Attachment 7 - F Drawings.pdf
PDF 582 KB Posted
- Attached to
- Y1GZ--Construct Replacement Warehouse Prescott VAMC (Minor Construction) Federal contract opportunity
- Solicitation number
- 36E77620R0043
About this file
This solicitation is for the construction of a replacement warehouse facility at the Northern Arizona VA Health Care System in Prescott, Arizona. The Department of Veterans Affairs intends to award a single firm-fixed-price contract for design-bid-build services to construct a new approximately 10,930 square foot conditioned warehouse, along with associated site work including nearly 30,000 square feet of paving and over 5,000 square feet of hardscape. The solicitation will be a total SDVOSB set-aside with an anticipated value between $5-10 million and a performance period of approximately 360 calendar days. Proposals are due on or around July 27, 2020 in response to request for proposal number 36E77620R0043.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. PROVIDE A NEW ADDRESSABLE FIRE ALARM AND
DETECTION SYSTEM.
2. THE FIRE ALARM SYSTEM DRAWING DETAILS ARE
REPRESENTED BY THE SERIES OF FA DRAWINGS. THE FA
SERIES DRAWINGS MUST BE INTERPRETED IN THEIR
ENTIRETY FOR CONSTRUCTION AND INSTALLATION
REQUIREMENTS; NO SINGLE FA SERIES DRAWING
CONTAINS ALL INFORMATION RELATING TO THE FIRE ALARM
SYSTEM DESIGN INTENT OR SPECIFICATION.
3. THE FIRE ALARM SYSTEM SHALL MEET THE APPLICATION,
INSTALLATION, PERFORMANCE REQUIREMENTS IN
ACCORDANCE WITH VA FIRE PROTECTION DESIGN MANUAL,
THE NATIONAL ELECTRICAL CODE (NEC) 2017, NATIONAL
FIRE ALARM SIGNALING CODE (NFPA 72) 2019, INSTALLATION
OF AIR CONDITIONING AND VENTILATION SYSTEMS (NFPA
90A) 2018, AS WELL AS STATE AND LOCAL BUILDING CODES
AND STANDARDS.
4. THE CONTRACTOR SHALL CAREFULLY REVIEW
APPLICABLE CRITERIA AND STANDARDS, THESE DRAWINGS,
AND THE PROJECT SPECIFICATIONS FOR IMPORTANT
QUALIFICATION, DEFINITION, SUBMITTAL, PRODUCT,
INSTALLATION, AND TESTING REQUIREMENTS.
5. PRIOR TO BEGINNING ANY CONSTRUCTION, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION
OF ALL DIMENSIONS, MEASUREMENTS, AND LOCATIONS OF
DEVICES, UTILITIES, EQUIPMENT AND OTHER
OBSTRUCTIONS THAT MAY AFFECT THE OVERALL DESIGN
LAYOUT.
6. INITIATING DEVICE CIRCUITS (IDC) SHALL BE INSTALLED
UTILIZING CLASS "B" CONFIGURATION AND SHALL NOT BE T-
TAPPED.
7. SIGNALING LINE CIRCUITS (SLC) SHALL BE INSTALLED
UTILIZING CLASS "B" CONFIGURATION AND MAY BE T-
TAPPED.
8. NOTIFICATION APPLIANCE CIRCUITS (NAC) SHALL BE
INSTALLED UTILIZING CLASS "B" CONFIGURATION AND
SHALL NOT BE T-TAPPED.
9. BATTERY BACKUP FOR THE SYSTEM SHALL PROVIDE
SUFFICIENT POWER TO OPERATE THE SYSTEM UNDER
QUIESCENT LOAD FOR A MINIMUM OF 24 HOURS AND, AT
THE END OF THAT PERIOD, SHALL BE CAPABLE OF
OPERATING ALL ALARM NOTIFICATION APPLIANCES USED
FOR EVACUATION OR TO DIRECT AID TO THE LOCATION OF
AN EMERGENCY FOR 5 MINUTES.
10. THE AUDIBLE NOTIFICATION SYSTEM SHALL MEET ALL
AUDIBILITY CRITERIA AS REQUIRED BY NFPA 72.
11. ALL HORNS, WHEN WALL MOUNTED, SHALL HAVE THEIR
TOPS AT HEIGHTS NOT LESS THAN 90" ABOVE FINISHED
FLOOR AND BELOW THE FINISHED CEILINGS AT DISTANCES
OF NOT LESS THE 6".
12. PROVIDE SYNCHRONIZATION OF VISUAL NOTIFICATION
APPLIANCE CIRCUITS WHERE MORE THAN TWO DEVICES
ARE IN ANY FIELD OF VIEW.
13. THE INDICATED INTENSITIES FOR THE VISUAL
NOTIFICATION APPLIANCES REFLECT THE EFFECTIVE
INTENSITIES REQUIRED. PROVIDE VISUAL NOTIFICATION
APPLIANCE DISTANCE CALCULATIONS IF THE INSTALLED
NOTIFICATION APPLIANCES DEVIATE FROM THE DESIGN
DOCUMENTS.
14. WHERE CEILING-MOUNT HORN/STROBES ARE SHOWN,
THEY SHALL BE SUSPENDED SO THAT THE LENS IS NOT
MORE THAN 30 FT ABOVE FINISHED FLOOR PER NFPA
72:18.5.5.4.6.
15. ALL STROBE AND COMBINATION HORN/STROBE, WHEN
WALL MOUNTED, SHALL BE LOCATED SUCH THAT THE
ENTIRE LENS IS NOT LESS THAN 80" AND NOT GREATER
THAN 96" ABOVE THE FINISHED FLOOR.
16. MOUNT SMOKE DETECTORS ON THE BOTTOM OF THE
CEILING / DECK (NOT ON THE BOTTOM OF STRUCTURAL
MEMBERS) AND LOCATED MORE THAN THREE FEET FROM
AIR SUPPLY DIFFUSERS, AS INDICATED IN NFPA 72.
17. PROVIDE ELECTRONIC MONITORING OF ALL
WATERFLOW, PRESSURE, AND TAMPER SWITCHES FOR THE
FIRE SUPPRESSION SYSTEMS.
18. THE OPERABLE PART OF MANUAL STATIONS SHALL NOT
BE LESS THAN 42" AND NOT MORE THAN 48" ABOVE
FINISHED FLOOR LEVEL, AND LOCATED WITHIN 60" OF THE
EXIT DOORWAY.
GENERAL NOTES
FACU
F
WF
FIRE ALARM CONTROL UNIT
FIRE ALARM LEGEND
SPD SURGE PROTECTIVE DEVICE
FIRE ALARM PULL STATION
AIM ADDRESSABLE INPUT MODULE
WATERFLOW SWITCH
VS VALVE SUPERVISORY SWITCH
s SMOKE DETECTOR - SPOT TYPE
HORN
HORN STROBE
STROBE - WALL MOUNT
STROBE - CEILING MOUNT
SYMBOL MODIFIERS
C ncd
WP
CEILING MOUNTED
CANDELA RATING
WEATHER PROOF
s SMOKE DETECTOR / SENSOR FOR DUCT
REMOTE ALARM INDICATING AND TEST SWITCHRTS
FIRST FLOOR
FACU
SPD
s F AIM
WF
AIM
VS
120VAC DEDICATED
BRANCH CIRCUIT
62.5 MICRON MULTI-MODE FIBER OPTIC CABLE SHALL PROVIDE
FIRE ALARM CONNECTIVITY TO EXISTING CAMPUS RING
CONFIGURATION. TWO (2) FIBER OPTICAL CABLES CONSISTING
OF 4-STRAND OM1 FIBER UTILIZING ST CONNECTORS.
11 ALL OTHER TROUBLES • • • •
A B C D E F G H I J K L M
2 WATERFLOW SWITCH • • • • • • •
3 SMOKE DETECTOR • • • • • •
• PERFORM OPERATION/REPORT DEVICE STATUS
SUPERVISORY SIGNALS A B C D E F G H I J K L M
4 VALVE TAMPER SWITCH • • • •
TROUBLE CONDITIONS A B C D E F G H I J K L M
6 FIRE ALARM CONTROL PANEL AC POWER FAILURE • • • •
7 FIRE ALARM CONTROL PANEL LOW BATTERY • • • •
8 OPEN CIRCUIT • • • •
9 GROUND FAULT • • • •
10 NOTIFICATION APPLIANCE CIRCUIT SHORTED • • • •
SYSTEM OUTPUTS
TR
AN
SM
IT
F
IR
E
SU
PE
R
VI
SO
R Y
SI
G
N
AL
T O
S U
PE
R
VI
SI
N G
S
TA
TI
O
N
SYSTEM INPUTS C
O
N
TR
O L
U N
IT
A
N N
U N
C
IA
TI
O
N
AC
TU
AT
E
C O
M M
O N
A
LA
R M
S
IG
N
AL
IN
D
IC
AT
O R
AC
TU
AT
E
AU
D
IB
LE
A
LA
R M
S
IG
N
AL
AC
TU
AT
E
C O
M M
O N
S U
PE
R
VI
SO
R Y
SI
G
N
AL
IN
D
IC
AT
O R
AC
TU
AT
E
AU
D
IB
LE
S U
PE
R
VI
SO
R Y
SI
G
N
AL
AC
TU
AT
E
C O
M M
O N
T R
O U
BL
E
SI
G
N
AL
IN
D
IC
AT
O R
AC
TU
AT
E
AU
D
IB
LE
T R
O U
BL
E
SI
G
N
AL
N O
TI
FI
C
AT
IO
N
AC
TU
AT
E
AU
D
IB
LE
N O
TI
FI
C
AT
IO
N
A
PP
LI
AN
C
ES
AC
TU
AT
E
VI
SI
BL
E
N O
TI
FI
C
AT
IO
N
A
PP
LI
AN
C
ES
D
IS
PL
AY
/P R
IN
T
C H
AN
G
E O
F
ST
AT
U
S
TR
AN
SM
IT
F
IR
E
AL
AR
M
S
IG
N
AL
T O
S U
PE
R
VI
SI
N G
S
TA
TI
O
N
TR
AN
SM
IT
F
IR
E
TR
O U
BL
E
SI
G
N
AL
T O
S U
PE
R
VI
SI
N G
S
TA
TI
O
N
R
EQ
U
IR
ED
S
AF
ET
Y C
O N
TR
O
LS
SH
U
TD
O
W N
(H
VL
S) F
AN
/A
R U
FIRE ALARMS A B C D E F G H I J K L M
1 MANUAL PULL STATION • • • • • •
5 DUCT DETECTOR • •• •
SH
U
TD
O
W N
A
SS
O C
IA
TE
D H
VA
C
U N
IT
N
N
N
N
HORN HORN/STROBE
SUPPLY AIR DIFFUSER OR
RETURN AIR OPENING
SMOKE DETECTOR
SMOKE
DETECTORS
TO
O
PE
R
AB
LE
P
AR
T
5' MAX.
BO
TT
O M
O F
LE
N
S
" M
IN
TO
P
O F
LE
N
S
" M
AX
TO
P
O F
D
EV
IC
E
" M
IN
TO
P
O F
D
EV
IC
E
6" M
IN
36" MIN.
4" M
IN
" M
AX
4" MIN.
MANUAL PULL
STATION
FACU
Poole Fire Protection 19910 West 161st Street
Olathe, KS 66062
913.829.8650 office 913.829.8690 fax www.poolefire.com
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
STRUCTURAL / CIVIL ENGINEER
F
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
SHEET TITLE
ARCHITECT
MECHANICAL / ELECTRICAL / PLUMBING /
TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100 FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
R1 - CONSTRUCT REPLACEMENT
WAREHOUSE
FIRE ALARM GENERAL NOTES,
LEGEND, AND DIAGRAMS
01/06/2020 DBN SAB
500 AZ-89, PRESCOTT, AZ 86301
165-FA001
649-414
BID DOCUMENTS
N.T.S.1 FIRE ALARM RISER DIAGRAM
N.T.S.3 FIRE ALARM INPUT/OUTPUT MATRIX
N.T.S.2 FIRE ALARM DEVICE MOUNTING DETAILS
Revision # Date 51 OF 92
F
E
D
C
B
A
1 2 3 4 5
HAC
IT ROOM
WAREHOUSE
WALK-IN
REF.
STORAGE
(FLAM.)
STORAGE
(SHRED)
WRAPPING
UNISEX
TOILET
STORAGE
(AMMUNITION)
RECYCLING
AREA
MECHANICAL
PLOTTING
UNISEX
TOILET
111118
WORKSPACE
SV
OFFICE
C O
R R
ID
O
R
CORRIDOR
SECURE
STOR.
ELECTRICAL
BREAK
ROOM
REQUIRED AUDIBILITY LEGEND
30dB AMBIENT SPL 45dB EXPECTED SPL 54dB AMBIENT SPL 69dB EXPECTED SPL 91dB AMBIENT SPL 106dB EXPECTED SPL
Poole Fire Protection 19910 West 161st Street
Olathe, KS 66062
913.829.8650 office 913.829.8690 fax www.poolefire.com
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
STRUCTURAL / CIVIL ENGINEER
F
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
SHEET TITLE
ARCHITECT
MECHANICAL / ELECTRICAL / PLUMBING /
TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100 FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
R1 - CONSTRUCT REPLACEMENT
WAREHOUSE
FIRST FLOOR FIRE ALARM
AUDIBILITY PLAN
01/06/2020 DBN SAB
500 AZ-89, PRESCOTT, AZ 86301
165-FA101
649-414
BID DOCUMENTS
1/8" = 1'-0"1 FIRST FLOOR FIRE ALARM AUDIBILITY PLAN N
AUDIBILITY DESIGN
1. BECAUSE OF UNPREDICTABLE BACKGROUND NOISES AND
PROJECT CONDITIONS, THE AUDIBILITY DESIGN GOALS SHALL
BE CONFIRMED BY MEASUREMENT WITH CALIBRATED TEST
EQUIPMENT. IF RESULTS INDICATE THAT ADDITIONAL
NOTIFICATION APPLIANCES ARE REQUIRED, THE CONTRACTOR
SHALL ADD THEM AT NO ADDITIONAL COST.
2. THE EXPECTED AMBIENT SOUND LEVELS ARE INDICATED ON
PLANS.
Revision # Date 52 OF 92
F
WP
15cd cd cd cd cd cd cd
15cd
C
15cd
C15cd
15cd
C
30cd
30cd cd
15cd
30cd
F30cd
W P cd
FACU
s
VSVSWF
s
F
E
D
C
B
A
1 2 3 4 5
HAC
IT ROOM
WAREHOUSE
WALK-IN
REF.
STORAGE
(FLAM.)
STORAGE
(SHRED)
WRAPPING
UNISEX
TOILET
STORAGE
(AMMUNITION)
RECYCLING
AREA
MECHANICAL
PLOTTING
UNISEX
TOILET
WORKSPACE
SV
OFFICE
C O
R R
ID
O
R
CORRIDOR
SECURE
STOR.
ELECTRICAL
BREAK
ROOM
FACU
F
WF
FIRE ALARM CONTROL UNIT
FIRE ALARM LEGEND
SPD SURGE PROTECTIVE DEVICE
FIRE ALARM PULL STATION
AIM ADDRESSABLE INPUT MODULE
WATERFLOW SWITCH
VS VALVE SUPERVISORY SWITCH
s SMOKE DETECTOR - SPOT TYPE
HORN
HORN STROBE
STROBE - WALL MOUNT
STROBE - CEILING MOUNT
SYMBOL MODIFIERS
C ncd
WP
CEILING MOUNTED
CANDELA RATING
WEATHER PROOF
s SMOKE DETECTOR / SENSOR FOR DUCT
REMOTE ALARM INDICATING AND TEST SWITCHRTS
Poole Fire Protection 19910 West 161st Street
Olathe, KS 66062
913.829.8650 office 913.829.8690 fax www.poolefire.com
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
STRUCTURAL / CIVIL ENGINEER
F
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
SHEET TITLE
ARCHITECT
MECHANICAL / ELECTRICAL / PLUMBING /
TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100 FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
R1 - CONSTRUCT REPLACEMENT
WAREHOUSE
FIRST FLOOR FIRE ALARM PLAN
01/06/2020 DBN SAB
500 AZ-89, PRESCOTT, AZ 86301
165-FA102
649-414
BID DOCUMENTS
1/8" = 1'-0"1 FIRST FLOOR FIRE ALARM PLAN N
Revision # Date 53 OF 92
1. THE DESIGN AND INSTALLATION OF THE FIRE PROTECTION,
FIRE SUPPRESSION SYSTEM MUST BE IN ACCORDANCE WITH
U.S. DEPARTMENT OF VETERANS AFFAIRS FIRE PROTECTION
DESIGN MANUAL, SEVENTH EDITION, DECEMBER 2015; NFPA
13: STANDARD FOR THE INSTALLATION OF SPRINKLER
SYSTEMS, 2019 EDITION; NFPA 24: STANDARD FOR THE
INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR
APPURTENANCES, 2019 EDITION, AND NFPA 291:
RECOMMENDED PRACTICE FOR FIRE FLOW TESTING AND
MARKING OF HYDRANTS, 2019 EDITION.
2. THESE DRAWINGS ARE DIAGRAMMATIC AND CONCEPTUAL
IN NATURE, INTENDED TO CONVEY THE SCOPE OF WORK AND
GENERAL ARRANGEMENTS OF THE SYSTEM. COORDINATE
THE SYSTEM LAYOUT WITH ALL OTHER DISCIPLINES. ALL
CHANGES SHALL MEET THE DESIGN CRITERIA OUTLINED ON
THESE PLANS, MEET THE CRITERIA OF NFPA 13, THE
SPECIFICATIONS, AND BE DOCUMENTED ON THE AS-BUILT
PLANS.
3. SPRINKLER CONTRACTOR SHALL COORDINATE LOCATIONS
OF FIRE PROTECTION COMPONENTS INCLUDING PIPING,
ALARMS, DRAINS, SPRINKLERS, TEST POINTS, ETC., WITH ALL
ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND
ELECTRICAL COMPONENTS. OBSTRUCTIONS TO SPRINKLER
DISCHARGE SHALL BE CONSIDERED DURING INSTALLATION.
DO NOT INSTALL SPRINKLER PIPING BELOW EQUIPMENT OR
WITHIN CLEARANCE SPACES FOR MECHANICAL AND
ELECTRICAL EQUIPMENT. SPRINKLERS SHALL BE INSTALLED
UNDER OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13.
4. MATERIALS AND ACCESSORIES NECESSARY MUST BE
INSTALLED IN ACCORDANCE WITH THE APPLICABLE NFPA
CODES AND STANDARDS, PROJECT SPECIFICATIONS, AND BE
UL LISTED OR FM APPROVED FOR FIRE PROTECTION USE,
UNLESS OTHERWISE NOTED.
5. ALL VALVES INSIDE TO BE PROVIDED WITH ELECTRONIC
TAMPER SWITCHES WIRED TO THE FACU. VALVES IN NORMAL
CLOSED POSITION SHALL BE PROVIDED WITH TAMPER TO
ACTIVATE IN THREE TURNS OR LESS. ALL VALVES OUTSIDE
TO BE SUPERVISED WITH LOCK AND CHAIN.
6. ALL HANGERS MUST BE PROVIDED AND INSTALLED IN
ACCORDANCE WITH NFPA 13.
7. THE INSPECTOR'S TEST VALVES MUST BE LOCATED NO
MORE THAN 7 FEET AFF.
8. APPLICABLE UL CONSTRUCTION DETAILS AND SYSTEMS
SHALL BE USED WHERE FIRE RATED BARRIERS ARE
PENETRATED BY SPRINKLER PIPING.
9. ALL VALVES (DRAINS, INSPECTOR'S TEST, CONTROL) MUST
BE IDENTIFIED AS REQUIRED BY NFPA 13.
10. PIPING MUST BE ARRANGED FOR FLUSHING. READILY
REMOVABLE FITTINGS MUST BE PROVIDED AT THE END OF
ALL CROSS MAINS.
11. ALL PENDENT SPRINKLERS MUST BE INSTALLED IN THE
CENTER OF THE CEILING TILES.
12. DRAINS MUST BE LOCATED TO PROVIDE DRAINAGE IN
ACCORDANCE WITH NFPA 13 (2016 EDITION). ALL DRAINS AND
TEST CONNECTIONS MUST DISCHARGE TO THE EXTERIOR OF
THE BUILDING ON TO A SPLASH BLOCK OR PAVEMENT, AND
SHALL NOT DISCHARGE ACROSS PATHS OF EGRESS.
13. ALL SPRINKLER SYSTEM ALARM INITIATING AND
SUPERVISORY DEVICES MUST BE CONNECTED TO THE FIRE
ALARM SYSTEM.
14. ADDITIONAL SPRINKLERS MAY BE REQUIRED UNDER DUCT
WORK TO PROVIDE ADEQUATE COVERAGE PER NFPA 13.
15. A LISTED RELIEF VALVE MUST BE PROVIDED IN
ACCORDANCE WITH NFPA 13, SECTION 8.1.2 FOR THE
SPRINKLER SYSTEM.
16. AN AIR VENT MUST BE PROVIDED IN ACCORDANCE WITH
NFPA 13, SECTION 8.1.5 AND SECTION 16.7 FOR THE
SPRINKLER SYSTEM.
17. THE AIR ROTATION UNIT (ARU) SHALL BE CENTERED
APPROXIMATELY BETWEEN FOUR ADJACENT SPRINKLERS.
THE AIR ROTATION UNIT (ARU) SHALL BE INTERLOCKED TO
SHUT DOWN IMMEDIATELY UPON A WATERFLOW ALARM IN
ACCORDANCE WITH NFPA 13, SECTION 19.2.7.
18. THE SEISMIC DESIGN CATEGORY FOR THE FACILITY IS C
AND PER H-18-8 VA SEISMIC DESIGN REQUIREMENTS,
PRESCOTT (VAMC) IS ASSIGNED WITH A Ss (SPECTRAL
RESPONSE ACCELERATION) OF 0.304, A S1 (ONE SECOND
PERIOD SPECTRAL ACCELERATION) OF 0.088 AND SEISMICITY
OF MEDIUM LOW. PROVIDE SEISMIC BRACING IN
ACCORDANCE WITH NFPA 13.
19. PROVIDE CLEARANCE AROUND ALL PIPING EXTENDING
THROUGH WALLS AND FLOORS IN ACCORDANCE WITH NFPA
13, SECTION 18.4.
20. ALL SEISMIC BRACING SHALL BE DESIGNED AND
SUBMITTED FOR APPROVAL WITH THE SHOP DRAWING
SUBMITTAL, INCLUDING DRAWINGS AND CALCULATIONS.
FIRE SUPPRESSION GENERAL NOTES
WATER FLOW
SWITCH
PRESSURE
GAUGE
INSPECTOR'S TEST AND
DRAIN VALVE WITH RELIEF
VALVE DISCHARGE TO
EXTERIOR OF BUILDING
PIPE OUT TO FIRE
DEPARTMENT CONNECTION
WITH BALL-DRIP VALVE AT
ELBOW
BUTTERFLY VALVE
(NORMALLY CLOSED)
CHECK VALVE
BACKFLOW PREVENTION
ASSEMBLY
PROVIDE CLEARANCE AROUND THE PIPE IN
ACCORDANCE WITH NFPA 13, SECTION 18.4
PROVIDE RESTRAINT FOR THE
UNDERGROUND FITTINGS IN ACCORDANCE
WITH NFPA 13, SECTION 6.6. PROVIDE ONE
FOOT OF CLEARANCE FROM THE BOTTOM OF
THE FOOTING TO THE TOP OF THE SUPPLY
PIPE AND NO FITTINGS BENEATH FOOTINGS
OR FOUNDATION IN ACCORDANCE WITH NFPA
13, SECTION 6.4.3.
2" PIPE CONNECTION FOR
DOMESTIC WATER SUPPLY
6" LEAD-IN
Poole Fire Protection 19910 West 161st Street
Olathe, KS 66062
913.829.8650 office 913.829.8690 fax www.poolefire.com
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
STRUCTURAL / CIVIL ENGINEER
F
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
SHEET TITLE
ARCHITECT
MECHANICAL / ELECTRICAL / PLUMBING /
TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100 FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
R1 - CONSTRUCT REPLACEMENT
WAREHOUSE
FIRE SUPPRESSION GENERAL
NOTES AND SECTION
01/06/2020 DBN DRF
500 AZ-89, PRESCOTT, AZ 86301
165-FX001
649-414
BID DOCUMENTS
1/2" = 1'-0"1 FIRE SUPPRESSION RISER SECTION
Revision # Date 54 OF 92
HAC
IT ROOM
WAREHOUSE
WALK-IN
REF.
STORAGE
(FLAM.)
STORAGE
(SHRED)
WRAPPING
UNISEX
TOILET
STORAGE
(AMMUNITION)
116117
RECYCLING
AREA
MECHANICAL
AREA TO BE
PROTECTED BY DRY
TYPE SPRINKLERS
FIRE SUPPRESSION
RISER
FIRE DEPARTMENT
CONNECTION
SEE CIVIL DRAWINGS FOR
CONTINUATION
BACKFLOW PREVENTION
ASSEMBLY FORWARD
FLOW TEST CONNECTION
WITH HOSE VALVES
PLOTTING
FX001
SPRINKLER SYSTEM
SUPPLY PIPE
LOCAL WATERFLOW
ALARM (HORN/STROBE) TO
BE PROVIDED BY
SPRINKLER CONTRACTOR
UNISEX
TOILET
111118
WORKSPACE
F
E
D
C
B
A
1 2 3 4 5
SV
OFFICE
C O
R R
ID
O
R
CORRIDOR
SECURE
STOR.
ELECTRICAL
BREAK
ROOM
W P cd
HAZARD CLASSIFICATION LEGEND
LIGHT HAZARD
(0.10 GPM/FT² OVER 1,500 FT² WITH
100 GPM EXTERIOR HOSE DEMAND)
ORDINARY HAZARD GROUP 2
(0.20 GPM/FT² OVER 2,500 FT² WITH
250 GPM EXTERIOR HOSE DEMAND)
STORAGE HAZARD
(ESFR SPRINKLERS WITH 250 GPM EXTERIOR HOSE
DEMAND, CLASS IV, 30 FT MAXIMUM STORAGE)
ORDINARY HAZARD GROUP 1
(0.15 GPM/FT² OVER 2,500 FT² WITH
250 GPM EXTERIOR HOSE DEMAND)
N
Poole Fire Protection 19910 West 161st Street
Olathe, KS 66062
913.829.8650 office 913.829.8690 fax www.poolefire.com
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
STRUCTURAL / CIVIL ENGINEER
F
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
SHEET TITLE
ARCHITECT
MECHANICAL / ELECTRICAL / PLUMBING /
TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100 FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
R1 - CONSTRUCT REPLACEMENT
WAREHOUSE
FIRE SUPPRESSION HAZARD
CLASSIFICATION FIRST FLOOR
PLAN
01/06/2020 DBN DRF
500 AZ-89, PRESCOTT, AZ 86301
165-FX101
649-414
BID DOCUMENTS
1/8" = 1'-0"1 FIRST FLOOR FIRE SUPPRESSION PLAN
NOTES:
1. THE SPRINKLER SYSTEM DESIGN CRITERIA SHALL BE BASED
UPON NFPA 13, TABLE 23.5.1, USING ESFR SPRINKLERS WITH
MAXIMUM STORAGE HEIGHT OF 30 FEET, MAXIMUM CEILING
HEIGHT OF 40 FEET, WITH 25.2 K-FACTOR SPRINKLERS AT
MINIMUM OPERATING PRESSURE OF 25 PSI.
2. THE ESFR SPRINKLER SYSTEM DESIGN AND INSTALLATION
SHALL BE IN ACCORDANCE WITH NFPA 13, SECTION 14.2.11 IN
REGARDS TO OBSTRUCTIONS TO SPRINKLER DISCHARGE.