- Y1DA--SPECT/CT Site Preparation Project (Design-Build) Augusta, Georgia Charlie Norwood VAMC (Downtown)
- Solicitation number
- 36E77620R0031
About this file
This federal contract amendment provides additional documentation for solicitation number 36E77620R0031 for a SPECT/CT site preparation project at the Charlie Norwood VA Medical Center in Augusta, Georgia. The Department of Veterans Affairs seeks to award a firm-fixed-price design-build contract for the site preparation, including removing and installing drywall, flooring, ceilings, HVAC and electrical work. Eligible offerors are service-disabled veteran-owned small businesses. The project involves preparing an exam room to accommodate a new medical imaging device. The period of performance is approximately 180 days from notice to proceed. The estimated value is between $500,000 and $1,000,000. The solicitation was issued on March 20, 2020.
36E77620R0031 A00002 36E77620R0031 A00002.docx
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) A00002 03-20-2020
509-CSI-502
PCAC
Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence
OH
44131
PCAC
Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence
OH
44131 To all Offerors/Bidders
36E77620R0031 03-20-2020
X X X
The purpose of this amendment is to attached the entire solicitation and associated documents due to an error.
This does not change the question response date or proposal due date.
All other terms and conditions shall remain the same and in full effect.
Yolanda M. Ray Contracting Officer See attached document: S02 - 36E77620R0031.
See attached document: S02 - Attachment 1 - Specification 00 11 21 RFP to DB Spec SPECT CT Site Preparation (3-3-2020 YMR) (002).
See attached document: S02 - Attachment 2 - Statement of Work - Final (3-5-2020 YMR).
See attached document: S02 - Attachment 3 - Room- Intevo series Typical- PDF (7-2019) includes Bold.
See attached document: S02 - Attachment 4 - Symbia Site Specific Dwg 1800173RA 1_17_18.
See attached document: S02 - Attachment 5 - Symbia Typical Dwg 06112.
See attached document: S02 - Attachment 6 - Construction Wage Determination.
See attached document: S02 - Attachment 7 - Combined Specifications.
See attached document: S02 - Attachment 8 - Contractor Safety and Environmental Record Evaluation Form.
See attached document: S02 - Attachment 9 - Past Performance Questionnaire.
See attached document: S02 - Attachment 10 - Release of Claims.
See attached document: S02 - Attachment 11 - VHA Master Specifications.
See attached document: S02 - Attachment 12 - Section 01 32 16 Project Schedules.
See attached document: S02 - Attachment 13 - Section 01 42 19 Reference Standards SCE 11-19-2018.
See attached document: S02 - Attachment 14 - Section 01 33 23 Shop Drawings SCE 11-19-2018.
See attached document: S02 - Attachment 15 - Section 01 32 16 Project Schedules SCE 11-19-2018.
See attached document: S02 - Attachment 16 - Section 01 35 26 Safety Requirements SCE 11-19-2018.
See attached document: S02 - Attachment 17 - Section 01 57 19 Temporary Environmental Controls SCE 11-19-2018.
See attached document: S02 - Attachment 18 - Quality Control Requirements Plan SCE 11-19-2018.
See attached document: S02 - Attachment 19 - Brand Name or Equal Justification - SPECT CT - Augusta GA.
See attached document: S02 - Attachment 20 - Labor Standards Wage Determination.