36E77619R0010-006.pdf
PDF 19 MB Posted
- Solicitation number
- 36E77619R0010
About this file
36E77619R0010 S02 - Attachment 3 Drawings 650 333 Harwood Bid Drawings Full Set Rev1 2_Part3.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77619R0010-0004002.pdf | ||
| 36E77619R0010-0004000.docx | DOCX document | |
| 36E77619R0010-0004001.pdf | ||
| 36E77619R0010-0003000.docx | DOCX document | |
| 36E77619R0010-0003001.pdf | ||
| 36E77619R0010-0002001.pdf | ||
| 36E77619R0010-0002000.docx | DOCX document | |
| 36E77619R0010-0001000.docx | DOCX document | |
| 36E77619R0010-005.pdf | ||
| 36E77619R0010-001.docx | DOCX document | |
| 36E77619R0010-002.doc | DOC document | |
| 36E77619R0010-009.docx | DOCX document | |
| 36E77619R0010-007.pdf | ||
| 36E77619R0010-004.pdf | ||
| 36E77619R0010-008.pdf | ||
| 36E77619R0010-003.pdf | ||
| 36E77619R0010_2.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
HDMI
FSFS FS
FS
FS
FS
FS
FS
SS
SS
SS
SS
SS
SS
F
F
F
F
SS
SS
SS
SS
SS
SS
SS
@ FACP
AV
AV @ 54"
HDMI
HDMI
HDMI
AV @ 54"
@ 54'
@ 54"
@ 54"
HDMI
@ 54"
AV
AV
AV @ 54"
@ 54'
HDMI
@ 54"
AV @ 54"
@ 54'
AV
AV
AV
AV
CR
CR
CR
EL
EL
EL
ELEL
EL
DR
CC
SS
CC
CC CC
CC
M
M
CR
AD
CC
AD
W
CR
CR
PN
CC
EL
AV
@ 54"
FS
SS
FS FS
FS
FS
E
PPPP
GB
GB
GB
GB
GB
GB
GB
GB
GB
GB
GB GB GB GB GB GB GBGB GB GB GB
SC
SCRTE
RTE
EL EL
SS
SS
FS
FS
FACP
F
F
AV
AVH
D
M I
H D
M I
SS
FS FS
FS
FS FS
FS
SS
OM
D
D
D
D
D
HDMI
HDMI
HDMI
USB
HDMI
USB 2
HDMIHDMI
HDMI
USB
USB
HDMI
HDMI
FS
CONF.
1-09
CONF.
1-08
CONF.
1-07
TRASH / REC
1-06
JAN STOR
1-11
TLT-M
1-14
TLT-W
1-15
BREAK
ROOM
1-16
COPY
1-17
CONF.
1-54
CONF.
1-53
INTVW
1-38
INTVW
1-37
INTVW
1-36
INTVW
1-35
INTVW
1-34
INTVW
1-33
INVEST.
OFFICE
1-32
INVEST.
OFFICE
1-31
INVEST.
OFFICE
1-30
INVEST.
OFFICE
1-29
INVEST.
OFFICE
1-28
INVEST.
OFFICE
1-27
DIRECTOR
OFFICE
1-26
ALCOVE
1-43
TLT-M
1-45
TLT-W
1-44
COAT
1-42
CLST
1-40 TLT-U
1-46
TLT-U
1-47
STOR.
1-52
COPY
1-50
INVEST.
OFFICE
1-51
ELEC.
1-21
WORK RM /
LAB
1-24
CORR
CR-1-25
OPEN
OFFICE
1-18
VEST
1-01
CORR
CR-1-39
VEND.
1-41
MAIL /
STORAGE
1-04
CORR.
CR-1-05
STOR.
1-49
CORR.
CR-1-48
FB-8
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8
C.1
4.7 5.9
D.9
B.1
NP1A NP1B
NP1C
LC1
SEC
I.T.
1-19
OPEN
OFFICE
1-18
RECEPTION
1-03
CORR.
CR-1-05
RELOCATE EXISTING
MOTION SENSOR
RELOCATE EXISTING
MOTION SENSOR,
AND RECONNECT.
1-02.1
1-01.2
1-43
1 1/4"C FOR AV IN-SLAB (TYPICAL)
1"C FOR DATA IN-SLAB (TYPICAL)
LOCATE AT RECESSED
MULTI-GANG TV WALL
BOXES AT MONITOR AND
CREDENZA, TYPICAL
CONFERENCE ROOMS.
(2)4" EMT CONDUITS TO BASEMENT
IRM IT ROOM. INSTALL BUSHINGS ON
BOTH ENDS. INSTALL 90 AT TOP INTO
TOP OF TRAY. FIRE SEAL AROUND
CONDUITS.
110cd
110cd
110cd
110cd
KXKNOX BOX
WALL
MOUNTED
EMERGENCY
CALL PHONE
PANIC BUTTON TO
SECURITY SYSTEM
LOCAL
DOOR
RELEASE
NP1D
ADJUST CABLE TRAY ELEVATION AND ROUTING TO COORDINATE
WITH MECHANICAL EQUIPMENT AND DUCTWORK, TYPICAL.
EXISTING SECURITY DEVICES AND
WIRING TO REMAIN AND BE REUSED.
EXISTING SECURITY DEVICES AND
WIRING TO REMAIN AND BE REUSED.
PROJECTOR LOCATION.
LOCATE IN
MULTI-GANG
WALL BOX AT
MONITOR
110cd
110cd
MAIN DOOR AND MAIN
GATE TO HAVE NETWORK
INTERFACE TO RELEASE
DOORS
SEMI-FLUSH FIRE
ALARM PANEL.
COLOR: GRAY.
VERIFY DEVICE LOCATIONS
WITH ARCHITECTURAL WALL
PANELS/FINISH AND ALIGN.
LOCATE DEVICES IN RECESSED WALL BOX,
PROVIDE AV CONNECTION BETWEEN
MONITOR AND FLOOR BOX, TYPICAL.
LOCATE DEVICES AT CREDENZA, PROVIDE
HDMI CONNECTION FROM CREDENZA TO
MONITOR ABOVE, TYPICAL.
SECURITY WORK NOTE:
1. EXISTING WIRELESS SECURITY TRANSCEIVER /
RECEIVER DEVICES AND ASSOCIATED WIRING FOR
SIGNAL BETWEEN WAREHOUSE AND BUILDING 36 TO
REMAIN AND BE REUSED.
NOTIFICATION
DEVICE COLOR:
WHITE, TYPICAL.
AREA OF DEDUCT ALT NO 1
AREA OF DEDUCT ALT NO 3
DOORS SHALL RELEASE VIA A
SIGNAL FROM THE SECURITY
SYSTEM CONTROL PANEL, TYPICAL.
PROVIDE CABLE TRAY
BARRIER UL LISTED FOR
SMOKE SEAL AT SMOKE
PARTITIONS.
PROVIDE CABLE TRAY BARRIER
UL LISTED FOR SMOKE SEAL AT
SMOKE PARTITIONS.
1 1/4"C FOR AV IN-SLAB (TYPICAL)
1"C FOR DATA IN-SLAB (TYPICAL)
SYSTEMS WORK NOTE:
1. COORDINATE FINAL LOCATION OF FLOOR BOXES
WITH VA.
2. ADJUST CABLE TRAY ELEVATION AND ROUTING TO
COORDINATE WITH MECHANICAL EQUIPMENT AND
DUCTWORK.
3. VERIFY WITH OWNER IF ROOM WILL HAVE CEILING
PROJECTOR WITH POWERED SCREEN OR IF ROOM
WILL HAVE MONITOR ABOVE CREDENZA AS SHOWN.
RELOCATE DATA AND HDMI/AV CONNECTIONS AS
DIRECTED BY OWNER.
2"C FOR DATA IN-SLAB (TYPICAL)
2"C FOR DATA IN-SLAB (TYPICAL)2"C FOR DATA IN-SLAB (TYPICAL)
2"C FOR DATA IN-SLAB (TYPICAL)
1"C FOR DATA IN-SLAB (TYPICAL)
1"C FOR DATA IN-SLAB (TYPICAL)
1"C FOR AV IN-SLAB (TYPICAL)
1"C FOR DATA IN-SLAB (TYPICAL)
1"C FOR AV IN-SLAB (TYPICAL)
1"C FOR DATA IN-SLAB (TYPICAL)
1 1/4"C FOR AV IN-SLAB (TYPICAL)
2"C FOR DATA IN-SLAB (TYPICAL)
2"C FOR DATA IN-SLAB (TYPICAL)
12"x4" CAT 6 TRAY INSTALL AT 8'-8"' AFF
AND SUPPORT FROM WALL OR
STRUCTURE ABOVE
GLASS BREAK DETECTORS, MOUNT PER MANUFACTURERS
REQUIREMENTS. DETECTORS SHALL BE NOT FARTHER THAN
25FT. FROM ANY CORNER OF GLASS, TYPICAL.
COORDINATE AV CONSTRUCTION
FOR SMART BOARDS WITH PROPOSED
COMPUTER LOCATION FOR USB AND HDMI
CONNECTION, TYPICAL OF 2. VERIFY PC
LOCATION WITH VA. LOCATE DEVICES AT
SMARTBOARD IN MULTI-GANG WALL BOX.
COORDINATE AV CONSTRUCTION FOR SMART BOARDS
WITH PROPOSED COMPUTER LOCATION FOR USB AND
HDMI CONNECTION, TYPICAL OF 2. VERIFY PC LOCATION
WITH VA. LOCATE DEVICES AT SMARTBOARD IN MULTI-
GANG WALL BOX.
VERIFY WITH OWNER LOCATION OF PC AND PROVIDE THE FOLLWING:
1. HDMI CONNETIONS BETWEEN PC AND PROJECTOR,
2. HDMI CONNECTION BETWENN PC AND MONITOR,
3. HDMI AND USB CONNECTION BETWEEN PC AND SMARTBOARD.
VERIFY WITH OWNER LOCATION OF PC AND PROVIDE THE
FOLLWING:
1. HDMI CONNETIONS BETWEEN PC AND PROJECTOR,
2. HDMI CONNECTION BETWENN PC AND MONITOR,
3. HDMI AND USB CONNECTION BETWEEN PC AND
SMARTBOARD.
FB-6
RFB-2
RFB-2
RFB-2
RFB-2
RFB-2
RFB-2
FB-8
FB-6RFB-2
RFB-2
RFB-2
RFB-2
RFB-2
RFB-2
RFB-2
RFB-2
RFB-2
RFB-2
FB-6
FURN FURN
FURN
FURN
1 1/4"C FOR AV IN-SLAB (TYPICAL)
1"C FOR DATA IN-SLAB (TYPICAL)
SEE NOTE #3 FOR DEVICES AT MONITOR.
SEE NOTE #3 FOR
DEVICES AT MONITOR.
SEE NOTE #3 FOR DEVICES AT MONITOR.
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig ht h in ch o ne fo ot 16 on e q ua rte r i nc ot on e h al f th re e e ig hs th re e q ua rte rs
6" on e i
6" on e a nd on e h al f in es
6"
Raymond Picard Telephone: 401-459-4760 Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072-COA Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Electrical System First Floor Plan
ET-102
MLCMJK/AL 93 of 118
3/16" = 1'-0" Electrical Systems First Floor Plan
UP
DNDN
F
F SS
SS SS
SSSS
SS
SS
FSFS
FSFS
FS
SS
SS
2HDMI
AV @ 54"
@ 54'
AV
AV
HDMI
@ 54'
AV
@ 54"
HDMI
@ 54'
AV
@ 54"
AV
2 @ OC
SS
RTS
RTS
RTS
RTS
RTS
RTS
E
GBGBGBGBGBGB GB
GB
GB
GB
SUPPLY
RTU-B363003
R
ETR
U N
R
TU
-B363003
190°
SS
SSSS
SS
D
D
D
D
D 8D
D
D
D
D
D
D
2"C FOR DATA UNDER-SLAB (TYPICAL)
2" CONDUIT INSTALLED UP BEAM TO CEILING AND THEN TO
CABLE TRAY FOR SYSTEM FURNITURE DATA DROPS. RUN
CABLES IN SYSTEMS FURNITURE, CHASE TO CONDUIT AND
THEN HOME RUN TO DATA CLOSET VIA TRAY. TYPICAL FOR
ALL.
2" CONDUITS FOR DATA CABLES FROM
SYSTEMS FURNITURE. INSTALL IN SLAB
TO FURNITURE DATA CHASE THEN UP
WALL TO CABLE TRAY (TYPICAL).
(2)4" EMT CONDUITS TO BASEMENT
IRM IT ROOM. INSTALL BUSHINGS ON
BOTH ENDS. INSTALL 90 AT TOP INTO
TOP OF TRAY. FIRE SEAL AROUND
CONDUITS.
12"x4" CAT 6 TRAY INSTALL AT 7'-8" AFF
AND SUPPORT FROM WALL OR
STRUCTURE ABOVE
2"C FOR DATA, TYPICAL.2"C FOR DATA
JAN
2-07
TLT-M
2-11
TLT-W
2-12
BREAK
ROOM
2-13
COPY
2-15
CONF.
2-14
ELEC.
2-20
COPY
2-17
OPEN
OFFICE
2-16
CIRC.
CR-2-08
CIRC.
CR-2-18
OPEN
OFFICE
2-03
TEAMING/
CONF
2-04
TEAMING/
CONF
2-05
110cd
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8
C.1
4.7 5.9
D.9
B.1
2"C FOR DATA, UNDER-SLAB (TYPICAL)
110cd 110cd
110cd 110cd
110cd
ADJUST CABLE TRAY ELEVATION AND ROUTING
TO COORDINATE WITH MECHANICAL
EQUIPMENT AND DUCTWORK, TYPICAL.
2" CONDUITS FOR DATA CABLES.
ROUTE CONDUIT FROM FLOOR
BOX VIA UNDER SLAB/FLOOR TO
COLUMN AND RISE TO CABLE
TRAY , TYPICAL.
CEILING IS BEING USED AS
PLENUM RETURN. PROVIDE
PLENUM RATED WIRING, ETC.
EXISTING WIRELESS SECURITY
TRANSCEIVER / RECEIVER DEVICES
AND ASSOCIATED WIRING FOR
SIGNAL BETWEEN WAREHOUSE AND
BUILDING 36 TO REMAIN AND BE
REUSED.
STAIR 2
2S-23
I.T.
2-19
LOCATE DEVICES IN RECESSED WALL
BOX, PROVIDE AV CONNECTION
BETWEEN MONITOR AND FLOOR BOX,
TYPICAL.
LOCATE DEVICES AT CREDENZA,
PROVIDE HDMI CONNECTION FROM
CREDENZA TO MONITOR ABOVE,
TYPICAL.
1 1/2"C FOR DATA
DUCT SMOKE DETECTORS AS SHOWN
WITH TEST STATIONS FOR ROOF TOP
HVAC UNITS SUPPLY AND RETURN
LOCATED IN THIS APPROXIMATE AREA,
TYPICAL FOR HVAC UNITS 1 & 3. SEE EP-
104 FOR DUCT SMOKES LOCATED IN
ROOF MOUNTED DUCTWORK.
DUCT SMOKE DETECTORS AS SHOWN WITH TEST
STATIONS FOR ROOF TOP HVAC UNITS SUPPLY AND
RETURN LOCATED IN THIS APPROXIMATE AREA FOR
HVAC UNIT 2. SEE EP-104 FOR DUCT SMOKES WITH
NEMA 4 ENCLOSURES LOCATED IN ROOF MOUNTED
DUCTWORK.
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
AREA OF DEDUCT ALT. NO 2
SYSTEMS WORK NOTE:
1. COORDINATE FINAL LOCATION OF FLOOR BOXES
WITH VA.
2. ADJUST CABLE TRAY ELEVATION AND ROUTING TO
COORDINATE WITH MECHANICAL EQUIPMENT AND
DUCTWORK.
3. VERIFY WITH OWNER IF ROOM WILL HAVE CEILING
PROJECTOR WITH POWERED SCREEN OR IF ROOM
WILL HAVE MONITOR ABOVE CREDENZA AS SHOWN.
RELOCATE DATA AND HDMI/AV CONNECTIONS AS
DIRECTED BY OWNER.
2"C FOR DATA, UNDER-SLAB (TYPICAL)
LOCATE DEVICES IN RECESSED WALL
BOX, PROVIDE AV CONNECTION
BETWEEN MONITOR AND FLOOR BOX,
TYPICAL.
LOCATE DEVICES AT CREDENZA,
PROVIDE HDMI CONNECTION FROM
CREDENZA TO MONITOR ABOVE,
TYPICAL.
NAC SEC
GLASS BREAK DETECTORS, MOUNT PER MANUFACTURERS
REQUIREMENTS. DETECTORS SHALL BE NOT FARTHER THAN
25FT. FROM ANY CORNER OF GLASS, TYPICAL.
2"C FOR DATA, UNDER-SLAB (TYPICAL)2"C FOR DATA, UNDER-SLAB (TYPICAL)
1 1/2"C FOR AV
2" CONDUITS FOR DATA CABLES.
ROUTE CONDUIT FROM FLOOR
BOX VIA UNDER SLAB/FLOOR TO
COLUMN AND RISE TO CABLE
TRAY , TYPICAL.
2"C FOR DATA, UNDER-SLAB (TYPICAL)2"C FOR DATA, UNDER-SLAB (TYPICAL)
LOCATE DEVICES IN RECESSED WALL
BOX, PROVIDE AV CONNECTION
BETWEEN MONITOR AND FLOOR BOX,
TYPICAL.
LOCATE DEVICES AT CREDENZA,
PROVIDE HDMI CONNECTION FROM
CREDENZA TO MONITOR ABOVE,
TYPICAL.
1 1/2"C FOR DATA
1 1/2"C FOR AV
FB-8
FB-8
FB-8
FURN FURN
FURNFURN
FURN FURN
FURN FURN
FURN
FURN
SEE NOTE #3 FOR DEVICES AT
MONITOR.
STAIR 1
2S-10
SEE NOTE #3 FOR DEVICES AT
MONITOR.
SEE NOTE #3 FOR
DEVICES AT MONITOR.
TOP OF STAIRS
TOP OF STAIRS
TOP OF ELEVATOR SHAFT
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua
6" on e i
6" on e h al f in es
6"
Raymond Picard Telephone: 401-459-4760 Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072-COA Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Electrical System Second Floor Plan
ET-103
MLCMJK/AL 94 of 118
3/16" = 1'-0" Electrical Systems Second Floor Plan
V
V
T
PS
F
P
MPV
G GAS PIPING
FLOW SWITCH
AUTOMATIC AIR VENT
WATER HAMMER ARRESTOR
VENT PIPING
PRESSURE SWITCH
DOMESTIC HOT WATER PIPING
POINT OF CONNECTION TO EXISTING (TIE-IN POINT)
DOMESTIC COLD WATER PIPING
PRESSURE GAUGE W/PETCOCK
THERMOMETER W/IMMERSION WELL
MANUAL AIR VENT
DOMESTIC HOT WATER RECIRCULATION PIPINGDHWR
1. ALL PLUMBING GENERAL NOTES, SYMBOLS, LISTS AND DETAILS ARE TO BE
CONSIDERED AS APPLICABLE TO ALL PLUMBING DRAWINGS FOR THIS
PROJECT.
2. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND EXACT LOCATIONS
AND ARRANGEMENTS OF EXIST./NEW EQUIPMENT, DUCTWORK, PIPING
AND OTHER COMPONENTS SHALL BE DETERMINED IN THE FIELD WITH DUE
CONSIDERATION OF STRUCTURAL, ELECTRICAL AND ARCHITECTURAL
SYSTEMS. EXISTING STRUCTURAL SYSTEMS SHALL NOT BE MODIFIED
WITHOUT THE EXPRESS PERMISSION OF THE ENGINEER.
3. THE PROJECT SHALL BE PHASED IN ACCORDANCE WITH THE APPROVED
PHASING PLAN. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE
PROJECT ENGINEER FOR THE SEQUENCING AND TIMING OF OPERATIONS
PRIOR TO COMMENCING WORK. SEE SPECIFICATIONS.
4. CONTRACTOR IS TO MAINTAIN SERVICE TO ROOMS OUTSIDE THE PROJECT
SCOPE OF WORK AND PHASING SCHEDULE. IF INTERRUPTION OF SERVICE
IS REQUIRED COORDINATE SHUTDOWN WITH PROJECT ENGINEER.
5. CARE SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT EXISTING
SYSTEMS AND SURFACES TO REMAIN. RESTORE DAMAGED AREAS THAT ARE
BEYOND THE SCOPE OF THIS CONTRACT TO THEIR ORIGINAL CONDITION.
6. WHERE INDICATED ON THE DRAWINGS, REMOVE OR RELOCATE EXISTING
COMPONENTS AS REQUIRED TO ACCOMMODATE THE NEW WORK.
REMOVALS SHALL INCLUDE ALL ASSOCIATED OFF-SITE DISPOSAL COSTS.
7. COORDINATE REMOVALS AND RELOCATION'S INCLUDING SELECTIVE CUTTING
AND PENETRATIONS WITH ARCHITECTURAL, MECHANICAL, STRUCTURAL AND
ELECTRICAL CONTRACTORS.
8. MOST PARTITIONS ARE FULL HEIGHT AND REQUIRE UTILITIES PENETRATIONS
TO BE SEALED, SEE ARCHITECTURAL DWGS FOR PARTITION HEIGHTS.
DUCTWORK SHOWN FOR CLARITY THAT MAY RUN PARALLEL TO WALL
PARTITIONS WILL REQUIRE LOCATING IN THE FIELD TO MINIMIZE CONFLICT
WITH PARTITIONS.
9. FIELD VERIFY EXISTING EQUIPMENT AND PIPING PRIOR TO REMOVAL OR
REUSE. CONFIRM WITH PROJECT ENGINEER THAT ALL EQUIPMENT AND
PIPING DESIGNATED TO BE REMOVED IS NO LONGER IN SERVICE PRIOR
TO ITS REMOVAL. PROJECT ENGINEER SHALL HAVE FIRST RIGHT OF
REFUSAL ON ALL DEMO'D EQUIPMENT.
10. EXISTING EQUIPMENT AND PIPING TO REMAIN IN SERVICE SHALL BE
INSPECTED, REPORT INOPERABLE EQUIPMENT TO PROJECT ENGINEER.
11. ALL UNUSED (ABANDONED), PIPING AND EQUIPMENT INDICATED TO BE
REMOVED SHALL BE REMOVED AND CAPPED. REMOVE DEAD LEGS ALL
THE WAY TO THE MAIN. DO NOT LEAVE ABANDONED PIPING IN PLACE.
12. TIE-IN POINT LOCATIONS ARE APPROXIMATE. CONTRACTOR SHALL
DETERMINE EXACT LOCATIONS IN THE FIELD BASED ON EXISTING
CONDITIONS.
13. COORDINATE THE LOCATIONS OF ALL WALL MOUNTED EQUIPMENT WITH
FINAL EQUIPMENT/FURNITURE LAYOUT.
14. AT THE END OF EACH WORKING DAY, THE CONSTRUCTION SITE SHALL BE
LEFT IN A CLEAN AND NEAT CONDITION.
15. INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS AND GOOD PRACTICE NORMAL TO THE TRADE.
INSTALLATION SHALL INCLUDE PROVISIONS FOR ACCESS TO NORMAL
MAINTENANCE ITEMS SUCH AS BELTS, BEARINGS, FILTERS AND MOTORS.
PROVIDE ADEQUATE STRUCTURAL SUPPORTS AND SECURE MOUNTING
METHODS WITH PROVISIONS FOR VIBRATION ISOLATION AND EXPANSION
WHERE REQUIRED.
16. COORDINATE ALL PENETRATIONS WITH GENERAL CONTRACTOR. SEE
ARCHITECTURAL DRAWINGS FOR PENETRATION DETAILS. PLUMBING
CONTRACTOR SHALL PROVIDE FLASHING AND COUNTER FLASHING FOR
ROOF PENETRATIONS AS REQUIRED.
17. PROVIDE PIPE SUPPORTS, GUIDES AND OFFSETS AS NECESSARY TO
PREVENT UNDUE STRAIN ON PIPING.
18. SEE DETAILS AND PIPING DIAGRAMS FOR ADDITIONAL VALVES AND FITTINGS
NECESSARY FOR COMPLETE PIPING SYSTEMS.
19. SEE SPECIFICATIONS FOR OTHER REQUIREMENTS.
20. CONTRACTOR SHALL FIELD VERIFY ALL CLEARANCES AND DIMENSIONS.
21. PROVIDE ACCESS PANELS FOR ALL CONCEALED SHUT-OFF VALVES
EXCEPT THOSE ABOVE SUSPENDED CEILING.
22. INFILL ALL NEW OR EXISTING ABANDONED FLOOR SLAB PENETRATIONS
WITH GROUT, FULL THICKNESS OF SLAB. MAINTAIN 2 HR FIRE RATING.
ALL EXISTING CONCRETE FLOORS AND CHASES ARE 2 HOUR FIRE RATED.
23. ALL DOMESTIC WATER SUPPLY, VENT AND MEDICAL GAS PIPING SHALL BE
RUN ABOVE CEILINGS OR WITHIN PARTITIONS UNLESS OTHERWISE NOTED.
24. PLUMBING RISERS SHALL BE RUN CONCEALED WITHIN WALLS OR CHASES.
COORDINATE WITH ARCHITECTURAL DRAWINGS.
25. COORDINATE FINAL LOCATIONS OF MEDICAL GAS OUTLETS, AND VALVE
BOXES WITH ARCHITECT.
26. SANITARY LINES SHALL SLOPE 1/4" PER FOOT UNLESS NOTED OTHERWISE.
PIPE DROP
PIPE RISER
PIPE TEES - DOWN
PIPE TEES - UP
PIPE CONNECTION
PIPE BREAK - TO CONTINUE
DIRECTION OF FLOW
KEYNOTE CALL OUT
SYMBOLS DESCRIPTIONSABBREVIATIONS
PIPE CAP
PIPE GUIDE
PIPE ANCHORANCHOR
GUIDE
DCW
DHW
V
G
REVISION TAG
REVISION CLOUD
EQUIPMENT DESIGNATIONRH-1
NEW WALL MOUNTED RECESSED MEDICAL VACUUM OUTLET.
NEW WALL MOUNTED RECESSED OXYGEN OUTLET.
NEW MEDICAL GAS ALARM PANEL OR VALVE BOX
GAS METER
WATER METERM
G
P-TRAP
PIPE SLOPE
DESCRIPTIONSSYMBOLS
EXISTING WALL MOUNTED RECESSED MEDICAL AIR
BRACKET
TO REMAIN.
EQUIPMENT, GRILLE, REGISTER OR
DIFFUSER
TAG
EXISTING WALL MOUNTED RECESSED MEDICAL VACUUM
OUTLET TO REMAIN.
EXISTING WALL MOUNTED RECESSED OXYGEN OUTLET TO
REMAIN.
OXYGENO
MEDICAL AIRA
MEDICAL VACUUMMV
NITROGENN
NITROUS OXIDENO
CARBON DIOXIDECO2
O
A
MV
N
NO
CO2
MULTIPURPOSE VALVE
THERMOMETER
PRESSURE REGULATING VALVE
UNION
CIRCUIT BALANCE VALVE
SWING CHECK VALVE
BALL VALVE
BUTTERFLY VALVE
GATE VALVE
GLOBE VALVE
LIFT CHECK VALVE
FLANGE
STRAINER W/DRAIN VALVE AND CAP
DRAIN VALVE AND CAP
BLV
BFV
SCV
CBV
ACV
ACV
GV
GLV
MPV
PRV
T
LCV
FLG
RSV
PGV
QC
QO
SHC
RELIEF OR SAFETY VALVE
PLUG VALVE
QUICK CLOSING, FUSIBLE LINK
QUICK OPENING
SQUARE HEAD COCK
U
3-WAY AUTOMATIC CONTROL VALVE (MIXING PATTERN)
2-WAY AUTOMATIC CONTROL VALVE
NEW WALL MOUNTED RECESSED MEDICAL AIR BRACKET.
EXISTING WALL MOUNTED RECESSED MEDICAL AIR BRACKET
TO BE REMOVED.
EXISTING WALL MOUNTED RECESSED MEDICAL VACUUM
OUTLET TO BE REMOVED.
EXISTING WALL MOUNTED RECESSED OXYGEN OUTLET TO BE
REMOVED.
EXISTING MEDICAL GAS ALARM PANEL OR VALVE BOX
EXISTING MEDICAL GAS ALARM PANEL OR VALVE BOX TO
BE
REMOVED.
PIPE SIZE (DIAMETER)12"
PIPE SIZE, GANG RISERS (DIAMETER)
12"S UP
14"DN
1-1/2"
SYMBOLS DESCRIPTIONSDESCRIPTIONSDESCRIPTIONS ABBREVIATIONS
TITLENUMBER
EXISTING PLUMBING FIXTURE TO REMAIN
EXISTING WATER COOLER
EXISTING TOILET
EXISTING MOP SINK OR SHOWER
NEW PLUMBING FIXTURE
NEW WATER COOLER
NEW TOILET
NEW MOP SINK OR SHOWER
EXISTING PLUMBING FIXTURE TO BE REMOVED
EXISTING WATER COOLER TO BE REMOVED
EXISTING TOILET TO BE REMOVED
EXISTING MOP SINK OR SHOWER TO BE REMOVED
SYMBOLS DESCRIPTIONS
SYMBOLS DESCRIPTIONS
DUCT ACCESS DOOR
ABOVE FINISHED FLOOR
ACCESS PANEL
ARCHITECT
AIR SEPARATOR
BELOW SLAB (TYPE "K" COPPER)
BRITISH THERMAL UNIT
BRITISH THERMAL UNIT PER HOUR
COLD & HOT WATER
CLEAN OUT
CONNECT
CONTRACTOR
COLD WATER
DIAMETER
DOWN
DRAIN
DRINKING WATER
DRINKING WATER RECIRC.
DRAWING(S)
EXISTING
EACH
ELECTRICAL CONTRACTOR
EXPANSION LOOP
EXPANSION TANK
EXISTING TO BE REMOVED
EXISTING TO REMAIN
FLEXIBLE CONNECTION
FLOOR CLEAN OUT
FLOOR DRAIN
FLOOR DRAIN W/ TRAP PRIMER
FREEZE PROOF HOSE BIBB
FEET PER MINUTE
FEET
GALLONS
GENERAL CONTRACTOR
GALLONS PER MINUTE
GATE VALVE
HEIGHT
HORSE POWER
HOT WATER
HOT WATER RECIRCULATION
INTERNATIONAL PLUMBING CODE
INSIDE DIAMETER
INCHES
INDIRECT WASTE
KILOWATTS
THOUSANDS OF B.T.U.'S PER HOUR
MECHANICAL
MOUNTED
NORMALLY CLOSED
NORMALLY OPEN
NOT IN CONTRACT
NOT TO SCALE
OUTSIDE DIAMETER
PLUMBING CONTRACTOR
PRESSURE DROP
POUNDS PER SQUARE INCH
ROOF DRAIN
ROOM
RELIEF VALVE
RAIN WATER LEADER
SANITARY
SANITARY DRAIN
SQUARE FEET
STATIC PRESSURE
STAINLESS STEEL
TYPICAL
VENT
VACUUM BREAKER
VENT THROUGH ROOF
WASTE
WITH
WALL CLEANOUT
BFP BACK FLOW PREVENTOR
CONCENTRIC REDUCER (ENLARGER)
ECCENTRIC REDUCER (ENLARGER)
CRD
ERD
FLOOR DRAINFD
FLOOR CLEAN OUTFCO
WASTE ANETHESIA GAS DISPOSAL (EVAC)WAGDWAGD
DE-IONIZED WATERDIDI
O
A
V
O
A
V
O
A
V type
PIPING BELOW FLOOR/UNDER SLAB
NOTE:
REFER TO ARCHITECTURAL DOCUMENTS FOR DEDUCT ALTERNATE ITEMS.
REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
PLUMBING: THERE ARE NO PLUMBING ALTERNATES. INSTALL ALL PLUMBING AS
MEDICAL GAS SYMBOLSPIPING SYMBOLSGENERAL SYMBOLSGENERAL ABBREVIATIONSGENERAL PLUMBING NOTES
NEW EQUIPMENT SYMBOLS
DEMOLITION EQUIPMENT SYMBOLS
PLUMBING ALTERNATE LIST
AD
AFF
AP
ARCH
AS
BS
BTU
BTUH
C&HW
CO
CONN
CONTR
CW
DIA
DN
D
DW
DWR
DWG OR DWGS
E,EX OR (E)
EA.
EC
EL
ET
ETBR
ETR
FC
FCO
FD
FDTP
FPHB
FPM
FT
GAL
GC
GPM
GV
H
HP
HW
HWR
I.P.C.
ID
IN
IR
KW
MBH
MECH
MTD
N.C. OR NC
N.O. OR NO
NIC
NTS
OD
PC
PD
PSI
RD
RM
RV
RWL
S
SD
SF
SP
SS
TYP
V
VB
VTR
W W/
WCO
EXISTING PIPING TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
LIMIT OF DEMOLITION
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc he s
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Legend & General Notes
PL001
ERDCMP 99 of 118
EXISTING WATER HEATER TO
BE REMOVED. REMOVE ALL
PIPING AND ACCESSORIES.
2"ø DCW
1"ø DCW
HEATING MAKEUP TO REMAIN
2"ø DCW
3"ø DCW
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8 C.1
4.7
5.9
D.9
B.1
REMOVE ALL ABOVE SLAB
PLUMBING SYSTEM
COMPONENTS WITHIN
THIS AREA. PROVIDE
CLEANOUTS WHERE
REQUIRED BY CODE.
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Domestic Water Basement Demolition Plan
PD101
ERDCMP 100 of 118
3/16" = 1'-0"1 Plumbing Domestic Water Basement Demolition Plan
EXISTING SUMP PUMP TO REMAIN.
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8 C.1
4.7
5.9
D.9
B.1
REMOVE ALL ABOVE SLAB
PLUMBING SYSTEM
COMPONENTS WITHIN
THIS AREA. PROVIDE
CLEANOUTS WHERE
REQUIRED BY CODE.
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Sanitary & Vent Basement Demolition Plan
PD102
ERDCMP 101 of 118
3/16" = 1'-0"1 Plumbing Sanitary & Vent Basement Demolition Plan
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8 C.1
4.7
5.9
D.9
B.1
REMOVE ALL PLUMBING
SYSTEM COMPONENTS
WITHIN THIS AREA.
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Domestic Water First Floor Demolition Plan
PD103
ERDCMP 102 of 118
3/16" = 1'-0"1 Plumbing Domestic Water First Floor Demolition Plan
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8 C.1
4.7 5.9
D.9
B.1
REMOVE ALL PLUMBING
SYSTEM COMPONENTS
WITHIN THIS AREA.
PROVIDE CLEANOUTS
WHERE REQUIRED BY
CODE.
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Sanitary & Vent First Floor Demolition Plan
PD104
ERDCMP 103 of 118
3/16" = 1'-0"1 Plumbing Sanitary & Vent First Floor Demolition Plan
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8 C.1
4.7
5.9
D.9
B.1
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Domestic Water Second Floor Demolition Plan
PD105
ERDCMP 104 of 118
3/16" = 1'-0"1 Plumbing Domestic Water Second Floor Demolition Plan
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8 C.1
4.7
5.9
D.9
B.1
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Sanitary & Vent Second Floor Demolition Plan
PD106
ERDCMP 105 of 118
3/16" = 1'-0"1 Plumbing Sanitary & Vent Second Floor Demolition Plan
STAIR 2
GS-23
STAIR 1
GS-10
FD-E
2 1/2"ø DCW UP 1"ø DHW UP 1/2"ø DHWR UP
2 1/2"ø DCW UP 1 1/2"ø DHW UP
3/4"ø DHWR UP
DWM
36BA001
ROUTE WH VENTING UP TO
ROOF. MINIMIZE OFFSETS.
INSTALL PER
MANUFACTURER'S
RECOMMENDATIONS.
WATER HEATER VENTING UP. EXTEND
BEYOND ROOF. INSTALL ACCORDING TO
MANUFACTURER'S RECOMMENDATIONS.
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8 C.1
4.7
5.9
D.9
B.1
P-801
P-801
TP-36BA002
EXP
36BA001
FD-E
FD-E
TP-36BA001
3"ø DCW
3"ø DCW
2 1/2"ø DCW
1 1/2"ø DCW
1 1/2"ø DHW
1 1/2"ø DHW
3/4"ø DHWR
3/4"ø DHWR
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Domestic Water Basement Plan
PL101
ERDCMP 106 of 118
3/16" = 1'-0"1 Plumbing Domestic Water Basement Plan
EMERG
ELECTRIC
G-08
WATER
SERVICE
G-09
STAIR 2
GS-23
ELECTRIC
G-07
TEL / IT
G-05
CORR
CR-G-06
BOILER
G-03
ELEV LOBBY
G-01
STAIR 1
GS-10
FD-E
FD-E
EXISTING SUMP PUMP TO REMAIN.
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8 C.1
4.7
5.9
D.9
B.1
CO
CONNECT ELEVATOR
SUMP PUMP DISCHARGE
TO SAN LINE WITH AIRGAP.
ELEVATOR SUMP PUMP DISCHARGE. PROVIDE
STANCOR ELEVATOR PIT SYSTEM MODEL SE-50 O/M
ELV OR EQUAL. PUMP CAPACITY SHALL BE 3000
GPH AT 20 FT OF HEAD, 120V/1PH, 0.5 HP, 2"
DISCHARGE. PUMP SHALL TURN OFF WHEN OIL IS
DETECTED AND ACTIVATE ALARM. MANUAL
OVERRIDE TO RESTART PUMP SHALL BE PROVIDED.
INSTALL PER MANUFACTURER'S
RECOMMENDATIONS
2"ø SAN
NOTE:
PROVIDE CLEANOUTS WHERE REQUIRED
BY CODE ON NEW PIPING AND EXISTING
PIPING TO REMAIN.
TP-36BA002
DWM
36BA001
EXP
36BA001
VENT PIPING SERVING EXISTING
ITEMS IN THIS AREA SHALL REMAIN
WHERE POSSIBLE. RE-ROUTE ON
FLOOR ABOVE TO ACCOMODATE NEW
ARCHITECTURAL PLAN.
4"ø SAN
4"ø SAN
4"ø SAN
4"ø SAN
4"ø SAN 4"ø SAN
2 1/2"ø SAN UP
4"ø SAN UP
4"ø SAN UP
4"ø SAN 2 1/2"ø SAN
2 1/2"ø SAN UP
2 1/2"ø SAN
4"ø SAN 2"ø SAN UP
4"ø SAN UP 4"ø SAN UP
2"ø SAN UP
CO
DOWN TO SIMPLEX PUMP PRE-MANUFACTURED
PACKAGE WITH BASIN AND ALARM. ZOELLER PUMP
MODEL M211 WITH POLY MOLDED BASIN WITH ALARM.
4/10HP, 115V, 1 PH, 5.5 AMPS, 32 GPM AT 15 FT HEAD.
INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
COORDINATE LOCATION WITH ALL OTHER TRADES.
CONTRACTOR SHALL
COORDINATE FINAL FLOOR
DRAIN LOCATION WITH
SPRINKLER ENTRANCE AND
OTHER TRADES.
FCO
FD-E
2 1 /2" ø
SA
N
4"ø SAN
1-1/4" NG TO NEW
1-1/4" OVERFLOW DRAIN
FROM CONDENSATED PUMP
1-1/4" OVERFLOW DRAIN
FROM CONDENSATED PUMP
FIRST FLOOR
TRENCHING REQUIRED
FIRST FLOOR TRENCHING REQUIRED
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Sanitary & Vent Basement Plan
PL102
ERDCMP 107 of 118
3/16" = 1'-0"1 Plumbing Sanitary & Vent Basement Plan
CONF.
1-09
CONF.
1-08
CONF.
1-07
TRASH / REC
1-06
JAN STOR
1-11
TLT-M
1-14
TLT-W
1-15
BREAK
ROOM
1-16
COPY
1-17
CONF.
1-54
CONF.
1-53
INTVW
1-38
INTVW
1-37
INTVW
1-36
INTVW
1-35
INTVW
1-34
INTVW
1-33
INVEST.
OFFICE
1-32
INVEST.
OFFICE
1-31
INVEST.
OFFICE
1-30
INVEST.
OFFICE
1-29
INVEST.
OFFICE
1-28
INVEST.
OFFICE
1-27
DIRECTOR
OFFICE
1-26
ALCOVE
1-43
TLT-M
1-45
TLT-W
1-44
COAT
1-42
CLST
1-40 TLT-U
1-46
TLT-U
1-47 STOR.
1-52
COPY
1-50 INVEST.
OFFICE
1-51
ELEC.
1-21
EMERG.
ELEC
1-22
WORK RM /
LAB
1-24
CORR
CR-1-25
OPEN
OFFICE
1-18
VEST
1-01
CORR
CR-1-39
ENTRY
LOBBY/
WAITING
1-02
VEND.
1-41
MAIL /
STORAGE
1-04
CORR.
CR-1-05
P-103
P-103 P-498
P-498
P-498
P-103
P-103P-498
EWC-609
P-531
P-502
P-499
P-499
P-203
P-103 P-103
P-103 P-499
P-499
P-531
EWC-609
1/2"ø DHWR UP
1"ø DHW UP
2"ø DCW UP
2 1/2"ø DCW DN
1 1/2"ø DHW DN 3/4"ø DHWR DN
2 1/2"ø DCW DN 1"ø DHW DN
1/2"ø DHWR DN
WATER HEATER VENTING UP & DN. EXTEND
BEYOND ROOF. INSTALL ACCORDING TO
MANUFACTURER'S RECOMMENDATIONS.
TP-361A003
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8 C.1
4.7
5.9
D.9
B.1
STOR.
1-49
CORR.
CR-1-48
I.T.
1-19
RECEPTION
1-03
P-801
FD-C
FD-C
2"ø DCW
3/4"ø DCW
2"ø DCW
3/4"ø DCW 3/4"ø DCW
1 1/2"ø DCW
1 1/2"ø DCW
2 1/2"ø DCW 2"ø DCW
2"ø DCW
1 1/2"ø DCW
1 1/2"ø DCW
1 1/2"ø DCW 1"ø DHW
3/4"ø DHW
3/4"ø DHW
1"ø DHW
3/4"ø DHW
1"ø DHW
1/2"ø DHWR
1 GPM
1 GPM
P-801
3/4"ø DCW DN
AREA OF DEDUCT ALT NO 1
AREA OF DEDUCT ALT NO 3
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Domestic Water First Floor Plan
PL103
ERDCMP 108 of 118
3/16" = 1'-0"1 Plumbing Domestic Water First Floor Plan
CONF.
1-09
CONF.
1-08
CONF.
1-07
TRASH / REC
1-06
JAN STOR
1-11
TLT-M
1-14
TLT-W
1-15
BREAK
ROOM
1-16
COPY
1-17
CONF.
1-54
CONF.
1-53
INTVW
1-38
INTVW
1-37
INTVW
1-36
INTVW
1-35
INTVW
1-34
INTVW
1-33
INVEST.
OFFICE
1-32
INVEST.
OFFICE
1-31
INVEST.
OFFICE
1-30
INVEST.
OFFICE
1-29
INVEST.
OFFICE
1-28
INVEST.
OFFICE
1-27
DIRECTOR
OFFICE
1-26
ALCOVE
1-43
TLT-M
1-45
TLT-W
1-44
COAT
1-42
CLST
1-40 TLT-U
1-46
TLT-U
1-47
STOR.
1-52
COPY
1-50 INVEST.
OFFICE
1-51
ELEC.
1-21
EMERG.
ELEC
1-22
WORK RM /
LAB
1-24
CORR
CR-1-25
OPEN
OFFICE
1-18
VEST
1-01
CORR
CR-1-39
ENTRY
LOBBY/
WAITING
1-02
VEND.
1-41
MAIL /
STORAGE
1-04
CORR.
CR-1-05
FCO
P-498
P-103
P-103 P-498
P-531
P-103
P-103 P-498
P-498
EWC-609
EWC-609
P-531 P-499
P-499
P-103
P-103P-103
P-203 P-499
P-499
P-502
FCO
FD-C FD-C
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8 C.1
4.7
5.9
D.9
B.1
STOR.
1-49
CORR.
CR-1-48
I.T.
1-19
RECEPTION
1-03
TP-361A003
FCO
VTR
2 1/2"ø SAN DN 2"ø SAN UP
4"ø SAN DN
4"ø SAN DN
4"ø SAN UP
4"ø SAN UP
2 1/2"ø SAN DN 2 1/2"ø SAN
3" VTR
2 1/2"ø VENT2 1/2"ø VENT
2 1/2"ø VENT UP
2"ø VENT UP
2"ø VENT1 1/2"ø VENT UP
1 1/4"ø D
1-1/4" OVERFLOW
FIELD ROUTE TO
BASEMENT.
1-1/4" OVERFLOW
FIELD ROUTE TO
BASEMENT.
P-531
SANITARY DOWN
TRENCHING REQUIRED FOR HATCHED AREA.
SEE BASEMENT SANITARY PLAN
TRENCHING REQUIRED FOR HATCHED AREA.
SEE BASEMENT SANITARY PLAN
AREA OF DEDUCT ALT NO 1
AREA OF DEDUCT ALT NO 3
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Sanitary & Vent First Floor Plan
PL104
ERDCMP 109 of 118
3/16" = 1'-0"1 Plumbing Sanitary & Vent First Floor Plan
DNDN
P-499
P-531
P-103
P-103P-103
P-203
P-499
P-502
2"ø DCW DN
1"ø DHW DN
1/2"ø DHWR DN
WATER HEATER VENTING FROM BASEMENT.
EXTEND BEYOND ROOF. INSTALL
ACCORDING TO MANUFACTURER'S
RECOMMENDATIONS.
TP-362A004
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8 C.1
4.7
5.9
D.9
B.1
JAN
2-07
TLT-M
2-11
TLT-W
2-12
BREAK
ROOM
2-13
COPY
2-15
CONF.
2-14
ELEC.
2-20
COPY
2-17
OPEN
OFFICE
2-16
CIRC.
CR-2-08
CIRC.
CR-2-18
OPEN
OFFICE
2-03
TEAMING/
CONF
2-04
TEAMING/
CONF
2-05
I.T.
2-19
EWC-609
FD-C
FD-C
2"ø DCW
1 1/2"ø DCW1 1/2"ø DCW
3/4"ø DHW
1"ø DHW 1/2"ø DHWR
1 GPM
TO HUM-1
ON ROOF
3/4"ø DCW
AREA OF DEDUCT ALT NO 1
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Domestic Water Second Floor Plan
PL105
ERDCMP 110 of 118
3/16" = 1'-0"1 Plumbing Domestic Water Second Floor Plan
DNDN
P-502
P-499
P-203
P-103
P-103
P-103
P-499
P-531
FD-CFD-C
A
2 3 4 5 6 7 8 9
F
E
D.8
D.2
D
C.5
C
B.5
B
6.2
B.6
7.92.8 3.2
B.8 C.1
4.7
5.9
D.9
B.1
JAN
2-07
TLT-M
2-11
TLT-W
2-12
BREAK
ROOM
2-13
COPY
2-15
CONF.
2-14
ELEC.
2-20
COPY
2-17
OPEN
OFFICE
2-16
CIRC.
CR-2-08
CIRC.
CR-2-18
OPEN
OFFICE
2-03
TEAMING/
CONF
2-04
TEAMING/
CONF
2-05
I.T.
2-19
EWC-6093" VTR
2"ø SAN DN
4"ø SAN DN
4"ø SAN DN
2 1/2"ø VENT DN
2"ø VENT DN
2"ø VENT3"ø VENT
1 1/2"ø VENT DN
1 1/2"ø VENT
1-1/4" OVERFLOW
FIELD ROUTE TO
BASEMENT.
3/4" CONDENSATE
DRAIN FROM
DISPERSION MANIFOLD
3/4"ø D
1-1/2" DRAIN FROM
HUMIDIFIER
3/4"ø D
DRAIN TO MOP SINK
PROVIDE CONDENSATE DRAIN PUMP AND RECEIVER.
RATED FOR 212 F WATER,
12 GPM MINIMUM,
1/2 HP MOTOR, 120V/1PH.
INSTALL PER MFR'S RECOMMENDATIONS.
VENT TO ROOF.
3/4" CONDENSATE
PUMP DISCHARGE ROUTE STACKED DRAIN LINES
ALONG DUCT INSIDE SOFFIT.
AREA OF DEDUCT ALT NO 1
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Sanitary & Vent Second Floor Plan
PL106
ERDCMP 111 of 118
3/16" = 1'-0"1 Plumbing Sanitary & Vent Second Floor Plan
ADJUSTABLE HANGER W/ROLLER
(FOR PIPE 3" THRU 6")(FOR PIPES 2 1/2" & SMALLER)
NOTES:
1. SEE SPECIFICATION FOR HANGER SIZES.
2. PIPE 8" AND LARGER SHALL HAVE ROLLER SUPPORTED BY DUAL RODS.
CLEVIS HANGER
PIPE
INSULATION
GALVANIZED
INSULATION
SHIELD 12"
LONG
PIPE COVERING
PROTECTIVE
SADDLE
HEAVY-DUTY
CLEVIS HANGER
LOCKING NUT
(TYPICAL)
SUPPORT NUT
(TYPICAL)
PIPE HANGER N.T.S.
NOTE:
FLOOR DRAINS REQUIRE TRAP PRIMER. REFER TO TRAP PRIMER DETAIL ON THIS SHEET.
SLOPE TO DRAIN
FINISHED
FLOOR
SURFACE
CONCRETE FLOOR
FLOOR
DRAIN
STRAINER
FLOOR DRAIN IN EXISTING FLOOR N.T.S.
INTERIOR FLOOR CLEANOUT (FCO)
CAST IRON LONG SWEEP 1/4 BEND
OR CAST IRON COMB. Y & 1/8
BEND. (USE REDUCING TYPE FOR
SIZE CHANGES)
BUILDING WASTE
OR DRAIN
CAST IRON CLEANOUT
WITH COVER FOR
APPLICABLE DUTY
DIRECTION OF FLOW
CAST IRON EXTENSION-
SAME AS DRAIN SIZE UP
TO 4" DIAMETER
FINISHED FLOOR
INTERIOR WALL CLEANOUT (WCO)
FLOOR
PLUGGED TEE
WITH CLEANOUT
CHROME WALL COVER
AND SCREW AT FINISH
AREAS ONLY
MAY EXTEND AS WASTE OR VENT
WALL
CLEANOUT N.T.S.
"P"TRAP
TRAP PRIMER
CONNECTION
1/2" FROM TRAP
PRIMER
TRAP PRIMER FTG
VENT
FLOOR DRAIN
FLOOR DRAIN W/ TRAP PRIMER N.T.S.
3/4" DRAIN TO INDIRECT DRAIN
DRAIN VALVE,
DRAIN TO PAN
WATER HEATER
SEISMIC STRAPS
SECURE TO
STRUCTURE
DRAIN PAN
CW SUPPLY
HW SUPPLY
EXP-36BA001
AMTROL MODEL ST-12-C
6.4 GA TOTAL VOLUME,
2.6 GAL MIN
ACCEPTANCE.
ASME T&P RELIEF VALVE
HW CIRCULATION
DCP-36BA001
TACO 006B-IFC 3GPM, 7 FT
HEAD, 115V, 60HZ, 1PH,
0.52A, 3250RPM, 1/40HP140°F
HW SUPPLY
130°F
THERMOMETER
TMV-36BA001
POWERS MIXING VALVE
MODEL LFLM491-2 OR
EQUAL. INSTALL ON WALL IN
ACCESSIBLE LOCATION.
0.5 GPM MIN FLOW
5 GPM MAX FLOW
WATER HEATER & HI-LOW RECIRCULATION SYSTEM N.T.S.
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459- Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001 F: (207) 865-1136
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
ASBESTOS:
Axiom Partners 979 Main St.
Wakefield, MA 01880 T: (781) 213-9198 F: (781) 213-6992
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
FULLY SPRINKLERED
COA#:PE.0005072- Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts
– F ina l
04-03-2017
Plumbing Details & Schedules
PL501
ERDCMP 112 of 118
WATER HEATER SCHEDULE
Unit Type Unit Mark CAPACITY STORAGE CAPACITY STORAGE TEMP VOLTS PHASE MANUFACTURER AND MODEL
DWM 36BA001 237 GPH @ 100 DEG F RISE 55 140 120 1 HTP MODEL PH-199-55SA
PLUMBING FIXTURE SCHEDULE
TAG
Description
CW CONNECTION
SIZE
HW CONNECTION
SIZE
WASTE
CONNECTION
SIZE
VENT
CONNECTION
SIZE
TP CONNECTION
SIZE MANUFACTURER AND MODEL
EWC 609 EWC HANDICAPPED 1/2" 1 1/2" 1 1/2" ELKAY LZSTLR8WSVR*K WATER COOLER
FD C FLOOR DRAIN 3" 2" 1/2" ZURN Z415B WITH TRAP PRIMER CONNECTION
FD E FLOOR DRAIN 4" 2" 1/2" ZURN Z610 WITH TRAP PRIMER CONNECTION
P 103 WATER CLOSET 1" 4" 2" AMERICAN STANDARD MODEL 3351.101 WATER CLOSET WITH SLOAN MODEL 111-1/1.6/1.1 FLUSH VALVE P 203 URINAL 3/4" 2" 1 1/2" AMERICAN STANDARD MODEL 6590.001EC URINAL WITH SLOAN MODEL 186-0.25 FLUSH VALVE P 498 LAV-WALL HUNG 1/2" 1/2" 1 1/2" 1 1/2" KOHLER MODEL K-1999 LAVATORY WITH CHICAGO FAUCETS MODEL 116.770.AB.1 FAUCET P 499 LAV-COUNTER 1/2" 1/2" 1 1/2" 1 1/2" CHICAGO FAUCETS MODEL 116.770.AB.1 FAUCET. BOWL IS INTEGRAL TO COUNTER.
P 502 SERVICE SINK 1/2" 1/2" 3" 2" FIAT MODEL TSBC1610 SERVICE SINK WITH CHICAGO FAUCETS MODEL 540-LD897SWXFABCP FAUCET. PROVIDE SERVICE SINK WITH HOSE, HOSE BRACKET & WALL GUARDS P 531 SINK-COUNTER 1/2" 1/2" 1 1/2" 1 1/2" ELKAY MODEL LRAD252165 SINK WITH GROHE MODEL 32665 FAUCET
P 801 FREEZEPROOF HOSE BIBB 3/4" WATTS HY-725
TP 36BA001 TRAP PRIMER 1/2" PRECISION PLUMBING PRODUCTS PTS-4. FIELD ROUTE 1/2" PIPING BETWEEN TRAP PRIMER & TRAP. PLUG UNUSED PORTS.
TP 36BA002 TRAP PRIMER 1/2" PRECISION PLUMBING PRODUCTS PTS-4. FIELD ROUTE 1/2" PIPING BETWEEN TRAP PRIMER & TRAP. PLUG UNUSED PORTS.
TP 361A003 TRAP PRIMER 1/2" PRECISION PLUMBING PRODUCTS PTS-4. FIELD ROUTE 1/2" PIPING BETWEEN TRAP PRIMER & TRAP. PLUG UNUSED PORTS.
TP 362A004 TRAP PRIMER 1/2" PRECISION PLUMBING PRODUCTS PTS-4. FIELD ROUTE 1/2" PIPING BETWEEN TRAP PRIMER & TRAP. PLUG UNUSED PORTS.
PROVIDE CHICAGO FAUCETS MODEL 131-CFMAB OR EQUAL AT EACH HOT WATER SUPPLY TO FIXTURES. SET TO 120 DEG (ADJ.)
| Sheets |
| +T001 - Title Sheet |
| G001.pdf |
| Sheets |
| -G001 - VA Project General Notes |
| G002.pdf |
| Sheets |
| -G002 - General Notes & Material Legend |
| AD100.pdf |
| Sheets |
| AD100 - Basement Demolition Plan |
| AD101.pdf |
| Sheets |
| AD101 - First Floor Demolition and Abatement Plans |
| AD102.pdf |
| Sheets |
| AD102 - Second Floor Demolition and Abatement Plan |
| AD103.pdf |
| Sheets |
| AD103 - Roof Demolition Plan |
| AD201.pdf |
| Sheets |
| AD201 - Demolition Elevations |
| AS001.pdf |
| Sheets |
| AS001 - Assembly Types & Typical Mounting Heights |
| AS002.pdf |
| Sheets |
| AS002 - Code Plans |
| AS100.pdf |
| Sheets |
| AS100 - Basement Plan |
| AS101.pdf |
| Sheets |
| AS101 - First Floor Plan |
| AS102.pdf |
| Sheets |
| AS102 - Second Floor Plan |
| AS103.pdf |
| Sheets |
| AS103 - Roof Plan |
| AS104.pdf |
| Sheets |
| AS104 - First Floor Furniture, Equipment, and Finish Plan |
| AS105.pdf |
| Sheets |
| AS105 - Second Floor Furniture, Equipment, and Finish Plan |
| AS106.pdf |
| Sheets |
| AS106 - First Floor Reflected Ceiling Plan, Ceiling Systems and Details |
| AS107.pdf |
| Sheets |
| AS107 - Second Floor Reflected Ceiling Plan |
| AS201.pdf |
| Sheets |
| AS201 - Exterior Elevations |
| AS210.pdf |
| Sheets |
| AS210 - Interior Elevations |
| AS211.pdf |
| Sheets |
| AS211 - Interior Elevations |
| AS212.pdf |
| Sheets |
| AS212 - Interior Elevations |
| AS213.pdf |
| Sheets |
| AS213 - Interior Elevations |
| AS301.pdf |
| Sheets |
| AS301 - Sections |
| AS302.pdf |
| Sheets |
| AS302 - Sections |
| AS401.pdf |
| Sheets |
| AS401 - Enlarged Plans |
| AS402.pdf |
| Sheets |
| AS402 - Elevator Plans, Sections & Details |
| AS403.pdf |
| Sheets |
| AS403 - Stair Details |
| AS501.pdf |
| Sheets |
| AS501 - Exterior Details |
| AS502.pdf |
| Sheets |
| AS502 - Exterior Details |
| AS503.pdf |
| Sheets |
| AS503 - Exterior Details |
| AS504.pdf |
| Sheets |
| AS504 - Interior Details |
| AS505.pdf |
| Sheets |
| AS505 - Typical Interior Partition Details |
| AS507.pdf |
| Sheets |
| AS507 - Typical Casework Details |
| AS601.pdf |
| Sheets |
| AS601 - Door and Frame Schedule, Notes, and Details |
| AS602.pdf |
| Sheets |
| AS602 - Window and Storefront Types and Details |
| AS603.pdf |
| Sheets |
| AS603 - Storefront and Exterior Details |
| AS605.pdf |
| Sheets |
| AS605 - Finish & Materials Legends |
| AS402.pdf |
| Sheets |
| AS402 - Elevator Plans, Sections & Details |
| Structural Collated.pdf |
| Sheets |
| SB100 - FIRST FLOOR FRAMING/FOUNDATION PLAN |
| SB300 - FOUNDATION SECTIONS & DETAILS |
| SF101 - EXISTING LOW ROOF/ 2ND FLOOR FRAMING PLAN AND MEZZANINE INFILL FRAMING PLAN |
| SF102 - ROOF FRAMING PLAN |
| SF200 - BRACED FRAME AND SHOTCRETE WALL ELEVATIONS |
| SF500 - FRAMING SECTIONS & DETAILS |
| SF501 - FRAMING SECTIONS & DETAILS |
| SF502 - FRAMING SECTIONS & DETAILS |
| SS001 - GENERAL NOTES |
| 650-333-SB100.pdf |
| Sheets |
| SB100 - FIRST FLOOR FRAMING/FOUNDATION PLAN |
| SB300 - FOUNDATION SECTIONS & DETAILS |
| SF101 - EXISTING LOW ROOF/ 2ND FLOOR FRAMING PLAN AND MEZZANINE INFILL FRAMING PLAN |
| SF102 - ROOF FRAMING PLAN |
| SF200 - BRACED FRAME AND SHOTCRETE WALL ELEVATIONS |
| SF500 - FRAMING SECTIONS & DETAILS |
| SF501 - FRAMING SECTIONS & DETAILS |
| SF502 - FRAMING SECTIONS & DETAILS |
| SS001 - GENERAL NOTES |
| 650-333-SB300.pdf |
| Sheets |
| SB100 - FIRST FLOOR FRAMING/FOUNDATION PLAN |
| SB300 - FOUNDATION SECTIONS & DETAILS |
| SF101 - EXISTING LOW ROOF/ 2ND FLOOR FRAMING PLAN AND MEZZANINE INFILL FRAMING PLAN |
| SF102 - ROOF FRAMING PLAN |
| SF200 - BRACED FRAME AND SHOTCRETE WALL ELEVATIONS |
| SF500 - FRAMING SECTIONS & DETAILS |
| SF501 - FRAMING SECTIONS & DETAILS |
| SF502 - FRAMING SECTIONS & DETAILS |
| SS001 - GENERAL NOTES |
| 650-333-SF101.pdf |
| Sheets |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.