Risk Assessment.pdf

PDF 444 KB Posted

Attached to
Z2DA--Renovate Oncology Hematology, for 1st Floor Bldg. 1 - Wichita
Solicitation number
36E77620B0005
Issued by

About this file

This document provides details for a federal contract opportunity to renovate oncology, hematology, and dialysis facilities at the Robert J. Dole VA Medical Center in Wichita, Kansas. The Department of Veterans Affairs intends to issue a single firm-fixed-price design-bid-build contract through an invitation for bid solicitation set aside for Service-Disabled Veteran-Owned Small Businesses. The contractor shall provide all labor, materials, equipment, and supervision to complete renovations and relocations for oncology, hematology, and dialysis on the first floor of Building 1. The period of performance is approximately 270 calendar days with a Notice to Proceed expected in June 2020. The magnitude of construction is estimated between $2 million to $5 million. Questions must be submitted in writing by the specified deadline to the issuing office.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A

Pre-Construction Risk Assessment Project Number and Title:

Project Location:

Project Coordinator:

Assessment Date: Planned Start Date (FY/QTR):

Pre-Construction Risk Assessment Y N Air Quality (also reference ICRA) Potential Mitigation

Will air handlers or other HVAC equipment be modified or replaced?

Are there potential impacts to air intakes or existing filters?

Will there be materials, installations, or equipment causing vapors/fumes?

Will there be any asbestos removal or hazardous material demolition?

Will there be dust generated during the project (interior or exterior)?

Y N Noise/Vibration Will there be rotary equipment such as motors or generators in use?

Will there be noise/vibration generated that will impact areas adjacent?

Will rotary drills, hammer drills, concrete vibration or similar tools be in use?

Y N Utility Interruptions/Impacts

Will there be any work on domestic water systems (ref. VHA Directive 1061)?

Will there be any utility shutdowns (IT, electrical, HVAC, steam, plumbing, medical gas, vacuum, water, fire alarm).

Y N Patient Safety

Will any patient safety systems such as wander guard, patient monitoring, nurse call, or code blue be out of service?

Will any medical equipment be placed out of service during construction?

Y N Other

Will construction compromise access or security?

Will there be any hot work required?

Will there be any confined space entry?

Will duress/panic alarms be placed out of service, moved, or added?

For CT, PET, or Nuclear Medicine Services: Prior to installation of new/replacement imaging equipment or room modification where ionizing radiation will be emitted or radioactive materials will be stored, a physicist must conduct a shield design and a survey prior to clinical use of the room.

Other?

Project COR/LP Signature: Construction Safety Subcommittee Review:

Attachment A

Additional Requirements and Comments:

Attachment B Infection Control Risk Assessment

(Match construction activity to patient risk group to determine project class)

CONSTRUCTION ACTIVITY TYPE PATIENT RISK GROUP

A: Inspection, non-invasive activity-includes, not limited to removal of ceiling tiles for inspection (1/50 sq ft), painting (not sanding), wall covering, electrical trim work, minor plumbing, activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.

Low Risk- (Office Areas)

B: Small scale, short duration, creating minimal dust-includes but not limited to installation of telephone/computer cabling, access to chase spaces, cutting of walls or ceiling where dust migration can be controlled.

Medium Risk- (Cardiology, ECHO, Endoscopy, Nuclear Medicine, Physical Therapy, Radiology/MRI, Respiratory Therapy)

C: Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies. Includes but not limited to sanding of walls for painting or wall covering; removal of floor coverings, ceiling tiles, and casework; new wall construction; minor duct work or electrical work above the ceilings; major cabling activity; any activity which cannot be completed in a single work shift.

High Risk- (CCU, ER, Laboratories (specimen), Outpatient Surgery, Pediatrics, Pharmacy, Post Anesthesia care, Surgical Units)

D: Major duration and construction activities-Includes, but not limited to:

activities that require consecutive work shifts; requires heavy demolition or removal of a complete cabling system; new construction.

Highest Risk- (Any area caring for Immunocompromised patients, Cardiac Cath Lab, Central Sterile Supply, ICU, Medical Unit, Negative pressure isolation rooms, Oncology, Operating rooms)

Project Class

Patient Risk Group TYPE A TYPE B TYPE C TYPE D LOW Risk I II II III/IV MEDIUM Risk I II III IV HIGH Risk I II III/IV IV HIGHEST Risk II III/IV III/IV IV

During Construction Project Upon Completion of Project CLASS I 1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace any ceiling tile displaced for visual inspection.

1. Clean work area upon completion of task.

CLASS II

1. Include all items from Class I above

2. Provides active means to prevent air-borne dust from dispersing into atmosphere

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape (or similar method).

5. Block off and seal air vents.

6. Place dust mat at access points of work area.

7. Contain construction waste before transport in tightly covered containers.

8. Isolate HVAC system in areas where work is being performed to prevent contamination of duct system.

1. Wipe surfaces with cleaner/disinfectant.

2. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

3. Remove isolation of HVAC system in areas where work is being performed.

CLASS III

1. Include all items from Class I/II above

2. Involve infection control in design/planning before construction begins.

3. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

1. Include all items from Class I/II above

2. Do not remove barriers from work area until completed project is thoroughly cleaned.

3. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with cleaner/disinfectant.

6. Coordinate with EMS for final cleaning prior to bring area back into service.

CLASS IV

1. Include all items from Class I/II/III above

2. Involve infection control in design/planning before construction begins.

3. Seal holes, pipes, conduits, and punctures appropriately.

4. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.

5. Walk-off mats are recommended to minimize tracking of heavy dirt and dust from construction areas. Shoe covers may be considered in certain areas.

1. Include all items from Class I/II/III above

Is there a risk to the Contractor of T.B. exposure?

PROJECT CLASS: <SELECT>

YES NO

Infection Control Officer Signature: Infection Control Additional Requirements/Comments:

NOTES (Consider adjacencies - above, below, lateral, shared HVAC, etc.):

Clear Form

Attachment B

Infection Control Construction Permit Permit No:

Location of Construction: Project Start Date:

Project Coordinator: Estimated Duration:

Contractor Performing Work Permit Expiration Date:

Supervisor: Telephone:

YES NO CONSTRUCTION ACTIVITY YES NO INFECTION CONTROL RISK GROUP

TYPE A: Inspection, non-invasive activity GROUP 1: Low Risk TYPE B: Small scale, short duration, moderate to high levels GROUP 2: Medium Risk

TYPE C: Activity generates moderate to high levels of dust, requires greater 1 work shift for completion

GROUP 3: Medium/High Risk

TYPE D: Major duration and construction activities Requiring consecutive work shifts

GROUP 4: Highest Risk

CLASS I 1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace any ceiling tile displaced for visual inspection.

3. Minor Demolition for Remodeling

CLASS II 1. Provides active means to prevent air-borne dust from dispersing into atmosphere

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Wipe surfaces with cleaner/disinfectant.

6. Contain construction waste before transport in tightly covered containers.

7. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

8. Place dust mat at entrance and exit of work area.

9. Isolate HVAC system in areas where work is being performed; restore when work completed.

CLASS III

Date

Initial

1. Obtain infection control permit before construction begins.

2. Isolate HVAC system in area where work is being done to prevent contamination of the duct system.

3. Complete all critical barriers or implement control cube method before construction begins.

4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

5. Do not remove barriers from work area until complete project is checked by Infection Prevention & Control and thoroughly cleaned by Environmental Services.

6. Vacuum work with HEPA filtered vacuums.

7. Wet mop with cleaner/disinfectant

8. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

9. Contain construction waste before transport in tightly covered containers.

10. Cover transport receptacles or carts. Tape covering.

11. Upon completion, restore HVAC system where work was performed.

CLASS IV

Date

Initial

1. Obtain infection control permit before construction begins.

2. Isolate HVAC system in area where work is being done to prevent contamination of duct system.

3. Complete all critical barriers or implement control cube method before construction begins.

4. Maintain negative air pressure within work site utilizing

HEPA equipped air filtration units.

5. Seal holes, pipes, conduits, and punctures appropriately.

6. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.

7. All personnel entering work site are required to wear shoe covers.

8. Do not remove barriers from work area until completed project is checked by Infection Prevention & Control and thoroughly cleaned by Environmental. Services.

9. Vacuum work area with HEPA filtered vacuums.

10.

11.

Wet mop with disinfectant.

Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

12. Contain construction waste before transport in tightly covered containers.

13. Cover transport receptacles or carts. Tape covering.

14. Upon completion, restore HVAC system where work was performed.

Additional Requirements:

Permit Authorized By (Infection Control): Permit Acknowledged By (Contractor):

Date: Date:

Permit Requested By (COR/LP):

Date:

Infection Control Construction Permit
Permit No:
CLASS III
Date Initial
Date Initial
Project Number and Title: 589A7-18-205 Re-roof Build589A7-19-401, Renovate for Oncology and Hematology Construct Endoscopy Suiteing #1
Project Location: 1st Floor and main lobby of building 1 East wing
Project Coordinator: Conrad Pierce
Assessment Date: 3/5/2020
Planned Start Date FYQTR: 4th qtr, 2020
Air Quality also reference ICRA:
Potential MitigationWill air handlers or other HVAC equipment be modified or replaced: Only affects construction site
Potential MitigationAre there potential impacts to air intakes or existing filters: Only affects construction site
Potential MitigationWill there be materials installations or equipment causing vaporsfumes:
Potential MitigationWill there be any asbestos removal or hazardous material demolition: Any possible asbestos have tested, and positive test results will require abatement. See Attachment A for more details
Potential MitigationWill there be dust generated during the project interior or exterior: Ensure infectious control barriers are in place. See Attachment A for more details
Potential MitigationNoiseVibration:
Potential MitigationWill there be rotary equipment such as motors or generators in use: Possible air compressors to be used. Locate air compressor in spot that'll mitigate vibrations. See Attachment A for more details
Potential MitigationWill there be noisevibration generated that will impact areas adjacent: De-conflict with time lines, and locations of equipment to mitigate vibrations and noise. See Attachment A for more details
Potential MitigationWill rotary drills hammer drills concrete vibration or similar tools be in use:
Potential MitigationUtility InterruptionsImpacts:
Potential MitigationWill there be any work on domestic water systems ref VHA Directive 1061: Only affects construction site
Potential MitigationWill there be any utility shutdowns IT electrical HVAC steam plumbing medical gas vacuum water fire alarm: Only affects construction site
Potential MitigationPatient Safety:
Potential MitigationWill any patient safety systems such as wander guard patient monitoring nurse call or code blue be out of service:
Potential MitigationWill any medical equipment be placed out of service during construction:
Potential MitigationOther:
Potential MitigationWill construction compromise access or security:
Potential MitigationWill there be any hot work required: Hot work permits will be required from safety as needed
Potential MitigationWill there be any confined space entry:
Potential MitigationWill duresspanic alarms be placed out of service moved or added:
Potential MitigationFor CT PET or Nuclear Medicine Services Prior to installation of newreplacement imaging equipment or room modification where ionizing radiation will be emitted or radioactive materials will be stored a physicist must conduct a shield design and a survey prior to clinical use of the room:
Potential MitigationOther_2:
Project CORLP Signature:
Construction Safety Subcommittee Review:
Additional Requirements and Comments:

Will there be any asbestos removal or hazardous material demolition?

Any currently identified asbestos will need to be abated, and any possible asbestos found shall be tested, and positive test results will require abatement.

Will there be dust generated during the project (interior or exterior)?

Most dust on this project will be in construction site only. Infectious control barriers shall be utilized as needed. Main locations will be the entry into the corridor from the lobby, and at the entrances to the lobby during the lobby portion of the construction.

Will there be rotary equipment such as motors or generators in use?

Air compressors may be used on this project. To mitigate any vibrations and noise caused by them the air compressors will be placed a sufficient distance away from the medical spaces, and hoses to the equipment will be ran to them. All hoses will remain in controlled spaces as to not cause a tripping hazard to patients or staff.

Will there be noise/vibration generated that will impact areas adjacent?

See above mitigation factors.

Infection Control Officer Signature:
Infection Control Additional RequirementsComments:
NOTES Consider adjacencies above below lateral shared HVAC etc: Most, if not all work, will be conducted outside.
Permit No:
Location of Construction: Robert J Dole VAMC main campus and CBOCs
Project Start Date: Aug 2019
Project Coordinator_2: Conrad Pierce
Estimated Duration: 1 yr
Contractor Performing Work: Floyd Construction
Permit Expiration Date:
Supervisor: Connie Drake
Telephone: 316-685-2221 ext 58108
CONSTRUCTION ACTIVITY:
GROUP 1 Low Risk:
GROUP 2 Medium Risk:
GROUP 3 MediumHigh Risk:
GROUP 4 Highest Risk:
Date:
Initial:
CLASS IV:
Initial_2:
Additional Requirements:
Permit Requested By CORLP: Conrad Pierce
Permit Authorized By Infection Control:
Permit Acknowledged By Contractor:
Date_3:
Date_4:
Patient Risk: Off
Dropdown4: [CLASS III]
Group5: Choice1
Date_2: July 31st, 2019
Group1: Choice1
Group2: Choice1
Group3: Choice2
Group4: Choice1
Group6: Choice1
Group7: Choice1
Group8: Choice2
Group9: Choice1
Group10: Choice1
Group11: Choice2
Group12: Choice2
Group13: Choice2
Group14: Choice1
Group15: Choice2
Group16: Choice2
Group17: Choice2
Group18: Choice2
Group19: Choice4
Group20: Choice1
Group21: Choice2
Group22: Choice2
Group23: Choice2
Group24: Choice2
Group25: Choice1
Group26: Choice2
Group27: Choice1
Group28: Choice2
Group29: Choice2

File details come from the government source that posted it. Updated .