ATTACHMENT_4_-_FINAL_DRAWINGS_B24_-_MECHANICAL-PLUMBING.pdf

PDF 13 MB Posted

Attached to
Clinical Expansion for Mental Health and Sleep Lab - San Fancisco
Solicitation number
36E77619R0005
Issued by

About this file

36E77619R0005 ATTACHMENT 4 - FINAL DRAWINGS B24 - MECHANICAL-PLUMBING.pdf

View the file

Other files

File Type Posted
36E77619R0005-0003001.pdf PDF
36E77619R0005-0003002.pdf PDF
36E77619R0005-0003000.docx DOCX document
36E77619R0005-0002003.docx DOCX document
36E77619R0005-0002001.pdf PDF
36E77619R0005-0002002.docx DOCX document
36E77619R0005-0002004.pdf PDF
36E77619R0005-0002000.docx DOCX document
ATTACHMENT_11_-_CONTRACTOR_SAFETY_AND_ENVIRONMENTAL_RECORD_EVALUATION_FORM.docx DOCX document
Geotech_Report.pdf PDF
Technical_Questions_Tracking_Spreadsheet_-_SF_Mental_Health_-_01-16-2019.pdf PDF
Door_Schedule.pdf PDF
36E77619R0005_0001.docx DOCX document
Site_Visit_Sign_In_Sheet_-_San_Fran_Mental_Health_-_01-16-2019.pdf PDF
ATTACHMENT_9_-_CONSTRUCTION_WAGE_RATES_-_SAN_FRANCISCO_-_01-04-2019.pdf PDF
ATTACHMENT_3_-_FINAL_DRAWINGS_B24_-_ELECTRICAL.pdf PDF
ATTACHMENT_8_-_ADDENDUM_2.pdf PDF
36E77619R0005_1.docx DOCX document
ATTACHMENT_5_-_FINAL_DRAWINGS_B24_-_STRUCTURAL.pdf PDF
ATTACHMENT_10_-_J_A_BRAND_NAME_ITEM.pdf PDF
ATTACHMENT_11_-_PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
ATTACHMENT_1_-_FINAL_DRAWINGS_B24_-_ARCHITECTURAL_-_08-17-2018.pdf PDF
ATTACHMENT_2_-_FINAL_DRAWINGS_B24_-_CIVIL_-_V2_-__08-17-2018.pdf PDF
ATTACHMENT_9_-_CONSTRUCTION_WAGE_RATES_-_SAN_FRANCISCO_-_12-07-2018.pdf PDF
ATTACHMENT_6_-_FINAL_SPECIFICATIONS_B24_-_VOLUME_1_-_10-31-2018.pdf PDF
ATTACHMENT_7_-_FINAL_SPECIFICATIONS_B24_-_VOLUME_2_-_02-10-_2017.pdf PDF
36E77619R0005-000.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M0.1

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

Tflagg Stamp

M0.2

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

1 2 3 4 5 6 7 8 9 10 11 12

A

B

C

D

E

F9

M

B5

5.42.4

G

F

4.8

C1 f

ER1

8x8 f

ER2

12x12 f

ER1

8x8 f R1

22x22 f

CD1-2

6X6 f

CD1-4

6X6 f

CD1-4

12X12 f

CD2-3

6x6

CD1-2

6X6 f

CD1-4

10X10 f

CD1-4

8"x8" f

CD2-3

8X8 f

CD1-3

6x6 f

CD1-4

10x10 f

CD2-4

6x6 f

ER1

8x8 f R2

22x22 f R1

22x22 f R1

22x22 f

CD-1-2

8"x8" f R1

22x22 f R2

22x22 f R1

24X24 f R1

22x22 f R1

22x22 f R1

22x22 f R1

22x22

8"ø

10"ø

10"ø

8"ø

8"ø

8"ø

24"x14"

24"x14"

6"ø

6"ø 10"ø

6"ø

8"ø

10"ø

8"ø

6"ø 10"ø

10"ø

10"ø

T

24-TU-1-2

FS

8"ø

6"ø

6"ø

6"ø

8"ø f R1

22x22

T

24-TU-1-8

T

24-TU-1-9

T

24-TU-1-10

T

24-TU-1-1

T

24-TU-1-4

T24-TU-1-2

f R1

22x22

8"ø f

CD2-4

8"x8" f

CD1-4

6X6

6"ø

10"ø

12"ø

6"ø 14"x8"

14"x14" 18"x14" 20"x14"

26"x16" SA10"ø 10"ø

6"ø

14"x8"

12"ø

8"ø

8"ø

T

24-F-1 f

CD1-4

14X14

16"x8"

18"x12" 16"x12" f

CD1-4

14X14

8"ø

28"x16"

10"ø

6"ø

6"ø

6"ø

6"ø 8"ø

10"ø RA BELOW

24"x14" RA BELOW

16"x14"

16"x12"

12"ø 8"x8"

6"ø

8"x6"

6"ø

12"ø14"x10"

10"ø 10"ø

10"ø f R1

22x22 f

CD1-4

8X8

8"ø

8"ø f

CD1-4

8"x8"

6"ø

FS

12"ø

30"x12" SA ABOVE f

CD1-4

8X8

8"ø f

CD1-4

8X8

8"ø

8"øT 24-F-7

T

24-TU-1-3

36"x16"

RA (R)

6"ø

R1 100f

6X6

6"ø f

CD1-4

10x10

10"ø f R1

22x22

10"ø

10"ø

6"ø

6"ø f R1

22x22 f R1

22x22 f

CD1-4

10X10 f

CD1-4

6X6

6"ø f

CD1-4

6X6 6"ø

T

24-TU-1-5

T

24-TU-1-6

10"ø

32"x14"

SA(D) FA

26"x16" f

CD1-4

6X6

6"ø

R1 120f

22x22

T

24-TU-1-1

-T U

-1 -1

INTERVIEW ROOM

EXAM ROOM

ADMIN CUBICLES

JANITORS ROOM

ELECTRICAL

ROOM

MENS TOILET

WOMENS TOILET

MENTAL HEALTH EXAM

ROOM

MENTAL HEALTH EXAM

ROOM

MACHINE ROOM

ADMIN CUBICLE /

GROUP ROOM

MENTAL HEALTH EXAM

ROOM

ENTRY LOBBY

RECEPTION

ADMIN OFFICE

103 A

ROOM

SECONDARY ENTRANCE

111 A

MENTAL HEALTH EXAM

ROOM

CORRIDOR 2

CORRIDOR 1

CORRIDOR 3

ELEVATOR

MENTAL HEALTH EXAM

ROOM

MENTAL HEALTH EXAM

ROOM

110 B

112 B

MENTAL HEALTH EXAM

ROOM

119 A

MENTAL HEALTH EXAM

ROOM

117 A f

CD1-4

6x6 f

CD1-4

6x6 f

CD1-1

6x6

10"ø

14x12

EA(R)

6"ø

7"ø

10"ø

1/4" = 1'-0"1

1ST FLOOR PLAN

MECHANICAL 1ST

FLOOR PLAN

M2.1

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

8"ø (D)

A

B

C

D

E

F9

M

B5

5.42.4

G

F

4.8

C1 f

CD1-1

6X6 f

CD1-2

6X6 f

CD1-4

12X12 f

CD1-4

12X12 f

CD1-4

9X9 f

CD1-4

8X8 f

CD1-4

8X8 f

CD1-4

9X9

CD1-4

145f

8"x8"

CD1-4

145f

8"x8" f

CD2-4

6x6 f

CD1-4

6X6 f

CD1-4

8X8 f

CD1-4

8X8 f

CD1-4

6X6

CD2-4

6x6 f

CD2-4

8"x8" f

CD2-4

8"x8" f R2

12X12 f R1

22x22 f R1

22x22 f R1

24X24 f R1

22x22 f R1

22x22 f R2

6X6 f R1

22x22

ER6x6 f

ER1

6x6 f R1

22x22

ER

120f

6x6 f

ER

6x6

14"ø

10"ø

8"ø

6"ø

16"x10" 14x12

8"ø

8"ø

6"ø

46"x14" AL

10"ø

8"ø

8"ø

10"ø 8"ø

10"ø

20"x10"

14"ø

8"ø

8"ø8"ø

10"ø

20"x20" (R) TO REF-1

6"ø 14"x14"

14"x12" EA f

ER

6x6 f

CD1-4

8X8 f R2

10X10

20"x8"

20"x8"

10"ø f

CD1-4

6X6

"ø f

CD1-4

8X8

10"øFS

6"ø

6"ø10"ø

12"ø

10"ø f

CD1-2

10"x10"

4"x10" 8"x10"

6"ø

6"ø

6"ø6"ø

9"ø

12"x10"

12"x10"

6"ø

"x

A L

6"x10"

6"ø

6"ø 6"ø

6"ø

8"ø

8"ø

8"ø 10"ø

12"x10"

6"ø

FS

36"x16"

12"x10" 1 "x

14"ø

26"x18"

8"ø

12"x10" 12"x10"

10"ø

8"ø 6"ø 8"ø

6"ø

42"x72" AL(R)

6"ø

6"ø8"ø

10"ø 8"ø

"ø

10"x14"

16"x14"

8"ø

6"ø

8"ø

6"ø

26"x14"

36"x16"

RA AL

T

T

24-TU-2-16

T

24-TU-2-17

T

24-TU-2-20

T

24-TU-2-19

T 24-TU-2-18

T

24-TU-2-14

20"x8" AL f

CD1-2

10"x10" f R2

10X10 f

CD1-2

10"x10" f R2

10X10 f

CD1-4

10"x10"

6"ø f R1

8X8 f

CD1-4

6x6

R2 100f

8X8

6"ø

CD2-4

100f

6x6

5"ø

T

24-TU-2-12

T

24-TU-2-11

32"x14"

M3.5

M3.6

12"x10"

T T T

FS

FSFS

FSFS

EXAM ROOM

IT/ELEC

EXAM ROOM

TRASH/LINEN

CLEAN UTILITY

SLEEP LAB CONTROL

MASK-FIT / STORAGE

CONSULT ROOM

EQUIPMENT STORAGE

212A

ADMIN CUBICLES

OPEN AREA

UNISEX TOILET

SLEEP STUDIES ROOM

SLEEP STUDIES ROOM

211A 209

ADMIN CUBICLES

BARIATRIC

BATHROOM

SLEEP STUDIES ROOM

215A

ALCOVE

217A

SLEEP STUDIES ROOM

213A

JANITORIAL CLOSET

7"ø

8"ø

6"ø f

ER2

6x6

5"ø

16"x10"

8X8 ER2

150f

12x72AL

SA(D)

FS FS

8"ø f R1

22x22

ELEVATOR

STAIR 1

BARIATRIC

BATHROOM

BARIATRIC

BATHROOM

BARIATRIC

BATHROOM

STAIR 2

9"ø

MECHANICAL 2ND

FLOOR PLAN

M2.2

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

B

C

D

E

F9

B5

5.42.4

G

F

4.8

C1

M

PENTHOUSE/ BOILER

ROOM

T.O. PARAPET

T.O. PARAPET

T.O. PARAPET

OVERFLOW

33' - 0"

33' - 0"

T.O. PARAPET

DN

T.O. CURB

T.O. DRAIN

T.O. DRAIN

T.O. DRAIN

T.O. RIDGET.O. RIDGE

T.O. RIDGE

T.O. PARAPETT.O. PARAPET

T.O. PARAPET

T.O. PARAPET

T.O. PARAPET

T.O. PARAPET

ROOF SLOPE

1/4" PER FOOT

ADM

M3.5

M3.6

1/4" = 1'-0"1

MECHANICAL ROOF PLAN

MECHANICAL ROOF

PLAN

M2.3

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

B

C

D

E

F9

M

B5

5.42.4

G

F

4.8

C1

INTERVIEW ROOM

EXAM ROOM

ADMIN CUBICLES

JANITORS ROOM

ELECTRICAL ROOM

MENS TOILET

WOMENS TOILET

MENTAL HEALTH EXAM

ROOM

MENTAL HEALTH

EXAM ROOM

MACHINE ROOM

GROUP ROOM

ENTRY LOBBY

RECEPTION

ADMIN OFFICE

103 A

SECONDARY

ENTRANCE

111 A

STAIR 1

STAIR 2

CORRIDOR 2

CORRIDOR 1

CORRIDOR 3

ELEVATOR

MENTAL HEALTH EXAM

ROOM

MENTAL HEALTH EXAM

ROOM

110 B

MENTAL HEALTH EXAM

ROOM

112 B

MENTAL HEALTH

EXAM ROOM

119 A 117 A

MENTAL HEALTH

EXAM ROOM

MENTAL HEALTH

EXAM ROOM

MENTAL HEALTH

EXAM ROOM

MENTAL HEALTH

EXAM ROOM

MENTAL HEALTH

EXAM ROOM

MENTAL HEALTH

EXAM ROOM

MENTAL HEALTH

EXAM ROOM

1/4" = 1'-0"1

HYDRONIC 1ST FLOOR PLAN

MECHANICAL HYDRONIC

1ST FLOOR PLAN

M3.1

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

B

C

D

E

F9

M

B5

5.42.4

G

F

4.8

C1

STAIR 1

STAIR 2

CORRIDOR 1

ELEVATOR

EXAM ROOM

IT / ELEC

ROOM

EXAM ROOM

TRASH / LINEN

CLEAN UTILITY

SLEEP LAB CONTROL

MASK-FIT / STORAGE

CONSULT ROOM

EQUIPMENT STORAGE

212A

UNISEX TOILET

SLEEP STUDIES ROOM

SLEEP STUDIES ROOM

SLEEP STUDIES ROOM

SLEEP STUDIES ROOM

215A

213A 211A

BARIATRIC

BATHROOM

217A

ALCOVE

JANITORIAL

CLOSET

BARIATRIC

BATHROOM

BARIATRIC

BATHROOM

BARIATRIC

BATHROOM

ADMIN CUBICLES

ADMIN CUBICLES

OPEN AREA

1/4" = 1'-0"1 HYDRONIC 2nd FLOOR PLAN

MECHANICAL HYDRONIC

2ND FLOOR PLAN

M3.2

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

1 2 3

B

C

M

B5

2.4

C1

1/2" = 1'-0"1

ENLARGED BOILER ROOM

ENLARGED MECHANICAL

BOILER ROOM PLAN

M3.3

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

TOF

-1' - 4"

1ST FLOOR PLAN

0' - 0"

2nd FLOOR PLAN 13' - 0"

MECHANICAL

ROOF PLAN

26' - 0"

6"ø

6"ø

8"ø

26"x18" 10"ø 16"x10"

28"x16" 12"ø

14"x14"

7"ø

BCDEF9 B5G F C1

1/4" = 1'-0"1

BUILDING SECTION A

MECHANICAL BUILDING

SECTION

M3.5

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

TOF

-1' - 4"

1ST FLOOR PLAN

0' - 0"

2nd FLOOR PLAN 13' - 0"

MECHANICAL

ROOF PLAN

26' - 0"

8"ø6"ø

14"ø 8"ø

14"ø

30"x12" SA ABOVE

24"x14" RA BELOW 10"ø

6"ø 10"ø10"ø

6"ø

14"x46" AL

14"ø10"ø10"ø

8"ø

36"x16"

8"ø

16"x36" RA AL 10"ø 12"ø

12"x10"

12"ø

8"ø

6"ø

8"ø

12"x10"

1 2 3 4 5 6 7 8 9 10 11 125.42.4 4.8

1/4" = 1'-0"1

BUILDING SECTION B

MECHANICAL BUILDING

SECTION

M3.6

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

M4.1

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

M4.2

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

M4.3

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

M4.4

SUPPLY

RETURN

CLG-O

C

C

SUPPLY

RETURN

PH-O

H

C

FFILT-DPPFILT-DP

OA DA

SF-C

SF-S SDR-1

DA-T

SF VFD

LT-A PH-TDPR-1

DAPHI-A

DA1-P

LOCATED 2/3 DOWN THE

LONGEST DUCT RUN

DA-SD

SF-O

WIRE TO

SF VFDDPR1-S

24 VAC

SDR-1LT-ADA-SD

Safety Shutdown Relay Coil Wiring Detail

FIRE ALARM

SHUTDOWNDAPHI-A

(If used)

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

M5.1

PCHWP1-C

PCHWP1-S

CH1-EN

CHWS

CHWR

CHILLER 1 CONTROL

CABINET

CHW-DP

CHW-FSCHWE-T

CHWL-T

PCHWP1

CHILLER 1

SCHWP1-C

SCHWP1-S

SCHWP1 VFD

SCHWP1

SCHWR-T

SCHWS-T SCHW-F

CH1-S

SCHWP1-O

MIX-O

SHWP2-C

SHWP2-S

SHWP1-C

SHWP1-S

BP2-C

BP2-S

BP1-C

BP1-S

HWS

HWR

SHWR-T

SHW-F

HW-DP

BOILER 1

BLR1LW-T

BOILER 2

BLR2LW-T

PHWR-T

PHWS-T

BLR1-EN

BLR1-A

BLR1-S

BOILER 1 CONTROL

CABINET

BLR2-EN

BLR2-A

BLR2-S

BOILER 2 CONTROL

CABINET

SHWP1 VFD

SHWP1-O

SHWP2 VFD

SHWP2-OSHWP2

SHWP1

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

M5.2

SUPPLY

RETURN

CLG-O

C

C

SUPPLY

RETURN

PH-O

H

C

PFILT-DP

OA DA

SF-C

SF-S

DA-T

THERMOSTAT

PROVIDED W/ UNIT -

WIRED BY JCI

RA SA

ZN-T

REMOTE

CONTROLLER

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

M5.3

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

P0.1

B

C

D

E

F9

M

B5

5.42.4

G

F

4.8

C1

MENS TOILET

ELECTRICAL ROOM

JANITORS ROOM

WOMENS TOILET

MENTAL HEALTH EXAM

ROOM

MENTAL HEALTH EXAM

ROOM

EXAM ROOM

MENTAL HEALTH EXAM

ROOM

MENTAL HEALTH EXAM

ROOM

INTERVIEW ROOM

ADMIN CUBICLES

MACHINE ROOM

ADMIN CUBICLE /

GROUP ROOM

MENTAL HEALTH EXAM

ROOM

ENTRY LOBBY

RECEPTION

ADMIN OFFICE

103 A

SECONDARY ENTRANCE

111 A

MENTAL HEALTH EXAM

ROOM

MENTAL HEALTH EXAM

ROOM

MENTAL HEALTH EXAM

ROOM

MENTAL HEALTH EXAM

ROOM

110 B

MENTAL HEALTH EXAM

ROOM

112 B

MENTAL HEALTH EXAM

ROOM

119A 117A

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

LEVEL 1 PLUMBING FLOOR PLAN

P2.1

B

C

D

E

F9

M

B5

5.42.4

G

F

4.8

C1

EXAM ROOM

IT/ELEC

EXAM ROOM

SOILED UTILITY

CLEAN UTILITY

SLEEP LAB CONTROL

MASK-FIT / STORAGE

CONSULT ROOM

EQUIPMENT STORAGE

212A

ADMIN CUBICLES

ADMIN OFFICE

ADMIN OFFICE

CONFERENCE ROOM /

GROUP ROOM

UNISEX TOILET

SLEEP STUDIES ROOMSLEEP STUDIES ROOM

211A

ADMIN CUBICLES

TOILET

SLEEP STUDIES ROOM

TOILET

215A

ALCOVE

217A

SLEEP STUDIES ROOM

213A TOILET

TOILET

JANITORIAL CLOSET

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

LEVEL 2 PLUMBING FLOOR PLAN

P2.2

B

C

D

E

F9

B5

5.42.4

G

F

4.8

C1

M

PENTHOUSE/ BOILER

ROOM

STAIRCASE

#1

ELEVATOR

84 SF

& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

PLUMBING ROOF PLAN

P2.3

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capital Avenue

Sacramento, CA 95816

15203BP

TF

ZH

662-607

4150 CLEMENT ST.

SAN FRANCISCO, CA 94121

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities Management

3160 CROW CANYON ROAD

SUITE 240

SAN RAMON, CA 94583

OFFICE : (925) 830 1925

FAX : (925) 830 2750 of 05 / 23 / 2016

BUILDING 24

VJM

85% SUBMITTAL SET 09/01/2015

85% SUBMITTAL SET 10/01/2015

100% SUBMITTAL SET 03/22/2016

100% CD 05/23/2016

VANIR

100% CD, ADDENDUM 1 02/10/2017

PLUMBING DETAILS

P3.0

M0.1_15203
Layout1
M0.2_15203
M0.2
M2.1_15203
Layout1
M2.2_15203
Layout1
M2.3_15203
Layout1
M3.1_15203
Layout1
M3.2_15203
Layout1
M3.3_15203
Layout1
M3.5_15203
Layout1
M3.6_15203
Layout1
M4.1_15203
Layout1
M4.2_15203
Layout1
M4.3_15203
Layout1
M4.4_15203
Layout1
M5.1_15203
Layout1
M5.2_15203
Layout1
M5.3_15203
Layout1
P0.1_15203
Layout1
P2.1_15203
Layout1
P2.2_15203
Layout1
P2.3_15203
Layout1
P3.0_15203
Layout1
P3.1_15203
Layout1

File details come from the government source that posted it.