Addendum 2
Drawing sheets A‐2.1, A‐2.12, A‐ 2.21, A‐8.31, A‐8.36, M0.2, M‐2.2, M‐3.2, EL‐102 &
EP‐102
Demolition of Building 20: Contractor is responsible for complete demolition and removal of Building 20
(Sheet C‐2.0, 1A) to include; all footings/structures below grade, all abandoned utility piping within footprint, disconnection of electrical utility to the building. Area of work and temporary construction fence shall encompass Entire Building 20 and work shall comply with specifications. Contractor shall compact site to be flat and graded with gravel to be flush with existing asphalt. Provide new 6’ high chain link fence per detail G/C‐8.0 No reduction of work otherwise included on these referenced sheets or elsewhere in the contract documents shall be implied by this Addendum.
Construct Office and Floor Finish: The contractor shall upgrade interior finishes as detailed in this
Addendum 2 using applicable details in the construction drawings and specifications to complete the work. Contractor shall build out between gridlines 8‐12, A‐G as shown on the on the following pages to construct rooms 201,202, 204, 205, 206, 207 & 200 where open space was shown on original referenced pages. This new work also includes the associated mechanical and electrical required for a functional office space. No reduction of work otherwise included on these referenced sheets or elsewhere in the contract documents shall be implied by this Addendum 2. Utilize this Finish Schedule and Finish
Selection throughout the building to replace the respective selection in A‐8.36. Other elements to remain as indicated unless otherwise noted. New rooms (200‐207) to match selections for “open area”:
F1 ‐ CENTIVA‐ LVT
EE0795‐C
COLOR: ORE 6" WIDE PLANKS
SURFACE: QU
EDGE: SE
LOCATION: PRIMARY CORRIDORS UNLESS OTHERWISE NOTED
F2 ‐ MANNINGTON ‐HETEROGENEOUS SHEET VINYL
PARADIGM COLLECTION
PATTERN: STREAMLINE
COLOR: MODEL
INSTALL WITH INTERGRAL COVE BASE PER 12/A‐9.81
F3 ‐ PATCRAFT BUTTERFLY EFFECT
STYLE: FLUTTER MODULAR 10349
COLOR: GRAY PANSY – Contractor to obtain final approval through VA
F4 ‐ USG TRUE WOOD PANELS OR SIMILAR
LOCATION: 2ND FLOOR CONFERENCE ROOM
F5 ‐ CERAMIC OR PORCELAIN TILE
INSTALL 48' HIGH ON WET WALLS
DESIGN IDEA‐ DAL TILE VERANDA SOLIDS AND TONES
LOCATION: RESTROOMS
F6 ‐ FLORAZZO GEM S'MORES
LOCATION: LOBBY AND ELEVATOR FLOORS
F7 ‐ RUBBER FLOORING ‐ COLOR THAT COMPLEMENTS LVT
LOCATION: STAIRWELLS
Room Number
Room Name Floor (Should Be)
Approximate
SF
101 Entry Lobby F6
102 Reception F6
103 Admin Cubicles F3
103A Admin Office/MSA F3
104 Interview Room F3
106 Exam Room F3
107 Machine/Room F8
108 Mental Health Exam Room F3
109 Group Room F3
110 Mental Health Exam Room F3
110B Mental Health Exam Room F3
111 Mental Health Exam Room F3
111A Secondary Entrance F3
112 Mental Health Exam Room F3
112B Mental Health Exam Room F3
113 Mental Health Exam Room F3
114 Mental Health Exam Room F3
115 Mental Health Exam Room F3
116 Women’s Toilet F5
117 Mental Health Exam Room F3
117A Mental Health Exam Room F3
118 Men’s Toilet F5
119 Mental Health Exam Room F3
119A Mental Health Exam Room F3
120 Electrical Room F8
122 Janitors Room F8
200 Open Area/Conference Room F6 183
201 Admin Office/MSA F3 90
202 Admin Office/MSA F3 90
203 Unisex Toilet F5
204 Admin Office/MSA F3 81
205 Admin Office/MSA F3 81
206 Admin Office/MSA F3 100
207 Admin Office/MSA F3 70
208 Admin Cubicles F3
209 Admin Cubicles F3
210 Mask‐Fit/Storage Consult Room F2
211 Sleep Studies Room F2
211A Bariatric Bathroom F5
212 Sleep Lab Control F2
212A Equipment Storage F2
213 Sleep Studies Room F2
213A Bariatric Bathroom F5
214 Alcove F1
215 Sleep Studies Room F2
215A Bariatric Bathroom F5
216 Clean Utility F2
217 Sleep Studies Room F2
217A Bariatric Bathroom F5
218 Trash/Linen F2
219 Exam Room F2
220 IT/Elec Closet F8
222 Janitors Closet F8
224 Exam Room F2
300 Penthouse/Boiler Room F8
Stairs 1 Stair F7
Stairs 2 Stair F7
Corridors Corridors (Level 1) C1+C2 F1
Corridors Corridors (Level 2) C1+C2 F1
Corridors Corridors 3 L1 F1
Corridors Corridors 3 L2 F1 245