36E77619R0010-004.pdf
PDF 24 MB Posted
- Solicitation number
- 36E77619R0010
About this file
36E77619R0010 S02 - Attachment 3 Drawings 650 333 Harwood Bid Drawings Full Set Rev1 2_Part1.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77619R0010-0004002.pdf | ||
| 36E77619R0010-0004000.docx | DOCX document | |
| 36E77619R0010-0004001.pdf | ||
| 36E77619R0010-0003000.docx | DOCX document | |
| 36E77619R0010-0003001.pdf | ||
| 36E77619R0010-0002001.pdf | ||
| 36E77619R0010-0002000.docx | DOCX document | |
| 36E77619R0010-0001000.docx | DOCX document | |
| 36E77619R0010-005.pdf | ||
| 36E77619R0010-006.pdf | ||
| 36E77619R0010-001.docx | DOCX document | |
| 36E77619R0010-002.doc | DOC document | |
| 36E77619R0010-009.docx | DOCX document | |
| 36E77619R0010-007.pdf | ||
| 36E77619R0010-008.pdf | ||
| 36E77619R0010-003.pdf | ||
| 36E77619R0010_2.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig ht h in ch o ne fo ot 16 on e q ua rte r i nc ot on e h a lf i th re e e ig hs th re e q ua rte rs
6" on e i
6" on e a nd on e h a lf i nc he s
6"
Raymond Picard Telephone: 401-459-4760 Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P./F.P.
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
ABATEMENT
Axiom Partners 979 Main Street Wakefield, MA 01880
(781) 213-9198
Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts-
Fin al
04-03-2017
Title Sheet
+T001
PNDW
DEPARTMENT OF VETERANS AFFAIRS
PROVIDENCE VA MEDICAL CENTER
CAPTAIN JONATHAN H. HARWOOD CENTER
385 NIAGARA STREET
PROVIDENCE, RHODE ISLAND 02907
Project No. 650-333 Captain Jonathan H. Harwood Center Renovation
ARCHITECTS, ENGINEERS, CONSULTANTS VA - CONTRACTING OFFICER REPRESENTATIVE (C.O.R.)
Raymond Picard
(401) 459-4760 VA Providence - VISN1
49 DARTMOUTH STREET
PORTLAND, MAINE 04101
www.pdtarchs.com
Sheet List - All
Sheet Number Sheet Name
+T001 Title Sheet General -G001 VA Project General Notes -G002 General Notes & Material Legend Civil VF101 Survey-Plan-Field CD101 Civil-Plan-Demo CS101 Civil-Plan-Site CG101 Civil-Plan-Grading CU101 Civil-Plan-Utilities LP101 Landscape-Plan-Planting CS501 Civil-Details-Site CS502 Civil-Details-Site CS503 Civil-Details-Site CS504 Civil-Details-Site Architectural AD100 Basement Demolition Plan AD101 First Floor Demolition and Abatement Plans AD102 Second Floor Demolition and Abatement Plan AD103 Roof Demolition Plan AD201 Demolition Elevations AS001 Assembly Types & Typical Mounting Heights AS002 Code Plans AS100 Basement Plan AS101 First Floor Plan AS102 Second Floor Plan AS103 Roof Plan AS104 First Floor Furniture, Equipment, and Finish Plan AS105 Second Floor Furniture, Equipment, and Finish Plan AS106 First Floor Reflected Ceiling Plan, Ceiling Systems and Details AS107 Second Floor Reflected Ceiling Plan AS201 Exterior Elevations AS210 Interior Elevations AS211 Interior Elevations AS212 Interior Elevations AS213 Interior Elevations AS301 Sections AS302 Sections AS401 Enlarged Plans AS402 Elevator Plans, Sections & Details AS403 Stair Details AS501 Exterior Details AS502 Exterior Details AS503 Exterior Details AS504 Interior Details AS505 Typical Interior Partition Details AS506 Casework AS507 Typical Casework Details AS601 Door and Frame Schedule, Notes, and Details AS602 Window and Storefront Types and Details AS603 Storefront and Exterior Details AS605 Finish & Materials Legends Structural SS001 General Notes SB100 First Floor Framing/Foundation Plan SB300 Foundation Sections & Details SF101 Existing Low Roof, 2nd Floor Framing Plan and Mezzanine Infill Framing Plan SF102 Roof Framing Plan SF200 Braced Frame & Shotcrete Wall Elevations SF500 Framing Sections & Details SF501 Framing Sections & Details SF502 Framing Sections & Details Mechanical MH001 HVAC Legend & General Notes MD100 HVAC Basement Demolition Plan MD101 HVAC First Floor Demolition Plan MD102 HVAC Second Floor Demolition Plan MH100 HVAC Ductwork Basement Plan MH101 HVAC Piping Basement Plan MH102 HVAC Ductwork First Floor Plan MH103 HVAC Piping First Floor Plan MH104 HVAC Ductwork Second Floor Plan MH105 HVAC Piping Second Floor Plan MH106 HVAC Roof Plan MH501 HVAC Details MH502 HVAC Details MH503 HVAC Details MH601 HVAC Schedules MH602 HVAC Schedules MH603 HVAC Flow Diagrams MH801 HVAC Controls MH802 HVAC Controls Electrical E001 Electrical Legend and General Notes ED101 Electrical Basement Demolition Plan ED102 Electrical First Floor Demolition Plan ED103 Electrical Second Floor Demolition Plan ES101 Electrical Site Plan E002 Electrical One-Line Diagram E003 Electrical System One-Line Diagrams EL101 Electrical Lighting Basement EL102 Electrical Lighting First Floor Plan EL103 Electrical Lighting Second Floor Plan EP101 Electrical Power Basement Plan EP102 Electrical Power First Floor Plan EP103 Electrical Power Second Floor Plan EP104 Electrical Power & Systems Roof Plan ET101 Electrical Systems Basement Plan ET102 Electrical System First Floor Plan ET103 Electrical System Second Floor Plan E501 Electrical Details E502 Electrical Details E601 Electrical Schedules E602 Electrical Schedules Plumbing PL001 Plumbing Legend & General Notes PD101 Plumbing Domestic Water Basement Demolition Plan PD102 Plumbing Sanitary & Vent Basement Demolition Plan PD103 Plumbing Domestic Water First Floor Demolition Plan PD104 Plumbing Sanitary & Vent Basement Demolition Plan PD105 Plumbing Domestic Water Second Floor Demolitin Plan PD106 Plumbing Sanitary & Vent Second Floor Demolition Plan PL101 Plumbing Domestic Water Basement Plan PL102 Plumbing Sanitary & Vent Basement Plan PL103 Plumbing Domestic Water First Floor Plan PL104 Plumbing Sanitary & Vent First Floor Plan PL105 Plumbing Domestic Water Second Floor Plan PL106 Plumbing Sanitary & Vent Second Floor Plan PL501 Plumbing Details & Schedules Fire Protection FP001 Fire Protection General Notes, Details, & Legend FP100 Basement Level Fire Protection Plan FP101 First Level Fire Protection Hazard Classification Plan FP102 First Level Fire Protection Sprinkler Layout FP103 Second Level Fire Protection Hazard Classification Plan FP104 Second Level Fire Protection Sprinkler Layout
1. GENERAL CONTRACTOR SHALL ASSURE THAT ALL
TRADES ARE AWARE OF THEIR RESPECTIVE FULL SCOPE
OF WORK. CONTRACTOR SHALL PROCURE ALL
NECESSARY PERMITS AND INSPECTIONS. REFER TO ALL
CONTRACT DRAWINGS, SPECIFICATIONS AND NOTES
FOR ADDITIONAL RESPONSIBILITIES, DETAILS AND
SCOPE OF WORK. ALL WORK SHALL BE PERFORMED BY
PERSONNEL PROPERLY SKILLED IN THE TASK THEY ARE
PERFORMING AND AWARE OF THEIR PROJECT
RESPONSIBILITIES. WORKMANSHIP SHALL BE THE BEST
OF THEIR RESPECTIVE KIND USING THE MOST MODERN
APPROVED METHODS AND MATERIALS. GENERAL
CONTRACTOR SHALL DIRECTLY SUPERVISE ALL PHASES
OF CONSTRUCTION, AND THE SUPERVISOR SHALL HAVE
FULL AUTHORITY TO ACT ON FIELD CONDITIONS
ASSOCIATED WITH ALL TRADES TO PREVENT
CONSTRUCTION DELAYS. DAILY WORK LOGS SHALL BE
ISSUED TO THE VA PROJECT ENGINEER DESCRIBING IN
DETAIL THE MANPOWER, MAN-HOURS, WORK
PERFORMED BY EACH TRADE.
2. INFORMATION ON EXISTING CONDITIONS AND
PROPOSED DESIGN SOLUTIONS DESCRIBED IN THE
CONTRACT DOCUMENTS ARE BASED ON NON-
DESTRUCTIVE TESTING AND VISUAL SITE INVESTIGATION
OBSERVATIONS ACCESSIBLE IN AN OCCUPIED
STRUCTURE. LOCATIONS OF COMPONENTS ARE
APPROXIMATE AND INFORMATION PROVIDED IS
DIAGRAMMATIC. IN SOME INSTANCES, IT MAY HAVE
BEEN IMPRACTICABLE TO DETAIL ALL THE ITEMS IN THE
SPECIFICATIONS OR ON THE DRAWINGS BECAUSE OF
VARIANCES IN THE METHODS OF ACHIEVING THE
NECESSARY RESULTS. IN SUCH INSTANCES, THE
CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS,
DRAWINGS, SERVICES AND CONNECTIONS NECESSARY
NOT LIMITED TO THE INFORMATION PROVIDED TO
PRODUCE SYSTEMS, APPURTENANCES AND EQUIPMENT
WHICH ARE COMPLETE, FUNCTIONAL AND READY FOR
PROPER OPERATION BY FACILITY PERSONNEL FOR THE
PURPOSE INTENDED IN ACCORDANCE WITH THEIR
NEEDS AND THE REQUIREMENTS OF THE
MANUFACTURERS AT NO ADDITIONAL COST/TIME TO THE
GOVERNMENT. ALL WORK SHALL BE PERFORMED
WITHIN THE REQUIREMENTS OF THE GENERAL
CONDITIONS, GENERAL REQUIREMENTS, DRAWINGS,
SPECIFICATIONS AND NOTES. PRIOR TO THE BID
OPENING DATE THE CONTRACTOR IS HIGHLY ADVISED
TO VISIT THE FACILITY AND CAREFULLY EXAMINE THE
CONDITIONS/DIFFICULTIES THAT WILL AFFECT
CONSTRUCTION TO AVOID PROBLEMS THAT MAY BE
CAUSED BY UNFAMILIARITY WITH
CONDITIONS/DIFFICULTIES THAT ARE EITHER VISIBLE OR
READILY CONSTRUED BY AN EXPERIENCED OBSERVER.
3. GENERAL CONTRACTOR SHALL COORDINATE ALL
WORK WITH ALL TRADES, AND EQUIPMENT INSTALLERS
IN ORDER TO MAINTAIN PROPER USE AND ACCESS TO
ALL ITEMS AND SPACES. REFER TO THE "COORDINATION
DRAWING CHECKLIST" FOR FURTHER DETAILS. GENERAL
CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL
EQUIPMENT AND COMPONENTS BEING INSTALLED WITH
THE PLACEMENT LOCATION AND DIMENSION
REQUIREMENTS. PRIOR TO JOB EXECUTION EACH
TRADE SHALL SUBMIT "COMPLETE" COORDINATED SHOP
DRAWINGS INDICATING ALL EQUIPMENT AND MATERIAL
LAYOUTS INDICATING LOCATIONS FROM
WALLS/COLUMNS, BOTTOM/TOP ELEVATIONS, VIBRATION
ISOLATORS, SUPPORTS, DIMENSIONS, UTILITY
REQUIREMENTS AND EQUIPMENT SUBMITTAL NUMBERS.
EACH TRADE SHALL MAINTAIN A SET OF WORKING
DRAWINGS TO DOCUMENT AS-BUILT INFORMATION AS
THE WORK PROGRESSES AND SUBMIT TO THE VA
PROJECT ENGINEER MONTHLY FOR REVIEW.
4. THE CONTRACT DOCUMENTS SHOW OR DESCRIBE
THE GENERAL ARRANGEMENT OF PIPES, EQUIPMENT,
COMPONENTS, APPURTENANCES BUT DO NOT IDENTIFY
ALL REQUIRED FITTINGS AND OFFSETS THAT ARE
NECESSARY TO PROPERLY COMPLETE THE
INSTALLATION. CONTRACTOR SHALL ALTER LOCATION
OF ITEMS ON THE DRAWINGS WHERE NECESSARY TO
AVOID INTERFERENCE AND CLEARANCE DIFFICULTIES.
IT IS THE INTENT OF THE DRAWINGS/SPECIFICATIONS
THAT THE CONTRACTOR SHALL PROVIDE ALL MATERIALS
AND LABOR NECESSARY TO COMPLETE THE WORK
DESCRIBED OR IMPLIED BY THE DOCUMENTS AT NO
ADDITIONAL COST/TIME TO THE GOVERNMENT. SHOULD
THE CONTRACT DOCUMENTS NOT AGREE WITH
THEMSELVES THE GREATER QUANTITY OF SUPERIOR
WORK AND MATERIALS SHALL BE PERFORMED. NO
STATEMENTS HERE IN SHALL RELIEVE THE CONTRACTOR
OF HIS RESPONSIBILITY AS DESCRIBED ELSEWHERE IN
THE CONTRACT DOCUMENTS.
5. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, CLEARANCES,
INFORMATION AND ASSUMPTIONS ON EXISTING CONDITIONS. ALL
WORK SHALL BE PERFORMED WITHIN APPROVED TOLERANCES,
MEET THE REQUIREMENTS OF THE MANUFACTURER AND BE NEAT,
STRAIGHT, PLUMB, LEVEL, SMOOTH. CONTRACTOR IS
RESPONSIBLE FOR REVIEWING ALL CONTRACT DOCUMENTS FOR
DISCREPANCIES PRIOR TO COMMENCING ANY AND ALL WORK.
CONTRACTOR SHALL NOTIFY THE VA PROJECT ENGINEER OF ANY
VARIANCES WITH ADEQUATE TIME SO THAT ALTERNATE
SOLUTIONS CAN BE ESTABLISHED WITHOUT DISRUPTING THE
ESTABLISHED CONSTRUCTION SCHEDULE. DATA AND
INFORMATION FURNISHED OR REFERRED TO IN THE
CONSTRUCTION DOCUMENTS IS FOR THE CONTRACTOR'S USE.
THE GOVERNMENT ASSUMES NO RESPONSIBILITY FOR ANY
INTERPRETATION OF OR CONCLUSION DRAWN FROM THE DATA
OR INFORMATION MADE BY THE CONTRACTOR BASED ON THE
INFORMATION MADE AVAILABLE BY THE GOVERNMENT. NOR DOES
THE GOVERNMENT ASSUME RESPONSIBILITY FOR ANY
UNDERSTANDING REACHED OR REPRESENTATION MADE
CONCERNING CONDITIONS THAT CAN AFFECT THE WORK BY ANY
OF ITS OFFICERS OR AGENTS BEFORE THE EXECUTION OF THIS
CONTRACT, UNLESS THAT UNDERSTANDING OR REPRESENTATION
IS EXPRESSLY STATED IN THE CONTRACT.
6. SUBMITTALS AND SCHEDULES REQUIRED BY THE
CONSTRUCTION DOCUMENTS SHALL BE CHECKED BEFORE
SUBMISSION BY TECHNICALLY QUALIFIED EMPLOYEES OF THE
CONTRACTOR FOR ACCURACY, COMPLETENESS AND COMPLIANCE
WITH THE CONTRACT REQUIREMENTS. THESE DOCUMENTS SHALL
BE SIGNED/STAMPED BY THE CONTRACTOR CERTIFYING TO THIS
REVIEW. SHOP AND COORDINATION DRAWINGS FOR ALL
EQUIPMENT AND COMPONENT INSTALLATION ARE REQUIRED. THE
CONTRACTOR SHALL SUBMIT FOR REVIEW A MINIMUM OF 5 SETS
OF INDIVIDUAL SUBMITTALS/SCHEDULES FOR REVIEW. THE
CONTRACTOR SHALL ISSUE ONE SUBMITTAL PACKAGE ONLY FOR
EACH SPECIFICATION SECTION. THE SUBMITTAL PACKAGE SHALL
CONTAIN A "CHECKLIST TABLE" PREPARED BY THE CONTRACTOR
ITEMIZING ALL REQUIRED SUBMITTAL ITEMS IDENTIFIED IN THE
CONTRACT DOCUMENTS. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO ASSURE THE TIMELY SUBMISSION/REVIEW OF
ALL NECESSARY SUBMITTALS AND SCHEDULES. SUCH REVIEW BY
THE GOVERNMENT OR DESIGNEE SHALL NOT ALLEVIATE THE
CONTRACTOR OF COMPLYING WITH THE TERMS AND CONDITIONS
SPECIFIED IN THE CONTRACT DOCUMENTS.
7. CONTRACTOR SHALL PROCURE ALL NECESSARY PERMITS AND
INSPECTIONS. VERIFY IN ADVANCE OF PERFORMING ANY WORK
THE AVAILABILITY, TYPE, CAPACITY, LOCATION OF ENERGY
SYSTEMS (EG, MECHANICAL, ELECTRICAL, PLUMBING) NECESSARY
TO PERFORM THE WORK. PROVIDE ALL NECESSARY LABOR,
MATERIAL AND COORDINATION TO COMPLETE THE WORK
DESCRIBED OR IMPLIED BY THE CONSTRUCTION DOCUMENTS FOR
EQUIPMENT TO OPERATE IN THE MANNER INTENDED AT NO
ADDITIONAL COST OR TIME TO THE GOVERNMENT. IN THE EVENT
THAT THE CHARACTERISTICS OF ANY EQUIPMENT DO NOT AGREE
WITH THE CHARACTERISTICS OF THE AVAILABLE SYSTEM, MAKE
THE NECESSARY MODIFICATIONS. ALL APPURTENANCES,
ASSEMBLIES, ARTICLES, EQUIPMENT, COMPONENTS, AND
MATERIALS FURNISHED SHALL BE NEW AND FREE FROM DEFECTS,
AND BE OF THE MOST SUITABLE GRADE, SIZE AND CAPACITY FOR
THE PURPOSE INTENDED, UNLESS OTHERWISE SPECIFIED OR
APPROVED BY THE VA PROJECT ENGINEER. SHOULD THE
CONTRACT DOCUMENTS NOT AGREE WITH THEMSELVES THE
GREATER QUANTITY OF SUPERIOR QUALITY OF MATERIALS AND
WORK SHALL BE USED.
8. NEW WORK SHALL BE INSTALLED AND CONNECTED TO
EXISTING WORK NEATLY AND CAREFULLY. DISTURBED OR
DAMAGED WORK SHALL BE REPLACED OR REPAIRED TO ORIGINAL
CONDITION. CARE SHALL BE USED DURING REMOVAL AND
INSTALLATION TO AVOID DAMAGING THE SURROUNDING
SURFACES. DAMAGED SURFACES AND ITEMS WITHIN THE
CONTRACT LIMITS SHALL BE PATCHED, REPAIRED, REFINISHED,
PAINTED AND/OR REPLACED AS NECESSARY WITH MATERIALS
COMPARABLE TO THE SURROUNDING MATERIAL AND SURFACE
EQUAL TO NEW CONDITIONS UNLESS OTHERWISE NOTED OR
DIRECTED BY THE VA PROJECT ENGINEER. FINISHED SURFACES
SHALL BE INDISTINGUISHABLE FROM THE SURROUNDING AREA.
9. ALL APPURTENANCES, ASSEMBLIES, ARTICLES, EQUIPMENT,
COMPONENTS, AND MATERIALS INSTALLED SHALL BE COMPLETE
FOR OPERATION, SERVICE AND MAINTENANCE FOR THE PURPOSE
INTENDED NOT LIMITED TO THE DETAILS AND INFORMATION
PROVIDED. ALL APPURTENANCES, ASSEMBLIES, ARTICLES,
EQUIPMENT, COMPONENTS, MATERIALS AND EXECUTION SHALL
BE IN CONFORMANCE WITH THE CONTRACT DOCUMENTS,
MANUFACTURER'S WRITTEN PROCEDURES AND
RECOMMENDATIONS, LATEST EDITIONS OF ALL APPLICABLE
FEDERAL/STATE/CITY CODES, REGULATIONS, ORDINANCES, AND
THE JURISDICTION HAVING AUTHORITY (JHA) AS APPLICABLE.
EXCEPT WHERE SPECIFIC DATES ARE GIVEN, THE ISSUE
(INCLUDING AMENDMENTS, ADDENDA, REVISIONS, SUPPLEMENTS,
AND ERRATA) IN EFFECT ON THE DATE OF INVITATION FOR BIDS
SHALL BE APPLICABLE. IN THE EVENT THAT CRITERIA
REQUIREMENTS CONFLICT, THE MOST STRINGENT REQUIREMENT
(THE GREATER QUANTITY OF SUPERIOR WORK AND MATERIALS)
SHALL BE MET.
10. THE WAREHOUSE BUILDING INDICATED ON THE CIVIL
DRAWINGS WILL REMAIN IN USE BY THE VA DURING
CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE
ALL WORK WITH THE VA TO ENSURE CONTINUED ACCESS
TO THIS BUILDING AS REQUIRED THROUGHOUT
CONSTRUCTION.
11. ALL CONSTRUCTION DEBRIS IS TO BE REMOVED OFF-
SITE AND DISPOSED OF PROPERLY BY THE CONTRACTOR.
ALL DEBRIS SHALL BE REMOVED ON A DAILY BASIS. ALL
SALVAGEABLE ITEMS ARE THE PROPERTY OF THE VA.
CONTRACTOR SHALL REMOVE FROM THE SITE ALL ITEMS
WHICH THE VA DOES NOT INTEND TO REUSE.
12. PRE-BID SITE VISIT RECOMMENDATION: BEFORE
SUBMITTING BID, VISIT THE SITE AND CAREFULLY EXAMINE
THE AREAS TO IDENTIFY COMPLEXITY, EXISTING
CONDITIONS AND DIFFICULTIES THAT WILL AFFECT WORK.
BID SUBMISSION SHALL BE CONSTRUED AS ACCEPTANCE
OF THE EXISTING CONDITIONS AND DIFFICULTIES. NO
CHANGE TO THE CONTRACT PRICE OR SCHEDULE SHALL
BE ALLOWED FOR WORK CAUSED BY UNFAMILIARITY WITH
THE SITE CONDITIONS THAT ARE VISIBLE OR READILY
CONSTRUED BY AN EXPERIENCED OBSERVER. DUE TO
ONGOING FACILITY ALTERATIONS VARIATIONS IN THE
EXISTING CONDITIONS SHALL BE ANTICIPATED.
PRE-WORKSITE RE-VISIT REQUIREMENT: BEFORE
STARTING WORK IN A PARTICULAR AREA, VISIT THE
WORKSITE AND CAREFULLY EXAMINE THE AREAS TO
VERIFY COMPLEXITY, EXISTING CONDITIONS AND
DIFFICULTIES THAT WILL AFFECT WORK INCLUDING ALL
WORK DONE UNDER VARIOUS SPECIFICATION SECTIONS
AND THE VA. COMMENCEMENT OF WORK SHALL BE
CONSTRUED AS ACCEPTANCE OF THE EXISTING
CONDITIONS AND DIFFICULTIES. NO CHANGE TO THE
CONTRACT PRICE OR SCHEDULE SHALL BE ALLOWED FOR
WORK CAUSED BY UNFAMILIARITY WITH THE SITE
CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED
BY AN EXPERIENCED OBSERVER. DUE TO ONGOING
FACILITY ALTERATIONS VARIATIONS IN THE EXISTING
CONDITIONS SHALL BE ANTICIPATED.
13. LOCATION/COMPLEXITY VARIATIONS WITHIN THE
PROJECT LIMITS ARE CONSIDERED TO HAVE NO CHANGE
ON THE CONTRACT PRICE OR SCHEDULE. TO PERFORM
AND COMPLETE ALL NECESSARY WORK, CONTRACTOR
WITH EXPERIENCED/TRAINED PERSONNEL SHALL BE
RESPONSIBLE FOR THE PROPER PROTECTION AND
RELOCATION/RESTORATION OF OBSTRUCTIONS WITHIN
THE CONSTRUCTION BOUNDARIES CONSIDERED
INTERFERING WITH THE INSTALLATION OR PERFORMANCE
OF CONSTRUCTION AFTER CONFIRMING PLANS WITH THE
VA STAFF AND PROJECT ENGINEER.
14. NOT USED
15. NOT USED
16. CONTRACTOR SHALL REMOVE ALL ABANDONED
COMPONENTS WITHIN THE CONSTRUCTION AREA. WHEN
WIRING FEEDS OTHER ACTIVE DEVICES, WIRING SHALL BE
REMOVED BACK TO THE NEAREST JUNCTION BOX. OTHER
EXISTING ITEMS NOT COMPATIBLE WITH THE NEW
CONSTRUCTION SHALL BE REMOVED UNLESS OTHERWISE
DIRECTED BY THE VA PROJECT ENGINEER. WHERE
EXISTING ITEMS ARE REMOVED, WALL/FLOOR AREAS
SHALL BE PATCHED TO MATCH SURROUNDING MATERIAL
AND SURFACE. ALL REMOVED COMPONENTS SHALL BE
TERMINATED PROPERLY.
17. CONTRACTOR SHALL PROPERLY RELOCATE ANY
EXISTING SYSTEMS (INCLUDING BUT NOT LIMITED TO
PLUMBING/STEAM LINES, DUCTS, PIPES, CONDUITS,
HANGERS, FIXTURES, SURFACE MOUNTED DEVICES,
SUSPENSION SYSTEMS) CONSIDERED INTERFERING
WITH THE INSTALLATION OF NEW CONSTRUCTION AT NO
ADDITIONAL EXPENSE TO THE GOVERNMENT, AND
AFTER CONFIRMING PLANS WITH THE VA PROJECT
ENGINEER. THIS WILL INCLUDE THE RELOCATION
AND/OR REINSTALLATION OF ITEMS WITHIN THE
CONSTRUCTION BOUNDARIES TO PERFORM AND
COMPLETE ALL NECESSARY WORK AS REQUIRED.
18. CONTRACTOR SHALL MAINTAIN AND RESTORE ALL
UTILITIES SERVICING UNDISTURBED REGIONS WHICH
PASS THROUGH THE RENOVATED AREAS.
19. THE MEP DRAWINGS AND SPECIFICATIONS INCLUDE
WORK REQUIRED TO MAKE CONNECTIONS TO EXISTING
INFRASTRUCTURE IN BUILDING. SOME OF THIS WORK
INVOLVES REMOVAL AND REINSTALLATION OF EXISTING
HUNG CEILINGS. THE SCOPE OF THIS WORK IS
CONVEYED ENTIRELY IN THE MEP DOCUMENTS.
REPLACE ANY BUILDING COMPONENTS DAMAGED BY
THE WORK WITH MATCHING MATERIALS.
20. WHERE NEW PLUMBING/HVAC CONNECTIONS AREA
MADE TO EXISTING SYSTEMS, SHUT-OFF BALL VALVES
ARE TO BE INSTALLED. UNIONS SHALL BE INSTALLED TO
ACCOMMODATE FUTURE SERVICE AND MAINTENANCE
OF ALL EQUIPMENT.
21. NOT USED.
22. NOT USED.
23. NOT USED.
24. CONTRACTOR SHALL PROPERLY SANITIZE/CLEAN
THE EACH AREA TO ASSURE CLEAN, HEALTHY, PROPER
AND EFFICIENT OPERATION OF ALL SYSTEMS. AT A
MINIMUM, USE OF HEPA VACUUM CLEANERS AND
APPROVED SANITIZING CLEANERS ARE REQUIRED. AT
THE COMPLETION OF CONSTRUCTION IN EACH AREA,
ALL AFFECTED SURFACES SHALL BE LEFT CLEAN,
POLISHED AND SANITARY INCLUDING BUT NOT LIMITED
TO ACCESS COVERS, FLOORS, WALLS, SILLS,
EQUIPMENT, FURNITURE, OFFICE APPURTENANCES.
25. EXISTING SURFACES WITHIN THE CONTRACT LIMITS
ARE TO BE PATCHED, REFINISHED AND PAINTED WITH
MATERIALS COMPARABLE TO THE EXISTING SURFACE
UNLESS OTHERWISE NOTED OR DIRECTED BY THE VA
PROJECT ENGINEER. DAMAGED SURFACES AND ITEMS
SHALL BE PATCHED, REFINISHED, REPLACED AND
PAINTED WITH MATERIALS MATCHING THE EXISTING
SURROUNDING MATERIAL AND SURFACE UNLESS
OTHERWISE NOTED OR DIRECTED BY THE VA PROJECT
ENGINEER. FINISHED SURFACES SHALL BE
INDISTINGUISHABLE FROM THE SURROUNDING AREA AT
THE COMPLETION OF WORK IN EACH AREA.
26. CONTRACTOR IS RESPONSIBLE FOR CLEANING
BOTH NEW AND EXISTING DUCTWORK WITHIN THE
CONSTRUCTION BOUNDARY. CLEANING AND TESTING
COMPANIES SHALL BE A MEMBER OF AIAQC, ASCR,
IAQA, MSHI AND NADC, AND BE CERTIFIED TO MEET
OSHA 1926 STANDARDS.
27. NOT USED.
28. CONSTRUCTION SHALL NOT BLOCK ACCESS TO
NEW/EXISTING COMPONENTS AND PIPE VALVES.
PROVIDE PROPER ACCESS TO ALL EQUIPMENT AND
COMPONENTS REQUIRING OPERATION, SERVICE AND
MAINTENANCE WHETHER DETAILED ON THE DRAWINGS
OR NOT. ACCESS MUST BE CONVENIENTLY PLACED AS
DETERMINED BY THE VA PROJECT ENGINEER.
29. CONTRACTOR TO MAINTAIN BUILDING FIRE
PROTECTION DURING CONSTRUCTION. CONTRACTOR TO
REMOVE FIRE ALARM SYSTEM SMOKE DETECTORS THAT
CAN BE AFFECTED BY CONSTRUCTION WORK AND
TEMPORARILY REPLACE DEVICES WITH HEAT DETECTORS
(CHEMETRONICS SERIES 600 MODEL 601 RATE-OF-RISE &
135 F FIXED TEMPERATURE). PRIOR TO REMOVAL, TEST
DETECTORS TO ASSURE CORRECT OPERATION. AFTER
INSTALLATION, TEST SYSTEM FOR PROPER OPERATION,
AND REPORT RESULTS TO VA SAFETY OFFICER. AFTER
CONSTRUCTION DUST HAS BEEN ELIMINATED, REMOVE
HEAT DETECTORS, CLEAN EXISTING SMOKE DETECTORS,
REINSTALL, AND TEST FOR PROPER SYSTEM OPERATION.
ALL WORK ASSOCIATED WITH THE FIRE ALARM SYSTEM
MUST BE SCHEDULED 3 WEEKS IN ADVANCE WITH THE VA
SAFETY OFFICER.
30. ALL TEMPORARY, CONCEALED, FRAMING LUMBER
SHALL COMPLY WITH MIL-L-19140 FOR FIRE RETARDENT
TREATMENT, AND SHALL BEAR THE TESTING AGENCY
IDENTIFICATION MARK AND PERFORMANCE RATING.
31. ALL PENETRATIONS THROUGH FIRE/SMOKE WALLS ARE
TO BE SLEEVED UNLESS OTHERWISE NOTED OR DIRECTED
BY THE VA PROJECT ENGINEER. INSTALL FIRE SEAL
MATERIAL AT ALL PENETRATIONS, AND TROUGHS
PENETRATING FIRE/SMOKE WALLS. ALL PENETRATIONS
THROUGH FIRE/SMOKE WALLS (COMPARTMENTALIZATION)
WILL BE SEALED WITH APPROPRIATE FIRE RETARDANT
MATERIAL ON A DAILY BASIS, AND SHALL MAINTAIN THE
SAME INTEGRITY AS THE FIRE BARRIER BEING SEALED.
THE VA WILL BE COMPENSATED THROUGH CONTRACTOR
CONTRACT REDUCTION PER DAY FOR EACH FIRE WALL
PENETRATION NOT SEALED WITH ACCEPTABLE FIRE
RETARDANT MATERIAL TESTED IN ACCORDANCE WITH
ASTM E814 (F RATING) BY THE CLOSE OF BUSINESS THE
DAY THAT PENETRATION IS MADE.
32. ALL INSTALLED EQUIPMENT AND ARTICLES SHALL BE
COMPLETE FOR OPERATION, SERVICE AND MAINTENANCE
FOR THE PURPOSE INTENDED NOT LIMITED TO THE
DETAILS AND INFORMATION PROVIDED ON THE DRAWINGS
IN ACCORDANCE WITH THE MANUFACTURES PROCEDURES
AND RECOMMENDATIONS. ALL INSTALLED EQUIPMENT
SHALL BE LABELED WITH ENGRAVED BLACK PHENOLIC
NAME PLATES UTILIZING THE HOSPITAL NOMENCLATURE AS
DIRECTED BY THE VA PROJECT ENGINEER.
33. CONTRACTOR SHALL ENGAGE INDEPENDENT TESTING
COMPANIES SPECIALIZED AND CERTIFIED IN THE REQUIRED
TESTING OF ALL INSTALLED EQUIPMENT AND
COMPONENTS. CALIBRATED TESTING INSTRUMENTS,
MATERIALS, LABOR TO BE SUPPLIED BY THE INDEPENDENT
CERTIFIED TESTING COMPANY FURNISHED BY THE
CONTRACTOR. TAB REPORTS SHALL BE CO-CERTIFIED BY
A REGISTERED PROFESSIONAL MECHANICAL ENGINEER
AND THE TESTING COMPANY REPRESENTATIVE.
34. TWO WEEKS PRIOR TO EACH TESTING PHASE, SUBMIT
TO THE VA PROJECT ENGINEER 3 COPIES OF THE "STATUS
REPORT", AND SUPPORTING DOCUMENTATION THAT ALL
MATERIALS AND WORKMANSHIP HAS BEEN ACCOMPLISHED
IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS,
IS PROPERLY INSTALLED, IS READY FOR FULL OPERATION
IN ACCORDANCE WITH ALL APPLICABLE CODES AND THE
CONTRACT REQUIREMENTS
35. TWO WEEKS PRIOR TO THE FINAL INSPECTION,
CONTRACTOR SHALL PROVIDE THE VA PROJECT ENGINEER
2 COMPLETE SETS OF REPRODUCIBLE CLEAN & LEGIBLE
CAD QUALITY DRAWINGS, DISKS AND MARKED-UP
SPECIFICATIONS IDENTIFYING ALL DEVIATIONS FROM THE
ORIGINAL CONSTRUCTION DOCUMENTS. THE
DRAFTSMANSHIP SHALL BE COMPARABLE IN ALL WAYS TO
THE ORIGINAL DOCUMENTS, AND SHALL BE DATED AND
NOTED "AS-BUILT".
36. TWO WEEKS PRIOR TO THE FINAL INSPECTION,
CONTRACTOR SHALL PROVIDE THE VA PROJECT ENGINEER
WITH 3 COPIES OF THE COMPLETED "STATUS REPORT",
AND EITHER CERTIFICATION WITH SUPPORTING
DOCUMENTATION THAT ALL MATERIALS AND
WORKMANSHIP HAS BEEN ACCOMPLISHED IN
ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, IS
PROPERLY INSTALLED, IS READY FOR FACILITY USE IN
ACCORDANCE WITH ALL APPLICABLE CODES AND THE
CONTRACT REQUIREMENTS, OR LIST INCOMPLETE ITEMS,
VALUE OF UNCOMPLETED WORK, AND REASONS FOR BEING
INCOMPLETE WITH SUPPORTING DOCUMENTATION.
37. PROVIDE VA PROJECT ENGINEER WITH REFERENCE
DOCUMENTS ITEMIZED IN SECTION 01 42 19.
38. BID DEDUCT ALTERNATES AND UNIT PRICES SHALL BE
PROVIDED AT THE TIME OF BID FOR THE SPECIFIED ITEMS.
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459-4760 Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P./F.P.
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
ABATEMENT
Axiom Partners 979 Main Street Wakefield, MA 01880
(781) 213-9198
Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts-
Fin al
04-03-2017
VA Project General Notes
-G001 PNDW 2 of 118
PROJECT GENERAL NOTES
1. THESE GENERAL NOTES ARE INTENDED TO COMPLIMENT THE
CONTRACT DOCUMENTS. REFER TO THE CONTRACT DOCUMENTS FOR
DETAILED INFORMATION AND ADDITIONAL REQUIREMENTS.
2. ALL WORK INCLUDED IN THIS CONTRACT SHALL CONFORM TO ALL
FEDERAL, STATE, AND LOCAL LAWS, STATUTES, ORDINANCES, CODES, RULES
AND REGULATIONS, OR LAWFUL ORDERS OF PUBLIC AUTHORITY. PROMPTLY
REPORT ANY NONCONFORMITY DISCOVERED TO THE ARCHITECT.
3. THE INTENT OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL ITEMS
NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF WORK BY THE
CONTRACTOR AND TO PROVIDE A COMPLETE, FULLY OPERATIONAL BUILDING.
PROVIDE ALL LABOR, MATERIALS AND INCIDENTALS NECESSARY TO ACHIEVE
THIS INTENT.
4. FAILURE OF THE DRAWINGS OR SPECIFICATIONS TO INDICATE EACH
INCIDENTAL SHALL NOT RELIEVE THE CONTRACTOR FROM PROVIDING THE
NECESSARY ITEMS AS PART OF THIS CONTRACT. THE DRAWINGS SHOW THE
DESIGN, LOCATION, DESCRIBE THE QUALITY LEVEL AND CONSTRUCTION
TECHNIQUES IN A GENERAL SENSE ONLY.
5. ALL DETAILS ARE TYPICAL. WHAT IS SHOWN IN ONE CONDITION APPLIES
TO ALL OTHER SIMILAR CONDITIONS, UNLESS NOTED OTHERWISE.
6. VERIFY THE FOLLOWING ITEMS AND REPORT ANY DISCREPANCIES TO
THE ARCHITECT PRIOR TO PROCEEDING WITH WORK, AND PROCEED WITH THE
WORK ONLY AFTER SUCH DISCREPANCIES ARE RESOLVED:
• EXISTING CONDITIONS
• WALLS, FLOORS, ROOFS, AND SUBSTRATES WHERE PRODUCTS AND
SYSTEMS ARE TO BE INSTALLED.
• SIZE AND CONDITION OF WINDOW, DOOR, LOUVER, AND OTHER
OPENINGS WHERE PRODUCTS AND SYSTEMS ARE TO BE INSTALLED.
• THE EXISTENCE, SIZE, AND LOCATION OF ALL EXISTING UTILITIES,
MECHANICAL AND ELECTRICAL SYSTEMS.
• DISCREPANCIES BETWEEN OR WITHIN THE CONTRACT DOCUMENTS.
• UNSUITABLE SOILS: REPORT THE LOCATION OF ALL UNSUITABLE SOIL
MATERIALS BELOW ANTICIPATED LEVELS OF FOOTINGS OR SLABS PRIOR
TO SETTING FORMS.
• MECHANICAL, ELECTRICAL AND PLUMBING WHICH IMPACT CEILING
INSTALLATION HEIGHTS OR BUILDING THE APPEARANCE.
• DIMENSIONAL DISCREPANCIES.
7. COORDINATE THE WORK OF ALL SUBCONTRACTORS.
8. DO NOT PENETRATE STRUCTURAL BEAMS, COLUMNS, OR SHEAR WALLS
UNLESS SPECIFICALLY DETAILED OTHERWISE.
9. PROVIDE BOND-OUTS, BLOCKING, SLEEVES AND PIPES AS REQUIRED
FOR ALL WALL, FLOOR, ROOF, AND CEILING PENETRATIONS.
• MAINTAIN CONTINUITY OF FIRE RATED ASSEMBLIES AND SMOKE
ASSEMBLIES. SEAL ALL PENETRATIONS TO CONFORM TO U.L. RATED
ASSEMBLIES AND ALL NFPA AND IBC REQUIREMENTS. REFER TO THE
CODE PLANS FOR ADDITIONAL CODE REFERENCES.
• ALL PENETRATIONS SHALL COMPLY WITH THE ACOUSTICAL ASSEMBLY
RATING REQUIRED FOR EACH WALL OR FLOOR ASSEMBLY.
10. COORDINATE THE WORK TO ACHIEVE THE GIVEN VISUAL AND
PERFORMANCE REQUIREMENTS OF MECHANICAL, ELECTRICAL AND PLUMBING
SYSTEMS WITHIN THE INDICATED SPACE.
11. PROVIDE WORK HOLES OR ADEQUATE ACCESS AS REQUIRED TO
INSTALL NEW SYSTEMS IN CONCEALED SPACES.
12. PRODUCTS SHALL BEAR UL CLASSIFICATION WHERE REQUIRED BY
DESIGN. DO NOT REMOVE OR PAINT OVER UL CLASSIFICATIONS.
13. DEFINITIONS:
• NEW: INDICATES ITEMS THAT SHALL BE FURNISHED AND INSTALLED BY
THIS CONTRACT. TYPICALLY USED TO ENSURE CLARITY BETWEEN
VARIOUS COMPONENTS OF THE DRAWINGS. NOT ALL ITEMS ARE
LABELED AS "NEW" WHEN IT IS OBVIOUS BY OTHER INDICATION.
• EXISTING: EXISTING BUILDING OR SITE COMPONENTS WHICH ARE IN
PLACE AT THE START OF CONSTRUCTION. NOT ALL ITEMS ARE LABELED
AS "EXISTING" WHEN IT IS OBVIOUS BY OTHER INDICATION.
• REPAIR: RESTORE TO SUITABLE OR APPROPRIATE OPERATING AND
AESTHETIC CONDITION.
• RESTORE: BRING BACK TO FORMER CONDITION, BY REPAIRING OR
PATCHING AS REQUIRED.
• PATCH: RESTORE TO CONDITION MATCHING EXISTING ADJACENT
CONSTRUCTION, SURFACE TEXTURE AND FINISH.
• N.I.C. (NOT IN CONTRACT): WORK WHICH IS NOT INCLUDED IN THIS
CONTRACT, BUT WHICH MAY REQUIRE CONTRACTOR COORDINATION.
• REMOVE: DISMANTLE AND/OR EXTRACT FROM THE PREMISES ENTIRELY.
DISPOSE OF OFF OF THE SITE UNLESS NOTED OTHERWISE.
• REPLACE: DISMANTLE AND/OR EXTRACT FROM THE PREMISES
ENTIRELY. DISPOSE OF OFF OF THE SITE UNLESS NOTED OTHERWISE.
PROVIDE NEW MATERIAL AS INDICATED.
• DAMAGES: EXISTING BUILDING OR SITE COMPONENTS, NOT SCHEDULED
FOR WORK, WHICH ARE DAMAGED. SUCH ELEMENTS AND COMPONENTS
SHALL BE REPLACED OR RESTORED TO ORIGINAL CONDITION BY
METHODS APPROVED BY THE ARCHITECT.
• DEMOLISH: DISMANTLE AND/OR EXTRACT FROM THE PREMISES
ENTIRELY. DISPOSE OF OFF OF THE SITE UNLESS NOTED OTHERWISE.
• SALVAGE: REMOVE AND REINSTALL OR REMOVE AND DELIVER TO THE
OWNER, AS INDICATED. SALVAGED COMPONENTS MAY BE FOR LIMITED
REUSE, TO MATCH EXISTING CONDITIONS OR TO PATCH AND REPAIR AS
INDICATED.
GENERAL DEMOLITION AND REMOVAL NOTES
1. THE DEMOLITION DRAWINGS PROVIDE GENERAL COORDINATION
INFORMATION ONLY, AND ARE SCHEMATIC IN NATURE. THEY DO NOT
IDENTIFY ALL INDIVIDUAL ITEMS TO BE REMOVED. REMOVE ANY
EXISTING CONSTRUCTION WHICH IS IN THE WAY OF NEW
CONSTRUCTION OR PROHIBITS THE NEW CONSTRUCTION.
2. VERIFY EXISTING STRUCTURAL CONDITIONS PRIOR TO DEMOLITION OR
REMOVALS
3. PROTECT FROM DAMAGE AND WEATHER ANY EXISTING BUILDING
COMPONENTS, WHICH ARE EXPOSED AS A RESULT OF DEMOLITION OR
REMOVALS.
4. COORDINATE AND SCHEDULE ALL WORK IN EXISTING OCCUPIED
PORTIONS OF THE BUILDING WITH THE OWNER.
5. NOTIFY THE ARCHITECT AND OWNER IMMEDIATELY UPON DISCOVERY
OF POTENTIALLY HAZARDOUS MATERIAL OR SUBSTANCE NOT
ADDRESSED IN THE CONTRACT DOCUMENTS, INCLUDING BUT NOT
LIMITED TO ASBESTOS, PCB, LEAD, MERCURY, AND MOLD. DO NOT
DISTURB HAZARDOUS MATERIALS. HAZARDOUS MATERIAL SHALL BE
LEGALLY ABATED, TRANSPORTED, AND DISPOSED OF.
6. CONCRETE SLAB REMOVALS MAY BE REQUIRED THROUGHOUT THE
EXISTING BUILDING AND MAY NOT BE SHOWN ON THE DEMOLITION
DRAWINGS. COORDINATE THE EXTENT OF SLAB REMOVALS WITH
STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS. CUT TRENCHES IN
EXISTING CONCRETE FLOORS WITH NO MORE THAN A 1:2 SLOPE.
PROVIDE AN UNDER-SLAB VAPOR RETARDER AT SLABS ON GRADE.
REFER TO STRUCTURAL DRAWINGS FOR REINFORCEMENT
REQUIREMENTS. PATCH CONCRETE TO MATCH ADJACENT THICKNESS
AND FINISH PRIOR TO THE INSTALLATION OF UNDERLAYMENT OR NEW
FINISHES.
7. REMOVAL OF MATERIALS SHALL BE DONE WITHOUT DISTURBING
ADJACENT SURFACES OR THE CURRENT CONDITION OF OTHER
BUILDING ELEMENTS INTENDED TO REMAIN.
8. CONTRACTOR SHALL REMOVE FURNITURE AND OTHER MOVABLE
AND/OR FIXED EQUIPMENT PRIOR TO NEW WORK IN ANY AREA, VERIFY
WITH OWNER PRIOR TO REMOVAL/ DISPOSAL.
9. REMOVE ALL DAMAGED AND/OR DISCARDED BUILDING CONSTRUCTION
MATERIAL FROM CONCEALED SPACES. PRIOR TO CLOSING- OR
SEALING-OFF CONCEALED SPACES, THE CONTRACTOR SHALL ALLOW
FOR AN INSPECTION OF COMPONENTS WHICH WILL NOT BE VISIBLE
WHEN THE SPACES HAVE BEEN SEALED.
10. ALL DEMOLITION/REMOVAL DEBRIS IS THE PROPERTY OF THE
CONTRACTOR, UNLESS NOTED OTHERWISE, AND SHALL BE LEGALLY
DISPOSED OF.
CEILING NOTES
1. CEILING PLANS DO NOT SHOW EVERY FIXTURE OR COMPONENT. REFER TO
ELECTRICAL, PLUMBING, MECHANICAL AND STRUCTURAL DRAWINGS FOR EXTENT OF
ALL CEILING PENETRATIONS AND INSTALLATIONS AND COORDINATE PRIOR TO
INSTALLATION.
2. CENTER GRID LAYOUT IN ALL ROOMS UNLESS NOTED OTHERWISE.
3. ALL COMPONENTS MOUNTED IN OR BELOW A SUSPENDED ACOUSTIC CEILING
SHALL BE CENTERED IN THE CEILING TILE OR IN THE 2X2 PORTION OF TEGULAR
CEILING TILES, UNLESS NOTED OTHERWISE. THIS SHALL INCLUDE, BUT NOT BE
LIMITED TO, LIGHT FIXTURES, DIFFUSERS, SPEAKERS, SMOKE DETECTORS, AND
SPRINKLER HEADS.
4. PRIOR TO THE INSTALLATION OF CEILINGS, ALLOW FOR AN ABOVE-CEILING
INSPECTION OF COMPONENTS THAT WILL NOT BE VISIBLE WHEN THE CEILINGS HAVE
BEEN INSTALLED, INCLUDING INSPECTION OF FIRE, SMOKE, AND ACOUSTICAL
SEPARATIONS.
5. SEE ROOF PLAN FOR DIMENSION AND SCHEDULE OF SOLAR TUBE
6. COORDINATE FINAL LOCATION OF ALL CEILING MOUNTED PROJECTORS WITH
THE VA INTERIOR GENERAL NOTES
1. All mounting heights and clearances at Toilet rooms and elsewhere shall comply with the latest version of the ADA Accessibility Guidelines (ADAAG).
• Barrier-Free clearances are given. These clear dimensions shall be maintained in cases of discrepancy.
• All dimensions given for fixture and accessory locations are clear dimensions from finished surfaces, unless noted otherwise. Coordinate actual dimensions with wall construction and finishes.
• Locate all controls, flush valves, shutoffs and similar items in accordance with the latest version of the ADA Accessibility Guidelines (ADAAG).
• A range of mounting heights may be given for some items. Maintain a consistent mounting height, within the given range, throughout the Project, unless noted otherwise.
2. Install blocking behind all surface-applied fixtures, trim, grab bars, shelves, chair rails, picture rails, base moldings, tack or marker boards, window treatment, wall or base cabinets or counters, and miscellaneous accessories mounted on stud walls.
3. Fill CMU solid with grout at all surface-applied fixtures, trim, grab bars, shelves, chair rails, picture rails, base moldings, tack or marker boards, window treatment, wall or base cabinets or counters, and miscellaneous accessories mounted on CMU walls.
4. Install coat hooks at doors and walls.
5. Install transition strips between dissimilar flooring materials.
6. All wood not indicated to be painted shall be natural finish (clear).
7. All grab bar components shall be able to withstand a horizontal load of 250lbs at any point.
GENERAL PATCHING AND REPAIRING NOTES
1. WHERE NEW CONSTRUCTION EITHER INFILLS OR ABUTS EXISTING
CONSTRUCTION, THE FINISHED FACES SHALL ALIGN, AND THE SURFACES SHALL
BE FINISHED TO MATCH.
2. AFTER CUTTING, FITTING, OR REMOVAL OF BUILDING COMPONENTS, ANY
RESULTING HOLES SHALL BE PATCHED. SUCH PATCHES SHALL BE FLUSH WITH
ADJACENT SURFACES AND FINISHED TO MATCH.
3. MAINTAIN FIRE RATINGS, SMOKE RATINGS, AND ACOUSTICAL RATINGS.
4. PROVIDE METAL COVER PLATES AT ALL ABANDONED ELECTRICAL
DEVICES, FINISHED TO MATCH WALL.
DOOR AND WINDOW GENERAL NOTES
1. AT EXTERIOR WALLS AND MASONRY WALLS, COAT THE INSIDE OF ALL
HOLLOW METAL FRAMES WITH BITUMINOUS COATING.
2. FILL ALL INTERIOR HOLLOW METAL FRAMES ADJACENT TO MASONRY
WITH MORTAR.
3. PACK MINERAL-FIBER INSULATION IN ALL INTERIOR HOLLOW METAL
FRAMES IN STUD WALLS.
4. FILL ALL EXTERIOR METAL DOOR FRAMES WITH LOW-EXPANSION SPRAY-
FOAM INSULATION.
5. REFER TO SPECIFICATIONS FOR LOCATIONS OF TEMPERED, LAMINATED,
AND INSULATING GLASS.
6. PROVIDE DOOR STOPS TO PROTECT WALLS AT ALL LOCATIONS WHERE A
DOOR SWING WILL STRIKE THE WALL.
7. ALL EXTERIOR DOORS SHALL HAVE WEATHER STRIPPING, THRESHOLDS,
AND SHALL BE INSTALLED WEATHERTIGHT.
8. COORDINATE WITH DEDUCT ALTERNATE PLANS FOR ADDITIONAL DOOR
AND HARDWARE REQUIREMENTS.
ROOF GENERAL NOTES
1. PROTECT ALL OPENINGS CUT IN THE ROOF. PROVIDE TEMPORARY ROOFING IF
WORK IS TO BE UNFINISHED DURING ADVERSE WEATHER CONDITIONS THROUGHOUT THE
CONSTRUCTION PHASE.
2. PROVIDE FLASHING AT ALL ROOF PENETRATIONS. PENETRATIONS MAY NOT BE
INDICATED ON THE ROOF PLAN. REFER TO STRUCTURAL, MECHANICAL AND ELECTRICAL
PLANS FOR NUMBER, LOCATION, AND SIZE OF PENETRATIONS.
3. PROVIDE A 2 FEET WIDE WALKWAY WITH PROTECTION STRIPS ENTIRELY AROUND
ALL ROOF TOP MECHANICAL UNITS AND CREATE A PROTECTION STRIP PATHWAY, 2 FEET
WIDE, FROM THE ROOF ACCESS LOCATION(S) TO EACH MECHANICAL UNIT.
4. PROTECT ROOFING MATERIALS FROM CONSTRUCTION OPERATIONS.
5. PROVIDE CURBS AND PRESSURE TREATED WOOD BLOCKING AS REQUIRED FOR
ALL ROOF MOUNTED EQUIPMENT, UNLESS NOTES OTHERWISE.
VERTICAL CIRCULATION GENERAL NOTES
1. ALL HANDRAIL AND GUARDRAIL COMPONENTS SHALL BE ABLE TO WITHSTAND
A HORIZONTAL LOAD OF 250 POUNDS AT ANY POINT.
2. GUARDRAILS SHALL NOT ALLOW THE PASSAGE OF A 4-INCH SPHERE
BETWEEN MEMBERS.
3. ALL RAMP, STAIR, LADDER, ALTERNATING TREAD DEVICE, HANDRAIL AND
GUARDRAIL COMPONENTS SHALL COMPLY WITH THE APPLICABLE PROVISIONS OF
THE LATEST VERSION(S) IBC, NFPA 101, AND THE ADA.
MATERIALS LEGEND
GRAVEL
CONCRETE MASONRY UNIT
BRICK
CONCRETE
SOIL
STEEL
WOOD FRAMING
WOOD BLOCKING
GYPSUM BOARD
PLYWOOD
BATT INSULATION
RIGID INSULATION
AB
AB
AC
ADDL
ADJ
ADO
AFF
AH
AIB
ALT
ALUM
AOR
APPROX
ARCH
ARND
AVB
AWP
BD
BF
BIT
BLDG
BLKG
BM
BOT
BO
BRK
BRG
B/S
BSMT
C, CRS
CAB
CB
CC
CF
CFMF
CJ
CL
CLG
CLR
CMT
CMU
CO
COL
CONC
CONC/C
CONT
CONTR
CPT
CS
CSMT
CT
CWT
CUH
CY
DBL
DC
DEMO
DF
DIA, DIAM
DIM
DIV
DMP
DN
DR
DTL
DWG
DWR
E
EA
EF
EMHO
EIFS
EJ
EL
EP
ELEC
ELEV
EMER
ENCL
EQ
EQUIP
EXH
EXIST
EXT
EW
EWC
FB
FBO
FCS
FD
FE
FEC
FFE
FG
FHVC
FIN
FIN GR
FLR
FND
FP
F.O.
FRMG
FRP
FRT
FSR
FT
FTG
FTR
FUR
FV
FWC
GA
GALV
GB
GFB
GL
GWB
HARD
HB
HC
HD
HDO
HDWD
HDWR
HM
HORIZ
HR
HS
HT
HTG
HVAC
IBC
ID
IN
INCL
INFO
INSUL
INT
INV
JT
KIT
LAB
LAM
LAV
LB
LCC
LF
LH
LOC’N
LW
MAS
MATL
MAX
MC
MCWF
MDO
MECH
MED
MF
MFR
MH
MIR
MIN
MISC
MLDG
M.O.
MR
MRGB
MS
MSF
MTL
N
NA
NIC
NO
NOM
NRC
NTS
O/
OC
OD
OFS
OP
OH
OPH
OPNG
OPP
OPS
P, PTD
PC
PERF
PERIM
PRKG
PL
PLAM
PLYWD
PSF
PSI
PT
PTD
PTN
PVC
PVMT
QR
QT
RE:
REF
REQ’D
REV
RL
RF
RH
RM
R.O.
ROW
S
SAT
SAMF
SC
SCHED
SD
SECT
SF
SFT
SGL
SH
SHT
SHTHG
SIM
SLNT
SNR
SP
SPEC
SPKR
SQ
SS
STC
STD
STL
STOR
STRL
STRUCT
SUPT
SUSP
SV
T
TB
TB
T&G
TGL
THK
T.O.
TP
TPD
TV
TYP
UCR
UNO
VB
VC
VCT
VERT
VPW
VWC
W W/
WC
WD
WGL
WH
W/O
WS
WP
WWF
WWM
YD
ZCC
ANCHOR BOLT
AIR BARRIER
AIR CONDITIONING
ADDITIONAL
ADJUSTABLE
AUTOMATIC DOOR OPERATOR
ABOVE FINISHED FLOOR
AIR HANDLER
AIR INFILTRATION BARRIER
ALTERNATE
ALUMINUM
AREA OF REFUGE
APPROXIMATE
ARCHITECT(URAL)
AROUND
AIR/VAPOR BARRIER
ACOUSTICAL WALL PANEL
BOARD
BARRIER FREE
BITUMINOUS
BUILDING
BLOCKING
BENCHMARK
BOTTOM
BOTTOM OF
BRICK
BEARING
BACERROD AND SEALANT
BASEMENT
COURSE
CABINET
CATCH BASIN
CENTER TO CENTER
CUBIC FOOT
COLD FORMED METAL FRAMING
CONTROL JOINT
CENTERLINE
CEILING
CLEAR
CERAMIC MOSAIC TILE
CONCRETE MASONRY UNIT
CLEANOUT
COLUMN
CONCRETE
COLORED CONCRETE
CONTINUOUS OR CONTINUE
CONTRACTOR
CARPET
COUNTERSINK
CASEMENT
CERAMIC TILE
CERAMIC WALL TILE
CABINET UNIT HEATER
CUBIC YARD
DOUBLE
DISPLAY CASE
DEMOLISH, DEMOLITION
DRINKING FOUNTAIN
DIAMETER
DIMENSION
DIVISION
DEMOUNTABLE PARTITION
DOWN
DOOR
DETAIL
DRAWING
DRAWER
EAST
EACH
EXHAUST FAN
ELECTRO MAGNETIC HOLD OPEN
EXTERIOR INSULATION FINISH SYSTEM
EXPANSION JOINT
ELEVATION
EPOXY PAINT
ELECTRICAL
ELEVATOR
EMERGENCY
ENCLOSED/ENCLOSURE
EQUAL
EQUIPMENT
EXHAUST
EXISTING
EXTERIOR
EYEWASH
ELECTRIC WATER COOLER
FIRE BLANKET
FURNISHED BY OWNER
FLOOR COATING SYSTEM
FLOOR DRAIN
FIRE EXTINGUISHER
FIRE EXTINGUISHER AND CABINET
FINISHED FLOOR ELEVATION
FIBERGLASS
FIRE HOSE AND VALVE CABINET
FINISH(ED)
FINISH GRADE
FLOOR(ING)
FOUNDATION
FIREPROOFING
FACE OF
FRAME(ING)
FIBER REINFORCED PLASTIC
FIRE RETARDANT TREATED
FLEXIBLE SHEET ROOFING
FOOT(FEET)
FOOTING
FIN TUBE RADIATION
FURRED(ING)
FIELD VERIFY
FABRIC WALL COVERING
GAUGE
GALVINIZED
GRAB BAR
GROUND FACE CMU
GLASS, GLAZING
GYPSUM WALLBOARD
HARDENER
HOSE BIBB
HOLLOW CORE
HEAD
HIGH DENSITY OVERLAY
HARDWOOD
HARDWARE
HOLLOW METAL
HORIZONTAL
HAND RAIL
HIGH SCHOOL
HEIGHT
HEATING
HEATING/VENTILATION/AIR CONDITIONING
INSTALLED BY CONTRACTOR
INSIDE DIAMETER
INCH (ES)
INCLUDE (D), (ING)
INFORMATION
INSULATED
INTERIOR
INVERT
JOINT
KITCHEN
LABORATORY
LAMINATE (D)
LAVATORY
POUND (S)
LEAD COATED COPPER
LINEAR FOOT
LEFT HAND
LOCATION
LIGHTWEIGHT (CMU)
MASONRY
MATERIAL
MAXIMUM
MEDICINE CABINET
MULTI COLOR WALL FINISH
MEDIUM DENSITY OVERLAY
MECHANICAL
MEDIUM
MEMBRANE FLASHING
MANUFACTURER
MANHOLE
MIRROR
MINIMUM
MISCELLANEOUS
MOULDING, MOULDING
MASONRY OPENING
MOISTURE RESISTANT
MOISTURE RESISTANT GYPSUM BOARD
MOP SINK
METAL STUD FRAMING
METAL
NORTH
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION COEFFICIENT
NOT TO SCALE
OVER
ON CENTER
OUTSIDE DIAMETER
OVERFLOW SCUPPER
OPAQUE
OVERHEAD
OPPOSITE HAND
OPENING
OPPOSITE
OPERABLE PANEL SYSTEM
PAINT/PAINTED
PRECAST CONC.
PERFORATED
PERIMETER
PARKING
PLATE
PLASTIC LAMINATE
PLYWOOD
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PRESSURE TREATED
PAPER TOWEL DISPENSER
PARTITION
POLYVINYL CHLORIDE
PAVEMENT
QUARTER ROUND
QUARRY TILE
REFERENCE
REFRIGERATOR
REQUIRED
REVISION (S), REVISED
RAIN LEADER
RUBBER FLOOR
RIGHT HAND
ROOM
ROUGH OPENING
RIGHT OF WAY
SOUTH
SUSPENDED ACOUSTICAL TILE
SELF ADHERING MEMBRANE FLASHING
SOLID CORE
SCHEDULE
STORM DRAIN, SOAP DISPENSER
SECTION
SQUARE FOOT
STORE FRONT
SAFETY GLASS
SHOWER
SHEET
SHEATHING
SIMILAR
SEALANT
SANITARY NAPKIN RECEPTOR
SPECIAL PAINT
SPECIFICATION
SPEAKER
SQUARE
STAINLESS STEEL
SOUND TRANSMISSION CLASS
STANDARD
STEEL
STORAGE
STRUCTURAL
STRUCTURE/STRUCTURAL
SUPPORT
SUSPENDED
SHEET VINYL
TOILET
TOWEL BAR
TACKBOARD
TONGUE AND GROOVE
TEMPERED GLASS
THICK(NESS)
TOP OF
TOILET PARTITION
TOILET PAPER DISPENSER
TELEVISION
TYPICAL
UNDER COUNTER REFRIGERATOR
UNLESS NOTED OTHERWISE
VAPOR BARRIER/VINY BASE
VALVE CABINET
VINYL COMPOSITION TILE
VERTICAL
VENEER PLYWOOD
VINYL WALL COVERING
WEST
WITH
WATER CLOSET
WOOD
WIRE GLASS
WATER HEATER
WITHOUT
WATERSTOP
WATERPROOF
WELDED WIRE FABRIC
WELDED WIRE MESH
YARD
ZINC-COATED COPPER
ABBREVIATIONS
SYMBOLS
ROOM TAG
DOOR TAG
1t WINDOW\GLAZING TAG
0.0
A41.1
FIRE RATINGS
SMOKE
1 HOUR FIRE RATED PARTITION
WALL TAG
A101
SIM
BUILDING SECTION
WALL SECTION
PLAN OR SECTION DETAIL
INTERIOR ELEVATION
EXTERIOR ELEVATION
A101
SIM
FLOOR LEVEL\VERTICAL ELEVATION
COLUMN CENTERLINE
Room name
150 SF
SPECIALTY EQUIPMENT\
TOILET ACCESSORY TAG
CASEWORK TAG
1i
1i
DEMOLITION KEY NOTE#
XX
A101
A101
GENERAL ARCHITECTURAL NOTES
1. THE DRAWINGS USE A SYSTEM OF KEYED NOTES ON PLANS, ELEVATIONS
AND DETAILS. INSTRUCTIONS FOR SPECIFIC COMPONENTS OF THE WORK ARE
KEYED TO THE DRAWINGS. BUILDING SYSTEMS (PARTITIONS, ROOF &
FOUNDATION) ARE KEYED TO FLOOR PLANS, WALL SECTIONS, ROOF PLAN AND
OTHER DETAILS AS APPROPRIATE.
2. MAINTAIN MINIMUM MANEUVERING CLEARANCES AT DOORS IN
COMPLIANCE WITH THE ADA ACCESSIBILITY GUIDELINES (ADAAG), INCLUDING BUT
NOT LIMITED TO THE FOLLOWING EXCERPT FROM 2010 ADA STANDARDS FOR
ACCESSIBLE DESIGN:
3. ALL MOUNTING HEIGHTS AND CLEARANCES AT TOILET ROOMS AND
ELSEWHERE SHALL COMPLY WITH THE LATEST VERSION OF THE ADA
ACCESSIBILITY GUIDELINES (ADAAG).
• BARRIER-FREE CLEARANCES ARE GIVEN. THESE CLEAR DIMENSIONS
SHALL BE MAINTAINED IN CASES OF DISCREPANCY.
• ALL DIMENSIONS GIVEN FOR FIXTURE AND ACCESSORY LOCATIONS ARE
CLEAR DIMENSIONS FROM FINISHED SURFACES, UNLESS NOTED
OTHERWISE. COORDINATE ACTUAL DIMENSIONS WITH WALL
CONSTRUCTION AND FINISHES.
• LOCATE ALL CONTROLS, FLUSH VALVES, SHUTOFFS AND SIMILAR ITEMS IN
ACCORDANCE WITH THE LATEST VERSION OF THE ADA ACCESSIBILITY
GUIDELINES (ADAAG).
• SOME ITEMS MAY INDICATE A RANGE IN MOUNTING HEIGHT. MAINTAIN A
CONSISTENT MOUNTING HEIGHT, WITHIN THE GIVEN RANGE,
THROUGHOUT THE PROJECT, UNLESS NOTED OTHERWISE.
4. MAINTAIN CLEAR DIMENSIONS IN ACCORDANCE WITH THE LATEST
VERSION OF THE ADA ACCESSIBILITY GUIDELINES (ADAAG).
5. ALL GRAB BAR COMPONENTS SHALL BE ABLE TO WITHSTAND A LOAD OF
250LBS AT ANY POINT.
6. INSTALL BLOCKING BEHIND ALL SURFACE-APPLIED FIXTURES, TRIM, GRAB
BARS, SHELVES, CHAIR RAILS, PICTURE RAILS, BASE MOLDINGS, TACK OR MARKER
BOARDS, WINDOW TREATMENT, WALL OR BASE CABINETS OR COUNTERS, AND
MISCELLANEOUS ACCESSORIES MOUNTED ON STUD WALLS.
7. ALL EXPOSED WOOD NOT INDICATED TO BE PAINTED SHALL BE NATURAL
FINISH (CLEAR).
8. FLOORING AND FLOOR FINISHES SHALL BE INSTALLED TO A MAXIMUM
DIFFERENTIAL OF 1/16" BETWEEN DISSIMILAR MATERIALS. PROVIDE TRANSITION
STRIPS OR THRESHOLDS (1/2" MAXIMUM) OF SAME MATERIAL AS FLOORING
AND/OR AS NOTED ON THE DRAWINGS, BETWEEN DISSIMILAR FLOORING
MATERIALS
9. PATCH AND LEVEL EXISTING SUBFLOORS IN COMPLIANCE WITH 09 65 16
AND 09 65 19 TO RECEIVE NEW FLOOR FINISHES AS INDICATED IN THE ROOM
FINISH SCHEDULE.
10. ALL EXPOSED PIPES UNDER LAVATORIES AND SINKS SHALL BE INSULATED
OR OTHERWISE CONFIGURED TO PROTECT AGAINST CONTACT.
11. INSTALL 2 COAT HOOKS CENTERED ON THE INSIDE OF SINGLE USER
TOILET ROOM DOORS, MOUNTED AT 48”AFF AND 60”AFF.
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459-4760 Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P./F.P.
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
ABATEMENT
Axiom Partners 979 Main Street Wakefield, MA 01880
(781) 213-9198
Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts-
Fin al
04-03-2017
General Notes & Material Legend
-G002 PNDW 3 of 118
ARCHITECTURE
INTERIOR DESIGN
PLANNING
49 DARTMOUTH STREET
PORTLAND, MAINE 04101
www.pdtarchs.com
Dwg: of 118
VF101
PLANNING
49 DARTMOUTH STREET
PORTLAND, MAINE 04101
www.pdtarchs.com
Dwg: of 118
CS101
CIVIL - PLAN - SITE
PLANNING
49 DARTMOUTH STREET
PORTLAND, MAINE 04101
www.pdtarchs.com
Dwg: of 118
CG101
CIVIL - PLAN - GRADING
W
W
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W
ARCHITECTURE
INTERIOR DESIGN
PLANNING
49 DARTMOUTH STREET
PORTLAND, MAINE 04101
www.pdtarchs.com
Dwg: of 118
CIVIL - PLAN - UTILITIES
CU101
PLANNING
49 DARTMOUTH STREET
PORTLAND, MAINE 04101
www.pdtarchs.com
Dwg: of 118
LANDSCAPE - PLAN - PLANTING
LP101
PLANNING
49 DARTMOUTH STREET
PORTLAND, MAINE 04101
www.pdtarchs.com
Dwg: of 118
CIVIL - DETAILS - SITE
CS501
PLANNING
49 DARTMOUTH STREET
PORTLAND, MAINE 04101
www.pdtarchs.com
Dwg: of 118
CIVIL - DETAILS - SITE
CS502
PLANNING
49 DARTMOUTH STREET
PORTLAND, MAINE 04101
www.pdtarchs.com
Dwg: of 118
CIVIL - DETAILS - SITE
CS503
PLANNING
49 DARTMOUTH STREET
PORTLAND, MAINE 04101
www.pdtarchs.com
Dwg: of 118
CIVIL - DETAILS - SITE
CS504
DN
UP
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
6.2
C.4
D.2
AD201
7.9
AD201
AD201
AD201
W6
REMOVE ALL EXISTING
PLUMBING FIXTURES
W2
F3 W6
D1
W2
W2
W2D1
W2
F4
REMOVE SHOWER
ROOMS, FINISHES,
AND FIXTURES
W5
W5
D1
D2
D1
W3
W3D1
REMOVE SLAB FOR
ELEVATOR PIT -
COORDINATE
REMOVAL WITH
STRUCTURAL
B.8
B.1
J
2.8 3.2
4.7 5.9
W1DEMOLISH AS REQ FOR
NEW OPENING
REMOVE SLAB AS
REQ FOR NEW
FLOOR DRAIN
GENERAL DEMOLITION AND REMOVAL NOTES
1. THE DEMOLITION DRAWINGS PROVIDE GENERAL COORDINATION
INFORMATION ONLY, AND ARE SCHEMATIC IN NATURE. THEY DO NOT
IDENTIFY ALL INDIVIDUAL ITEMS TO BE REMOVED. REMOVE ANY
EXISTING CONSTRUCTION WHICH IS IN THE WAY OF NEW
CONSTRUCTION OR PROHIBITS THE NEW CONSTRUCTION.
2. VERIFY EXISTING STRUCTURAL CONDITIONS PRIOR TO DEMOLITION OR
REMOVALS
3. PROTECT FROM DAMAGE AND WEATHER ANY EXISTING BUILDING
COMPONENTS, WHICH ARE EXPOSED AS A RESULT OF DEMOLITION OR
REMOVALS.
4. COORDINATE AND SCHEDULE ALL WORK IN EXISTING OCCUPIED
PORTIONS OF THE BUILDING WITH THE OWNER.
5. NOTIFY THE ARCHITECT AND OWNER IMMEDIATELY UPON DISCOVERY
OF POTENTIALLY HAZARDOUS MATERIAL OR SUBSTANCE NOT
ADDRESSED IN THE CONTRACT DOCUMENTS, INCLUDING BUT NOT
LIMITED TO ASBESTOS, PCB, LEAD, MERCURY, AND MOLD. DO NOT
DISTURB HAZARDOUS MATERIALS. HAZARDOUS MATERIAL SHALL BE
LEGALLY ABATED, TRANSPORTED, AND DISPOSED OF.
6. CONCRETE SLAB REMOVALS MAY BE REQUIRED THROUGHOUT THE
EXISTING BUILDING AND MAY NOT BE SHOWN ON THE DEMOLITION
DRAWINGS. COORDINATE THE EXTENT OF SLAB REMOVALS WITH
STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS. CUT TRENCHES IN
EXISTING CONCRETE FLOORS WITH NO MORE THAN A 1:2 SLOPE.
PROVIDE AN UNDER-SLAB VAPOR RETARDER AT SLABS ON GRADE.
REFER TO STRUCTURAL DRAWINGS FOR REINFORCEMENT
REQUIREMENTS. PATCH CONCRETE TO MATCH ADJACENT THICKNESS
AND FINISH PRIOR TO THE INSTALLATION OF UNDERLAYMENT OR NEW
FINISHES.
7. REMOVAL OF MATERIALS SHALL BE DONE WITHOUT DISTURBING
ADJACENT SURFACES OR THE CURRENT CONDITION OF OTHER
BUILDING ELEMENTS INTENDED TO REMAIN.
8. CONTRACTOR SHALL REMOVE FURNITURE AND OTHER MOVABLE
AND/OR FIXED EQUIPMENT PRIOR TO NEW WORK IN ANY AREA, VERIFY
WITH OWNER PRIOR TO REMOVAL/ DISPOSAL.
9. REMOVE ALL DAMAGED AND/OR DISCARDED BUILDING CONSTRUCTION
MATERIAL FROM CONCEALED SPACES. PRIOR TO CLOSING- OR
SEALING-OFF CONCEALED SPACES, THE CONTRACTOR SHALL ALLOW
FOR AN INSPECTION OF COMPONENTS WHICH WILL NOT BE VISIBLE
WHEN THE SPACES HAVE BEEN SEALED.
10. ALL DEMOLITION/REMOVAL DEBRIS IS THE PROPERTY OF THE
CONTRACTOR, UNLESS NOTED OTHERWISE, AND SHALL BE LEGALLY
DISPOSED OF.
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Project Engineer
Dwg:
ARCHITECT/ENGINEERS
CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h a lf i th re e e ig th re e q ua
6" on e i
6" on e h a lf i nc
6"
Raymond Picard Telephone: 401-459-4760 Providence VA - VSN1
1 2 3 4 5 6 7 8
Providence, RI
A
B
C
D
E
M.E.P./F.P.
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
F
VA Medical CenterCIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103 F: (617) 523-4333
ABATEMENT
Axiom Partners 979 Main Street Wakefield, MA 01880
(781) 213-9198
Harwood Center for Research 650-333
0%
C on str uc tio n D oc um en ts-
Fin al
04-03-2017
Basement Demolition Plan
AD100
PNDW
1/8" = 1'-0"A1 DEMO - BASEMENT PLAN
DEMOLITION LEGEND
Key Name Comments
WALL NOTES
W1 REMOVE EXISTING 8" MASONRY UNIT PARTITION AND ALL
ASSOCIATED ITEMS
W2 REMOVE EXISTING 4" MASONRY UNIT PARTITION AND ALL
ASSOCIATED ITEMS.
W3 REMOVE EXISTING METAL STUD AND GYP BD PARTITION
AND ALL ASSOCIATED ITEMS.
W4 WALL TO BE SELECTIVELY DEMOLISHED AS NECESSARY
FOR NEW WINDOW AND FRAME - SEE DEMO ELEVATIONS
W5 WALL TO BE SELECTIVELY DEMOLISHED AS NECESSARY
FOR NEW DOOR AND FRAME
W6 REMOVE GLAZED WALL TILE DOWN TO CMU STRUCTURE
W7 REMOVE SIGN
DOOR AND WINDOW NOTES
D1 REMOVE EXISTING DOOR, HM FRAME AND ASSOCIATED
BLOCKIGN & HARDWARE.
D2 REMOVE EXISTING WINDOW UNIT, FRAME, BLOCKING
D3 REMOVE EXISTING VAULT DOOR, FRAME AND ASSOCIATED
BLOCKING & HARDWARE
D4 REMOVE EXISTING LOUVER, FRAME, AND BLOCKING
D5 REMOVE EXISTING PRECAST CONC SILL
D6 REMOVE OVERHEAD DOOR AND ALL ASSOCIATED
COMPONENTS
FLOOR NOTES
F1 REMOVE EXISTING CARPET
F2 REMOVE EXISTING VCT FLOORING
F3 REMOVE EXISTING CERAMIC TILE FLOORING
F4 REMOVE EXISTING SHOWER CURB AND TROUGH
CEILING NOTES
C1 REMOVE EXISTING SUSPENDED ACOUSTICAL CEILING TILE
AND SUSPENSION GRID SYSTEM
C2 REMOVE ACOUSTICAL CEILING TILES ATTACHED TO CEILING
SLAB
MISCELLANEOUS NOTES
M1 REMOVE EXISTING AIR CONDITIONER UNIT AND ALL
ASSOCIATED MATERIALS
M2 REMOVE EXISTING RAILING
M3 REMOVE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.