Attachment A - Original Statement of Work.doc
DOC document 150 KB Posted
- Solicitation number
- 36C78627Q0021_1
About this file
This is a Statement of Work (SOW) for turf fertilization and herbicide application services at Salisbury National Cemetery (Annex) in Salisbury, North Carolina, covering approximately 34 developed acres comprising 23 acres of Tall Fescue turf, 11 acres of Bermudagrass, and 2 acres of planting beds. The contractor must provide pre-emergent and post-emergent crabgrass control, broadleaf weed control, yellow nutsedge treatment, and granular fertilization services according to species-specific application schedules. For Tall Fescue, services include nine scheduled applications from January through November, with specific NPK fertilizer ratios (30-0-10 and 30-5-10) applied at 4 lbs. per 1,000 square feet and liquid herbicide applications timed to soil temperatures and weather conditions. For Bermudagrass, ten scheduled applications run from February through October with different fertilizer specifications (20-0-15 and 44-0-0 NPK ratios) applied at rates of 1 lb. nitrogen per 1,000 square feet. Optional pest control for grubs, mole crickets, and fire ants may be requested by the cemetery management.
The contractor must maintain a full-time, English-speaking Site Manager with at least five years of direct supervisory experience who is physically present during all work operations and coordinates with the Contracting Officer's Representative (COR) to avoid disrupting burial services, ceremonies, and visitor activities. All herbicide and fertilizer applications must follow manufacturer label instructions, be applied with properly calibrated equipment, and meet a 90-percent effectiveness standard for weed control within ten days; any deficient applications must be reperformed at no additional cost. Contractor personnel must possess current North Carolina commercial pesticide/herbicide licenses, adhere to strict standards of conduct and appearance including steel-toed shoes and no visible tattoos or profanity, and complete all work during daylight hours (7:30 a.m. to 4:00 p.m.) Monday through Friday, excluding federal holidays. The contractor is responsible for all labor, equipment, materials, debris removal, equipment maintenance, and turf damage repair, with payment made in arrears upon completion of each application upon COR verification and invoicing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment A - Revised Statement of Work.doc | DOC document | |
| Attachment B - Revised Price Schedule.docx | DOCX document | |
| SF30_Amendment 0001.docx | DOCX document | |
| Revised Combined Synopsis Solicitation_36C78627Q0021.docx | DOCX document | |
| 36C78627Q0021.docx | DOCX document | |
| Attachment C - SCA Wage Determination 2015-4423 Rev 35 02.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Description / Specifications / Work Statement
A.1 BACKGROUND
The Salisbury National Cemetery (annex), located in Salisbury, NC, contains grounds that encompass approximately 52 total acres of land with 34 developed acres of turf to be treated. Cemetery turf grass is comprised of 23 acres of turf type Tall Fescue mixture while a recent expansion area consists of 11 acres of Bermudagrass and two acres of planting beds. There will be two different application schedules for these separate turf grass species.
National cemeteries are National Shrines that honors veterans with a final resting place and lasting memorials that commemorate their service to our Nation. The cemeteries receive visitors; hold ceremonies and conduct committal services. Because of their special significance and attention, they receive from the public, strict adherence to contract specifications is essential.
Every action by contractor personnel at a national cemetery must be performed with the special care, reverence, dignity, and respect that acknowledges the cemetery as the final resting place that commemorates the service and sacrifice that service members, Veterans and their families made for our Nation. Critically important is the awareness required of the Contractor employees of the remains buried in the grounds where the work is performed. The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.
A.2 PLACE(S) OF PERFORMANCE
The Contractor shall furnish all labor, equipment, materials and supplies necessary to provide turf fertilization and broadleaf / crabgrass weed control services to the following VA National Cemetery:
| CEMETERY |
| ADDRESS |
| ACREAGE |
| REQUIRED |
SERVICES
| SALISBURY NATIONAL CEMETERY (ANNEX) |
| 501 Statesville Boulevard, Salisbury, NC 28144 |
| 23 acres to be treated (Tall Fescue) and 11 acres (Bermudagrass) 2 acres of planting beds |
| Turf Fertilization & Herbicide / Applications |
A.3 TURF APPLICATION SCHEDULE
Contractors shall provide turf fertilization, pre/post-emergent crabgrass, post emergent broadleaf weed and post emergent nut sedge control services at the Salisbury National Cemetery in accordance with the following Application Schedule. If any weather occurrences interfere with the recommended schedule dates, the Contractor shall notify the COR and District Agronomist within one (1) business day to get approval for alternate application dates.
| TURF APPLICATION TURF APPLICATION |
| ANNUALA D |
| DESCRIPTION |
TALL FESCUE APPLICATION SCHEDULE
| Soil Sample |
| January |
| Contractor will submit soil samples to the local agricultural extension agency for testing. Samples will be taken from various areas of multiple sections in both the Tall Fescue sections and the Bermudagrass sections. Results of the tests will be provided to the COR by the contractor upon receipt. |
| #1 |
| March |
| Applied in spring 1 to 2 weeks prior to the expected germination of crabgrass (when soil temperatures at 2-inch depth reach 55 degrees, in March) - Pre-emergent control for annual weed grasses such as crabgrass applied in liquid form at the manufacturers recommended label rate, and a liquid post emergent application for control of broadleaf weeds such as clover, dandelion, plantain & spurge. |
| #2 |
| April 15th – 20th |
Pre-emergent control for crabgrass / weed grasses as well as a post emergent control of broadleaf weeds applied in liquid form.
| #3 |
| May 15th – 20th |
Granular turf fertilization using a fertilizer with a 30-0-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft.
| #4 |
| July 15th – 20th |
| Post emergent treatment of crabgrass, other weed grasses, broadleaf weeds and nut sedge applied in liquid form. |
| #5 |
| August 15th – 20th |
| Tall Fescue grass - Post emergent treatment of crabgrass other weed grasses, broadleaf weeds and nut sedge applied in liquid form. |
| #6 |
| August 15th – 20th |
Application of pre-emergent weed control / herbicide to two acres of cemetery planting beds.
| #7 |
| September 10th – 15th |
| Granular turf fertilization using a fertilizer with a 30-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft |
| #8 |
| October 1st – 10th |
| Post emergent treatment of crabgrass, other weed grasses, broadleaf weeds and nut sedge applied in liquid form. |
| #9 |
| Nov 10th – 15th |
| Granular turf fertilization using a fertilizer with a 30-0-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft. |
BERMUDAGRASS APPLICATION SCHEDULE
| #10 |
| February 28th – March 3rd |
| Bermuda Grass Sections Only - This is a suggested time frame only and contractor will monitor current weather conditions and soil temperatures to ensure that soil temperatures are at the appropriate level for germination of crabgrass seed before application of herbicide. This application will be a pre-emergent control for annual weed grasses focusing mainly on crab grass and will be applied in granular form per manufacturers recommended label rate. The product to be used will be specified for safe use on Bermuda grass. |
| #11 |
| March 20th – 25th |
| Application of pre-emergent weed control / herbicide to two acres of cemetery planting beds. |
| #12 |
| April 1st – 5th |
| This application will be a granular fertilization using a fertilizer with a 20-0-15 NPK ratio (30% slow release SCU) with 3% Fe, Mn & Mg applied at a rate 1 lb. N per 1,000 Sq. Ft. |
| #13 |
| May 15th – May 20th |
This is recommended time frame only - all turf grass must be completely out of dormancy and actively growing before application of herbicide is completed. This application will be a post emergent control application for broadleaf weeds such as dandelion, clover and other broadleaf weeds applied in liquid form at manufacturers recommended labels using an approved herbicide for use on Bermuda grass. Also included will be a granular fertilizer using a fertilizer (recommend Andersons HCU) with an 44-0-0 NPK ratio applied at a rate of 1 lb. of nitrogen per 1,000 sq. ft
| #14 |
| June 28th – Jul 15th |
Bermuda Grass Sections Only (contractor will monitor current temperatures and weather conditions to ensure that application of broadleaf herbicide will not injure the turf grass due to excessive heat – above 90 degrees) - This application will be a post emergent control application for broadleaf weeds such as dandelion, clover and other broadleaf weeds applied in liquid form at manufacturers recommended label rate, using an approved herbicide for use on Bermuda turf grass. Also included, there will be a granular fertilizer using a fertilizer with a 20-0-15 NPK ratio (30% slow release SCU) with 3% Fe, Mn & Mg applied at a rate of 1 lb. N per 1,000 sq. ft.
| #15 |
| Aug 15th – 25th |
This application will be a treatment for post emergent control of crab grasses and other weeds, broadleaf weed and nut sedge.
| #16 |
| Sep 20th – Oct 5th |
This application will be a granular turf fertilization using a 0-0-21 NPK ratio (KMag product) applied at a rate of 8 lbs. per 1,000 sq. ft.
| OPTIONAL |
| As Needed |
| Grub / Mole Crickets / Fire Ant Control: Contractor will apply pesticide that controls these pests and will be applied at the manufacturer’s recommended label rate. Application will be made to areas directed by the COR and will only be done at the request of the cemetery. |
A.4 APPLICATION REQUIREMENTS / COOL SEASON TURF GRASS – TURF TYPE TALL FESCUE
(a) Initial Pre-Emergent Crabgrass Application: Contractor shall apply a pre-emergent crabgrass herbicide such in liquid form to control crabgrass and other weed grasses. All herbicides must be applied with properly calibrated equipment. The Contractor shall begin the application after the soil temperature has reached 55 degrees for three consecutive days. This is the time that crabgrass seeds begin active germination in the soil. Any application that is completed before this time period may not be as effective in overall crabgrass control. The dates for application listed in the application schedule are only an estimated time frame and could begin earlier or later depending upon the soil temperatures and weather conditions.
(b) Second (Split) Pre-Emergent Crabgrass Application: Contractor shall make a second application of pre-emergent herbicide in liquid form approximately 4-6 weeks after the initial application to help ensure full season long pre-emergent control for crabgrass.
(c) Broadleaf Weed / Weed Grass / Yellow Nutsedge Control: Broadleaf herbicides must be applied in liquid form with properly calibrated spraying equipment.
The contractor will not substitute a granular herbicide in place of liquid to perform the applications without approval from both the COR and Contracting Officer. The herbicide must be for the control of various cool season turf weed species such as white clover, dandelions, plantain and prostrate spurge as well as weed grasses and yellow / purple nutsedge. Applications must be timely and at the proper dosage so that perennial weeds do not go to seed and continue to spread. Applications shall not be laid within 6-hours of anticipated rainfall [see paragraph A.4.(h) & A.4(i)]. Herbicide shall be applied to all turf acreage, in burial sections and including areas between and around all headstones and along section perimeters. Applicator must be sure to carefully apply the herbicide to all weed leaf surfaces to ensure that a sufficient weed kill / control takes place. The spring application for the treatment of broadleaf weeds will begin when the broadleaf weeds begin actively growing. As Memorial Day services at all National Cemeteries are very important and bring many visitors and family members to the cemetery, it is essential that the Contractor carefully treat all the turf to eradicate broadleaf weeds as much as possible, especially dandelions. If after ten days of Contractor ‘s initial application there is not adequate control of weeds and still active dandelion growth or any other weeds, the Contractor will return to the cemetery to specifically address these areas at no additional cost to the government.
(d) Fertilization: Contractor shall apply a granular only turf fertilizer, which is specified in the application schedule to all turf areas using a properly calibrated spreader/sprayer. The fertilizer shall have a guaranteed NPK analysis of 30-0-10 and consists of a minimum 50% slow-release nitrogen from sulfur coated urea. Fertilizer shall be applied to all turf areas at the times and rates that are listed in the turf application schedule. The Contractor will not substitute a liquid fertilizer for granular fertilizer for any reason without approval from both the COR and the Contracting Officer.
(e) Post Emergent Crabgrass / Nut Sedge): Contractor will apply liquid herbicide to effectively control post emergent crabgrass and other weed grasses as well as nut sedge that are actively growing. This application will be a spot treatment and not cover the entire turf area, concentrating only on those areas that may have a high concentration of actively growing crabgrass or nut sedge. The recommended product for the post emergent control of crabgrass is quinclorac / Drive and the recommended product for post emergent control of nut sedge is SledgeHammer.
(f) Grub / Mole Crickets / Fire Ant Control: Contractor will apply pesticide that controls these pests and will be applied at the manufacturer’s recommended label rate. Application will be made to areas directed by the COR and will only be done at the request of the cemetery and after this Optional Line Item has been funded.
(g) All application methods of herbicides and fertilizers shall be in strict accordance with manufacturer label recommendations, Department of Environmental Protection and all applicable federal, state and local laws and will be applied at the manufacturers recommended label rate for cool season turf grass.
(h) All applications must be made in accordance with manufacturers’ label instructions to ensure proper rate and timing of application. The Contractor shall apply liquid broadleaf herbicide no earlier than 6 hours before anticipated rainfall to allow herbicide sufficient time to be absorbed into plant tissue to maximize the herbicide’s full potential. Any rainfall that is received within this six-hour time frame after the application shall require the Contractor to treat all turf areas a second time at the Contractor’s expense. Prior to any application, the Contractor shall provide the COR with a copy of product label for each chemical used and appropriate supporting Material Safety Data Sheets (MSDS).
(i) Contractor personnel applying herbicides shall possess a current / valid State of North Carolina commercial pesticide/herbicide application license. The contractor is responsible for damage resulting from negligent application and failure to follow manufacturer label instructions,
(j) All turf applications shall be applied with appropriate calibrated spreading and spraying equipment. Liquid and pellet surface applications shall be uniformly distributed within the cemetery’s defined area of coverage including between and around all headstones and markers. Surface applications shall not be made where surface run-off is likely to occur or near a water source.
(k) Appropriate flags or markers shall be posted in all treated areas for a period of 24 hours after herbicide treatment has been applied. The Contractor shall remove all flags upon expiration of the 24-hour period.
(l) Each turf application shall be completed within each “Annual Application Date” (weather permitting) or within close proximity to these dates as these are estimated time frames and may change based on weather and temperature. All applications shall be applied in accordance with manufacturers label instructions to ensure proper rate and timing. Ten (10) days after completion of the application, the Contractor and COR shall jointly inspect and assess results. In areas where results are less than acceptable, the Contractor shall re-perform the application at no additional cost to the Government (*Acceptable is defined as 90% of actively growing broadleaf weeds and weed grasses are eliminated).
(m) The Contractor shall not dispose of, rinse, mix nor store any herbicide containers/bags on cemetery premises except as authorized by cemetery management.
(n) No herbicide application equipment may be kept or stored on the cemetery premises when the Contractor is not working.
A.4.1 APPLICATION REQUIREMENTS / WARM SEASON TURF GRASS – BERMUDAGRASS
(a) Initial Pre-Emergent Crabgrass Application: Contractor shall apply a pre-emergent crabgrass herbicide such in liquid form to control crabgrass and other weed grasses. All herbicides must be applied with properly calibrated equipment. The Contractor shall begin the application after the soil temperature (2 inch) has reached 55 degrees for three consecutive days. This is the time that crabgrass seeds begin active germination in the soil. Any application that is completed before this time period may not be as effective in overall crabgrass control. The dates for application listed in the application schedule are only an estimated time frame and could begin earlier or later depending upon the soil temperatures and weather conditions. Products to be used must be specified for use on warm season turf grass and will be applied at the recommended label rate.
(b) Broadleaf Weed / Weed Grass / Yellow Nutsedge Control: Herbicides must be applied in liquid form with properly calibrated spraying equipment. The Contractor will not substitute a granular herbicide in place of liquid to perform the applications without approval from both the COR and Contracting Officer. The herbicide must be for the control of various warm season turf weed species including broadleaf weeds, weed grasses and yellow / purple nutsedge.
Applications must be timely and at the proper dosage so that perennial weeds do not go to seed and continue to spread. Herbicide shall be applied to all turf acreage, in burial sections and including areas between and around all headstones and along section perimeters. Applicator must be sure to carefully apply the herbicide to all weed leaf surfaces to ensure that a sufficient weed kill / control takes place. The spring application for the treatment of broadleaf weeds will begin when the broadleaf weeds begin actively growing. As Memorial Day services at all National Cemeteries are very important and bring many visitors and family members to the cemetery, it is essential that the Contractor carefully treat all the turf to eradicate broadleaf weeds as much as possible, especially dandelions. If after one week of Contractor ‘s initial application there is not adequate control of weeds and still active dandelion growth or any other weeds, the Contractor will return to the cemetery to specifically address these areas at no additional cost to the government. Products to be used must be specified for use on warm season turf grass and will be applied at the recommended label rate.
Fertilization: Contractor shall apply a granular only turf fertilizer, which is specified in the application schedule to all turf areas using a properly calibrated spreader/sprayer. The fertilizer shall be applied at a rate recommended in the soil test report. Fertilizer shall be applied to all turf areas at the times and rates that are listed in the turf application schedule. Fertilizer will only be used that is recommended for warm season turf grass. The Contractor will not substitute a liquid fertilizer for granular fertilizer without prior written approval from the Contracting Officer.
A.5 CONTRACT MANAGEMENT
A.5.1 SITE Manager
(a) The Contractor shall provide an English speaking “Site Manager” who shall be responsible for the following:
(i) Directing, overseeing and coordinating the work involved.
(ii) Staying abreast of all upcoming cemetery functions including special holiday events and burial activities.
(iii) Ensuring that contract work does not cause any committal service, ceremony, procession or visitation to be delayed, altered, or otherwise impacted in such a way that the dignity, security, or safety of the event or visit is compromised.
(i) Site Manager must be physically present whenever work is being performed, other than trash and debris pick up. Site Manager must also have no less than five years’ experience as a direct supervisor of employees supervising and performing all tasks set forth in the scope of work and be able to communicate in and speak English.
(Note: To cause the least possible interference with cemetery activities, contract personnel shall stop (cease) all work in areas where burials are taking place. As a general "rule-of-thumb", work should not take place within 1,000 feet of an ongoing committal service, or ceremony. The Site Manager shall re-direct work throughout the rest of the Cemetery – so that productive use of labor and equipment is assured, and downtime is avoided. If the Contractor fails to re-direct employees away from an event in a timely fashion, the COR may then do so.)
(b) Communication & Coordination of Work with COR: Contractor shall participate in regular meetings with Government personnel and other Contractors at the cemetery to coordinate contract work schedules and contract related issues. Communication with the COR is strongly encouraged. Burial activities at NCA shall take precedence over contract work activities. Work activity and noise cannot disturb Burial Services. Trucks and workers are prohibited from passing through the service area during this period.
(c) Notwithstanding the Contractors responsibility for total management during the performance of this contract, the administration of the contract shall require maximum coordination between the Government and the Contractor. The Government shall provide, at the time of contract award, with a list of Government personnel authorized to act as Contracting Officer's Representatives.
A.6 REPRESENTATIVES OF The Contracting Officer
(a) The Contracting Officer reserves the right to designate representatives to act for him/her in providing technical guidance and advice or generally supervises the work to be performed under this contract. Such designation shall be in writing and shall define the scope and limitations of the designee's authority. A copy of the designation(s) shall be furnished to the Contractor at time of award.
(b) The VA Contracting Officer shall delegate one (or more) representative to serve as the Contracting Officer’s Representative (COR). The COR will notify the Contractor of the daily cemetery activities and operations so the Contractor can adjust the work schedule as needed to avoid these areas of the cemetery.
(c) VA Contracting Officer: All administrative functions remain with the VA Contracting Officer. Any modifications to the contract, including those involving non-cost changes, increases and decreases in cost or level of services provided, termination or extension of the contract (in part or in whole) and decisions concerning claims or disputes, must be authorized in writing by the Government Contracting Officer.
A.7 FEDERAL Holidays
(a) All work required under this contract shall be performed during normal business days and daylight hours between 7:30 am and 4:00 pm, local time, Monday through Friday, excluding Federal holidays. Deviations from the work schedule shall require prior written permission from the COR. The following is a list of the Federal holidays:
New Year's Day
Martin Luther King’s
President's Day Memorial Day Juneteenth
Fourth of July
Labor Day Columbus Day
Veterans Day
Thanksgiving Day
Christmas Day
A.8 RESPONSIBILITIES
(a) The Contractor shall be aware of the labor and equipment requirements needed to meet contract specifications. There shall be no excusable delays other than those mentioned in FAR 52.212-4(f). The Contractor is responsible for following the notification requirements in this clause. The government expects the Contractor to work throughout certain weather conditions and to apply additional labor and equipment as necessary to meet deadlines.
(b) Cooperation with other Contractors: The government may undertake or award other contracts for additional work at or near the site of work for this contract. The Contractor shall fully cooperate with other Contractors and with Government employees and shall carefully adapt scheduling and performance of work, adhering to any direction provided by the COR.
(c) The Contractor shall not operate trucks, tractors, or other heavy equipment on any turf area except as provided in this contract or as authorized by the COR. The Contractor shall be responsible for repairing turf damage caused by the Contractor during all weather conditions that is deemed excessive by the COR at no additional cost to the government.
(d) At the end of each day, the Contractor shall remove all equipment from the cemetery site. At all times, rubbish and trash generated by the Contractor shall be kept clear of vehicles and pedestrian traffic throughout the site. The government shall not provide receptacles for the disposal of debris related to this contract.
A.9 STANDARDS OF EMPLOYEE CONDUCT
Contractor and Contractor personnel are required to adhere to the following standards of dress and conduct while performing work in the Salisbury National Cemetery. These standards and regulations are enforceable under Title 38, U.S.C. Section 218. Contractor and Contractor Personnel --
(a) You should be fully clothed, to include long slacks or pants and shirt, buttoned up from neck to waist. Clothing shall be clean each day. Any soiled clothing should be cemetery work-related that day. T-shirts and/or tank tops as outer garments are prohibited. Shoes/boots shall have no holes or loose soles. Steel-toed shoes are required in accordance with OSHA. Contractor employees shall maintain personal hygiene.
(b) Shall not engage in loud or boisterous behavior or use profane or abusive language. Shall show proper reverence during committal service.
(c) Should not eat or drink beverages except water or non-alcoholic drinks while in the work area or on site of committal shelter during service. Use of intoxicating beverages and/or drugs is strictly prohibited.
(d) Contractor personnel shall not lean, sit or stand on or against headstones or monuments. No tools, equipment or other items shall be placed or leaned on headstones or monuments.
(e) SMOKING is not permitted in any buildings within the Salisbury National Cemetery. This restriction includes offices, restrooms, stairwells, entrances, exits or any other public area.
(f) It shall be the discretion of the COR to implement immediate removal of Contractor and/or Contractor personnel from cemetery grounds if these standards are not adhered to during the performance of the contract. Contractor shall administer disciplinary action immediately as required to Contractor employees.
A.10 SUPERVISION & TRAINING
(a) The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required.
(b) The Contractor shall remove employees for cause, to include, but not limited to, misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government.
(c) The Contractor shall also be responsible for training and safety precautions for Contractor employees performing work under these specifications. OSHA standards shall be observed by the Contractor in all work performed. Appropriate safety equipment shall be furnished by the Contractor-to-Contractor personnel and shall be used as prescribed by OSHA standards.
A.11 USE OF CEMETERY FACILITIES
(a) The Government shall not be responsible for any loss, damage, or theft of Contractor items, nor shall free telephone service be provided. Contractor shall be responsible for acceptable standards of housekeeping and custodial maintenance of Department of Veterans Affair’s facilities used by Contractor's employees.
(b) The Government shall not provide the Contractor with any fuel storage, equipment or telephones. The Contractor shall take adequate safety precautions to prevent hazardous product spills, fire hazards, odors and unsanitary conditions.
(c) The Contractor is responsible for safely handling any chemicals, pesticides, herbicides, cleaning solutions, etc. in accordance with manufacturers’ recommendations. An MSDS (Material Safety Data Sheet) is required for all chemicals, pesticides, herbicides and cleaning solutions.
(d) No maintenance or repair of Contractor equipment shall be conducted on cemetery property without the COR’s written approval.
(e) Contractor employees may park privately owned vehicles in the area designated for parking by the COR.
A.12 INSPECTION & MONITORING PROCEDURES
(a) A record-keeping system of Contractor work performance shall be established and implemented by the COR for the services involved. The COR shall inspect and verify that fertilizer and herbicide applications are applied in accordance with the Turf Application Schedule and at the appropriate turf application rate. Contractor will provide application logs to the COR that shows the product name, amount applied, and date of application.
(b) Payment: Upon completion of each turf application, the Contractor shall submit an invoice in arrears for services rendered. Prior to certification of payment, invoices shall be verified for accuracy by the COR. The COR shall verify the services provided and authorize payment as indicated in the Price Schedule. VA reserves the right to reject any work that does not meet contract specifications.
[END OF STATEMENT OF WORK / SPECIFICATIONS]
File details come from the government source that posted it. Updated .