ATTACHMENT_7_-_Drawings_3_of_4.pdf

PDF 14 MB Posted

Attached to
Construct New Inpatient Mental Health Building - Minor Construction - Danville VAMC
Solicitation number
36E77619B0002
Issued by

About this file

36E77619B0002 ATTACHMENT 7 - Drawings 3 of 4.pdf

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REF.

DD WW

D W

REF.

R E

F

LOBBY

TOILET

103 SOILED UTILITY

CLEAN STOR

RECEIVING

MECH

EMS STOR

EQUIP STOR

PATIENT STOR

TELECOM

ELEC

ENTRY

INTAKE

INTAKE EXAM

BED BUG

TOILET

LAUNDRY

LAUNDRY

CLEAN LINEN

CONSULT

CONSULT

QUIET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

BARIATRIC/ADA 3

PATIENT 12

PATIENT 14

PATIENT 15

PATIENT 13

PATIENT 11

PATIENT 10

GROUP

DAY

FITNESS

TOILET

SOILED LINEN

JANITOR

PATIENT 8

PATIENT - DOUBLE

PATIENT 9

PATIENT 7

PATIENT-DOUBLE

BARIATRIC/ADA 2

TOILET

TOILET

TOILET

TOILET

TOILET

CLEAN STORAGE

NOURISHMENT

DINING

CONSULT

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

PATIENT 6

PATIENT 5

PATIENT 4

PATIENT 2

PATIENT 1

PATIENT 3

BARIATRIC/ADA 1

TREATMENT

EXAM

ANTE RM

RESTRAINT

CONSULT

MEDS

NURSE MANAGER

ON-CALL

ON-CALL TOILET

NURSE WORK AREA

WARD CLERK

VISITATION

CONFERENCE

NURSING MOTHER

RM

SOCIAL WORK

STAFF HALLWAY

LOUNGE

STAFF TOILET

STAFF TOILET

WAITING

OPEN

WORKSTATIONS

PRINT AREA

PROVIDER OFFICE

PROVIDER OFFICE

CORRIDOR

CORRIDOR

SALLY PORT

CORRIDOR

CORRIDOR

CORRIDOR

136CORRIDOR

COMPUTER STATION

TOILET

PHONE STATION

P-5

P-6

P-5P-

P-

P-

P-

P-6

P-3

P-5

NURSE STATION

148A

P-5

P-5

P-6

P-6

P-4

P-4

P-5

P-5

P-6

P-4

P-5 P-5

P-6

P-4

P-

P-5

P-

P-6 P-4

P-

P-5

P-

P-4 P-6

P-4

P-4

P-6

P-6

P-

P- 5 P-5

P-6

P-4

P-5

P-6

P-5

P-5

WP-1

FINISH ABBREVIATIONS

CPT - CARPET TILE

RB - RESILIENT BASE

WP - WALL PROTECTION

CG - CORNER GUARD

AT - ACOUSTICAL CEILING

P - PAINT

RF - RESILIENT FLOORINGPL - PLASTIC LAMINATE

S - SOLID SURFACE

VCT - VINYL COMPOSITION TILEPT - PORCELAIN TILE

TS - TRANSITION STRIP

GT - GROUT

RES - RESINOUS FLOORING

SVT - LUXURY VINYL TILE

WG - WALL GRAPHIC

WC - WINDOW COVERING

HR - HANDRAIL

CR - CRASH RAIL RP - RESIN PANEL

SC - SEALED CONCRETE

CC - CUBICLE CURTAIN

RESW - RESINOUS WALL

ALL FINISHES IN SCHEDULE TO

DEFINE THE BASIS OF DESIGN.

CHR - CHAIR RAIL

BG - BUMPER GUARD

FINISHES GENERAL NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

WALL FINISH SHALL BE PROVIDED FROM WALL CORNER TO WALL CORNER, UNLESS

OTHERWISE NOTED.

REFER TO FINISH PLANS, CEILING PLAN, AND INTERIOR ELEVATIONS FOR ADDITIONAL

INFORMATION.

REFER TO FINISH PLANS FOR INFORMATION REGARDING ACCENT PAINT LOCATIONS AND

FLOORING PATTERNS.

PROVIDE P-1 ON WALLS AS FIELD COLOR. REFER TO FINISH SCHEDULE AND FINISH PLANS

FOR ACCENT WALL COLOR DESIGNATIONS.

PROVIDE P-2 ON HOLLOW METAL DOOR AND WINDOW FRAMES IN SEMI-GLOSS FINISH.

PROVIDE P-7 ON GYPSUM BOARD CEILINGS AND BULKHEADS.

PROVIDE PAINT TO MATCH WALL PAINT ON ALL EXPOSED METAL ACCESS PANELS, DUCTS

AND OTHER MISC. EXPOSED CONSTRUCTION ELEMENTS.

REFER TO INTERIOR ELEVATION SHEET AS403 FOR WALL TILE PATTERN. PAINT WALLS

ABOVE TILE AS IDENTIFIED IN FINISH SCHEDULE.

INSTALL CORNER GUARDS ABOVE RESILIENT BASE.

INSTALL WALL BASE OVER IMPACT RESISTANT WALL PROTECTION.

PROVIDE TS-1 BETWEEN CERAMIC TILE FLOORING AND CARPET FLOOR.

PROVIDE TS-2 BETWEEN CERAMIC TILE FLOORING AND RESILIENT FLOORING.

PROVIDE TS-3 BETWEEN CARPET AND RESILIENT TILE FLOORING.

PROVIDE MANUFACTURER TYPICAL TRIM, TRANSITION, AND FINISHING ACCESSORIES.

EDGES AND JOINT SHALL BE FINISHED SMOOTH AND TO MANUFACTURER'S

INSTRUCTIONS.

CERAMIC/PORCELAIN TILE SHALL BE INSTALLED IN PATTERN AS SHOWN IN ELEVATIONS.

WALL TILE PATTERN APPLIES TO ALL WALLS IN THAT SPACE.

ALL CHANGES IN FLOORING SHALL BE INSTALLED WITH CENTERLINE UNDER DOORS.

PROVIDE AND INSTALL CORNER GUARDS ON ALL OUTSIDE CORNERS OF INTERIOR WALLS.

ALL EXPOSED END PANELS OF CASEWORK SHALL HAVE FURNITURE FINISHED ENDS.

FINISH PLAN NOTES

1.

2.

3.

ALIGN.

ALIGN FLOORING PATTERN TO BULKHEAD ABOVE.

INDICATES DIRECTION OF FLOOR PATTERN

L I

CE

NSED

ARCHITECT

JOSEPH J GUIDROZ

001-017130

S

TATE

OF I LL

IN

O I S

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Sheet Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA ILLIANA - DANVILLE, IL

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

MARK SHOVIAK, COR 550-317

MEP Engineer

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

VA ILLIANA HEALTH CARE SYSTEM

1900 EAST MAIN STREET

DANVILLE, ILLINOIS 61832

OF 118

C U s e rs

\t a tk in s o n \D o c u m e n ts

\1 .1

V

A D a n v ill e In p a ti e n t M

H T

A T

K

IN

S O

N

G U

ID

O

N D

E S

IG

N

.C O

M .r v t

100% SUBMISSION

AF101

TDCJJG

FINISH PLAN

2017/11/21

AE CONSTRUCT NEW INPATIENT

MENTAL HEALTH BUILDING

SCALE: 1/8" = 1'-0"AF101

1 FINISH FLOOR PLANN

N

PROJECT

NORTH

TRUE

NORTH

D W

REF.

R E

F

LOBBY

TOILET

103 SOILED UTILITY

CLEAN STOR

RECEIVING

MECH

EMS STOR

EQUIP STOR

PATIENT STOR

TELECOM

ELEC

ENTRY

INTAKE

INTAKE EXAM

BED BUG

TOILET

LAUNDRY

LAUNDRY

CLEAN LINEN

CONSULT

CONSULT

QUIET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

BARIATRIC/ADA 3

PATIENT 12

PATIENT 14

PATIENT 15

PATIENT 13

PATIENT 11

PATIENT 10

GROUP

DAY

FITNESS

TOILET

SOILED LINEN

JANITOR

PATIENT 8

PATIENT - DOUBLE

PATIENT 9

PATIENT 7

PATIENT-DOUBLE

BARIATRIC/ADA 2

TOILET

TOILET

TOILET

TOILET

TOILET

CLEAN STORAGE

NOURISHMENT

DINING

167CONSULT

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

PATIENT 6

PATIENT 5

PATIENT 4

PATIENT 2

PATIENT 1

PATIENT 3

BARIATRIC/ADA 1

TREATMENT

EXAM

ANTE RM

RESTRAINT

CONSULT

MEDS

NURSE MANAGER

ON-CALL

ON-CALL TOILET

NURSE WORK AREA

WARD CLERK

VISITATION

CONFERENCE

NURSING MOTHER

RM

SOCIAL WORK

STAFF HALLWAY

LOUNGE

STAFF TOILET

200 STAFF TOILET

WAITING

OPEN

WORKSTATIONS

PRINT AREA

PROVIDER OFFICE

PROVIDER OFFICE

CORRIDOR

CORRIDOR

SALLY PORT

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

COMPUTER STATION

TOILET

PHONE STATION

4' - 8

1 1

10' - 0"

3'

3 3

FINISHES GENERAL NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

WALL FINISH SHALL BE PROVIDED FROM WALL CORNER TO WALL CORNER, UNLESS

OTHERWISE NOTED.

REFER TO FINISH PLANS, CEILING PLAN, AND INTERIOR ELEVATIONS FOR ADDITIONAL

INFORMATION.

REFER TO FINISH PLANS FOR INFORMATION REGARDING ACCENT PAINT LOCATIONS AND

FLOORING PATTERNS.

PROVIDE P-1 ON WALLS AS FIELD COLOR. REFER TO FINISH SCHEDULE AND FINISH PLANS

FOR ACCENT WALL COLOR DESIGNATIONS.

PROVIDE P-2 ON HOLLOW METAL DOOR AND WINDOW FRAMES IN SEMI-GLOSS FINISH.

PROVIDE P-7 ON GYPSUM BOARD CEILINGS AND BULKHEADS.

PROVIDE PAINT TO MATCH WALL PAINT ON ALL EXPOSED METAL ACCESS PANELS, DUCTS

AND OTHER MISC. EXPOSED CONSTRUCTION ELEMENTS.

REFER TO INTERIOR ELEVATION SHEET AS403 FOR WALL TILE PATTERN. PAINT WALLS

ABOVE TILE AS IDENTIFIED IN FINISH SCHEDULE.

INSTALL CORNER GUARDS ABOVE RESILIENT BASE.

INSTALL WALL BASE OVER IMPACT RESISTANT WALL PROTECTION.

PROVIDE TS-1 BETWEEN CERAMIC TILE FLOORING AND CARPET FLOOR.

PROVIDE TS-2 BETWEEN CERAMIC TILE FLOORING AND RESILIENT FLOORING.

PROVIDE TS-3 BETWEEN CARPET AND RESILIENT TILE FLOORING.

PROVIDE MANUFACTURER TYPICAL TRIM, TRANSITION, AND FINISHING ACCESSORIES.

EDGES AND JOINT SHALL BE FINISHED SMOOTH AND TO MANUFACTURER'S

INSTRUCTIONS.

CERAMIC/PORCELAIN TILE SHALL BE INSTALLED IN PATTERN AS SHOWN IN ELEVATIONS.

WALL TILE PATTERN APPLIES TO ALL WALLS IN THAT SPACE.

ALL CHANGES IN FLOORING SHALL BE INSTALLED WITH CENTERLINE UNDER DOORS.

PROVIDE AND INSTALL CORNER GUARDS ON ALL OUTSIDE CORNERS OF INTERIOR WALLS.

ALL EXPOSED END PANELS OF CASEWORK SHALL HAVE FURNITURE FINISHED ENDS.

FLOORING FINISH LEGEND

SVT-3CPT-1 SVT-1

NOT USED

SVT-2

SC-1

RF-1SVT-4

NO FINISH

FLOOR IN THIS

AREA

RES-1PT-1

DIRECTION OF PATTERN DOES NOT

INDICATE DIRECTION OF INSTALLATION.

FINISH ABBREVIATIONS

CPT - CARPET TILE

RB - RESILIENT BASE

WP - WALL PROTECTION

CG - CORNER GUARD

AT - ACOUSTICAL CEILING

P - PAINT

RF - RESILIENT FLOORINGPL - PLASTIC LAMINATE

S - SOLID SURFACE

VCT - VINYL COMPOSITION TILEPT - PORCELAIN TILE

TS - TRANSITION STRIP

GT - GROUT

RES - RESINOUS FLOORING

SVT - LUXURY VINYL TILE

WG - WALL GRAPHIC

WC - WINDOW COVERING

HR - HANDRAIL

CR - CRASH RAIL RP - RESIN PANEL

SC - SEALED CONCRETE

CC - CUBICLE CURTAIN

RESW - RESINOUS WALL

ALL FINISHES IN SCHEDULE TO

DEFINE THE BASIS OF DESIGN.

CHR - CHAIR RAIL

BG - BUMPER GUARD

FINISH PLAN NOTES

1.

2.

3.

ALIGN.

ALIGN FLOORING PATTERN TO BULKHEAD ABOVE.

INDICATES DIRECTION OF FLOOR PATTERN

L I

CE

NSED

ARCHITECT

JOSEPH J GUIDROZ

001-017130

S

TATE

OF I LL

IN

O I S

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Sheet Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA ILLIANA - DANVILLE, IL

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

MARK SHOVIAK, COR 550-317

MEP Engineer

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

VA ILLIANA HEALTH CARE SYSTEM

1900 EAST MAIN STREET

DANVILLE, ILLINOIS 61832

OF 118

C U s e rs

\t a tk in s o n \D o c u m e n ts

\1 .1

V

A D a n v ill e In p a ti e n t M

H T

A T

K

IN

S O

N

G U

ID

O

N D

E S

IG

N

.C O

M .r v t

100% SUBMISSION

AF102

TDCJJG

FINISH PLAN - FLOORING

2017/11/21

AE CONSTRUCT NEW INPATIENT

MENTAL HEALTH BUILDING

SCALE: 1/8" = 1'-0"AF102

1 FINISH FLOOR PLAN

N

N

D W

REF.

R E

F

LOBBY

TOILET

SOILED UTILITY

CLEAN STOR

RECEIVING

MECH

EMS STOR

EQUIP STOR

PATIENT STOR

TELECOM

ELEC

ENTRY

INTAKE

INTAKE EXAM

BED BUG

TOILET

LAUNDRY

LAUNDRY

CLEAN LINEN

CONSULT

CONSULT

QUIET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

BARIATRIC/ADA 3

PATIENT 12

PATIENT 14

PATIENT 15

PATIENT 13

PATIENT 11

PATIENT 10

GROUP

DAY

FITNESS

TOILET

SOILED LINEN

JANITOR

PATIENT 8

PATIENT - DOUBLE

PATIENT 9

PATIENT 7

PATIENT-DOUBLE

BARIATRIC/ADA 2

TOILET

TOILET

TOILET

TOILET

TOILET

CLEAN STORAGE

NOURISHMENT

DINING

CONSULT

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

PATIENT 6

PATIENT 5

PATIENT 4

PATIENT 2

PATIENT 1

PATIENT 3

BARIATRIC/ADA 1

TREATMENT

EXAM

ANTE RM

RESTRAINT

CONSULT

MEDS

NURSE MANAGER

ON-CALL

ON-CALL TOILET

NURSE WORK AREA

WARD CLERK

VISITATION

CONFERENCE

NURSING MOTHER

RM

SOCIAL WORK

STAFF HALLWAY

LOUNGE

STAFF TOILET

STAFF TOILET

WAITING

OPEN

WORKSTATIONS

PRINT AREA

PROVIDER OFFICE

PROVIDER OFFICE

CORRIDOR

CORRIDOR

SALLY PORT

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

COMPUTER STATION

TOILET

PHONE STATION

NURSE STATION

148A

IN-04.04

IN-04.04

IN-04.04

IN-04.04

IN-04.04

IN-04.04

IN-04.04

IN

-0

.0

IN

-0 .0

IN

-0 .0

IN

-0

.0

IN

-0

.0

IN-04.04

IN

-0

.0

IN

-0 .0

IN-04.04

IN-04.04 IN-04.04IN-04.04 IN-04.04

IN-04.04 IN-04.04

IN-04.04

IN-04.04

IN-04.04

IN-04.04

IN-04.04

IN-04.04

IN-04.04

IN

-0

.0

IN

-0 .0

IN

-0 .0

IN

-0 .0

IN

-0 .0

IN

-0

.0

IN

-0 .0

IN

-0 .0

IN

-0 .0

IN

-04.04

IN

-04.04

IN

-04.04

IN

-04.04

IN

-04.04

IN

-04.04

IN

-04.04

IN

-04.04

IN

-04.04

IN

-04.04

IN

-04.04

IN

-04.04

IN

-04.04

IN-04.04

IN-04.04 IN-03.01 IN-03.01

IN-03.01

IN-03.01

IN

-0

.0

IN

-0

.0

IN-01.02

IN-01.02 IN-01.02

IN

-0

.0

IN-01.02

IN-01.02

IN

-01.02

IN

-01.02

IN-01.02

IN

-0

.0

IN

-0 .0

IN

-0 .0

IN

-0 .0

IN-02.04

IN

-0

.0

IN

-0 .0

IN-09.01 IN-09.01

IN

-0

.0

IN-09.01

IN

-0

.0

IN-02.01

IN-02.07

IN-02.08

IN-02.01

IN-02.07

IN-02.08

IN

-0

.0

IN-08.02

IN-08.02

IN

-0

.0

IN-11.01

IN-03.01

SIGNAGE GENERAL NOTES

REFER TO ROOM FINISH SCHEDULE FOR SIGNAGE TYPES TO BE PROVIDED.

SIGNAGE TO MATCH FACILITIES STANDARD AND CURRENT VA SIGNAGE DESIGN GUIDES.

INFORMATION PROVIDED IS FOR REFERENCE ONLY.

INSTALL SIGNAGE SO IT DOES NOT CONFLICT WITH MEP COMPONENTS SUCH AS LIGHT

SWITCHES, AND IS VISIBLE.

SIGNAGE IN INPATIENT UNIT ADHERED TO THE WALL WITH ADHESIVE. WHERE FASTENERS

ARE REQUIRED, TAMPER-RESISTANT FASTENERS SHALL BE USED.

ALL SIGNAGE COPY SHALL BE APPROVED BY COR PRIOR TO ORDERING.

REFER TO SIGNAGE PLAN FOR TAGGED SIGNAGE LOCATIONS.

A.

B.

C.

D.

E.

F.

L I

CE

NSED

ARCHITECT

JOSEPH J GUIDROZ

001-017130

S

TATE

OF I LL

IN

O I S

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Sheet Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA ILLIANA - DANVILLE, IL

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

MARK SHOVIAK, COR 550-317

MEP Engineer

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

VA ILLIANA HEALTH CARE SYSTEM

1900 EAST MAIN STREET

DANVILLE, ILLINOIS 61832

OF 118

C U s e rs

\t a tk in s o n \D o c u m e n ts

\1 .1

V

A D a n v ill e In p a ti e n t M

H T

A T

K

IN

S O

N

G U

ID

O

N D

E S

IG

N

.C O

M .r v t

100% SUBMISSION

AF103

TDCJJG

SIGNAGE PLAN

2017/11/21

AE CONSTRUCT NEW INPATIENT

MENTAL HEALTH BUILDING

SCALE: 1/8" = 1'-0"AF103

1 FINISH FLOOR PLAN

N

N

PROJECT

NORTH

D W

REF.

R E

F

LOBBY

TOILET

103 SOILED UTILITY

CLEAN STOR

RECEIVING

MECH

EMS STOR

EQUIP STOR

PATIENT STOR

TELECOM

ELEC

ENTRY

INTAKE

INTAKE EXAM

BED BUG

TOILET

LAUNDRY

LAUNDRY

CLEAN LINEN

CONSULT

CONSULT

QUIET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

BARIATRIC/ADA 3

PATIENT 12

PATIENT 14

PATIENT 15

PATIENT 13

PATIENT 11

PATIENT 10

GROUP

DAY

FITNESS

TOILET

SOILED LINEN

JANITOR

PATIENT 8

PATIENT - DOUBLE

PATIENT 9

PATIENT 7

PATIENT-DOUBLE

BARIATRIC/ADA 2

TOILET

TOILET

TOILET

TOILET

TOILET

CLEAN STORAGE

NOURISHMENT

DINING

CONSULT

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

PATIENT 6

PATIENT 5

PATIENT 4

PATIENT 2

PATIENT 1

PATIENT 3

BARIATRIC/ADA 1

TREATMENT

EXAM

185 ANTE RM

RESTRAINT

CONSULT

MEDS

NURSE MANAGER

ON-CALL

ON-CALL TOILET

NURSE WORK AREA

WARD CLERK

VISITATION

CONFERENCE

NURSING MOTHER

RM

SOCIAL WORK

STAFF HALLWAY

LOUNGE

STAFF TOILET

STAFF TOILET

WAITING

OPEN

WORKSTATIONS

PRINT AREA

PROVIDER OFFICE

PROVIDER OFFICE

CORRIDOR

CORRIDOR

SALLY PORT

CORRIDOR

CORRIDOR

CORRIDOR

136CORRIDOR

COMPUTER STATION

TOILET

PHONE STATION

106105 107 108

109A

113114

117118

122A

122B

192B

192A

208B

194A

201 200

166A

136A 186A

115A

167A

167B

M1801

A1016

K4670

M3150

M7255

R6200

M9025

M8330

G1025

M8125

G1025

U7256

M2400

R6200

M1801

M1801 M1801

A1016 F0275 F0275

E0066

M2400 M2300M2300

U1802

F0206

F0205

F0290

F0220

M1810

F0206

F0205

F0340

M1801

A1030

F0305

A1032A1032

U0005

U0005

M1801

M2300

M2400

F0206

F0205

F0635

F0206

F0205

F0290

F0205

F0340

T8

T9

F0220

A1030

F0635

F0290

F0205

M1801

F0205

F0635

F0290 M1801

M1801

F0290 F0635

F0205 F0220

M1801

F0635

F0290

M1801

A1016

F0205

F0290

M1801

F0206

F0205 F0206F0205

U1802

F0290

F0206

F0205

F0340

M1801

M1801

F0205

F0206

U0001 R7250

U0003 K1550

F0275F0275

F0290

U1802

R7250

K4670

115B

136B

186B

167C

208A

194B 194C

109B

U7257

K2490

F0226

F0796

F0271

F0272

U0300

U0301

F0575

F0200

F0575 M7012

M7000 U2000

F0273

R4000

EQUIPMENT GENERAL NOTES

PROVIDE BLOCKING IN WALLS TO ACCOMMODATE CASEWORK, FURNISHINGS,

TECHNOLOGY AND WALL MOUNTED ACCESSORIES.

REFER TO SHEET // AS401 // FOR TOILET ACCESSORY INFORMATION AND FOR

TOILETS AND SINK LOCATIONS.

COORDINATE EQUIPMENT LOCATION, POWER AND DATA EQUIPMENTS WITH

EQUIPMENT AND ENGINEERING DRAWINGS.

COORDINATE EQUIPMENT LOCATION AND WATER REQUIREMENTS WITH

EQUIPMENT AND ENGINEERING DRAWINGS.

REFER TO FURNITURE VENDOR DRAWINGS FOR FINAL FURNITURE PLACEMENT

AND DETAILED FURNITURE SCHEDULE.

A.

B.

C.

D.

E.

RESPONSIBLE PARTY LEGEND

CODE

CFCI CONTRACTOR FURNISHED/ INSTALLED

GFCI GOVERNMENT FURNISHED/ CONTRACTOR INSTALLED

GFCR GOVERNMENT FURNISHED/CONTRACTOR ROUGH IN

GFGI GOVERNMENT FURNISHED & INSTALLED

L I

CE

NSED

ARCHITECT

JOSEPH J GUIDROZ

001-017130

S

TATE

OF I LL

IN

O I S

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Sheet Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA ILLIANA - DANVILLE, IL

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

MARK SHOVIAK, COR 550-317

MEP Engineer

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

VA ILLIANA HEALTH CARE SYSTEM

1900 EAST MAIN STREET

DANVILLE, ILLINOIS 61832

OF 118

C U s e rs

\t a tk in s o n \D o c u m e n ts

\1 .1

V

A D a n v ill e In p a ti e n t M

H T

A T

K

IN

S O

N

G U

ID

O

N D

E S

IG

N

.C O

M .r v t

100% SUBMISSION

AQ101

TAAJJG

FURNITURE & EQUIPMENT PLAN

2017/11/21

AE CONSTRUCT NEW INPATIENT

MENTAL HEALTH BUILDING

SCALE: 1/8" = 1'-0"AQ101

1 CONSTRUCTION FLOOR PLAN

EQUIPMENT AND FURNITURE SCHEDULE

wtwt DESCRIPTION

MANUFACTUR

ER FFE FURNISHED

GFGI - GOVERNMENT FURNISHED GOVERNMENT INSTALLED

A1012 TELEPHONE, WALL MOUNTED GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

A1016 TELEPHONE, DESK GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

A1030 LOCKERS, DOUBLE TIER GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

A1032 LOCKER, BOX, PERSONAL EFFECTS GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

E0066 Workstation, Corner GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0200 CHAIR, PATIENT, BARIATRIC GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0205 CHAIR, SIDE WITH ARMS Haworth Inc GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0206 CHAIR, SIDE, BARIATRIC WITH ARMS GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0220 CHAIR, CONFERENCE GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0226 CHAIR, DINING, PSYCHIATRIC Norix GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0271 CHAIR, ROCKING, PSYCHIATRIC GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0272 CHAIR, UPHOLSTERED, NO ARMS, PSYCHIATRIC Norix GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0273 CHAIR, UPHOLSTERED, ARMS, PSYCHIATRIC GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0275 CHAIR, SWIVEL, HIGH BACK Steelcase GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0290 TASK CHAIR GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0305 Chair, Waiting Room Single Haworth Inc GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0340 STOOL, SELF ADJUSTING GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0575 DESK, DRESSER, PSYCHIATRIC GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0635 DESK GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

F0796 CAFE TABLE, PSYCHIATRIC Norix GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

G1025 EXERCISE, MACHINE, ELIPTICAL GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

K1550 COFFEE MAKER Generic GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

K4670 MICROWAVE GE Profile GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

M1810 COPIER, FLOOR STANDING, DIGITAL GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

M2400 DRYER GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

M3150 PYXIS GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

M7000 PATIENT BED, BARIATRIC GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

M7012 PATIENT BED, STANDARD Norix GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

M7255 MEDICATION CART GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

M8125 ERGMETER, BICYCLE, STATIONARY GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

M8330 TREADMILL, ELECTRIC GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

M9025 TABLE, EXAMINATION/ TREATMENT, WITH

CABINET

Midmark GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

R6200 UNDERCOUNTER REFRIGERATOR GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

R7250 REFRIGERATOR GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

U0001 POPCORN MAKER GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

U0003 COOK-SERVE OVEN BURLODGE GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

U0300 TABLE, GAME, PSYCHIATRIC Norix GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

U0301 TABLE, OCCASSIONAL, PSYCHIATRIC Norix GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

U1802 LAPTOP COMPUTER GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

U2000 STOOL, PATIENT Norix GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

U7256 ISOLATION CART GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

U7257 BED BUG OVEN, 208V KEYSTONE

AUTOMATION

GFGI - GOVERNMENT FURNISHED GOVERNMENT

INSTALLED

EQUIPMENT AND FURNITURE SCHEDULE

wtwt DESCRIPTION

MANUFACTUR

ER FFE FURNISHED

CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED

K2490 DISHWASHER Hobart CFCI - CONTRACTOR FURNISHED CONTRACTOR

INSTALLED

GFCRI - GOVERNMENT FURNISHED CONTRACTOR ROUGH-IN

F3060 ELECTRONIC SMARTBOARD W/ PROJECTOR GFCRI - GOVERNMENT FURNISHED CONTRACTOR

ROUGH-IN

M0512 WALL MOUNTED TELEVISION GFCRI - GOVERNMENT FURNISHED CONTRACTOR

ROUGH-IN

M1801 DESKTOP COMPUTER GFCRI - GOVERNMENT FURNISHED CONTRACTOR

ROUGH-IN

M2300 TAMPER RESISTANT WASHER FISHER

PAYKEL

GFCRI - GOVERNMENT FURNISHED CONTRACTOR

ROUGH-IN

R4000 ICE MAKER GFCRI - GOVERNMENT FURNISHED CONTRACTOR

ROUGH-IN

N

N

PROJECT

NORTH

NTS

NTS

NTS

NTS

NTS

NTS

NTS

NTS

NTS

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

CLASSSYMBOL TYPE

LIGHT HAZARD 0.10 225 SQ. FT.WET PIPE

ORDINARY HAZARD GROUP 1 0.15 130 SQ. FT.WET PIPE

DENSITY

GPM/SQ. FT.

MAX. COVERAGE

PER HEAD

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

CLASSSYMBOL TYPE

LIGHT HAZARD 0.10 225 SQ. FT.WET PIPE

ORDINARY HAZARD GROUP 1 0.15 130 SQ. FT.WET PIPE

DENSITY

GPM/SQ. FT.

MAX. COVERAGE

PER HEAD

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

TYPESYMBOL MANUFACTURER MODEL RESPONSE K-FACTOR FINISH TEMP ORIFICE COVERAGE

INSTITUTIONAL TYCO TY3281 QUICK 5.6 WHITE 165 1 / 2 STANDARD

REMOTE AREA

RECESSED PENDENT TYCO TYFRB QUICK 5.6 WHITE 155 1 / 2 STANDARD

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

TYPESYMBOL MANUFACTURER MODEL RESPONSE K-FACTOR FINISH TEMP ORIFICE COVERAGE

INSTITUTIONAL TYCO TY3281 QUICK 5.6 WHITE 165 1 / 2 STANDARD

REMOTE AREA

RECESSED PENDENT TYCO TYFRB QUICK 5.6 WHITE 155 1 / 2 STANDARD

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

Sheets
GI000 - COVER SHEET
GI101 - LIFE SAFETY PLAN
GI102 - LIFE SAFETY PLAN, ATTIC
GI103 - ALTERNATES
GI104 - PATIENT SAFETY RISK ASSESSMENT PLAN
AS001 - ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AS101 - DIMENSION FLOOR PLAN
AS102 - CONSTRUCTION FLOOR PLAN
AS103 - REFLECTED CEILING PLAN
AS104 - ROOF PLAN
AS201 - BUILDING ELEVATIONS
AS202 - BUILDING ELEVATIONS
AS311 - WALL SECTIONS
AS312 - WALL SECTIONS
AS401 - ENLARGED TOILET PLANS & ELEVATIONS
AS402 - TOILET ELEVATIONS
AS403 - ENLARGED PLANS AND ELEVATIONS
AS501 - DETAILS
AS511 - DETAILS
AS601 - DOOR SCHEDULE & DETAILS
AS602 - WINDOW SCHEDULE & DETAILS
AS603 - DOOR & WINDOW DETAILS
AS901 - CASEWORK SECTIONS AND DETAILS
AF100 - FINISH SCHEDULES AND SIGNAGE
AF101 - FINISH PLAN
AF102 - FINISH PLAN - FLOORING
AF103 - SIGNAGE PLAN
AQ101 - FURNITURE & EQUIPMENT PLAN

File details come from the government source that posted it.