Attachment 11 - S Drawings.pdf
PDF 2 MB Posted
- Attached to
- Y1GZ--Construct Replacement Warehouse Prescott VAMC (Minor Construction) Federal contract opportunity
- Solicitation number
- 36E77620R0043
About this file
This notice describes a forthcoming federal contract solicitation for construction services. The Department of Veterans Affairs intends to issue a request for proposal to award a firm-fixed-price design-bid-build contract for construction of a replacement warehouse at the Northern Arizona VA Health Care System campus in Prescott, Arizona. The new approximately 10,930 square foot single-story warehouse will provide conditioned storage to replace aging facilities and include over 29,000 square feet of exterior paving and parking. The period of performance is approximately 360 calendar days. The estimated value is between $5-10 million. The solicitation will utilize the Lowest Price Technically Acceptable source selection procedure and be set aside exclusively for Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 236220 and size standard is $39.5 million. The anticipated solicitation date is July 27, 2020.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
THE STRUCTURAL DRAWINGS DEPICT THE STRUCTURE IN ITS FINAL CONSTRUCTED CONFIGURATION.
NEITHER CONSTRUCTION MEANS AND METHODS NOR CONSTRUCTION SAFETY ARE PART OF THE
STRUCTURAL ENGINEER’S EXPERTISE OR SCOPE OF WORK. THE GENERAL CONTRACTOR AND HIS
SUBCONTRACTORS ARE FULLY RESPONSIBLE FOR THE MEANS AND METHODS USED TO CONSTRUCT
THE STRUCTURE AND FOR FULL COMPLIANCE WITH ALL JOB SAFETY RELATED REGULATIONS AND CONDITIONS AT THE SITE. LIMITED SITE VISITS, IF ANY, BY THE STRUCTURAL ENGINEER ARE SOLELY
TO OBSERVE COMPLETED PARTS OF THE STRUCTURE. THE STRUCTURAL ENGINEER IS NEITHER
QUALIFIED TO OBSERVE NOR COMMENT ON CONSTRUCTION MEANS AND METHODS AND JOB SITE
SAFETY.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS PRIOR TO
FABRICATION/CONSTRUCTION. NOTIFY STRUCTURAL ENGINEER AND ARCHITECT OF ANY
DISCREPANCIES PRIOR TO FABRICATION/CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ALL
WORK FITTING AS INTENDED BY THE DRAWINGS AND SPECIFICATIONS.
PRINCIPAL OPENINGS ARE SHOWN ON THE DRAWINGS. SEE ARCHITECTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS FOR OPENINGS, SLEEVES, CURBS, INSERTS, DEPRESSIONS, ETC. NOT SHOWN.
ALL DETAILS ARE TYPICAL UNLESS NOTED OTHERWISE. DETAILS SHALL APPLY TO SIMILAR AND LIKE
CONDITIONS.
SHOP DRAWINGS SHALL BE NEW DRAWINGS PRODUCED BY THE CONTRACTOR, ILLEGIBLE
REPRODUCTIONS OF THE DESIGN DRAWINGS WILL BE REJECTED. ELECTRONIC FILES MAY BE
PURCHASED FROM THE ENGINEER OF RECORD FOR THE PURPOSE OF PREPARING SHOP DRAWINGS.
THE CONTRACTOR WILL BE REQUIRED TO SIGN AN INDEMNITY STATEMENT AND FEES FOR THE
ELECTRONIC FILES SHALL BE PAID IN FULL PRIOR TO TRANSMISSION OF THE ELECTRONIC FILES TO
THE CONTRACTOR. THE USE OF REPRODUCTIONS OF THESE CONTRACT DRAWINGS BY ANY
CONTRACTOR, SUBCONTRACTOR, ERECTOR, FABRICATOR, OR MATERIAL SUPPLIER IN LIEU OF
PREPARATION OF SHOP DRAWINGS SIGNIFIES HIS ACCEPTANCE OF ALL INFORMATION SHOWN HEREIN AS CORRECT, AND OBLIGATES HIMSELF TO ANY JOB EXPENSE, REAL OR IMPLIED, ARISING DUE TO ANY ERRORS OR OMISSIONS THAT MAY OCCUR HEREIN. ITEMS MARKED (*) SHALL HAVE SHOP DRAWINGS SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE IN WHICH THE PROJECT IS
LOCATED.
MINIMUM SHOP DRAWING SUBMITTAL REQUIREMENTS INCLUDE:
CONCRETE MIX DESIGNS FOR EACH CLASS OF CONCRETE WITH TEST DATA
CONCRETE ACCESSORIES (VAPOR BARRIER, REINFORCING SUPPORT CHAIRS, ETC.)
CONCRETE REINFORCING SHOP DRAWINGS
PRE-ENGINEERED METAL BUILDING DRAWINGS (*)
CRANES, CONCRETE TRUCKS AND ALL OTHER HEAVILY LOADED VEHICLES ARE NOT TO BE DRIVEN
ACROSS GRADE BEAMS OR BUILDING SLABS.
ERECTION OF STRUCTURAL STEEL MAY NOT BEGIN UNTIL CONCRETE FOUNDATION HAS CURED FOR A
MINIMUM OF THREE (3) DAYS. STRUCTURAL STEEL OR OTHER HEAVY LOADS SHALL NOT BE
STOCKPILED ON ANY SLAB UNTIL IT HAS CURED FOR A MINIMUM OF THREE (3) DAYS.
NOTE THAT THE GROUND FLOOR SLAB IS A GROUND SUPPORTED SLAB AT GRADE AS PER THE DESIGN RECOMMENDED IN THE SOIL REPORT. IT IS NOT A STRUCTURAL SLAB AND AS SUCH IS NOT DESIGNED FOR ANY EXTERNAL UPWARD OR DOWNWARD LOADS, IT IS INTENDED TO BE ENTIRELY SUPPORTED BY
THE PREPARED GROUND UNDER THE SLAB. THE CONTRACTOR SHOULD NOTE THAT THE
PERFORMANCE OF THE SLAB AS DESIGNED AND INTENDED BY THE SOIL ENGINEER IS HIGHLY
DEPENDENT ON MANY ENVIRONMENTAL CONDITIONS OVER WHICH THE OWNER HAS CONTROL AFTER THE OCCUPANCY OF THE BUILDING. THE CONTRACTOR AND THE OWNER SHOULD CONSULT WITH THE SOIL ENGINEER IF THERE ARE ANY QUESTIONS CONCERNING CONSTRUCTION, PERFORMANCE AND
RISKS INVOLVED IN GROUND SUPPORTED SLAB AT GRADE CONSTRUCTION.
BUILDING CODE: INTERNATIONAL BUILDING CODE, 2012 EDITION
DEAD LOAD:
ANY CHANGES IN CONSTRUCTION MATERIALS FROM THOSE SHOWN ON
THE ARCHITECTURAL OR STRUCTURAL DRAWINGS SHALL BE REPORTED BY
THE CONTRACTOR TO THE STRUCTURAL ENGINEER FOR VERIFICATION OF
LOAD CARRYING CAPACITY OF THE STRUCTURE.
LIVE LOAD:
ROOF: 20 PSF
EXITWAYS: 100 PSF
LIGHT STORAGE: 125 PSF
MECHANICAL: 150 PSF
PLATFORM: 250 PSF
HANDRAILS: 50 PLF / 200 POUNDS IN ANY DIRECTION
LIVE LOAD REDUCTIONS HAVE BEEN APPLIED IN ACCORDANCE WITH THE
BUILDING CODE, UNLESS NOTED OTHERWISE.
ARCHITECTURAL BARRIER ACT:
GRAB BAR: 250 LBS ANY DIRECTION
TUB/SHOWER SEAT: 250 LBS ANY DIRECTION
FASTENERS: 250 LBS ANY DIRECTION
WIND LOAD:
INTERNATIONAL BUILDING CODE, 2012 EDITION
VELOCITY (ULT) : 115 MPH THREE SECOND GUST
EXPOSURE: B
RISK CATEGORY: II
INTERNAL PRESSURE COEFFICIENT, Gcpi: +/- 0.18
COMPONENTS AND CLADDING:
WALLS (EFFECTIVE WIND AREA 50 SQUARE FEET):
INTERIOR ZONE: 40 PSF
CORNERS: 45 PSF
(10’-10” FROM EACH CORNER)
SEISMIC LOAD:
RISK CATEGORY: II
SEISMIC IMPORTANCE FACTOR (I): 1.0
MAPPED SPECTRAL RESP ACCEL (Ss/S1): 0.304g/0.089g
SITE CLASS: C
SPECTRAL RESPONSE COEFF (Sds/Sd1): 0.243g/0.1g
SEISMIC DESIGN CATEGORY: C
SEISMIC FORCE RESISTING SYSTEM: RE: PEMB MANUF
DESIGN BASE SHEAR: RE: PEMB MANUF
SEISMIC RESPONSE COEFF (Cs): RE: PEMB MANUF
RESPONSE MODIFICATION COEFFICIENT (R): RE: PEMB MANUF
ANALYSIS PROCEEDURE USED: RE: PEMB MANUF
SNOW LOAD:
GROUND SNOW LOAD (Pg): 30 PSF FLAT ROOF SNOW LOAD (Pf): 36 PSF SNOW EXPOSURE FACTOR (Ce): 1.0
SNOW LOAD IMPORTANCE FACTOR (I): 1.0
THERMAL FACTOR (Ct): 1.0
ALLOWABLE SOIL BEARING CAPACITY (AT 18” BELOW LOWEST ADJACENT FINISHED
GRADE, PER GEOTECHNICAL REPORT)
TOTAL LOAD: 2000 PSF
1 2 3 a a a a
L
L h
Θ
EFFECTIVE WIND AREA ft²
20 ft² 50 ft² 100 ft²
ZONE
-40
ROOF DESIGNGROSS PRESSURES,
WIND ONLY (PSF)
-60
-80
-40
-50
-65
-35
-45
-45 a = 10'-10"
EARTHWORK
1. WHERE CONSTRUCTION DOCUMENT REQUIREMENTS DIFFER FROM THE PROJECT SPECIFIC
GEOTECHNICAL REPORT, THE MORE STRINGENT OF THE TWO SHALL GOVERN.
2. SITE PREPARATION FOR THE BUILDING PAD SHALL CONSIST OF THE REMOVAL OF EXISTING
PAVEMENT, VEGETATION, ORGANIC MATTER AND ANY ADDITIONAL MATERIAL AS NECESSARY
TO PROVIDE THE REQUIRED AMOUNT OF FILL UNDER THE BUILDING AND EXTENDING OUT A
MINIMUM OF 5’-0” BEYOND THE PERIMETER OF THE BUILDING. IN AREAS WHERE THERE IS
VEGETATION, CONTRACTOR SHALL SCALP VEGETATION COMPLETELY TO A DEPTH OF 8
INCHES DEEP AT LEAST FIVE FEET BEYOND THE BUILDING EDGES.
3. LOOSE SOILS WERE ENCOUNTERED TO DEPTHS RANGING FROM APPROXIMATELY 4.5 TO 6
FEET WITHIN THE BUILDING FOOTPRINT. DUE TO THE POTENTIAL FOR EXCESSIVE
SETTLEMENTS, THE LOOSE SOILS SHALL BE REMOVED TO FIRM SOIL, EXTENDING AT LEAST 5
FEET OUTSIDE OF THE BUILDING FOOTPRINT. REMOVAL SHALL INCLUDE CONTIGUOUS
EXTERIOR SLABS AND STRUCTURES INCLUDING: EXTERIOR SLAB ON GRADE STORAGE, FORK
LIFT RAMPS, AND LOADING DOCKS. THE EXPOSED GROUND SURFACE SHALL BE SCARIFIED,
MOISTURE CONDITIONED, AND THOROUGHLY COMPACTED. THE REMOVED SOILS MAY THEN
BE RE-USED AND REPLACED IN CONTROLLED, COMPACTED, AND TESTED LIFTS, IN
ACCORDANCE WITH THE COMPACTION CRITERIA.
4. A MINIMUM THICKNESS OF 6 INCHES PROCESSSED AGGREGATE BASE COURE IN
ACCORDANCE WITH MAG SPECIFICATIONS, SECTION 702, SHALL BE PLACED BETWEEN THE
MOISTURE CONDITIONED AND COMPACTED GRANULAR SOILS AND ALL CONCRETE SLABS-ON-
GRADE.
5. THE SUBGRADE SHALL BE PROOFROLLED WITH A HEAVY, RUBBER-TIRED VEHICLE (STATIC
WEIGHT OF AT LEAST 20 TONS AND WITH TIRE PRESSURES OF AT LEAST 90 PSI). THE
CONTRACTOR SHALL MAKE AT LEAST TWO COMPLETE PASSES OVER THE AREA WITH THE
SECOND PASS PERPENDICULAR TO THE FIRST PASS. AREAS OF THE SUBGRADE THAT ARE
OBSERVED TO BE SOFT OR WEAK SHALL BE OVEREXCAVATED AND REPLACED WITH
PROPERLY COMPACTED SELECT FILL.
6. SUBGRADE SHALL THEN BE SCARIFIED AND MOISTURE CONDITIONED TO AN EIGHT (8) INCH
DEPTH AND THEN RECOMPACTED TO BETWEEN 95 AND 100 PERCENT OF THE MAXIMUM DRY
DENSITY AS DETERMINED BY THE STANDARD PROCTOR DENSITY TEST (ASTM D698). THE
MOISTURE CONTENT SHALL BE BETWEEN OPTIMUM AND +3 PERCENT OF THE OPTIMUM
MOISTURE CONTENT. PROVIDE A MINIMUM OF FOUR (4) FIELD DENSITY TESTS ON THE
SUBGRADE OR ONE (1) FOR EVERY 2,500 SQUARE FEET WHICHEVER IS GREATER.
7. SELECT FILL MATERIAL FOR THE BUILDING PAD SHALL BE INORGANIC SANDY CLAY WITH A LIQUID LIMIT BETWEEN 26 AND 40 AND PLASTICITY INDEX BETWEEN 10 AND 20. STRUCTURAL
SELECT FILL PAD MATERIAL SHALL BE TESTED FOR ACCEPTABILITY AND A MOISTURE
DENSITY CURVE SHALL BE ESTABLISHED.
8. SELECT FILL SHALL BE PLACED IN SIX (6) INCH LOOSE LIFTS AND COMPACTED TO BETWEEN
95 AND 100 PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE STANDARD
PROCTOR DENSITY TEST (ASTM D698). THE MOISTURE CONTENT SHALL BE BETWEEN -2
PERCENT OF THE OPTIMUM AND +2 PERCENT OF THE OPTIMUM MOISTURE CONTENT FOR
SELECT FILL. SELECT FILL MATERIAL SHALL EXTEND TO 5'-0" BEYOND THE BUILDING
PERIMETER. PROVIDE A MINIMUM OF (4) FIELD DENSITY TESTS ON EACH LIFT OF SELECT FILL
OR ONE (1) TEST PER DAY.
9. SELECT FILL MATERIAL SHALL BE TESTED DURING PLACEMENT OF EACH LIFT FOR THE
ATTERBERG LIMITS IN ACCORDANCE WITH ASTM D4318-98 METHOD B “STANDARD TEST
METHOD FOR LIQUID LIMIT, PLASTIC LIMIT AND PLASTICITY INDEX OF SOILS” TO VERIFY THAT
THE SELECT FILL MATERIAL IS IN ACCORDANCE WITH THE ORIGINALLY APPROVED SELECT
FILL MATERIAL. PROVIDE A MINIMUM OF ONE (1) TEST PER DAY.
10. CONTRACTOR SHALL MAINTAIN A CLEAN EXCAVATION THAT IS FREE OF WATER 100 PERCENT
OF THE TIME. CONTRACTOR SHALL PROVIDE PUMPS AS REQUIRED TO REMOVE ANY WATER
AT ALL TIMES.
11. THE SITE SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AWAY FROM THE BUILDING
PAD DURING BUILDING PAD INSTALLATION AND WHEN THE BUILDING PAD AND BUILDING ARE
COMPLETED.
12. PLUMBING AND UTILITY TRENCHES WITHIN THE BUILDING PAD SHALL HAVE PIPING BEDDED
ON 6” MINIMUM OF CEMENT STABILIZED SAND WITH 4” MINIMUM ALL AROUND. BACKFILL IN
UTILITY TRENCHES SHALL CONSIST OF COMPACTED SELECT FILL. PROVIDE A BENTONITE
PLUG FOR THE FULL DEPTH AND WIDTH OF THE UTILITY TRENCH TO A MINIMUM OF 1’-0”
ABOVE THE BOTTOM OF THE FOUNDATION AT THE EXTERIOR FACE OF BUILDING
FOUNDATIONS WHERE UTILITY TRENCHES ENTER THE BUILDING.
13. PROVIDE A MINIMUM SIX (6) INCH CLAY CAP FOR A MINIMUM OF 5’-0” AROUND THE PERIMETER
OF THE BUILDING. THE CAP SHALL EXTEND AS REQUIRED TO COVER THE LIMITS OF THE
EXCAVATION AND SELECT FILL BUILDING PAD MATERIALS.
SITE DRAINAGE
1. DURING CONSTRUCTION, GRADE THE SITE TO PROVIDE POSITIVE DRAINAGE AWAY FROM ALL
BUILDINGS AND SLABS. WATER SHALL NOT BE ALLOWED TO POND ADJACENT TO THE BUILDING
FOUNDATIONS OR SLABS.
2. DOWNSPOUTS FROM ROOF DRAINS AND GUTTERS SHALL BE COLLECTED AND PIPED AWAY FROM THE BUILDING. WHEN WATER IS NOT PIPED WAY FROM THE BUILDING, DOWNSPOUTS SHALL DUMP ONTO A CAST IN PLACE 4” THICK X 3’-0” WIDE CONCRETE SWALE REINFORCED WITH #4 AT 12” ON
CENTER EACH WAY AND EXTENDING 10’-0” OUT FROM THE BUILDING.
3. FINAL SITE GRADING SHALL BE IN COMPLIANCE WITH THE INTERNATIONAL BUILDING CODE
SECTION 1804.4. PERVIOUS SURFACES ADJACENT TO BUILDINGS SHALL SLOPE AWAY FROM
BUILDING AT 5% MINIMUM FOR AT LEAST 10 FEET. IMPERVIOUS SURFACES ADJACENT TO
BUILDINGS SHALL SLOPE AWAY FROM BUILDING AT 2% MINIMUM FOR AT LEAST 5 FEET.
4. TREES AND VEGETATION SHALL NOT BE ALLOWED WITHIN A DISTANCE EQUAL TO THREE
QUARTERS THEIR ULTIMATE HEIGHT AWAY FROM THE BUILDING.
5. IRRIGATE VEGETATION AND SOILS ADJACENT TO THE BUILDING (NO MORE THAN 15 MINUTES
THREE TIMES A WEEK) ON AN AS NEEDED BASIS TO MAINTAIN UNIFORM SOIL MOISTURE
CONDITIONS AROUND THE PERIMETER OF THE BUILDING FOLLOWING CONSTRUCTION.
FOUNDATIONS
1. PREPARED GRADE AREA UNDER ALL BUILDING SLABS AND GRADE BEAMS SHALL BE COVERED
WITH A 15 MIL WATER VAPOR BARRIER MEETING THE REQUIREMENTS OF ASTM E 1745 (LATEST EDITION), CLASS C OR BETTER WITH MAXIMUM WATER PERMEANCE OF 0.01 PERMS WHEN TESTED IN ACCORDANCE WITH ASTM E96. THE WATER VAPOR BARRIER SHALL BE INSTALLED AND LAPPED
AND TAPED IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM E 1643 (LATEST EDITION).
PENETRATIONS SHALL BE SEALED IN STRICT ACCORDANCE WITH THE MANUFACTURER’S
RECOMMENDATIONS AND REQUIREMENTS.
2. FOUNDATION DETAILING SHOWN ON THE DRAWINGS IS BASED ON A FOUNDATION DESIGN
SPECIFIED IN THE SOIL REPORT COMPLETED BY ENGINEERING & TESTING CONSULTANTS INC., PROJECT NO. 9999, DATED OCTOBER 12, 2018. THE RECOMMENDATIONS CONTAINED IN THE SOIL
REPORT SHALL NOT SUPERCEDE THE REQUIREMENTS SHOWN ON THE DESIGN DRAWINGS OR IN
THE SPECIFICATIONS WHEN THE REQUIREMENTS SHOWN IN THE DRAWINGS ARE GREATER THAN
THOSE SHOWN IN THE GEOTECHNICAL REPORT. THE CONTRACTOR IS REQUIRED TO SECURE A
COPY OF THE GEOTECHNICAL REPORT FROM THE OWNER AND HAVE A COPY ON THE JOB SITE AT
ALL TIMES FOR HIS USE AND REFERENCE.
3. FOUNDATION DETAILING SHOWN ON THE DRAWINGS IS BASED ON A MINIMUM OF 5 FEET OF
SELECT FILL MATERIAL BENEATH THE FLOOR SLAB AND EXTENDING 5’-0” BEYOND THE BUILDING
PERIMETER.
4. ALL BACKFILL FOR BURIED PIPES AND CONDUIT WITHIN THE BUILDING PAD AND EXTENDING OUT MINIMUM 5’-0” BEYOND THE BUILDING SHALL BE BACKFILLED WITH SELECT FILL BACKFILL. DO NOT USE SAND BACKFILL. A BENTONITE PLUG SHALL BE PROVIDED FOR THE FULL DEPTH AND WIDTH OF ALL UTILITY TRENCHES TO A MINIMUM OF 1'-0" ABOVE THE BOTTOM OF THE FOUNDATION AT THE
EXTERIOR FACE OF THE BUILDING FOUNDATION.
5. CONDUITS SHALL NOT BE PLACED IN THE CONCRETE SLAB. CONDUITS SHALL BE PLACED IN THE
SELECT FILL MATERIAL BENEATH THE VAPOR BARRIER. ALL PENETRATIONS OF THE VAPOR
RETARDER SHALL BE SEALED IN STRICT ACCORDANCE WITH THE MANUFACTURER’S
RECOMMENDATIONS AND REQUIREMENTS.
6. FOUNDATION WALL BACKFILL SHALL NOT BE UNBALANCED BY MORE THAN TWO (2) FEET ON
EITHER SIDE AT ANY TIME. BASEMENT WALL AND RESTRAINED RETAINING WALL BACKFILL SHALL
NOT BE PLACED UNLESS THE WALL IS ADEQUATELY BRACED. RETAINING WALL AND BASEMENT
WALL BACKFILL SHALL BE FREE DRAINING GRANULAR BACKFILL ACCEPTABLE TO THE
GEOTECHNICAL ENGINEER.
7. CONTRACTOR SHALL HAND TAMP BOTTOM OF EXCAVATIONS TO A HARD SURFACE BEFORE
PLACING REINFORCING STEEL.
8. FOUNDATION CONTRACTOR TO ENSURE PROPER ANCHOR ROD PROJECTION AND THAT ANCHOR
RODS ARE HELD SECURELY IN POSITION PRIOR TO CONCRETE PLACEMENT. STRUCTURAL STEEL
COLUMN ANCHOR RODS SHALL BE SET WITH A TEMPLATE.
9. SOIL BEARING TESTS SHALL BE PERFORMED BY A GEOTECHNICAL ENGINEER PRIOR TO
INSTALLING FOOTINGS TO ENSURE DESIGN ALLOWABLE BEARING VALUES ARE MET. IF ACTUAL
SITE CONDITIONS DO NOT SATISFY THESE REQUIREMENTS, COORDINATE ADJUSTMENTS WITH
ARCHITECT/ENGINEER/GEOTECHNICAL ENGINEER.
10. ALL FOOTINGS SHALL BE CONSOLIDATED WITH A CONCRETE VIBRATOR AS PER THE
REQUIREMENTS OF ACI 318 AND ACI 308R, LATEST EDITION.
11. FOOTINGS SHALL BE POURED IMMEDIATELY UPON COMPLETION OF EXCAVATION AND CLEANING
OF FOOTING BEARING SURFACE. ALL SPOILS FROM THE FOOTING EXCAVATIONS SHALL BE
REMOVED FROM THE BUILDING PAD.
12. PROVIDE PIER SLEDS TO MAINTAIN 3” MINIMUM CLEAR COVER ON FOOTING SHAFT REINFORCING, PIER SLEDS SHALL BE STAGGERED ALONG THE VERTICAL REINFORCING. DO NOT PLACE SLEDS AT
THE SAME LOCATION.
CONCRETE
1. ALL CONCRETE REINFORCING BARS SHALL CONFORM TO ASTM A615, GRADE 60, EXCEPT WHERE NOTED. NO. 3 BARS SHALL CONFORM TO ASTM A615, GRADE 40. DEFORMED BAR ANCHORS SHALL
CONFORM TO ASTM A496, GR 70.
2. ALL WELDED WIRE FABRIC SHALL BE SMOOTH WIRE FABRIC CONFORMING TO ASTM A185, AND
SHALL BE FURNISHED IN FLAT SHEETS ONLY. ROLLED WIRE FABRIC WILL BE REJECTED.
• CONCRETE IN THE FOLLOWING AREAS SHALL HAVE SAND AND CRUSHED
CARBONATE AGGREGATE CONFORMING TO ASTM C33, TYPE 1 PORTLAND
CEMENT, FLYASH CONFORMING TO ASTM C618, CLASS ‘C’ UP TO 20 PERCENT
REPLACEMENT BY VOLUME AND THE FOLLOWING DESIGNATED COMPRESSIVE
STRENGTH (f’c) IN 28 DAYS:
• SPREAD FOOTINGS --------- 4500 PSI (w/c = 0.45 MAX)
• SLABS ON GRADE ------------ 4500 PSI (w/c = 0.45 MAX)
• ALL OTHER CONCRETE ---- 4500 PSI (w/c = 0.45 MAX)
• CONCRETE SUPPLIER SHALL BE AWARE OF CEMENTS THAT CAN CAUSE
ETTRINGITE FORMATION IN THE CEMENT PASTE AND BE PREPARED TO SHOW
THAT THE CEMENTS USED WILL NOT CAUSE THIS PROBLEM.
4. CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE AS FOLLOWS; SEE SEC. 7.7 ACI 318, LATEST EDITION FOR CONDITIONS NOT NOTED, PROVIDE CHAIR SUPPORTS (AZTEC CASTLE CHAIR, WHC SERIES ‘B’ OR EQUAL) TO ADEQUATELY SUPPORT BARS FOR PROPER CLEARANCE AS
RECOMMENDED BY THE AMERICAN CONCRETE INSTITUTE AND THE CONCRETE REINFORCING
STEEL INSTITUTE. SLAB ON GRADE REINFORCEMENT SHALL BE SUPPORTED AT 45-INCH MAXIMUM
INTERVALS OR EVERY THIRD BAR.
• FOOTINGS ---- 3 IN.
• GRADE BEAMS ---- 3 IN. BOT., 2 IN. SIDE (3” EARTH FORMED), 2 IN. TOP
• SLAB ON GRADE ---- 1 IN. TOP
5. DETAILING OF CONCRETE REINFORCEMENT AND ACCESSORIES SHALL BE IN ACCORDANCE WITH
ACI PUBLICATION 315, LATEST EDITION. ALL HOOKED BARS SHOWN IN DETAILS SHALL HAVE
STANDARD HOOKS UNLESS NOTED OTHERWISE.
6. ALL MIXING, TRANSPORTING, PLACING AND CURING OF CONCRETE SHALL BE DONE IN
ACCORDANCE WITH THE RECOMMENDATIONS OF THE AMERICAN CONCRETE INSTITUTE, ACI 301,
LATEST EDITION.
7. NO HORIZONTAL JOINTS WILL BE PERMITTED IN CONCRETE EXCEPT WHERE THEY NORMALLY
OCCUR OR WHERE NOTED. VERTICAL JOINTS SHALL OCCUR AT CENTER SPANS OR AT LOCATIONS
APPROVED BY THE STRUCTURAL ENGINEER.
8. REINFORCING BARS SHALL NOT BE WELDED WITHOUT APPROVAL OF THE STRUCTURAL ENGINEER.
9. UNLESS NOTED OTHERWISE CONTINUOUS BOTTOM REINFORCING BARS SHALL BE SPLICED AT
SUPPORTS AND CONTINUOUS TOP REINFORCING BARS SHALL BE SPLICED AT MID-SPAN.
10. ALL CONTINUOUS REINFORCEMENT SHALL HAVE CLASS B LAP AT SPLICES. PROVIDE 1-#6 X 6’-0”
TOP AND BOTTOM (TWO 36” LEGS WITH 90 DEGREE BEND) AT EACH FACE OF GRADE BEAMS AT
CORNERS AND INTERSECTIONS, AND AT 18” ON CENTER VERTICALLY AT WALLS.
11. CONDUITS ARE NOT ALLOWED IN SLABS, BEAMS, WALLS OR COLUMNS. ALL CONDUITS SHALL BE
SUSPENDED FROM OR ATTACHED TO THE CONCRETE STRUCTURE.
12. ALL BASE PLATES AND ANCHOR RODS SHALL BE PROTECTED WITH 3” (MIN.) OF CONCRETE.
ANCHOR RODS SHALL BE FABRICATED FROM FULL BODIED STEEL RODS CONFORMING TO ASTM
F1554 GR.36, WASHERS CONFORMING TO ASTM F884 AND NUTS CONFORMING TO ASTM A194 OR
A563 AND HAVING THE SAME DIAMETER AS THE BOLT DIAMETER AND USING CUT THREADS.
ROLLED THREADS ARE NOT ACCEPTABLE. BOLTS SHALL BE SET USING RIGID TEMPLATES.
13. PROVIDE (1) - #5 X 4’-0” AT RE-ENTRANT CORNERS AND AROUND RECTANGULAR HOLES IN SLABS
UNLESS NOTED OTHERWISE. PLACE BAR DIAGONAL TO CORNER WITH 1” CLEARANCE FROM TOP
AND THE SIDE OF THE SLAB AT THE CORNER.
14. WHERE FRESH CONCRETE IS DEPOSITED AGAINST HARDENED CONCRETE (GREATER THAN 8
HOURS OLD), CLEAN EXISTING SURFACE OF LAITANCE AND FOREIGN MATERIAL AND DAMPEN THE
EXISTING SURFACE. IF REQUIRED, ROUGHEN EXISTING CONCRETE TO ¼” AMPLITUDE.
15. SAW CUT JOINTS OR KEYED CONSTRUCTION JOINTS IN SLABS ON GRADE SHALL BE SPACED TO DIVIDE THE SLAB INTO PANELS NOT TO EXCEED 225 SQUARE FEET. THE LONGER DIMENSION OF EACH PANEL SHALL NOT EXCEED THE SHORTER DIMENSION BY MORE THAN 20%. JOINTS SHALL BE
LOCATED AT COLUMN CENTERLINES WHERE POSSIBLE. CONTRACTOR SHALL SUBMIT JOINT
PRE-ENGINEERED METAL BUILDINGS
1. ALL STRUCTURAL STEEL USED FOR PRE-ENGINEERED BUILDING COMPONENTS SHALL BE
DESIGNED, FABRICATED, AND ERECTED IN CONFORMANCE WITH THE LATEST STANDARDS OF THE AISC. THE DESIGN AND FABRICATION OF LIGHT GAGE STEEL MEMBERS SHALL COMPLY WITH THE
AISI, LATEST EDITION.
2. THE DESIGN FOR ALL PRE-ENGINEERED BUILDING MEMBERS AND COMPONENTS (INCLUDING
ANCHOR BOLT SIZES, LENGTHS AND EMBEDMENT) SHALL BE THE RESPONSIBILITY OF THE PRE-
ENGINEERED BUILDING MANUFACTURER. THE DESIGN SHALL BE CARRIED OUT UNDER THE
DIRECTION OF A PROFESSIONAL ENGINEER REGISTERED IN THE STATE WHERE THE PROJECT IS
LOCATED.
3. SHOP DRAWINGS SHALL BE PREPARED FOR ALL STRUCTURAL ITEMS AND SUBMITTED FOR REVIEW.
CONTRACT DRAWINGS SHALL NOT BE REPRODUCED AND USED AS SHOP DRAWINGS. ANY ITEMS
DEVIATING FROM THE CONTRACT DRAWINGS OR FROM PREVIOUSLY SUBMITTED SHOP DRAWINGS
SHALL BE SO NOTED. SHOP DRAWINGS SHALL BE SEALED AND SIGNED BY A PROFESSIONAL
ENGINEERED REGISTERED IN THE STATE WHERE PROJECT IS LOCATED.
4. THE SCOPE OF WORK INCLUDES THE FOLLOWING AT A MINIMUM:
A. PROVIDING SHOP DRAWINGS FOR METAL BUILDING WHICH MATCHES
ARCHITECTURAL AND STRUCTURAL DIMENSIONS.
B. PROVIDING ALL PRE-ENGINEERED METAL BUILDING FRAMES AND COMPONENTS,
FASTENERS, SHEETING, ETC.
C. TRANSPORTING AND ERECTING NEW FRAMES AND COMPONENTS ON SITE.
D. PROVIDING NEW GIRTS AS REQUIRED AND AS SHOWN ON THE CONTRACT
DOCUMENTS TO ENCLOSE THE BUILDING.
E. PROVIDE METAL PANEL CLADDING AS SHOWN ON ARCHITECTURAL DRAWINGS.
F. PUNCH-OUT/CLOSE-OUT AS REQUIRED BY THE OWNER/CONTRACTOR.
5. THE DESIGN OF ALL PRE-ENGINEERED COMPONENTS SHALL BE BASED ON THE LOADS INDICATED
IN THE "DESIGN LOADS" SECTION OF THE STRUCTURAL NOTES. DEFLECTIONS OF THE PRE-
ENGINEERED BUILDING STRUCTURE UNDER LOADING SHALL NOT EXCEED THE FOLLOWING:
A. RIGID FRAMES AND COLUMNS -
a. DRIFT H/300 LATERAL (BRITTLE FINISHES)
b. VERTICAL L/180 (LIVE LOAD)
c. VERTICAL L/360 (LIVE LOAD, BRITTLE CEILING FINISHES)
B. WALL GIRTS AND EAVE STRUTS
C. L/180 LATERAL
6. BASES OF COLUMNS SHALL BE DESIGNED AS PINNED SUPPORTS.
7. X-BRACING SHALL BE ROD BRACING WITH TURNBUCKLES ----NOT CABLE.
8. ALL BUILDING COMPONENTS SHALL BE COMPATIBLE WITH THE CONTRACT DOCUMENTS. ANY
REQUESTS FOR MODIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT DURING THE BIDDING
PROCESS.
9. FIELD WELDED CONNECTIONS FOR LIGHT GAUGE MEMBERS SHALL NOT BE PERMITTED WITHOUT
SPECIFIC WRITTEN APPROVAL OF THE ARCHITECT.
10. LATERAL STABILITY OF THE BUILDING FRAME SHALL BE PROVIDED IN THE STRUCTURAL FRAMING.
WALLS AND OTHER BUILDING COMPONENTS SHALL NOT BE USED TO RESIST LATERAL LOADS
UNLESS NOTED OTHERWISE.
11. THE METAL BUILDING ENGINEER IS TO PROVIDE TO THE OWNER, A STATE BOARD OF INSURANCE
FORM WPI-2, IF REQUIRED FOR THE PROJECT/LOCATION.
12. THE METAL BUILDING ENGINEER IS TO PROVIDE SPECIAL INSPECTION WORK AND THE FINAL
LETTER OF COMPLIANCE FOR THEIR PORTION OF THE WORK IN COMPLIANCE WITH THE
INTERNATIONAL BUILDING CODE SECTION 1704.3.
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
F
SHEET TITLE
ARCHITECT
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
STRUCTURAL / CIVIL ENGINEER
H2B, INC. (AZ FIRM #18690)
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH. / ELEC. / PLUMB. / TECH. ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 W. 161ST STREET
OLATHE, KS 66062
(913) 829-8650
COMMISSIONING
GLHN ARCHITECTS & ENGINEERS, INC.
2939 E. BROADWAY BLVD
TUCSON, AZ 85716
(520) 881-4546
165-
R1 - CONSTRUCT REPLACEMENT WAREHOUSESTRUCTURAL GENERAL NOTES
01/06/2020 ED TBH
500 AZ-89, Prescott, AZ 86301
SA-001
649-414BID DOCUMENTS
STRUC ABREVIATIONS
+/- PLUS OR MINUS
A.R. ANCHOR ROD
ADDNL ADDITIONAL
ADJ ADJACENT
AESS ARCHITECTURALLY EXPOSED STRUC STL
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ARCH ARCHITECT OR ARCHITECTURAL
B/ BOTTOM OF
B/W BETWEEN
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
CF COLD FORMED
CHKD CHECKED
CIP CAST IN PLACE
CJ CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS
CTR CENTER
db DIA OF REINF BAR, DIA OF BOLT
DBA DEFORMED BAR ANCHOR
DBL DOUBLE
DIA DIAMETER
DIAG DIAGONAL
DIR DIRECTION
DWL DOWEL
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ENGR ENGINEER
EOD EDGE OF DECK
EOS EDGE OF SLAB
EQ EQUAL
EQP EQUIPMENT
EW EACH WAY
EXIST EXISTING
EXT EXTERIOR
F.V. FIELD VERIFY
FLG FLANGE
FLR FLOOR
FND FOUNDATION
FS FAR SIDE
FTG FOOTING
G.C. GENERAL CONTRACTOR
GA GAGE
GALV GALVANIZED
GB GRADE BEAM
HORIZ HORIZONTAL
HSA HEADED STUD ANCHOR
HSS HOLLOW STRUCTURAL SECTION
IF INSIDE FACE
INT INTERIOR
JST JOIST
k KIPS (1000 LBS)
LCE COMPRESSION EMBEDMENT LENGTH
LCS COMPRESSION LAP SPLICE LENGTH
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LTE TENSION EMBEDMENT LENGTH
LTS TENSION LAP SPLICE LENGTH
LW LIGHTWEIGHT
MAS MASONRY
MATL MATERIAL
MNFR MANUFACTURER
MTL METAL
NIC NOT IN CONTRACT
NS NEAR SIDE
NS NON-SHRINK
NTS NOT TO SCALE
O.F. OUTSIDE FACE
OC ON CENTER
OPP OPPOSITE
OVS OVERSIZED
P/C PRECAST
PAF POWDER ACTUATED FASTENER
PEN PENETRATION
PL PLATE
PLF POUNDS PER LINEAL FOOT
PMB PRE-ENGINEERED METAL BUILDING
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
R.F. RIGID FRAME
RC REINFORCED CONCRETE
RE: OR REF REFER TO
REINF REINFORCING
REQD REQUIRED
SC SLIP CRITICAL
SDS SELF DRILLING SCREW
SIM SIMILAR
SLV SHORT LEG VERTICAL
SOG SLAB ON GRADE
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STIR STIRRUPS
STL STEEL
SW SHEAR WALL
SYM SYMMETRIC
T&B TOP AND BOTTOM
T/ TOP OF
TOS TOP OF STEEL
TRANS TRANSVERSE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
W/ WITH
W/O WITHOUT
WF WIDE FLANGE
WP WORK POINT
WWF WELDED WIRE FABRIC
26 OF 94Revision # Date 92
STRUCTURAL TESTING AND INSPECTIONS
SPECIAL INSPECTIONS
SPECIAL INSPECTION WORK AND THE FINAL LETTER OF COMPLIANCE HAVE NOT BEEN
INCLUDED IN THE STRUCTURAL ENGINEER OF RECORD’S SCOPE OF SERVICES. PER IBC
CHAPTER 17, THE OWNER IS RESPONSIBLE FOR OBTAINING THE SERVICES OF THE SPECIAL
INSPECTOR AND THE TESTING LABORATORY. SPECIAL INSPECTIONS CAN BE PROVIDED BY AN
INDEPENDENT SPECIAL INSPECTOR APPROVED BY THE BUILDING AUTHORITY OR BY THE
ENGINEER OF RECORD. THE SPECIAL INSPECTION WORK DOES NOT INCLUDE THE TESTING
LABORATORY SERVICES AS CALLED FOR ON THE DRAWINGS. ARRANGEMENTS FOR SPECIAL
INSPECTIONS SHOULD BE MADE PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. THE
CONTRACTOR IS RESPONSIBLE FOR NOTIFYING THE OWNER IF SPECIAL INSPECTIONS ARE
REQUIRED ON THE APPROVED PERMIT DRAWINGS AND FOR NOTIFYING THE TESTING
LABORATORY AND SPECIAL INSPECTOR IN A TIMELY MANNER PRIOR TO PROCEEDING WITH
CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK
REQUIRING INSPECTIONS WITHOUT THE TESTING LABORATORY’S OR SPECIAL INSPECTOR’S
PRESENCE. THE STRUCTURAL ENGINEER WILL NOT PROVIDE A FINAL LETTER OF COMPLIANCE
AFTER THE WORK IS COMPLETE UNLESS HE HAS PERFORMED THE SPECIAL INSPECTIONS.
STRUCTURAL STATEMENT OF SPECIAL INSPECTIONS
INCLUDED HERE ARE SPECIAL INSPECTIONS REQUIRED FOR STRUCTURAL ELEMENTS.
REFERENCE STATEMENT OF SPECIAL INSPECTIONS BY ARCHITECT AND OTHER CONSULTANTS
FOR SPECIAL INSPECTION DETAILS OF NON-STRUCTURAL ITEMS REQUIRED BY IBC.
PER IBC 1704.2.4, THE STRUCTURAL SPECIAL INSPECTOR SHALL KEEP RECORDS OF ALL
STRUCTURAL INSPECTIONS AND SHALL FURNISH INSPECTION REPORTS TO THE OWNER AND
THE STRUCTURAL REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE (SRDP).
DISCOVERED DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR
FOR CORRECTION. IF SUCH DISCREPANCIES ARE NOT CORRECTED, THE DISCREPANCIES SHALL
BE BROUGHT TO THE ATTENTION OF THE OWNER AND THE SRDP. THE SPECIAL INSPECTION
PROGRAM DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES.
A FINAL REPORT OF SPECIAL INSPECTION DOCUMENTING COMPLETION OF ALL SPECIAL
INSPECTIONS, TESTING AND CORRECTION OF ANY DISCREPANCIES NOTED IN THE INSPECTIONS
SHALL BE SUBMITTED TO THE OWNER AND THE SRDP PRIOR TO THE ISSUANCE OF A
CERTIFICATE OF OCCUPANCY AND USE.
CONTRACTOR RESPONSIBILITY
PER IBC 1704.4, EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF A MAIN WIND-
OR SEISMIC FORCE-RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM OR A WIND- OR
SEISMIC-RESISTING COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS SHALL
SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE
OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. THE
CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL CONTAIN ACKNOWLEDGEMENT OF
AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL
INSPECTIONS.
STRUCTURAL SCHEDULE OF SPECIAL INSPECTIONS
QUALIFICATIONS OF INSPECTORS AND TESTING TECHNICIANS
THE QUALIFICATIONS OF ALL PERSONNEL PERFORMING SPECIAL INSPECTION AND TESTING
ACTIVITIES ARE SUBJECT TO THE APPROVAL OF THE OWNER. THE CREDENTIALS OF ALL
INSPECTORS AND TESTING TECHNICIANS SHALL BE PROVIDED TO THE SPECIAL INSPECTOR
FOR THEIR RECORDS.
KEY FOR MINIMUM QUALIFICATION OF INSPECTION AGENTS
WHEN THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE OR SPECIAL
INSPECTOR OF RECORD DEEMS APPROPRIATE THAT THE INDIVIDUAL PERFORMING THE
STIPULATED TEST OR INSPECTION HAVE A SPECIFIC CERTIFICATION, LICENSE OR EXPERIENCE
AS INDICATED BELOW. SUCH REQUIREMENT SHALL BE LISTED BELOW AND SHALL BE CLEARLY
IDENTIFIED WITHIN THE SCHEDULE UNDER THE AGENT QUALIFICATION DESIGNATION.
• PE/SE STRUCTURAL ENGINEER – A LICENSED SE OR PE SPECIALIZING IN THE DESIGN OF
BUILDING STRUCTURES
• PE/GE GEOTECHNICAL ENGINEER – A LICENSED PE SPECIALIZING IN SOIL MECHANICS
AND FOUNDATIONS
• EIT ENGINEER IN TRAINING – A GRADUATE ENGINEER WHO HAS PASSED THE
FUNDAMENTALS OF ENGINEERING EXAM
• ETT EXPERIENCED TESTING TECHNICIAN – AN EXPERIENCED TESTING TECHNICIAN WITH A
MINIMUM OF 5 YEARS EXPERIENCE WITH THE STIPULATED TEST OR INSPECTION
1. AMERICAN CONCRETE INSTITUTE (ACI) CERTIFICATION
• ACI-CFTT CONCRETE FIELD TESTING TECHNICIAN – GRADE 1
• ACI-CCI CONCRETE CONSTRUCTION INSPECTOR
• ACI-LTT LABORATORY TESTING TECHNICIAN – GRADE 1&2
ACI-STT STRENGTH TESTING TECHNICIAN
AMERICAN WELDING SOCIETY (AWS) CERTIFICATION
• AWS-CWI CERTIFIED WELDING INSPECTOR
• AWS/AISC-SSICERTIFIED STRUCTURAL STEEL INSPECTOR
PERIODIC, CONTINUOUS, OBSERVE, PERFORM, AND DOCUMENT ARE DEFINED AS IN THE SPECIFIC
REFERENCE STANDARD.
CONCRETE TESTING
1. PER IBC 1705.3, SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION SHALL BE
PERFORMED.
2. CONCRETE MIX DESIGNS SHALL BE SUBMITTED FOR REVIEW INDICATING CONFORMANCE WITH
ACI 318, LATEST EDITION.
3. SLUMP TESTS, CONFORMING TO ASTM C143, SHALL BE TAKEN AT THE POINT OF DISCHARGE AT
THE SAME RATE AS NOTED BELOW IN NOTE NUMBER 5.
4. AIR CONTENT TESTS CONFORMING TO ASTM C173, VOLUMETRIC METHOD FOR LIGHTWEIGHT
OR NORMAL WEIGHT CONCRETE; ASTM C231 PRESSURE METHOD FOR NORMAL WEIGHT
CONCRETE; SHALL BE TAKEN FOR EACH DAY’S POUR OF EACH TYPE OF AIR-ENTRAINED
CONCRETE.
5. CONCRETE TEMPERATURE SHALL BE TESTED HOURLY WHEN AIR TEMPERATURE IS 40 DEG F (4
DEG C) AND BELOW, WHEN 80 DEG F (27 DEG C) AND ABOVE, AND EACH TIME A SET OF
COMPRESSION TEST SPECIMENS IS MADE.
6. ONE SET OF FOUR COMPRESSION TEST SPECIMENS CONFORMING TO ASTM C31 SHALL BE
MOLDED AND STORED FOR LABORATORY-CURED SPECIMENS. COMPRESSIVE STRENGTH TESTS
SHALL CONFORM TO ASTM C39 AND SHALL CONSIST OF ONE SET FOR EACH DAY’S POUR
EXCEEDING 5 CU. YDS. PLUS ADDITIONAL SETS FOR EACH 50 CU. YDS. MORE THAN THE FIRST 25
CU. YDS OF EACH CONCRETE CLASS PLACED IN ANY ONE DAY. ONE SPECIMEN SHALL BE
TESTED AT 7 DAYS, TWO SPECIMENS SHALL BE TESTED AT 28 DAYS, AND ONE SPECIMEN SHALL
BE RETAINED FOR LATER TESTING AS REQUIRED.
7. IN THE ABSENCE OF SUFFICIENT DATA OR DOCUMENTATION PROVIDING EVIDENCE OF
CONFORMANCE TO QUALITY STANDARDS FOR MATERIALS IN THE LATEST EDITION OF ACI 318,
THE BUILDING OFFICIAL SHALL REQUIRE TESTING OF MATERIALS IN ACCORDANCE WITH THE
APPROPRIATE STANDARDS AND CRITERIA FOR THE MATERIAL IN THE LATEST EDITION OF ACI
318.
8. VERIFY CONCRETE IS BEING CONSOLIDATED IN ACCORDANCE WITH THE RECOMMENDATIONS
OF ACI 318 AND ACI 309R, LATEST EDITION.
9. VERIFY THAT POST INSTALLED ANCHORS ARE AS SPECIFIED AND THAT ANCHORS ARE
INSTALLED PER THE MANUFACTURER’S RECOMMENDATIONS AND REQUIREMENTS.
10. PER IBC 1705.5.4, REPORTS OF PRECONSTRUCTION TESTS FOR SHOTCRETE IN ACCORDANCE WITH IBC SECTION 1908.5, SHALL BE SUBMITTED BY THE OWNER OR THE OWNER'S AUTHORIZED
AGENT TO THE BUILDING OFFICIAL.
11. SPECIAL INSPECTIONS AND TESTS SHALL NOT BE REQUIRED FOR:
A. ISOLATED SPREAD CONCRETE FOOTINGS OF BUILDINGS THREE STORIES OR LESS ABOVE
GRADE PLANE AND THAT ARE FULLY SUPPORTED ON EARTH OR ROCK.
B. CONTINUOUS CONCRETE FOOTINGS SUPPORTING WALLS OF BUILDINGS THREES STORIES
OR LESS ABOVE GRADE PLANE THAT ARE FULLY SUPPORTED ON EARTH OR ROCK WHERE:
a. THE FOOTINGS SUPPORT WALLS OF LIGHT-FRAME CONSTRUCTION
b. THE FOOTINGS ARE DESIGNED IN ACCORDANCE WITH IBC TABLE 1809.7.
c. THE STRUCTURAL DESIGN OF THE FOOTING IS BASED ON THE SPECIFIED COMPRESSING STRENGTH f'c, NOT MORE THAN 2,500 POUNDS PER SQUARE INCH (PSI), REGARDLESS OF
THE COMPRESSIVE STRENGTH SPECIFIED IN THE APPROVED CONSTRUCTION
DOCUMENTS OR USED IN THE FOOTING CONSTRUCTION.
C. NONSTRUCTURAL CONCRETE SLABS SUPPORTED DIRECTLY ON THE GROUND, INCLUDING
PRESTRESSED SLABS ON GRADE, WHERE THE EFFECTIVE PRESTRESS IN THE CONCRETE IS
LESS THAN 150 PSI.
D. CONCRETE FOUNDATION WALLS CONSTRUCTED IN ACCORDANCE WITH IBC TABLE
1807.1.6.2.
E. CONCRETE PATIOS, DRIVEWAYS, AND SIDEWALKS, ON GRADE.
SOIL SPECIAL INSPECTIONS
1. PER IBC 1705.6, SPECIAL INSPECTIONS AND TESTS OF EXISTING SITE SOIL CONDITIONS, FILL
PLACEMENT, AND LOAD-BEARING REQUIREMENTS SHALL BE PERFORMED.
2. DURING FILL PLACEMENT, VERIFY THAT PROPER MATERIALS AND PROCEDURES ARE USED IN
ACCORDANCE WITH THE PROVISIONS OF THE APPROVED GEOTECHNICAL REPORT.
3. WHERE IBC SECTION 1803 DOES NOT REQUIRE REPORTING OF MATERIALS AND PROCEDURES
FOR FILL PLACEMENT, VERIFY THAT THE IN-PLACE DRY DENSITY OF THE COMPACTED FILL IS
NOT LESS THAN 90 PERCENT OF THE MAXIMUM DRY DENSITY AT OPTIMUM MOISTURE CONTENT
DETERMINED IN ACCORDANCE WITH ASTM D1557.
EARTHWORK TESTING
1. DURING EARTHWORK OPERATIONS KEEP A COMPETENT TRAINED TECHNICIAN ASSIGNED TO
THE PROJECT. SERVICES PROVIDED SHALL INCLUDE:
a. OBSERVE STRIPPING OPERATIONS AND EVALUATE THE REQUIRED STRIPPING DEPTH
DURING THESE OPERATIONS.
b. OBSERVE PROOFROLLING OPERATIONS AFTER SITE STRIPPING. DETERMINE IF ANY
SOFT SPOTS NEED TO BE UNDERCUT TO FIRM SOILS, REPLACED WITH SELECT FILL
AND RECOMPACTED.
c. VERIFY THAT THE SUBGRADE SHALL THEN BE SCARIFIED AND MOISTURE
CONDITIONED TO AN EIGHT (8) INCH DEPTH AND THEN RECOMPACTED TO BETWEEN
95 AND 100 PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE
STANDARD PROCTOR DENSITY TEST (ASTM D698). THE MOISTURE CONTENT SHALL
BE BETWEEN OPTIMUM AND +3 PERCENT OF THE OPTIMUM MOISTURE CONTENT.
PROVIDE A MINIMUM OF FOUR (4) FIELD DENSITY TESTS ON THE SUBGRADE OR ONE
(1) FOR EVERY 2,500 SQUARE FEET WHICHEVER IS GREATER.
d. STRUCTURAL SELECT FILL PAD MATERIAL SHALL BE TESTED FOR ACCEPTABILITY
AND A MOISTURE DENSITY CURVE SHALL BE ESTABLISHED. SELECT FILL MATERIAL
SHALL BE AN INORGANIC SANDY CLAY WITH LIQUID LIMIT OF 26 AND PLASTICITY
INDEX BETWEEN 10 AND 20.
e. SELECT FILL SHALL BE PLACED IN SIX (6) INCH LOOSE LIFTS AND COMPACTED TO
BETWEEN 95 AND 100 PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY
THE STANDARD PROCTOR DENSITY TEXT (ASTM D698). THE MOISTURE CONTENT
SHALL BE BETWEEN OPTIMUM AND +3 PERCENT OF THE OPTIMUM MOISTURE
CONTENT FOR SELECT FILL. VERIFY THAT SELECT FILL MATERIAL EXTENDS TO 5’-0”
BEYOND THE BUILDING PERIMETER.
f. SELECT FILL MATERIAL SHALL BE TESTED DURING PLACEMENT OF EACH LIFT FOR
THE ATTERBERG LIMITS IN ACCORDANCE WITH ASTM D4318-98 METHOD B “STANDARD
TEST METHOD FOR LIQUID LIMIT, PLASTIC LIMIT AND PLASTICITY INDEX OF SOILS” TO
VERIFY THAT THE SELECT FILL MATERIAL IS IN ACCORDANCE WITH THE ORIGINALLY
APPROVED SELECT FILL MATERIAL. PROVIDE A MINIMUM OF ONE (1) TEST PER LIFT
OR ONE (1) FOR EVERY 2,500 SQUARE FEET WHICHEVER IS GREATER WITH A
MAXIMUM OF TEN (10) PER LIFT.
g. OBSERVE THE EXCAVATION DAILY AND ENSURE THAT THE CONTRACTOR MAINTAINS
A CLEAN EXCAVATION THAT IS FREE OF WATER 100% OF THE TIME. CONTRACTOR
SHALL PROVIDE PUMPS AS REQUIRED TO REMOVE ANY WATER AT ALL TIMES.
h. OBSERVE GRADING OPERATIONS TO ENSURE THAT PROPER DRAINAGE AWAY FROM
THE BUILDING PAD IS PROVIDED.
SCHEDULE OF SPECIAL INSPECTIONS
VERIFICATION / INSPECTION SOIL / FOUNDATION INSPECTION
IBC SECTION 1705.6, TABLE 1705.6
EXTENT
CONTINUOUS,
PERIODIC
COMMENTS
AGENT
PE/GE, EIT,
OR ETT
VERIFY MATERIALS BELOW SHALLOW
FOUNDATIONS ARE ADEQUATE TO
ACHIEVE THE DESIGN BEARING
CAPACITY.
PERIODIC
PERIODIC
PERIODIC
CONTINUOUS
PERIODIC
ETT
ETT
ETT
ETT
ETT
IBC 1705.6,
TABLE 1705.6
IBC 1705.6,
TABLE 1705.6
IBC 1705.6,
TABLE 1705.6
IBC 1705.6,
TABLE 1705.6
IBC 1705.6,
TABLE 1705.6
VERIFY EXCAVATIONS ARE EXTENDED TO
PROPER DEPTH AND HAVE REACHED
PROPER MATERIAL.
PERFORM CLASSIFICATION AND TESTING
OF COMPACTED FILL MATERIALS.
PRIOR TO PLACEMENT OF COMPACTED
FILL, INSPECT SUBGRADE AND VERIFY
THAT SITE HAS BEEN PREPARED
PROPERLY.
VERIFY USE OF PROPER MATERIALS,
DENSITIES AND LIFT THICKNESS DURING
PLACEMENT AND COMPACTION OF
COMPACTED FILL.
THE APPROVED GEOTECHNICAL REPORT AND THE CONSTRUCTION DOCUMENTS PREPARED BY THE REGISTERED DESIGN
PROFESSIONALS SHALL BE USED TO DETERMINE COMPLIANCE.
SCHEDULE OF SPECIAL INSPECTIONS
VERIFICATION / INSPECTION CAST-IN-PLACE DEEP FOUNDATION INSPECTION
IBC SECTION 1705.7, TABLE 1705.7
EXTENT
CONTINUOUS,
PERIODIC
COMMENTS
AGENT
PE/GE, EIT,
OR ETT
INSPECT EXCAVATION OPERATIONS AND
MAINTAIN COMPLETE AND ACCURATE
RECORDS FOR EACH ELEMENT.
CONTINUOUS
CONTINUOUS
ETT
ETT
IBC 1705.8,
TABLE 1705.8
IBC 1705.8,
TABLE 1705.8
VERIFY PLACEMENT LOCATIONS AND
PLUMBNESS, CONFIRM ELEMENT
DIMENSIONS, LENGTHS, AND ADEQUATE
END-BEARING STRATA CAPACITY.
RECORD CONCRETE OR GROUT
VOLUMES.
FOR CONCRETE ELEMENTS PERFORM
TESTS AND ADDITIONAL SPECIAL
INSPECTIONS IN ACCORDANCE WITH
SECTION 1705.3.
- -IBC 1705.3
THE APPROVED GEOTECHNICAL REPORT AND THE CONSTRUCTION DOCUMENTS PREPARED BY THE REGISTERED DESIGN
PROFESSIONALS SHALL BE USED TO DETERMINE COMPLIANCE.
SPECIAL INSPECTION OF FABRICATED ITEMS
PER IBC 1704.2.5, WHERE FABRICATION OF STRUCTURAL, LOAD-BEARING OR LATERAL LOAD-
RESISTING MEMBERS OR ASSEMBLIES IS BEING CONDUCTED ON THE PREMISES OF A FABRICATOR'S
SHOP:
EITHER:
A. SPECIAL INSPECTIONS OF THE FABRICATED ITEMS SHALL BE PERFORMED DURING
FABRICATION AT THE FABRICATOR'S SHOP, OR;
B. THE FABRICATOR SHALL HAVE BEEN APPROVED TO PERFORM WORK WITHOUT SPECIAL
INSPECTIONS IN ACCORDANCE WITH IBC 1704.2.5.1. AT COMPLETION OF FABRICATION, THE
APPROVED FABRICATOR SHALL SUBMIT A CERTIFICATE OF COMPLIANCE TO THE OWNER OR
THE OWNER'S AUTHORIZED AGENT FOR SUBMITTAL TO THE BUILDING OFFICIAL AS SPECIFIED
IN IBC SECTION 1704.5 STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH THE
APPROVED CONSTRUCTION DOCUMENTS.
REINFORCING STEEL INSTALLATION
1. DURING THE CAST-IN-PLACE CONCRETE STRUCTURAL MEMBER REINFORCING PLACEMENT
OPERATIONS KEEP A COMPETENT TRAINED TECHNICIAN ASSIGNED TO THE PROJECT. INSPECT
REINFORCING UTILIZING ACI 311.4R “GUIDE FOR CONCRETE INSPECTION” AS A GUIDE.
SERVICES PROVIDED SHALL INCLUDE:
a. VERIFY TYPE AND GRADE OF ALL REINFORCING STEEL.
b. VERIFY REBAR IS FREE OF OIL, DIRT, EXCESSIVE RUST AND FROM DAMAGE IN
SHIPMENT TO SITE.
c. VERIFY REINFORCING IS ADEQUATELY TIED, CHAIRED AND SUPPORTED TO PREVENT
DISPLACEMENT DURING CONCRETE PLACEMENT. VERIFY MINIMUM AND MAXIMUM
CLEAR DISTANCES BETWEEN BARS AND MINIMUM STRUCTURAL DISTANCE TO
OUTSIDE OF CONCRETE. VERIFY QUANTITY, SIZE AND LOCATION OF
REINFORCEMENT. VERIFY MINIMUM CONCRETE COVER IS MAINTAINED BETWEEN
REBAR AND SURFACE OF CONCRETE.
d. VERIFY SIZE AND PLACEMENT OF REBAR. VERIFY LAP LENGTHS, LOCATIONS AND
STAGGERS AND VERIFY BENDS FOR MINIMUM DIAMETER, SLOPE AND LENGTH.
VERIFY HOOKED BAR LENGTHS AND LOCATIONS.
SCHEDULE OF SPECIAL INSPECTIONS
VERIFICATION / INSPECTION CONCRETE INSPECTION
IBC SECTION 1705.6, TABLE 1705.6
EXTENT
CONTINUOUS,
PERIODIC
COMMENTS
AGENT
PE/GE, EIT,
OR ETT
INSPECTION OF REINFORCING STEEL,
INCLUDING PRESTRESSING TENDONS,
AND VERIFY PLACEMENT.
PERIODIC
PERIODIC
PERIODIC
CONTINUOUS
PERIODIC
ETT
AWS-CWI
ETT
ETT
ETT
ACI 318: 3.5, 7.1-7.7
IBC 1910.4
AWS D1.4
ACI 318: 3.5.2
ACI 318: 8.1.3, 21.1.8
IBC 1908.5,1909.1
ACI 318: 3.8.6, 8.1.3, 21.1.8
IBC 1909.1
ACI 318: Ch. 4, 5.2-5.4
IBC 1904.2, 1910.2, 1910.3
PERIODIC
CONTINUOUS
PERIODIC
CONTINUOUS
CONTINUOUS
PERIODIC
PERIODIC
ACI-CFTT
OR ACI-STT
ETT
ETT
ETT
ETT
ETT
ASTM C 172
ASTM C 31
ACI 318: 5.6, 5.8
IBC 1910.10
ACI 318: 5.9, 5.10
IBC 1910.6, 1910.7, 1910.8
ACI 318: 5.11-5.13
IBC 1910.9
ACI 318: 18.20
ACI 318: 18.18.4
ACI 318: 6.2
ACI 318: 6.1.1
INSPECTION OF REINFORCING STEEL
WELDING IN ACCORDANCE WITH TABLE
ON STEEL SPECIAL INSPECTIONS.
INSPECTION OF ANCHORS CAST IN
CONCRETE WHERE ALLOWABLE LOADS
HAVE BEEN INCREASED OR WHERE
STRENGTH DESIGN IS USED.
INSPECTION OF ANCHORS POST-
INSTALLED IN HARDENED CONCRETE
MEMBERS.
INSPECTION FOR MAINTENANCE OF
SPECIFIED CURING TEMPERATURE AND
TECHNIQUES.
INSPECT FORMWORK FOR SHAPE,
LOCATION AND DIMENSIONS OF THE
CONCRETE MEMBER BEING FORMED.
VERIFYING USE OF REQUIRED MIX
DESIGN.
AT THE TIME FRESH CONCRETE IS
SAMPLED TO FABRICATE SPECIMENS
FOR STRENGTH TESTS, PERFORM SLUMP
AND AIR CONTENT TESTS, AND
DETERMINE THE TEMPERATURE OF THE
CONCRETE.
INSPECTION OF CONCRETE AND
SHOTCRETE PLACEMENT FOR PROPER
APPLICATION TECHNIQUES.
INSPECTION OF PRESTRESSED
CONCRETE:
A. APPLICATION OF
PRESTRESSING FORCES
B. GROUTING OF BONDED
PRESTRESSING TENDONS IN
THE SEISMIC FORCE-
RESISTING SYSTEM.
VERIFICATION OF IN-SITU CONCRETE
STRENGTH, PRIOR TO STRESSING OF
TENDONS IN POST-TENSIONED
CONCRETE AND PRIOR TO REMOVAL OF
SHORES AND FORMS FROM BEAMS AND
STRUCTURAL SLABS.
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
F
SHEET TITLE
ARCHITECT
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
STRUCTURAL / CIVIL ENGINEER
H2B, INC. (AZ FIRM #18690)
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH. / ELEC. / PLUMB. / TECH. ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 W. 161ST STREET
OLATHE, KS 66062
(913) 829-8650
COMMISSIONING
GLHN ARCHITECTS & ENGINEERS, INC.
2939 E. BROADWAY BLVD
TUCSON, AZ 85716
(520) 881-4546
165-
R1 - CONSTRUCT REPLACEMENT WAREHOUSESPECIAL INSPECTIONS
01/06/2020 ED TBH
500 AZ-89, Prescott, AZ 86301
SA-010
649-414BID DOCUMENTS
27 OF 94Revision # Date 92
DEVELOPMENT AND LAP SPLICE SCHEDULE
#3
#4
#5
#6
#7
#8
#9
BAR
F'c = 3000 psi
EMBEDMENT
8 21
COMPR TENSION (LTE)
OTHER
LAP SPLICE
(LCS) TOP
COMPR TENSION (LTS)
OTHER
HOOK
(LDH)
16 12 28 21 6
22 15 37 28 8
27 19 46 36 10
33 23 56 43 12
48 26 81 62 13
55 30 93 71 15
80 62 34 105 80 17
F'c = 4000 psi
EMBEDMENT
(LCE) TOP
COMPR TENSION (LTE)
OTHER
LAP SPLICE
(LCS) TOP
COMPR TENSION (LTS)
OTHER
HOOK
(LDH)
18 14 12 24 18 6
25 19 15 32 25 7
31 24 19 40 31 8
37 28 23 48 37 10
54 42 26 70 54 12
62 47 30 80 62 13
70 54 34 91 70 15
(LCE)
#10 90 70 38 118 90 19 24 78 60 38 102 78 17
#11 100 77 42 131 100 22 27 87 67 42 113 87 1931
TOP
NOTES (GENERAL):
1. STAGGER ALL SPLICES 12 db MIN, BUT NOT LESS THAN 12"
2. ALL DIMENSIONS INDICATED IN TABLE ARE IN INCHES
3. BARS GREATER THAN #11 SHALL BE MECHANICALLY SPLICED
4. ALL SPLICES SHALL BE WIRED IN CONTACT STACKED
VERTICAL.
MULTIPLIERS:
ALL EMBEDMENT AND LAP SPLICE LENGTHS SHALL BE INCREASED
AS REQ'D BY THE MULTIPLIERS BELOW. APPLY MULTIPLE
MULTIPLIERS IF APPLICABLE.
1.3 -- IF CONC CONTAINS LIGHT WEIGHT AGGREGATES
1.3 -- IF EPOXY COATED REBAR USED
NOTES (PERTAINING TO TABLE):
1. TOP BARS ARE HORIZONTAL BARS THAT HAVE MORE THAN 12" OF
FRESH CONCRETE CAST BELOW THEM.
2. ALL BARS THAT ARE NOT "TOP BARS" ARE "OTHER" BARS
3. ABBREVIATIONS:
- LCE - COMPRESSION EMBEDMENT LENGTH
- LTE - TENSION EMBEDMENT LENGTH
- LCS - COMPRESSION LAP SPLICE LENGTH
- LTS - TENSION LAP SPLICE LENGTH
- LDH - HOOKED BAR TENSION EMBEDMENT LENGTH
ARRANGE PRIMARY SLAB BARS TO
PASS BY PENETRATIONS. DO NOT
TERMINATE SLAB BARS AT
PENETRATIONS
1#5X5'-0" T&B AT
ENDS AND IN
BETWEEN ALL
PENETRATIONS
1#5X5'-0" T&B EACH
SIDE
LARGER OF ADJACENT
PENETRATION DIAMETERS
D1 & D2 OR 6",
WHICHEVER IS GREATER ALIGN PENETRATIONS WHERE POSSIBLE
2" TYP2"
TY
P
NOTE:
DETAIL DOES NOT APPLY FOR PENETRATIONS LARGER THAN 12" IN DIAMETER. SEE TYP
SLAB OPENING DETAIL FOR SUCH PENETRATIONS.
TOP BARS
CL PIPE SLEEVE
COORDINATE LOCATION
& SIZE W/ MECH
2' - 0" 2' - 0"
SL
AB
, S
EE
P
LA
N
BOTTOM BARS
2-#6 ADDL. T & B
(4 TOTAL)
DOUBLE STIRRUP
(EACH SIDE OF SLEEVE)
TY
P
2" C
LR
OF
PIPE SLEEVE
(S
LA
B
TH
IC
KN
ES
S
RE
F.
T O
PL
AN
1/8" WIDE SAWCUT, PROVIDE FILLER
VAPOR BARRIER
SAW CUT JOINT
T/2 T/4
T
SLAB REINF SHALL BE
DISCONTINUOUS @ SAWCUT
LOCATIONS (MIN EVERY OTHER BAR)
3/4" CLEAR
SAWCUT NOTES:
1. SAWCUT SLAB BETWEEN 6-8 HOURS AFTER FINISH (2-4 HOURS FOR EARLY-ENTER DRY-CUT SAWS).
2. SAWCUT DEPTH SHALL BE 1/4 THE SLAB THICKNESS "T" BUT NOT LESS THAN 1" (WHICHEVER IS GREATER). SAWCUT DEPTH SHALL BE ONE (1) INCH MININUM FOR EARLY-ENTER DRY-CUT SAWS.
3. JOINTS SHALL BE PROTECTED FROM HARD-WHEELED EQUIPMENT TRAFFIC OR WILL BE REPLACED
AT THE CONTRACTOR'S EXPENSE.
4. PROVIDE CONSTRACTION JOINTS IN SLAB SUCH THAT NO DISTANCE BETWEEN JOINTS EXCEEDS 40
FEET AND NO AREA BOUNDED BY JOINTS EXCEED 1600 SQUARE FEET.
90.00°
90.00°
CONTROL OR
CONSTRUCTION
JOINT
4" MIN (TYP)
1/4" PREFORMED JOINT FILLER
AROUND COLUMN AND AT EDGE
OF BLOCKOUT. FILL JOINT
WITH SEALANT (TYP)
EDGE OF SLAB OR
FACE OF WALL
NOTE:
PROVIDE SONOTUBE BLOCKOUT WHEN
CONTROL / CONSTRUCTION JOINTS DO
NOT EXTEND FROM ALL CORNERS OF
BLOCKOUT
EDGE OF SLAB OR
FACE OF WALL
EDGE OF BLOCK
OUT
EDGE OF
BLOCKOUT
INTERIOR COL
EXTERIOR COL
CORNER COL
STIRRUP AND TIE HOOK
#3 #4 #5
BAR
SIZE
1 ½
2 ½
4 ½
5 ½
D= INSIDE DIAMETER OF BEND
6db FOR #3, #4, #5
12db FOR #6, #7, #8
DE
TA
ILI
NG
D
IM
EN
SI
ON D
A OR G
db
D
DE
TA
ILI
NG
D
IM
EN
SI
ON
A
OR
G
HO
OK
AND SMALLER
6db FOR #8 BARS D
D db
90° HOOK
135° HOOK
CORNER CONDITIONS-STIRRUP OR TIE
90° HOOK
90° HOOK
BEYOND
135° HOOK
90° HOOK
BEYOND
135° HOOK
135° HOOK
90° HOOK
135° HOOK
GROSS TIE
D
(INCHES)
90° HOOK
A OR G
(INCHES)
135° HOOK
A OR G
(INCHES)
4 ½
END HOOK DIMENSIONS
#3 #4 #5 #6 #7 #8 #9 #10 #11
BAR
SIZE
#14 #18
FINISHED
BEND
DIAMETER D,
(INCHES)
180 ° HOOKS
A OR G'
(INCHES)
A OR G'
(INCHES)J, (INCHES)
2 ¼
3 ¾ 4 ½ 5 ¼
9 ½
10 ¾
18 ¼
11 ¾ 13 ¼ 14 ¾ 21 ¾ 28 ½
90° HOOK
D= INSIDE DIAMETER OF BEND
db
D
A
OR
G db
DETAILING DIMENSION
90° HOOK
2 1/2"
4db OR
MINIMUM
D
DIMENSION
DETAILING
A OR G
HOOK
J db
180° HOOK
¾" CHAMFER, TYPICAL
BOTTOM REINFORCEMENT,
WHERE SCHEDULED
TOP REINFORCEMENT,
REFER TO SCHEDULE
1-#4 CONTINUOUS AT
PERIMETER WITH 1-#4X4'-0"
AT EXTERIOR CORNERS
AND 1-#4X4'-0" DIAGONAL AT
RE-ENTRANT CORNERS
REFER TO NOTE 1
2'-0"
2'- 0"
2" 4'-0
RE-ENTRANT
CORNERS
EXTERIOR
CORNERS
HOUSEKEEPING PAD REINFORCEMENT SCHEDULE
PAD THICKNESS TOP
REINFORCEMENT
BOTTOM
REINFORCEMENT
T-4" WWR 4x4-W2.9xW2.9 OR #3@12" EACH WAY NONE
4"< T< = 6" 6" < T < =8"
8" < T < = 12" 12" < T < = 16"
WWR 4x4-W4xW4 OR #4@18" EACH WAY WWR 4x4-W6xW6 OR #4@12" EACH WAY
#4@18" EACH WAY
#4@12" EACH WAY
NONE
NONE
#4@18" EACH WAY
#4@12" EACH WAY
NOTE:
1. REFER TO ARCHITECTURAL, STRUCTURAL, OR MEP DRAWING FOR HOUSEKEEPING PAD
PLAN DIMENSIONS AND THICKNESS (4" MINIMUM THICKNESS).
2. CONTRACTOR SHALL COORDINATE DIMENSIONS AND OTHER SPECIAL REQUIREMENT WITH
EQUIPMENT MANUFACTURERS AND PROVIDE WHERE REQUIRED WHETHER SHOWN ON
STRUCTURAL DRAWING OR NOT.
PD3 BASKET ASSEMBLY OR EQUAL;
3/8" PLATE @ 18" O.C. MIN. 8" LONG PLATE
(SLAB THICKNESS &
REINFORCEMENT
REF. TO PLAN)
TOOLED JOINT, 1/2" Ø
VAPOR BARRIER
CONSTRUCTION JOINT
TO
TA
L
AN
CH
OR
R
OD
LE
NG
TH
AN
CH
OR
R
OD
E
MB
ED
M
EN
T
1½
¾"
NOTES:
TOP OF
COLUMN
BASE PLATE
PLATE
WASHER
TOP OF
CONCRETE
MINIMUM
LENGTH AS
REQUIRED TO
ACCOMMODATE
GROUT, BASE
PLATE,
PLATE WASHER,
NUT,
AND THREAD
OVERRUN
1. ANCHOR BOLTS SHALL BE F1554 GRADE 36 WITH HEAVY HEX NUT.
DIAMETERS SPECIFIED BY THE METAL BUILDING SUPPLIER. EMBEDMENT
LENGTHS CORRESPONDING TO ANCHOR BOLT DIAMETERS
SHALL BE:
5/8" DIAMETER BOLT: MIN 8" EMBEDMENT
3/4" DIAMETER BOLT: MIN 12" EMBEDMENT
1" DIAMETER BOLT: MIN 16" EMBEDMENT
1-1/4" DIAMETER BOLT: MIN 20" EMBEDMENT
1-1/2" DIAMETER BOLT: MIN 24" EMBEDMENT
2. UNLESS NOTED OTHERWISE, ALL ANCHOR RODS NUTS SHALL BE
TIGHTENED TO A "SNUG TIGHT" CONDITION AS DEFINED BY AISC
AFTER THE CONCRETE IS AT LEAST 14 DAYS OLD.
3. THE HOLE IN THE PLATE WASHER SHALL BE 1/16" LARGER THAN
THE DIAMETER.
TACK WELD NUT TO ROD
HEAVY
HEX
NUT
HEAVY
HEX
NUT
AN
CH
OR
R
OD
E
MB
ED
M
EN
T
TOP OF
COLUMN
BASE PLATE
PLATE
WASHER
TOP OF
CONCRETE
HEAVY HEX NUT
NOTES:
1. ANCHOR BOLTS SHALL BE F1554 GRADE 36 WITH HEAVY HEX NUT.
EMBEDMENT LENGTHS CORRESPONDING TO ANCHOR BOLT DIAMETERS
SHALL BE:
3/4" DIAMETER BOLT: MIN 8" EMBEDMENT
1" DIAMETER BOLT: MIN 12" EMBEDMENT
2. ALL ANCHOR BOLTS SHALL BE INSTALLED WITH HILTI HY200
OR APPROVED EQUAL. INSTALL PER MANUFACTUERE'S
RECOMMENDATIONS.
3. THE HOLE IN THE PLATE WASHER SHALL BE 1/16" LARGER THAN
THE DIAMETER.
MINIMUM LENGTH AS
REQUIRED TO
ACCOMMODATE
GROUT, BASE PLATE,
PLATE WASHER, NUT,
AND THREAD
OVERRUN
1/
2"
TO
TA
L
AN
C H
O R
R O
D L
EN
G
TH
EXISTING
CONCRETE
ALL THREADED
ROD
ONLY USE POST INSTALLED
ANCHOR DETAIL AS REQUIRED
DE
PT
H
6 ¾
DR
AI
N
3'' C
L
WIDTH (+ 8")
DRAIN
6"
3/4
SEE ARCH SEE ARCH
SLOPE FLOOR TO DRAINFLOOR DRAIN
RE: PLUMBING DWGS
(2) #5 EACH WAY
WATER VAPOR
BARRIER
VERIFY LOCATION WITH
PLUMBING DRAWINGS
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
F
SHEET TITLE
ARCHITECT
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
STRUCTURAL / CIVIL ENGINEER
H2B, INC. (AZ FIRM #18690)
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH. / ELEC. / PLUMB. / TECH. ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 W. 161ST STREET
OLATHE, KS 66062
(913) 829-8650
COMMISSIONING
GLHN ARCHITECTS & ENGINEERS, INC.
2939 E. BROADWAY BLVD
TUCSON, AZ 85716
(520) 881-4546
165-
R1 - CONSTRUCT REPLACEMENT WAREHOUSETYPICAL DETAILS - CONCRETE
01/06/2020 ED DT
500 AZ-89, Prescott, AZ 86301
SA-030
649-414BID DOCUMENTS
NTS2 SPLICE & DEVELOPMENT SCHEDULE
NTS6 TYPICAL ALIGNED CIP SLAB PENETRATIONS
NTS8 CONCRETE BEAM PENETRATION DETAIL
NTS4 TYPICAL SLAB ON GRADE CONTROL JOINTS
NTS5 SLAB ON GRADE JOINTS AT COLUMNS
NTS1 TYPICAL STIRRUP AND TIE HOOK TYPES
NTS3 TYPICAL END HOOK TYPES
NTS7 TYPICAL HOUSEKEEPING PAD OVER SLAB ON GRADE
NTS9 INTERIOR CONTROL JOINT @ CHANGE IN SLAB THICKNESS AND REINFORCEMENT
3/4" = 1'-0"10 TYPICAL ANCHOR ROD DETAIL
NO SCALE11 POST-INSTALLED ANCHOR BOLT DETAIL
3/4" = 1'-0"12 FLOOR DRAIN DETAIL
Revision # Date 92
4'-0" MAX
CLASS B TYP
INTERRUPTED BAR
ADD ½ OF PARALLEL
INTERRUPTED BARS AT EACH
SIDE OF OPENING BUT NOT LESS
THAN (1) #5 EF FOR WALLS OR (1)
#5 T&B FOR SLABS
OPENING > 12"
(1) #5 X 3'-0" EA. FA. FOR WALLS OR
(1) #5 X 3'-0" T&B FOR SLABS
DIAGONAL BARS AT EACH
CORNER
A
A
A
A
A A A A
WHERE NOT POSSIBLE
TO MAINTAIN CLASS B
PAST OPENING
HOOK REINFORCING"U" BARS TO MATCH
SIZE OF WALL OR
SLAB REINFORCEMENT
6" TYP
ADD BARS PARALLEL
TO WALL OPENING
A REQ'D.
NOTES:
1. SEE WALL ELEVATIONS OR PLANS FOR REINFORCEMENT AT LARGER OPENINGS.
2. CLUSTERS OF SMALL HOLES WHOSE OVERALL MEASUREMENT EXCEEDS 1'-0" SHOULD
BE REINFORCED AS ONE OPENING.
3. WALLS CAN SPAN IN EITHER DIRECTION.
CORNERSINTERSECTIONS ENDS
DWLS TO
MATCH
HORIZ REINF
SIZE AND
SPACING (TYP)
HORIZONTAL BARS
U-BARS TO MATCH SIZE AND
SPACING OF HORIZ BARS
(TYP)
STD HOOK
WALLS WITH 2 LAYERS OF
REINF (10" OR GREATER)
WALLS WITH 1 LAYER OF
REINF (< 10")
LT
S
LTS
STD HOOK
LTS
LT
S
CORNER BARS.
MATCH HORIZ
REINF SIZE AND
SPACING
DWLS TO MATCH
HORIZ REINF SIZE AND
SPACING. ALT HOOK
DIRECTIONS (TYP)
3' - 0"
2'
- 6
'-0 " M
IN
E
MB
ED
ME
NT
3" CLR
0' - 2 " C
HAMFER
3"
1'
- 0
1'
- 0
1'
- 0
3"
3"
8 - #6 BARS (TYP)
#4 TIES @ 12" O.C.
8 - #6 BARS (TYP)
#4 TIES @ 12" O.C.
NOTE:
ANCHOR BOLTS DESIGNED
AND PROVIDED BY POLE
MANUFACTURER
NOTE:
1. LIGHT POLE FOUNDATION DESIGNED FOR 30 FOOT TALL POLE CAPABLE OF RESISTING PRESSURES.
INDUCED BY 3 SECOND GUST AT 120 MPH DESIGN WIND SPEED.
2. CONCRETE TO HAVE 3,500 PSI MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS.
3. REINFORCING STEEL TO HAVE 60 KSI YIELD STRENGTH.
4. MINIMUM HORIZONTAL CLEARANCE FROM ADJACENT FOUNDATIONS SHALL BE NO LESS THAN 18 INCHES.
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANT INFORMATION
F
SHEET TITLE
ARCHITECT
FULLY SPRINKLERED
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .