36E77619R0005-0002003.docx

DOCX document 26 KB Posted

Attached to
Clinical Expansion for Mental Health and Sleep Lab - San Fancisco
Solicitation number
36E77619R0005
Issued by

About this file

36E77619R0005 0002 Spec 09 66 16 Torazzo.docx

View the file

Other files

File Type Posted
36E77619R0005-0003001.pdf PDF
36E77619R0005-0003002.pdf PDF
36E77619R0005-0003000.docx DOCX document
36E77619R0005-0002001.pdf PDF
36E77619R0005-0002002.docx DOCX document
36E77619R0005-0002004.pdf PDF
36E77619R0005-0002000.docx DOCX document
ATTACHMENT_11_-_CONTRACTOR_SAFETY_AND_ENVIRONMENTAL_RECORD_EVALUATION_FORM.docx DOCX document
Geotech_Report.pdf PDF
Technical_Questions_Tracking_Spreadsheet_-_SF_Mental_Health_-_01-16-2019.pdf PDF
Door_Schedule.pdf PDF
36E77619R0005_0001.docx DOCX document
Site_Visit_Sign_In_Sheet_-_San_Fran_Mental_Health_-_01-16-2019.pdf PDF
ATTACHMENT_9_-_CONSTRUCTION_WAGE_RATES_-_SAN_FRANCISCO_-_01-04-2019.pdf PDF
ATTACHMENT_3_-_FINAL_DRAWINGS_B24_-_ELECTRICAL.pdf PDF
ATTACHMENT_8_-_ADDENDUM_2.pdf PDF
36E77619R0005_1.docx DOCX document
ATTACHMENT_5_-_FINAL_DRAWINGS_B24_-_STRUCTURAL.pdf PDF
ATTACHMENT_10_-_J_A_BRAND_NAME_ITEM.pdf PDF
ATTACHMENT_11_-_PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
ATTACHMENT_1_-_FINAL_DRAWINGS_B24_-_ARCHITECTURAL_-_08-17-2018.pdf PDF
ATTACHMENT_2_-_FINAL_DRAWINGS_B24_-_CIVIL_-_V2_-__08-17-2018.pdf PDF
ATTACHMENT_9_-_CONSTRUCTION_WAGE_RATES_-_SAN_FRANCISCO_-_12-07-2018.pdf PDF
ATTACHMENT_6_-_FINAL_SPECIFICATIONS_B24_-_VOLUME_1_-_10-31-2018.pdf PDF
ATTACHMENT_7_-_FINAL_SPECIFICATIONS_B24_-_VOLUME_2_-_02-10-_2017.pdf PDF
ATTACHMENT_4_-_FINAL_DRAWINGS_B24_-_MECHANICAL-PLUMBING.pdf PDF
36E77619R0005-000.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10-01-15

SECTION 09 66 16

TERRAZZO FLOOR TILE

PART 1 - GENERAL

1.1 DESCRIPTION:

A. This section specifies requirements for terrazzo tile for installation over concrete floors.

1.2 RELATED WORK:

A. Resilient Base: Section 09 65 13, RESILIENT BASE AND ACCESSORIES.

B. Concrete Floors: Section 03 30 00, CAST-IN-PLACE CONCRETE.

C. Color, Size, Thickness, Finish and Type: Section 09 06 00, SCHEDULE FOR FINISHES.

D. Subfloor Testing and Preparation: Section 09 05 16, SUBSURFACE PREPARATION FOR FLOOR FINISHES.

1.3 QUALITY ASSURANCE:

A.Approval by Contracting Officer Representative (COR) is required of products or service, or proposed manufacturer, suppliers and installers, and will be based upon submission by Contractor of certification that:
1.Manufacturer has manufactured terrazzo tile as one of his principal products for a minimum of three (3) years. Submit list of not less than five (5) installations. List is to include name of project, and owner and location of project. Submit manufacturer’s qualifications.
2.Installer has installed terrazzo tile for a minimum of three (3) years. Submit installer’s qualifications.

1.4 SUBMITTALS:

A.Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B.Flooring Manufacturer's Literature and Data: Printed pre-installation and installation instructions for conditions indicated.
C.Certificates: Indicating materials conform to specified requirements. Indicating flooring manufacturer's approval of underlayment, substrate preparation, adhesive finishes and cleaners.
D.Samples: Terrazzo Tile each color, size, finish, and type to be used.

E. Manufacturer’s qualifications including list of installations.

F. Installer’s qualifications.

G. Moisture and pH test results as per Section 09 05 16, SUBSURFACE PREPARATION FOR FLOOR FINISHES.

H. Manufacturer’s warranty.

1.5 DELIVERY:

A. Deliver materials to job in manufacturer's original unopened containers, free of damage, with manufacturer's brand name marked thereon.

1.6 STORAGE:

A. Store materials in a protected area. That is kept dry and has a temperature not lower than 18 degrees C (65 degrees F) or higher than 27 degrees C (80 degrees F).

1.7 PROJECT CONDITIONS:

A. Do not install tiles until all other work that could cause damage to the finish flooring has been completed. Acclimate tiles and maintain spaces where tile is to be installed to a temperature of not less than 21 degrees C (70 degrees F) for at least 48 hours before, during and after the installation of tiles. A minimum temperature of 13 degrees C (55 degrees F) is to be maintained thereafter.

1.8 warranty:

A. Construction Warranty: Comply with FAR clause 52.246-21, “Warranty of Construction”.

1.9 APPLICABLE PUBLICATIONS:

A.The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by basic designation only.
B.ASTM International (ASTM):
C97/C97M-09Test Methods for Absorption and Bulk Specific Gravity of Dimension Stone
C109/C109M-13Compressive Strength of Hydraulic Cement Mortars
C501-84(R2009)Test Method for Relative Resistance to Wear of Unglazed Ceramic Tile by the Taber Abraser
E84-14Test Method for Surface Burning Characteristics of Building Materials
E90-09Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Element
E413-10Classification for Rating Sound Insulation
E492-09Standard Test Method for Laboratory Measurement of Impact Sound Transmission Through Floor-Ceiling Assemblies Using the Tapping Machine
E648-14cCritical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source
E989-06Standard Classification for Determination of Impact Insulation Class
F1869-11Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
F2170-11Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in Situ Probes
C.Code of Federal Regulation (CFR):
40 CFR 59Determination of Volatile Matter Content, Water Content, Density Volume Solids, and Weight Solids of Surface Coating

D. Tile Council of North America (TCNA):

DCOF AcuTest-2012 Dynamic Coefficient of Friction Test

PART 2 - PRODUCTS

2.1 TERRAZZO TILE:

A. Provide terrazzo tile that is of color, size, thickness, finish and type as specified in Section 09 06 00, SCHEDULE FOR FINISHES. Tiles are to consist of gem chips embedded in a rigid thermoset resin matrix. Provide granite chips that are manufacturer's standard gradation.

TERRAZZO TILE PROPERTIES

PROPERTY
TEST METHOD
VALUE
Compressive strength
ASTM C109/C109M

20 MPa (3000 psi) minimum

Water Absorption
ASTM C97/C97M
0.7 percent maximum
Abrasive Wear
ASTM C501
Index 28
Coefficient of Friction
TCNA DCOF AcuTest
0.42 when wet
Flame Spread
ASTM E84
Class A
Critical Radiant Flux
ASTM E648
Class I

2.2 ADHESIVE:

A. Provide terrazzo tile manufacturer's standard product or a product recommended by the terrazzo tile manufacturer.

1. Adhesive to have a VOC content of 70 g/L or less when calculated according to 40 CFR 59, (EPA Method 24).

2.3 RESILIENT BASE:

A. See Section 09 65 13, RESILIENT BASE AND ACCESSORIES.

2.4 TERRAZZO BASE/STRIPS:

A. Provide terrazzo base/strips matching the requirements of terrazzo tile and being a manufacturer’s standard product. Color, size, thickness, finish and type as specified in Section 09 06 00, SCHEDULE FOR FINISHES.

2.5 METAL EDGE STRIPS:

A. Extruded aluminum, butt-type, 38 mm (1-1/2 inches) wide with thickness to set top surface flush with top of tile and with bevel at exposed edge. Edge strips to have countersunk holes, within 12 mm (1/2 inch) of each end and spaced at no more than 203 mm (8 inches) on center for securement.

PART 3 - EXECUTION

3.1 GENERAL:

A. Provide terrazzo tile flooring on floor surfaces and walls where shown on the construction documents. After becoming familiar with details of the work, verify dimensions in the field, and advise the COR of any discrepancy before performing the work.

3.2 SUBFLOOR TESTING AND PREPARATION:

A. Prepare and test surfaces to receive terrazzo floor tile and adhesive as specified in Section 09 05 16, SUBSURFACE PREPARATION FOR FLOOR FINISHES.

3.3 INSTALLATION:

A.Install tile in accordance with the tile manufacturers approved installation instructions, except as specified herein. Lay design symmetrical about center lines of rooms. Joints are to be maximum 0.79 mm (1/32 inch) and in true alignment. Cut tile to fit snugly at pipes and other fixed vertical surfaces. Seal joints at pipes with silicone. Remove spots or smears of adhesive immediately. Make entire surfaces of finished tile floors smooth, straight, and free from bleeding adhesive, buckles, waves or projecting tile edges upon completion.
B.Metal Edge Strips: Secure strips with No. 10 aluminum alloy, counter sunk flathead machine screws with expansion sleeves. Provide metal edge strips, in one (1) piece, at any exposed edges of tile.
C.Terrazzo Base/Strips: Continuous and adhesively applied. Joints are to be tight and formed in same manner as floor tile.

D. Premolded Base: As specified in Section 09 65 13, RESILIENT BASE AND ACCESSORIES.

3.4 CLEANING:

A. Upon completion and after adhesive has cured, clean flooring in accordance with manufacturer's recommendations.

3.5 PROTECTION:

A. From the time of laying until acceptance, protect the flooring from damage. Replace damaged, loose, broken, or curled tiles. Except as necessary to install new tile, keep all traffic off new tile for at least 24 hours after installation.

E N D 09 66 16 - 1

File details come from the government source that posted it.