This is Standard Form 30, Amendment 0001, issued on October 26, 2026, by the Department of Veterans Affairs National Cemetery Administration to solicitation 36C78627Q0021 for turf application services at Salisbury (Annex) National Cemetery in Salisbury, North Carolina. The amendment provides responses to 25 questions submitted by potential quoters and attaches a revised Statement of Work, revised Price Schedule, and revised Combined Synopsis Solicitation to clarify the scope and requirements. The work is confined exclusively to the Salisbury Annex location at 501 Statesville Boulevard, Salisbury, NC 28144, and encompasses turf application services on 23 acres of tall fescue, 11 acres of Bermuda grass, and 2 acres of planting beds. The contract term consists of a twelve-month base year and two one-year option periods, with performance beginning from the date of award.

Key requirements clarified in the amendment include: all 16 turf applications listed in the price schedule must be completed within estimated annual application dates as specified in the revised Statement of Work, with soil samples required in January and pre-emergent applications required in late February of the base year regardless of award date; the proposed Site Manager must hold an active North Carolina Commercial Ground Applicator license at the time of quote submission and may be a subcontractor employee; the contractor must use products approved by the VA based on soil sample results and must perform joint inspections with the Contracting Officer Representative ten days after each application, with mandatory retreatment at no additional cost if results fall below 90% effectiveness; the optional pest control line item covering grubs, mole crickets, and fire ants applies to all 34 acres and counts toward total evaluated price; and the contractor must provide application logs and Material Safety Data Sheets prior to applications and coordinate work schedules with cemetery personnel, understanding that burial activities take precedence and work cannot disturb burial services. This is a Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside with NAICS code 561730 and PSC S208, subject to the Service Contract Act wage determination 2015-4423 Revision 35.

View the file

Other files

File Type Posted
Attachment A - Revised Statement of Work.doc DOC document
Attachment B - Revised Price Schedule.docx DOCX document
Revised Combined Synopsis Solicitation_36C78627Q0021.docx DOCX document
Attachment A - Original Statement of Work.doc DOC document
36C78627Q0021.docx DOCX document
Attachment C - SCA Wage Determination 2015-4423 Rev 35 02.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

36C78627Q0021

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

11/12/2026

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

10/26/2026

X

The purpose of this Amendment is to answer questions submitted by Potential Quoters and provide revised or missing documents.

See Continuation Pages.

Reminder: Include a signed and date copy of this amendment, and any potential future amendments, in your quotation package.

Sarah Poole Contracting Officer

CONTINUATION PAGE

The following questions and answers were received from potential quoters. Similar or duplicate questions were consolidated into a single question and response.

Question 1 – Statement of Work (pages 2, 3 and 6): The attachments list on page 2 includes "A – Statement of work," page 3 states "DESCRIPTION OF REQUIREMENT: See Statement of Work at Attachment A," and page 6 states that quotes shall be "evaluated in accordance with the criteria contained in the Statement of Work." No Statement of Work is posted on SAM.gov. Can the Statement of Work be posted?

Answer 1 – The original Statement of Work (SOW) and a revised SOW, that includes changes based on questions answered in this amendment, are attached to this amendment.

Question 2 – Place of performance (pages 1, 2, 3 and 14): The page 1 subject line reads "NAD-876 Salisbury Annex Turf Application-Salisbury National Cemetery Annex," page 2 and the SAM.gov description list "Salisbury (Annex) National Cemetery 501 Statesville Blvd Salisbury, NC 28144," and the site visit on page 3 is at the Salisbury (Annex) National Cemetery. However, page 1 lists the place of performance address as "Salisbury National Cemetery 202 Government Rd Salisbury, NC," page 3 states that delivery and acceptance "will be at the Place of Performance addresses listed on page 1" and that "Quoters are urged and expected to inspect all sites where services are to be performed," and the Price Schedule on page 14 is headed "SALISBURY NATIONAL CEMETERIES." Is the work at the Annex only, the main cemetery only, or both Answer 2 – The turf application services are only required for the Salisbury Annex National Cemetery location at 501 Statesville Blvd Salisbury, NC 28144.

Question 3 - Turf acreage (Attachment B, page 15): Turf Applications #3, #6 and #8 are applied to "the entire turf acreage," but the solicitation does not state the acreage. What is the total turf acreage to be treated, broken out by turf type (tall fescue and Bermuda grass) if available? Is a site map showing the turf sections and planting beds available?

Answer 3 – See Statement of Work paragraph A.1 (Attachment A). Tall fescue is 23 acres, Bermudagrass is 11 acres, and planting beds are 2 acres. #3,6# and 8# are listed under the Tall Fescue section of the schedule, so they only apply to Tall Fescue acreage. (See paragraph A.3 of the SOW)

Question 4 - Turf Application #13 (Attachment B, page 16): This application is labeled "Bermuda Grass Sections Only" but calls for "an approved herbicide for use on centipede turf grass," while Turf Applications #9 and #12 (pages 15 and 16) call for products for use on Bermuda grass. Should the herbicide for #13 be one approved for use on Bermuda grass, or are there centipede grass sections as well?

Answer 4 – Turf application #13 is for Bermudagrass. This cemetery does not have centipede turf grass.

Question 5 – Term (pages 1, 3, 8 and 20): Page 3 states "a twelve-month base year and two (2) one-year options," which is consistent with the Price Schedule and the FAR 52.217-9 total of "3 years, 6 months" on page 8, but the subject line on page 1 reads "Base plus 4-Option Year." Please confirm the term is a base year plus two option years. Also, the third period on page 20 is headed "OPTION YEAR 1 POP: January 1, 2029 thru 12/31/2029." Please confirm it is Option Year 2.

Answer 5 – The subject line on page 1 is incorrect. This requirement is for a twelve-month base year and two (2) one-year options. CLINS 2001 – 2018 are part of Option Year 2, which had an incorrect heading in the Price Schedule. Option Year 2 is January 1, 2029 – December 31, 2029.

Question 6 - Application timing (Attachment B, pages 14 to 17): Turf Application #1 is timed for March, when soil temperatures at a 2-inch depth reach 55 degrees; #10 and #15 are labeled Cool Season and Warm Season; #9 and #12 are tied to soil temperature and dormancy; and #13 is tied to heat. No timing is given for Turf Applications #2 through #8, #11, #14 and #16. Can the Government provide the intended month or window for those applications?

Answer 6 – Paragraph A.3 in the Statement of Work lists dates for all applications. Please see attached SOW. Some line items address soil temperatures because the application occurs during the time of year when seasons change and fluctuations can vary from year to year due to weather. Paragraph A.4(l) in the SOW states “Each turf application shall be completed within each Annual Application Date (weather permitting) or within close proximity to these dates as these are estimated time frames and may change based on weather and temperature.”

Question 7 - Start of performance: If the award is made after January 1, 2027, should we still include the January soil sampling and the late-February Bermuda pre-emergent in the base year, or price only the applications that fall after the award date?

Answer 7 – Yes, Quoters shall include all work for the base year, including the January sample and late February Bermuda pre-emergent.

Question 8 - Fertilizer acreage: The 30-0-10 and 30-5-10 applications are described as going "to the entire turf acreage." Does that mean the 23 acres of tall fescue or all 34 acres of turf?

Answer 8 – This means 23 acres of tall fescue; there are no treatments that cover both turf types at the same time.

Question 9 – Treated area: Does the 34 acres include the low-lying area near the drainage and the strips along the perimeter fence and tree line? If any application falls near standing water, should we plan for an aquatic-certified applicator? A map showing the treated areas would help everyone price the same ground.

Answer 9 – The 34 acres does not include low lying areas near the fence. This field is taller and you can clearly see where this starts and ends. There is no spraying near water, so aquatic-certified applicators aren’t necessary.

Question 10 - Optional pest control line. Is there an estimated acreage or number of treatments for the grub, mole cricket, and fire ant line, and will it count toward the total evaluated price?

Answer 10 – The optional pest control line item would be needed for all 34 acres, and it will count towards the total evaluated price.

Question 11 - Site Manager experience: The evaluation criteria ask for experience within the last five years supervising turf fertilization and pesticide work, while the SOW asks for no less than five years as a direct supervisor. Which standard will be used to judge technical acceptability?

Answer 11 – The evaluation will be based on the technical qualifications listed in the “Evaluation Process” paragraph of the combined synopsis solicitation, which states: ” Demonstrates that the proposed Site Manager has recent and relevant experience, within the last five (5) years, in supervising turf fertilization and pesticide applications.” The SOW has been updated. See attached Revised SOW.

Question 12 - Site Manager license: Must the Site Manager hold the NC Commercial Ground Applicator license when quotes are submitted, or by the start of performance? And may the Site Manager be an employee of a subcontractor rather than the prime?

Answer 12 – The Site Manager must hold the license when the quote is submitted because proof is required at time of quote submission, and it must remain current. Yes, the Site Manager may be an employee of a subcontractor if they are performing some or all the turf applications.

Question 13 - Will the VA approve compatible NC NPK fertilizer based on the soil sample results?

Answer 13 – Yes, soil samples will be used to approve NC NPK fertilizers.

Question 14 - If we have over 2 years’ experience in pesticide applications, is it an absolute requirement to have (5) years-experience in supervising turf fertilization and pesticide applications, or is two years enough?

Answer 14 – The Combined Synopsis Solicitation states that the Potential Quoter must be able to “Demonstrates that the proposed Site Manager has recent and relevant experience, within the last five (5) years, in supervising turf fertilization and pesticide applications.” It does not state five (5) years’ experience; rather, it states that they must have experience with turf fertilization and pesticide applications sometime within the last five years. SOW paragraph A.5.1 has been updated to reflect this same language to correct any discrepancies.

Question 15 - I was able to locate a 2013 map online with the sections of the Annex complex. Is there a more current machine-readable copy with the square footage of each section?

Answer 15 – No, there is not a more recent map.

Question 16 - Who gets the soil sample results besides the sub-contractor?

Answer 16 – The Contractor/sub-contractor shall provide a copy to the Contracting Officer Representative (COR), who will make sure the cemetery Director and Contracting Officer also get a copy.

Question 17 - How can we determine what is needed for optional pest control at the request of the cemetery? Is there an estimate per square feet for the coverage area?

Answer 17 – The Contractor shall use a product that kills all three pests mentioned in the SOW. The product shall be applied to the total acreage at the rate listed on the product’s label.

Question 18 - Are we expected to remove weeds by hand from plant beds? Does it matter how many acres we do in a day? Can you supply previous sample bids?

Answer 18 – No, weeds do not need to be removed by hand. It does not matter how many acres are completed in one day, but the work should be completed within the same week. Sample bids cannot be provided.

Question 19 - Does CLIN 0018 include BOTH Fescue and Bermuda Grass, or just Bermuda Grass?

Answer 19 – CLIN 0018 includes both Tall Fescue and Bermudagrass.

Question 20 – The Price Schedule and the schedule in the SOW do not have the same amount of CLINS. Which is correct? Specifically, CLIN 0016 does not match. How should it be priced?

Answer 20 – The schedule in the revised SOW and the revised Price Schedule (Attachment B) now match. See attached.

Question 21 - Post-Application Inspections: Are contractors required to perform follow-up site inspections after each application to evaluate treatment effectiveness? If so, what is the required timeframe and frequency?

Answer 21 – Yes, per SOW paragraph A.4.(l), the Contractor and COR will jointly inspect and assess results 10 days after completion of each application.

Question 22 – Retreatment Requirements: If an application does not achieve the desired results, is the contractor responsible for additional treatments at no additional cost? Are there specific performance standards that determine when retreatment is necessary?

Answer 22 – Yes, SOW paragraph A.4.(l) states, “In areas where results are less than acceptable, the Contractor shall re-perform the application at no additional cost to the Government (*Acceptable is defined as 90% of actively growing broadleaf weeds and weed grasses are eliminated).

Question 23 – Application Reporting: What documentation is required following each application, and are there specific submission deadlines?

Answer 23 – SOW Paragraph A.12 states, “Contractor will provide application logs to the COR that shows the product name, amount applied, and date of application.” And paragraph A.4.(h) states, “Prior to any application, the Contractor shall provide the COR with a copy of product label for each chemical used and appropriate supporting Material Safety Data Sheets (MSDS).

Question 24 – Scheduling: Are there required advance notification periods before applications, restrictions during burial services, or specific application windows beyond those identified in the Price Schedule?

Answer 24 – SOW paragraph A.5.1.(b) states, “Contractor shall participate in regular meetings with Government personnel and other Contractors at the cemetery to coordinate contract work schedules and contract related issues. Communication with the COR is strongly encouraged. Burial activities at NCA shall take precedence over contract work activities. Work activity and noise cannot disturb Burial Services. Trucks and workers are prohibited from passing through the service area during this period.

Question 25 – Treatment Acreage: Can you confirm that the scope includes 23 acres of Tall Fescue, 11 acres of Bermuda grass, and 2 acres of planting beds?

Answer 25 – Yes, this is the correct acreage.

Attached:

· Original Statement of Work

· Revised Statement of Work

· Revised Price Schedule

· Revised Combined Synopsis Solicitation