
PRESSURE REDUCING VALVE
REDUCER
SHOWER HEADS
JANITORS SINK
DRINKING FOUNTAIN & TYPE
SHOWER
BATHTUB
TANK TYPE WATER CLOSET
COUNTER TOP LAVATORY & TYPE
WALL MOUNTED LAVATORY & TYPE
URINAL SINK & TYPE
BALL VALVE
GATE VALVE WITH 3/4 " HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
GATE VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENT
MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT
PLUMBING PLAN NOTE CALL OUT
ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT
TECHNOLOGY PLAN NOTE CALL OUT
PLUMBING EQUIPMENT DESIGNATION
MECHANICAL EQUIPMENT DESIGNATION TAG
OWNER FURNISHED, CONTRACTOR INSTALLED
EQUIPMENT DESIGNATION
NEW WORK TO EXISTING WORK CONNECTION POINT
DETAIL NUMBER
SHEET NUMBER
LIMIT OF DEMOLITION
TRAP PRIMER LINE - BELOW SLAB (T)
CO
DOUBLE EXTERIOR CLEANOUT (ECO)
CLEANOUTS
DRAINS AND TRAPS
EQUIPMENT
FITTINGS AND ACCESSORIES
SHEET NUMBER
SECTION NUMBER
JANITORS SINK - CORNER
MEDICAL GAS OUTLET (TYPE)
EXISTING TO REMAIN
A
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF ECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
B
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C
C CELSIUS
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
D
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
E
EL ELEVATION
EMCS ENERGY MONOSERRAT
AND CENTRAL SYSTEM
EPA ENVIROMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
EX EXISTING
F
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
G
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK (DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
I
ID INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
K
KW KILOWATT
KWH KILOWATT-HOUR
L
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT
ROOM
MH MANHOLE
MOU MEMORANDUM OF
UNDERSTADING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM. NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
P
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE
INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH
GAGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
R
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS WATER
RWL RAIN WATER LEADER
S
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
T
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
V
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
Y
YCO YARD CLEANOUT
YH YARD HYDRANT
IRRIGATION WATER
26-P 3
PIPING SYMBOLS
ANNOTATION
XX-1
xx
X100
X100
GENERAL PLUMBING SYMBOLS
DENTAL
MEDICAL GASES
STORM
FUEL
EXISTING PIPING
WATER
WASTE
VALVE SYMBOLS
GENERAL EQUIPMENT
FLOOR MOUNTED FLUSH VALVE WATER
CLOSET
WALL MOUNTED FLUSH VALVE WATER
CLOSET
ETR
ABBREVIATIONS
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
F
SHEET TITLE
ARCHITECT
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
This Document is released for the purpose of interim review under the authority of John E. Sommers, P.E. 62840
STRUCTURAL / CIVIL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH. / ELEC. / PLUMB. / TECH. ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 W. 161ST STREET
OLATHE, KS 66062
(913) 829-8650
LANDSCAPE ARCHITECT
ARC STUDIOS INC.
3117 E. FLOWER STREET
TUCSON, AZ 85716
(520) 882-9655
COMMISSIONING
GLHN ARCHITECTS & ENGINEERS, INC.
2939 E. BROADWAY BLVD
TUCSON, AZ 85716
(520) 881-4546
R1 - CONSTRUCT REPLACEMENT
WAREHOUSE
PLUMBING LEGEND
01/06/2020 JRM RLC
500 AZ-89, PRESCOTT, AZ 86301
165-P-000
649-414
BID DOCUMENTS
on 01/06/2020.
It is not to be used for construction purposes.
Revision # Date
GG
FF
S
WCO
S
FCO
FCO
FCO
FD-C
FD-C
INVERT ELEVATION: 5274.28'
WCO
FD-E
3" S
WCO
TD-1
FD-E
BB
CC
EE
HH
DD
AA
KK
1 2
JJ
LL
S
WAREHOUSE
PLOTTING
IT ROOM
ELECTRICAL
SECURE STOR.
BREAK ROOM
SV OFFICE
CORRIDOR
WALK-IN REF.
WORKSPACE
UNISEX TOILET
UNISEX TOILET
CORRIDOR
MECHANICAL
STORAGE (SHRED)
STORAGE (FLAM.)
STORAGE (AMMUNITION)
WRAPPING
RECYCLING AREA
3" S 3" S
WH-1
FD-E
S
S
4" S
FD-E
P-707
P-707
ARU
P-103
P-414
P-414
P-103
P-502
P-528
P-608
2" V
V
2" V
3" V
3" V
3" S
3" S
3" S
2" S
3" S
2" V
DS-1
DS-2
N
1/8" = 1'-0"
PLUMBING WASTE LEVEL 1 FLOOR PLAN
GENERAL NOTES:
1. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S REPRESENTATIVE (COR).
2. DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF THE WORK.
PRIOR TO SUBMITTING BID, VISIT THE JOB SITE TO OBSERVE THE EXISTING CONDITIONS OF THE
PROJECT. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND PLANS FOR ADDITIONAL
REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE
CONSTRUCTION DOCUMENTS. NOTIFY COR OF ANY CONFLICTS OR DISCREPANCIES PRIOR TO
SUBMISSION OF BID.
3. ALL PLUMBING EQUIPMENT AND FIXTURES SHOWN SHALL BE FURNISHED AND INSTALLED BY
THE DIVISION 22 CONTRACTOR UNLESS NOTED OTHERWISE.
4. INSTALLATION SHALL COMPLY WITH LEGALLY CONSTITUTED CODES AND THE REQUIREMENTS
OF AUTHORITIES HAVING JURISDICTION AND ALSO MEET ALL OWNER REQUIREMENTS. OBTAIN
A COPY OF THE OWNER REQUIREMENTS AND REVIEW PRIOR TO SUBMITTING BID.
5. PLANS AND SPECIFICATIONS GOVERN WHERE THEY EXCEED CODE REQUIREMENTS.
6. VERIFY LOCATION AND DEPTH OF UTILITIES AT POINTS OF CONNECTION BEFORE START OF
PIPING INSTALLATION. REFER TO CIVIL PLANS.
7. INSTALL NO PLASTIC PIPE OF ANY KIND IN THIS PROJECT. NO PVC IS TO BE USED. REFER TO
SPECIFICATIONS FOR ACCEPTABLE PIPING MATERIALS.
8. COORDINATE ALL WORK WITH OTHER TRADES AND CONTRACTORS.
9. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING
REQUIREMENTS.
10. COORDINATE PIPE ROUTING AWAY FROM ELECTRICAL PANELS. DO NOT INSTALL PIPING OVER
ELECTRICAL PANELS.
11. COORDINATE ALL ROOF PENETRATIONS WITH OTHER TRADES. MAINTAIN 25’ MINIMUM
CLEARANCE FROM ALL AIR INTAKES. MAINTAIN 2’ CLEARANCE FROM ALL OTHER EQUIPMENT.
12. INSTALL NEW PLUMBING PIPING AS SHOWN. SEE FIXTURE SCHEDULE FOR INDIVIDUAL FIXTURE
CONNECTIONS.
13. PROVIDE VERTICAL LIFT SPRING LOADED CHECK VALVES IN HOT AND COLD WATER SUPPLIES
FOR MOP SINK FAUCETS DOWNSTREAM OF SHUTOFF VALVES.
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
F
SHEET TITLE
ARCHITECT
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
This Document is released for the purpose of interim review under the authority of John E. Sommers, P.E. 62840
STRUCTURAL / CIVIL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH. / ELEC. / PLUMB. / TECH. ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 W. 161ST STREET
OLATHE, KS 66062
(913) 829-8650
LANDSCAPE ARCHITECT
ARC STUDIOS INC.
3117 E. FLOWER STREET
TUCSON, AZ 85716
(520) 882-9655
COMMISSIONING
GLHN ARCHITECTS & ENGINEERS, INC.
2939 E. BROADWAY BLVD
TUCSON, AZ 85716
(520) 881-4546
R1 - CONSTRUCT REPLACEMENT
WAREHOUSE
PLUMBING WASTE LEVEL 1 FLOOR
PLAN
01/06/2020 JRM RLC
500 AZ-89, PRESCOTT, AZ 86301
165-PL-101
649-414
BID DOCUMENTS
on 01/06/2020.
It is not to be used for construction purposes.
PLUMBING WASTE PLAN NOTES:
1. CONNECT TO CIVIL SANITARY SEWER LINE. SEE CIVIL FOR CONTINUATION.
2. PROVIDE A 6” TRAPPED HUB DRAIN FOR RPZ DISCHARGE.
3. PROVIDE A 3” TRAPPED HUB DRAIN FOR DRIP PAN DISCHARGE. SEE SHEET 165-PP-101 FOR
RELATED INFORMATION.
3" VTR
P-501
(TYP) 1
2" VTR
BB
CC
EE
HH
DD
AA
KK
1 2
JJ
LL
3" VTR
3" VTR
N
1/8" = 1'-0"
PLUMBING WASTE ROOF PLAN
GENERAL NOTES:
1. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S REPRESENTATIVE (COR).
2. DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF THE WORK.
PRIOR TO SUBMITTING BID, VISIT THE JOB SITE TO OBSERVE THE EXISTING CONDITIONS OF THE
PROJECT. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND PLANS FOR ADDITIONAL
REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE
CONSTRUCTION DOCUMENTS. NOTIFY COR OF ANY CONFLICTS OR DISCREPANCIES PRIOR TO
SUBMISSION OF BID.
3. ALL PLUMBING EQUIPMENT AND FIXTURES SHOWN SHALL BE FURNISHED AND INSTALLED BY
THE DIVISION 22 CONTRACTOR UNLESS NOTED OTHERWISE.
4. INSTALLATION SHALL COMPLY WITH LEGALLY CONSTITUTED CODES AND THE REQUIREMENTS
OF AUTHORITIES HAVING JURISDICTION AND ALSO MEET ALL OWNER REQUIREMENTS. OBTAIN
A COPY OF THE OWNER REQUIREMENTS AND REVIEW PRIOR TO SUBMITTING BID.
5. PLANS AND SPECIFICATIONS GOVERN WHERE THEY EXCEED CODE REQUIREMENTS.
6. VERIFY LOCATION AND DEPTH OF UTILITIES AT POINTS OF CONNECTION BEFORE START OF
PIPING INSTALLATION. REFER TO CIVIL PLANS.
7. INSTALL NO PLASTIC PIPE OF ANY KIND IN THIS PROJECT. NO PVC IS TO BE USED. REFER TO
SPECIFICATIONS FOR ACCEPTABLE PIPING MATERIALS.
8. COORDINATE ALL WORK WITH OTHER TRADES AND CONTRACTORS.
9. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING
REQUIREMENTS.
10. COORDINATE PIPE ROUTING AWAY FROM ELECTRICAL PANELS. DO NOT INSTALL PIPING OVER
ELECTRICAL PANELS.
11. COORDINATE ALL ROOF PENETRATIONS WITH OTHER TRADES. MAINTAIN 25’ MINIMUM
CLEARANCE FROM ALL AIR INTAKES. MAINTAIN 2’ CLEARANCE FROM ALL OTHER EQUIPMENT.
12. INSTALL NEW PLUMBING PIPING AS SHOWN. SEE FIXTURE SCHEDULE FOR INDIVIDUAL FIXTURE
CONNECTIONS.
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
F
SHEET TITLE
ARCHITECT
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
This Document is released for the purpose of interim review under the authority of John E. Sommers, P.E. 62840
STRUCTURAL / CIVIL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH. / ELEC. / PLUMB. / TECH. ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 W. 161ST STREET
OLATHE, KS 66062
(913) 829-8650
LANDSCAPE ARCHITECT
ARC STUDIOS INC.
3117 E. FLOWER STREET
TUCSON, AZ 85716
(520) 882-9655
COMMISSIONING
GLHN ARCHITECTS & ENGINEERS, INC.
2939 E. BROADWAY BLVD
TUCSON, AZ 85716
(520) 881-4546
R1 - CONSTRUCT REPLACEMENT
WAREHOUSE
PLUMBING WASTE ROOF PLAN
01/06/2020 JRM RLC
500 AZ-89, PRESCOTT, AZ 86301
165-PL-102
649-414
BID DOCUMENTS
on 01/06/2020.
It is not to be used for construction purposes.
PLUMBING WASTE PLAN NOTES:
1. INSTALL VENT PIPING TO VENT THROUGH ROOF. VTR MUST BE A MINIMUM OF 25 FEET AWAY
FROM ANY FRESH AIR INLETS ON THE ROOF.
Revision # Date
13. PROVIDE VERTICAL LIFT SPRING LOADED CHECK VALVES IN HOT AND COLD WATER SUPPLIES
FOR MOP SINK FAUCETS DOWNSTREAM OF SHUTOFF VALVES.
P-801
P-801
P-801
P-801P-801
1 1/4" CW
/4
C W
1" CW 3/4" CW
3/4" CW
3/4" CW
3/4" CW
P-804
P-801
3/4" CW
P-804
BB
CC
EE
HH
DD
AA
KK
1 2
JJ
LL
FD-C
FD-C
FD-E
FD-E
BFP-1
PRV-1
ET-1
WH-1
FD-E
RP-1
1/2" HWR
1 1/4" HW
1 1/4" CW
P-707
P-608
P-707
FD-E
WAREHOUSE
PLOTTING
IT ROOM
ELECTRICAL
SECURE STOR.
BREAK ROOM
SV OFFICE
CORRIDOR
WALK-IN REF.
WORKSPACE
UNISEX TOILET
UNISEX TOILET
CORRIDOR
MECHANICAL
STORAGE (SHRED)
STORAGE (FLAM.)
STORAGE (AMMUNITION)
WRAPPING
RECYCLING AREA
/2
H
W R
/2
C W
/4
H W
C W
/2
H
W R
/2
H W
/4
C W
/2
H
W R
/4
H W
1/2" HWR
1 1/4" HW
1 1/4" CW
1/2" CW
1/2" HW
1/2" HWR
1/2" HWR
3/4" HW
3/4" CW
1 1/2" CW
1/2" HW
1/2" HWR
ARU
P-103
P-103
P-414
P-414
P-528
P-502
/4
C W
/2
H
W R
/4
H W
1 1/2" G
/2
G
/2
G
1 1/2" G
6" CW
3/4" CW
3/4" CW
1 1/2" CW
1 1/4" HW
1/2" HWR
1 1/2" G
1 1/2" CW
2" CW
WM-1
C W
/4
C W
N
1/8" = 1'-0"
PLUMBING SUPPLY LEVEL 1 FLOOR PLAN
GENERAL NOTES:
1. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S REPRESENTATIVE (COR).
2. DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF THE WORK.
PRIOR TO SUBMITTING BID, VISIT THE JOB SITE TO OBSERVE THE EXISTING CONDITIONS OF THE
PROJECT. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND PLANS FOR ADDITIONAL
REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE
CONSTRUCTION DOCUMENTS. NOTIFY COR OF ANY CONFLICTS OR DISCREPANCIES PRIOR TO
SUBMISSION OF BID.
3. ALL PLUMBING EQUIPMENT AND FIXTURES SHOWN SHALL BE FURNISHED AND INSTALLED BY
THE DIVISION 22 CONTRACTOR UNLESS NOTED OTHERWISE.
4. INSTALLATION SHALL COMPLY WITH LEGALLY CONSTITUTED CODES AND THE REQUIREMENTS
OF AUTHORITIES HAVING JURISDICTION AND ALSO MEET ALL OWNER REQUIREMENTS. OBTAIN
A COPY OF THE OWNER REQUIREMENTS AND REVIEW PRIOR TO SUBMITTING BID.
5. PLANS AND SPECIFICATIONS GOVERN WHERE THEY EXCEED CODE REQUIREMENTS.
6. VERIFY LOCATION AND DEPTH OF UTILITIES AT POINTS OF CONNECTION BEFORE START OF
PIPING INSTALLATION. REFER TO CIVIL PLANS.
7. INSTALL NO PLASTIC PIPE OF ANY KIND IN THIS PROJECT. NO PVC IS TO BE USED. REFER TO
SPECIFICATIONS FOR ACCEPTABLE PIPING MATERIALS.
8. COORDINATE ALL WORK WITH OTHER TRADES AND CONTRACTORS.
9. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING
REQUIREMENTS.
10. COORDINATE PIPE ROUTING AWAY FROM ELECTRICAL PANELS. DO NOT INSTALL PIPING OVER
ELECTRICAL PANELS.
11. COORDINATE ALL ROOF PENETRATIONS WITH OTHER TRADES. MAINTAIN 25’ MINIMUM
CLEARANCE FROM ALL AIR INTAKES. MAINTAIN 2’ CLEARANCE FROM ALL OTHER EQUIPMENT.
12. INSTALL NEW PLUMBING PIPING AS SHOWN. SEE FIXTURE SCHEDULE FOR INDIVIDUAL FIXTURE
CONNECTIONS.
13. PROVIDE VERTICAL LIFT SPRING LOADED CHECK VALVES IN HOT AND COLD WATER SUPPLIES
FOR MOP SINK FAUCETS DOWNSTREAM OF SHUTOFF VALVES.
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
F
SHEET TITLE
ARCHITECT
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
STRUCTURAL / CIVIL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH. / ELEC. / PLUMB. / TECH. ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 W. 161ST STREET
OLATHE, KS 66062
(913) 829-8650
LANDSCAPE ARCHITECT
ARC STUDIOS INC.
3117 E. FLOWER STREET
TUCSON, AZ 85716
(520) 882-9655
COMMISSIONING
GLHN ARCHITECTS & ENGINEERS, INC.
2939 E. BROADWAY BLVD
TUCSON, AZ 85716
(520) 881-4546
R1 - CONSTRUCT REPLACEMENT
WAREHOUSE
PLUMBING SUPPLY LEVEL 1 FLOOR
PLAN
01/06/2020 JRM RLC
500 AZ-89, PRESCOTT, AZ 86301
165-PP-101
649-414
BID DOCUMENTS
PLUMBING SUPPLY PLAN NOTES:
1. CONNECT TO CIVIL DOMESTIC WATER LINE. SEE CIVIL FOR CONTINUATION.
2. SEE SHEET 165-P-301 FOR PIPE ROUTING AT DOMESTIC WATER SERVICE ENTRANCE.
3. RECIRCULATION PUMP SHALL RUN CONTINUOUSLY.
4. PROVIDE DRIP PAN BENEATH DOMESTIC WATER PIPING. DISCHARGE DRIP PAN TO HUB DRAIN IN
WALL. SEE SHEET 165-PL-101 FOR RELATED INFORMATION.
5. PROVIDE 0.7 GPM FLOW CONTROL VALVE ON HOT WATER RECIRCULATION LINE. ALL OTHER
FLOW CONTROL VALVES SHALL BE 0.3 GPM UNLESS OTHERWISE NOTED. SEE PLUMBING
FIXTURE SCHEDULE ON SHEET 165-P-601 FOR RELATED INFORMATION.
6. CONNECT TO CIVIL NATURAL GAS LINE. SEE CIVIL FOR CONTINUATION.
7. ROUTE PIPING BEHIND ARU.
8. ROUTE 3/4" GAS LINE DOWN TO AHU-1. REFER TO MECHANICAL SHEETS FOR MORE INFO.
9. CONNECT TO FIRE SPRINKLER LINE. SEE FIRE PROTECTION FOR CONTINUATION.
10. PROVIDE A SHUT OFF VALVE FOR WALL HYDRANT 6'-0" A.F.F.