Fort Bliss Gravesite Expansion BD Part 2.pdf
PDF 16 MB Posted
- Solicitation number
- 36C78626B0028
About this file
These are bid documents for the Fort Bliss National Cemetery Expansion project, a U.S. Department of Veterans Affairs construction undertaking located at 5200 Fred Wilson Avenue, El Paso, Texas. The project number is 886CM3026 with an issue date of June 15, 2026, and comprises 150 pages of construction drawings and specifications prepared by Anderson Engineering of Minnesota, LLC, with geotechnical services by Terracon and cost estimating by Van Avelar/OCMI.
The base bid work includes site preparation, mass excavation, earthwork, grading, drainage, utility relocation, irrigation, landscaping, and demolition of existing infrastructure no longer required. The base bid specifically encompasses: gravesite expansion area development (Sections TT, UU, VV, QQ, and WW for preplaced concrete crypt construction), in-ground cremation sections (W and Y), supporting infrastructure repairs and upgrades, IT communications closet improvements at admin and maintenance buildings, and facility condition assessment discrepancy corrections. Option 1 includes additional gravesite expansion areas XX and YY with similar infrastructure components. The project includes extensive concrete curb and gutter replacement, bituminous pavement patching and overlay, sidewalk and parking area construction, retaining wall installation, chain-link fencing with barbed wire, concrete drainage channels with rip-rap lining, decorative gates, and landscaping restoration. Contractor responsibilities include maintaining staff and visitor access throughout construction, coordinating utility shutdowns with minimum 48-hour notice, protecting gravesites and existing infrastructure, obtaining all required permits, installing erosion control measures, and verifying existing utilities prior to excavation. The expansion area includes approximately 8,853 burial plots (6,632 preplaced burial crypts, 2,194 in-ground cremation sections, and 27 traditional burials) for the base bid, with Option 1 adding 2,664 plots.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIV8
PIV
PIV6 PIV7
PIV4
PIV3
PIV2
PI
V 1
PK
PK
PF
EX
. S
EC
TI
O N
S S
EX
. S
EC
TI
O N
R R
EX
. S
EC
TI
O N
P P
EX
. S
EC
TI
O N
N N
EX
. S
EC
TI
O N
X
EX
. S
EC
TI
O N
II
EX
. S
EC
TI
O N
J J
EX
. S
EC
TI
O N
M M
EX
. S
EC
TI
O N
G
EX
. S
EC
TI
O N
L
EX
. S
EC
TI
O N
L
CD102 CD103
CD104 CD105
CD107
CD109
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ de m o ov er al l.d w g ed it:
ks te bb in sa ve d:
4/
/2
:0
PM
p lo t:6 /2
2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KEYMAP
NTS
N
CS102 CS103
CS104 CS105
CS107
CS109
V-102 V-103
V-104 V-105
V-107
V-109
CD102 CD103
CD104 CD105
CD107
CD109
KYLE STEBBING
159267
0 100' 200'
N
OVERALL DEMOLITION PLAN
CD101
CNKS
1 OVERALL DEMOLITION PLAN
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING FENCE
EXISTING GAS MAIN
EXISTING OVERHEAD WIRES
EXISTING TELEPHONE
EXISTING UNDERGROUND
ELECTRIC
EXISTING HYDRANT AND GV
EXISTING SANITARY MANHOLE
EXISTING STORM SEWER INLET
REMOVE BITUMINOUS
PAVEMENT
REMOVE CONCRETE PAVEMENT
REMOVE CONCRETE CURB &
GUTTER
FULL-DEPTH SAWCUT
REMOVE SHRUBS AND
PLANTINGS. REPLACE IN-KIND
REMOVE & REPLACE TREE
IN-KIND
KEY NOTES
SEE SHEET CD111 FOR EXPANSION
AREA
1. ALL CURB SHOWN TO BE REMOVED AND
REPLACED ARE APPROXIMATE LOCATIONS AND
DIMENSIONS. CONTRACTOR TO COORDINATE
WITH COR FOR CURB REMOVAL LIMITS. ALL
CURB SHALL BE REMOVED WITH A FULL DEPTH
SAWCUT AT NEAREST JOINT AND REPLACED
IN-KIND. CONTRACTOR TO MATCH EXISTING
CURB TYPE, ELEVATIONS AND SLOPES FOR
NEW CURBS.
2. ALL PAVEMENT REMOVAL SHALL BE
TERMINATED WITH A FULL DEPTH SAWCUT. ALL
CONCRETE PAVEMENT AND WALK REMOVALS
SHALL BE TERMINATED WITH A FULL DEPTH
SAWCUT AT NEAREST JOINT.
3. ALL PAVEMENT REMOVAL FOR CURB
INSTALLATION SHALL BE REPLACED WHEN
COMPLETED PER DETAIL 8/CS501.
4. CONTRACTOR SHALL MAINTAIN STAFF AND
VISITOR ACCESS TO ALL PUBLIC AREAS OF THE
CEMETERY. COORDINATE WITH COR IF ACCESS
CANNOT BE MAINTAINED FOR A PERIOD OF
TIME.
5. CONTRACTOR SHALL REMOVE AND DISPOSE
ALL DEMOLITION ITEMS OFFSITE IN
ACCORDANCE WITH APPLICABLE FEDERAL,
STATE, AND LOCAL REQUIREMENTS.
6. CONTRACTOR SHALL OBTAIN ALL PERMITS
PRIOR TO CONSTRUCTION ACTIVITIES.
7. CONTRACTOR TO INSTALL EROSION CONTROL
MEASURES PRIOR TO STARTING WORK. SEE
SHEET CE501.
8. REPLACE IN-KIND ALL TREES & SHRUBS CALLED
OUT FOR REMOVAL WITHIN CONDUIT
INSTALLATION LIMITS. CONTRACTOR TO FIELD
VERIFY SIZE AND TYPE. PROTECT ALL TREES
AND SHRUBS NOT CALLED OUT TO BE
REMOVED.
9. CONTRACTOR TO FIELD VERIFY EXISTING
UTILITIES (ELEV, SIZE, TYPE...ETC) INSIDE
CONSTRUCTION LIMITS PRIOR TO EXCAVATION.
10. COORDINATE ALL SHUTDOWNS A MINIMUM OF
48 HOURS OR MORE WITH COR/CEMETERY
STAFF.
11. PROTECT EXISTING GRAVESITES, PAVEMENTS,
UTILITIES, PLANTING, ETC. FROM DAMAGE. ALL
DAMAGE TO BE REPAIRED IN KIND AT NO COST
TO THE GOVERNMENT.
GENERAL NOTES
BASE BID
PIV4
PIV3
PIV2
PI
V 1
22 LF
10 LF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ de m o en la rg em en ts
.d w ks te bb in d:
4/
/2
2:
P M lo t:6 /2
2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KEYMAP
NTS
N
CD102 CD103
CD104 CD105
CD107
CD109
KYLE STEBBING
159267
DEMOLITION PLAN 1
CD102
CNKS
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING FENCE
EXISTING GAS MAIN
EXISTING OVERHEAD WIRES
EXISTING TELEPHONE
EXISTING UNDERGROUND
ELECTRIC
EXISTING HYDRANT AND GV
EXISTING SANITARY MANHOLE
EXISTING STORM SEWER INLET
REMOVE BITUMINOUS
PAVEMENT
REMOVE CONCRETE PAVEMENT
REMOVE CONCRETE CURB &
GUTTER
FULL-DEPTH SAWCUT
REMOVE SHRUBS AND
PLANTINGS. REPLACE IN-KIND
REMOVE & REPLACE TREE
IN-KIND
0 30' 60'
N
1 DEMOLITION PLAN 1
MATCHLINE - SHEET CD104
M
AT
C H
LI
N
E
- S
H
EE
T C
D
KEY NOTES
SAWCUT PAVEMENT (FULL DEPTH) & DEMO
ASPHALT. FINALLY, REMOVE CONCRETE CURB AND
GUTTER. SEE DETAIL 8/CS501
PROTECT EXISTING POWER POLE
PROTECT EXISTING TREE
FULL DEPTH SAWCUT
REMOVE CONCRETE PAVEMENT
GENERAL NOTES
1. ALL CURB SHOWN TO BE REMOVED AND REPLACED ARE
APPROXIMATE LOCATIONS AND DIMENSIONS. CONTRACTOR TO
COORDINATE WITH COR FOR CURB REMOVAL LIMITS. ALL CURB
SHALL BE REMOVED WITH A FULL DEPTH SAWCUT AT NEAREST
JOINT AND REPLACED IN-KIND.
2. ALL PAVEMENT REMOVAL SHALL BE TERMINATED WITH A FULL
DEPTH SAWCUT. ALL CONCRETE PAVEMENT AND WALK REMOVALS
SHALL BE TERMINATED WITH A FULL DEPTH SAWCUT AT NEAREST
JOINT.
3. ALL PAVEMENT REMOVAL FOR CURB INSTALLATION SHALL BE
REPLACED WHEN COMPLETED PER DETAIL 8/CS501.
4. CONTRACTOR SHALL MAINTAIN STAFF AND VISITOR ACCESS TO ALL
PUBLIC AREAS OF THE CEMETERY. COORDINATE WITH COR IF
ACCESS CANNOT BE MAINTAINED FOR A PERIOD OF TIME.
5. CONTRACTOR SHALL REMOVE AND DISPOSE ALL DEMOLITION
ITEMS OFFSITE IN ACCORDANCE WITH APPLICABLE FEDERAL,
STATE, AND LOCAL REQUIREMENTS.
6. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO
CONSTRUCTION ACTIVITIES.
7. CONTRACTOR TO INSTALL EROSION CONTROL MEASURES PRIOR
TO STARTING WORK. SEE SHEET CE501.
8. PROTECT ALL TREES AND SHRUBS NOT CALLED OUT TO BE
REMOVED.
9. CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES (ELEV, SIZE,
TYPE...ETC) INSIDE CONSTRUCTION LIMITS PRIOR TO EXCAVATION.
CONTRACTOR SHALL VERIFY BURIED UTILITY LOCATIONS WITH "811"
UNDERGROUND UTILITIES LOCATION CENTER.
10. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND
CITY FOR TEMPORARY UTILITY CONNECTION/DISCONNECTS.
11. COORDINATE ALL SHUTDOWNS A MINIMUM OF 48 HOURS OR MORE
WITH COR/CEMETERY STAFF.
12. PROTECT EXISTING GRAVESITES, PAVEMENTS, UTILITIES,
PLANTING, ETC. FROM DAMAGE. ALL DAMAGE TO BE REPAIRED IN
KIND AT NO COST TO THE GOVERNMENT.
13. ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS OF
THE GEOTECHNICAL ENGINEER AND GEOTECHNICAL REPORT
UNLESS DIRECTED OTHERWISE.
PIV6 PIV7 1
82 LF
10 LF
80 LF
10 LF
19 LF
72 LF
85 LF
64 LF
60 LF
47 LF
130 LF
23 LF
20 LF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ de m o en la rg em en ts
.d w ks te bb in d:
4/
/2
2:
lo t:6 /2
2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KEYMAP
NTS
N
CD102 CD103
CD104 CD105
CD107
CD109
KYLE STEBBING
159267
DEMOLITION PLAN 2
CD103
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING FENCE
EXISTING GAS MAIN
EXISTING OVERHEAD WIRES
EXISTING TELEPHONE
EXISTING UNDERGROUND
ELECTRIC
EXISTING HYDRANT AND GV
EXISTING SANITARY MANHOLE
EXISTING STORM SEWER INLET
REMOVE BITUMINOUS
PAVEMENT
REMOVE CONCRETE PAVEMENT
REMOVE CONCRETE CURB &
GUTTER
FULL-DEPTH SAWCUT
REMOVE SHRUBS AND
PLANTINGS. REPLACE IN-KIND
REMOVE & REPLACE TREE
IN-KIND
0 30' 60'
N
1 DEMOLITION PLAN 2
MATCHLINE - SHEET CD105
M
ATC
H
LIN
E - SH
EET C
D
CNKS
KEY NOTES
SAWCUT PAVEMENT (FULL DEPTH) & DEMO ASPHALT.
FINALLY, REMOVE CONCRETE CURB AND GUTTER. SEE
DETAIL 8/CS501
REMOVE CONCRETE PAVEMENT
FULL DEPTH SAWCUT AT NEAREST JOINT
REMOVE PLANTING
REMOVE AND RELOCATE CAST STONE MASONRY SIGN.
SEE SHEET CS103 FOR LOCATION.
PROTECT EXISTING WALL/COLUMN & FOOTING. SEE
ARCHITECTURAL DRAWINGS FOR MORE INFO.
PROTECT EXISTING TREE
SEE SHEET CS102 FOR JOINTING PLAN
GENERAL NOTES
1. ALL CURB SHOWN TO BE REMOVED AND REPLACED ARE
APPROXIMATE LOCATIONS AND DIMENSIONS. CONTRACTOR TO
COORDINATE WITH COR FOR CURB REMOVAL LIMITS. ALL CURB
SHALL BE REMOVED WITH A FULL DEPTH SAWCUT AT NEAREST
JOINT AND REPLACED IN-KIND.
2. ALL PAVEMENT REMOVAL SHALL BE TERMINATED WITH A FULL
DEPTH SAWCUT. ALL CONCRETE PAVEMENT AND WALK REMOVALS
SHALL BE TERMINATED WITH A FULL DEPTH SAWCUT AT NEAREST
JOINT.
3. ALL PAVEMENT REMOVAL FOR CURB INSTALLATION SHALL BE
REPLACED WHEN COMPLETED PER DETAIL 8/CS501.
4. CONTRACTOR SHALL MAINTAIN STAFF AND VISITOR ACCESS TO ALL
PUBLIC AREAS OF THE CEMETERY. COORDINATE WITH COR IF
ACCESS CANNOT BE MAINTAINED FOR A PERIOD OF TIME.
5. CONTRACTOR SHALL REMOVE AND DISPOSE ALL DEMOLITION
ITEMS OFFSITE IN ACCORDANCE WITH APPLICABLE FEDERAL,
STATE, AND LOCAL REQUIREMENTS.
6. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO
CONSTRUCTION ACTIVITIES.
7. CONTRACTOR TO INSTALL EROSION CONTROL MEASURES PRIOR
TO STARTING WORK. SEE SHEET CE501.
8. PROTECT ALL TREES AND SHRUBS NOT CALLED OUT TO BE
REMOVED.
9. CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES (ELEV, SIZE,
TYPE...ETC) INSIDE CONSTRUCTION LIMITS PRIOR TO EXCAVATION.
CONTRACTOR SHALL VERIFY BURIED UTILITY LOCATIONS WITH "811"
UNDERGROUND UTILITIES LOCATION CENTER.
10. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND
CITY FOR TEMPORARY UTILITY CONNECTION/DISCONNECTS.
11. COORDINATE ALL SHUTDOWNS A MINIMUM OF 48 HOURS OR MORE
WITH COR/CEMETERY STAFF.
12. PROTECT EXISTING GRAVESITES, PAVEMENTS, UTILITIES,
PLANTING, ETC. FROM DAMAGE. ALL DAMAGE TO BE REPAIRED IN
KIND AT NO COST TO THE GOVERNMENT.
13. ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS OF
THE GEOTECHNICAL ENGINEER AND GEOTECHNICAL REPORT
UNLESS DIRECTED OTHERWISE.
EX
. S
EC
TI
O N
S S
EX
. S
EC
TI
O N
R R
EX
. S
EC
TI
O N
P P
EX
. S
EC
TI
O N
N N
EX
. S
EC
TI
O N
X
EX
. S
EC
TI
O N
II
EX
. S
EC
TI
O N
J J
EX
. S
EC
TI
O N
M M
EX
. S
EC
TI
O N
G
486 LF
10 LF
33 LF
20 LF
40 LF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ de m o en la rg em en ts
.d w ks te bb in d:
4/
/2
2:
lo t:6 /2
2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KEYMAP
NTS
N
CD102 CD103
CD104 CD105
CD107
CD109
KYLE STEBBING
159267
DEMOLITION PLAN 3
CD104
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING FENCE
EXISTING GAS MAIN
EXISTING OVERHEAD WIRES
EXISTING TELEPHONE
EXISTING UNDERGROUND
ELECTRIC
EXISTING HYDRANT AND GV
EXISTING SANITARY MANHOLE
EXISTING STORM SEWER INLET
REMOVE BITUMINOUS
PAVEMENT
REMOVE CONCRETE PAVEMENT
REMOVE CONCRETE CURB &
GUTTER
FULL-DEPTH SAWCUT
REMOVE SHRUBS AND
PLANTINGS. REPLACE IN-KIND
REMOVE & REPLACE TREE
IN-KIND
0 30' 60'
N
1 DEMOLITION PLAN 3
M
AT
C H
LI
N
E
- S
H
EE
T C
D
MATCHLINE - SHEET CD102
CNKS
KEY NOTES
SAWCUT PAVEMENT (FULL DEPTH) & DEMO
ASPHALT. FINALLY, REMOVE CONCRETE CURB
AND GUTTER. SEE DETAIL 8/CS501
REMOVE CONCRETE PAVEMENT
FULL DEPTH SAWCUT
REMOVE AND SALVAGE BENCH (3)
PROTECT EXISTING COLUMNS
MATCHLINE - SHEET CD111
SEE ARCHITECTURAL AND STRUCTURAL DRAWINGS
GENERAL NOTES
1. ALL CURB SHOWN TO BE REMOVED AND REPLACED ARE
APPROXIMATE LOCATIONS AND DIMENSIONS. CONTRACTOR TO
COORDINATE WITH COR FOR CURB REMOVAL LIMITS. ALL CURB
SHALL BE REMOVED WITH A FULL DEPTH SAWCUT AT NEAREST
JOINT AND REPLACED IN-KIND.
2. ALL PAVEMENT REMOVAL SHALL BE TERMINATED WITH A FULL
DEPTH SAWCUT. ALL CONCRETE PAVEMENT AND WALK REMOVALS
SHALL BE TERMINATED WITH A FULL DEPTH SAWCUT AT NEAREST
JOINT.
3. ALL PAVEMENT REMOVAL FOR CURB INSTALLATION SHALL BE
REPLACED WHEN COMPLETED PER DETAIL 8/CS501.
4. CONTRACTOR SHALL MAINTAIN STAFF AND VISITOR ACCESS TO ALL
PUBLIC AREAS OF THE CEMETERY. COORDINATE WITH COR IF
ACCESS CANNOT BE MAINTAINED FOR A PERIOD OF TIME.
5. CONTRACTOR SHALL REMOVE AND DISPOSE ALL DEMOLITION
ITEMS OFFSITE IN ACCORDANCE WITH APPLICABLE FEDERAL,
STATE, AND LOCAL REQUIREMENTS.
6. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO
CONSTRUCTION ACTIVITIES.
7. CONTRACTOR TO INSTALL EROSION CONTROL MEASURES PRIOR
TO STARTING WORK. SEE SHEET CE501.
8. PROTECT ALL TREES AND SHRUBS NOT CALLED OUT TO BE
REMOVED.
9. CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES (ELEV, SIZE,
TYPE...ETC) INSIDE CONSTRUCTION LIMITS PRIOR TO EXCAVATION.
CONTRACTOR SHALL VERIFY BURIED UTILITY LOCATIONS WITH "811"
UNDERGROUND UTILITIES LOCATION CENTER.
10. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND
CITY FOR TEMPORARY UTILITY CONNECTION/DISCONNECTS.
11. COORDINATE ALL SHUTDOWNS A MINIMUM OF 48 HOURS OR MORE
WITH COR/CEMETERY STAFF.
12. PROTECT EXISTING GRAVESITES, PAVEMENTS, UTILITIES,
PLANTING, ETC. FROM DAMAGE. ALL DAMAGE TO BE REPAIRED IN
KIND AT NO COST TO THE GOVERNMENT.
13. ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS OF
THE GEOTECHNICAL ENGINEER AND GEOTECHNICAL REPORT
UNLESS DIRECTED OTHERWISE.
40 LF
60 LF
40 LF
70 LF
75 LF
181 LF
30 LF
180 LF
274 LF
10 LF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ de m o en la rg em en ts
.d w ks te bb in d:
4/
/2
2:
lo t:6 /2
2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KEYMAP
NTS
N
CD102 CD103
CD104 CD105
CD107
CD109
KYLE STEBBING
159267
DEMOLITION PLAN 4
CD105
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING FENCE
EXISTING GAS MAIN
EXISTING OVERHEAD WIRES
EXISTING TELEPHONE
EXISTING UNDERGROUND
ELECTRIC
EXISTING HYDRANT AND GV
EXISTING SANITARY MANHOLE
EXISTING STORM SEWER INLET
REMOVE BITUMINOUS
PAVEMENT
REMOVE CONCRETE PAVEMENT
REMOVE CONCRETE CURB &
GUTTER
FULL-DEPTH SAWCUT
REMOVE SHRUBS AND
PLANTINGS. REPLACE IN-KIND
REMOVE & REPLACE TREE
IN-KIND
0 30' 60'
N
1 DEMOLITION PLAN 4
M
ATC
H
LIN
E - SH
EET C
D
MATCHLINE - SHEET CD103
CNKS
KEY NOTES
SAWCUT PAVEMENT (FULL DEPTH) & DEMO
ASPHALT. FINALLY, REMOVE CONCRETE
CURB AND GUTTER. SEE DETAIL 8/CS501
REMOVE CONCRETE PAVEMENT
FULL DEPTH SAWCUT
REMOVE AND SALVAGE BENCH
PROTECT EXISTING COLUMBARIUM WALL
MATCHLINE - SHEET CD107
GENERAL NOTES
1. ALL CURB SHOWN TO BE REMOVED AND REPLACED ARE
APPROXIMATE LOCATIONS AND DIMENSIONS. CONTRACTOR TO
COORDINATE WITH COR FOR CURB REMOVAL LIMITS. ALL CURB
SHALL BE REMOVED WITH A FULL DEPTH SAWCUT AT NEAREST
JOINT AND REPLACED IN-KIND.
2. ALL PAVEMENT REMOVAL SHALL BE TERMINATED WITH A FULL
DEPTH SAWCUT. ALL CONCRETE PAVEMENT AND WALK REMOVALS
SHALL BE TERMINATED WITH A FULL DEPTH SAWCUT AT NEAREST
JOINT.
3. ALL PAVEMENT REMOVAL FOR CURB INSTALLATION SHALL BE
REPLACED WHEN COMPLETED PER DETAIL 8/CS501.
4. CONTRACTOR SHALL MAINTAIN STAFF AND VISITOR ACCESS TO ALL
PUBLIC AREAS OF THE CEMETERY. COORDINATE WITH COR IF
ACCESS CANNOT BE MAINTAINED FOR A PERIOD OF TIME.
5. CONTRACTOR SHALL REMOVE AND DISPOSE ALL DEMOLITION
ITEMS OFFSITE IN ACCORDANCE WITH APPLICABLE FEDERAL,
STATE, AND LOCAL REQUIREMENTS.
6. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO
CONSTRUCTION ACTIVITIES.
7. CONTRACTOR TO INSTALL EROSION CONTROL MEASURES PRIOR
TO STARTING WORK. SEE SHEET CE501.
8. PROTECT ALL TREES AND SHRUBS NOT CALLED OUT TO BE
REMOVED.
9. CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES (ELEV, SIZE,
TYPE...ETC) INSIDE CONSTRUCTION LIMITS PRIOR TO EXCAVATION.
CONTRACTOR SHALL VERIFY BURIED UTILITY LOCATIONS WITH "811"
UNDERGROUND UTILITIES LOCATION CENTER.
10. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND
CITY FOR TEMPORARY UTILITY CONNECTION/DISCONNECTS.
11. COORDINATE ALL SHUTDOWNS A MINIMUM OF 48 HOURS OR MORE
WITH COR/CEMETERY STAFF.
12. PROTECT EXISTING GRAVESITES, PAVEMENTS, UTILITIES,
PLANTING, ETC. FROM DAMAGE. ALL DAMAGE TO BE REPAIRED IN
KIND AT NO COST TO THE GOVERNMENT.
13. ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS OF
THE GEOTECHNICAL ENGINEER AND GEOTECHNICAL REPORT
UNLESS DIRECTED OTHERWISE.
PK
PF
280 LF
179 LF
47 LF
110 LF
80 LF
140 LF
30 LF
90 LF
10 LF
30 LF
20 LF
20 LF
228 LF
114 LF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ de m o en la rg em en ts
.d w ks te bb in d:
4/
/2
2:
lo t:6 /2
2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KEYMAP
NTS
N
CS102 CS103
CS104 CS105
CS107
CS109
V-102 V-103
V-104 V-105
V-107
V-109
CD102 CD103
CD104 CD105
CD107
CD109
KYLE STEBBING
159267
DEMOLITION PLAN 6
CD107
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING FENCE
EXISTING GAS MAIN
EXISTING OVERHEAD WIRES
EXISTING TELEPHONE
EXISTING UNDERGROUND
ELECTRIC
EXISTING HYDRANT AND GV
EXISTING SANITARY MANHOLE
EXISTING STORM SEWER INLET
REMOVE BITUMINOUS
PAVEMENT
REMOVE CONCRETE PAVEMENT
REMOVE CONCRETE CURB &
GUTTER
FULL-DEPTH SAWCUT
REMOVE SHRUBS AND
PLANTINGS. REPLACE IN-KIND
REMOVE & REPLACE TREE
IN-KIND
0 30' 60'
N
1 DEMOLITION PLAN 6
MATCHLINE - SHEET CD109
MATCHLINE - SHEET CD105
CNKS
KEY NOTES
SAWCUT PAVEMENT (FULL DEPTH) & DEMO
ASPHALT. FINALLY, REMOVE CONCRETE
CURB AND GUTTER. SEE DETAIL 8/CS501
GENERAL NOTES
1. ALL CURB SHOWN TO BE REMOVED AND REPLACED ARE
APPROXIMATE LOCATIONS AND DIMENSIONS. CONTRACTOR TO
COORDINATE WITH COR FOR CURB REMOVAL LIMITS. ALL CURB
SHALL BE REMOVED WITH A FULL DEPTH SAWCUT AT NEAREST
JOINT AND REPLACED IN-KIND.
2. ALL PAVEMENT REMOVAL SHALL BE TERMINATED WITH A FULL
DEPTH SAWCUT. ALL CONCRETE PAVEMENT AND WALK REMOVALS
SHALL BE TERMINATED WITH A FULL DEPTH SAWCUT AT NEAREST
JOINT.
3. ALL PAVEMENT REMOVAL FOR CURB INSTALLATION SHALL BE
REPLACED WHEN COMPLETED PER DETAIL 8/CS501.
4. CONTRACTOR SHALL MAINTAIN STAFF AND VISITOR ACCESS TO ALL
PUBLIC AREAS OF THE CEMETERY. COORDINATE WITH COR IF
ACCESS CANNOT BE MAINTAINED FOR A PERIOD OF TIME.
5. CONTRACTOR SHALL REMOVE AND DISPOSE ALL DEMOLITION
ITEMS OFFSITE IN ACCORDANCE WITH APPLICABLE FEDERAL,
STATE, AND LOCAL REQUIREMENTS.
6. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO
CONSTRUCTION ACTIVITIES.
7. CONTRACTOR TO INSTALL EROSION CONTROL MEASURES PRIOR
TO STARTING WORK. SEE SHEET CE501.
8. PROTECT ALL TREES AND SHRUBS NOT CALLED OUT TO BE
REMOVED.
9. CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES (ELEV, SIZE,
TYPE...ETC) INSIDE CONSTRUCTION LIMITS PRIOR TO EXCAVATION.
CONTRACTOR SHALL VERIFY BURIED UTILITY LOCATIONS WITH "811"
UNDERGROUND UTILITIES LOCATION CENTER.
10. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND
CITY FOR TEMPORARY UTILITY CONNECTION/DISCONNECTS.
11. COORDINATE ALL SHUTDOWNS A MINIMUM OF 48 HOURS OR MORE
WITH COR/CEMETERY STAFF.
12. PROTECT EXISTING GRAVESITES, PAVEMENTS, UTILITIES,
PLANTING, ETC. FROM DAMAGE. ALL DAMAGE TO BE REPAIRED IN
KIND AT NO COST TO THE GOVERNMENT.
13. ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS OF
THE GEOTECHNICAL ENGINEER AND GEOTECHNICAL REPORT
UNLESS DIRECTED OTHERWISE.
218 LF
71 LF
120 LF
209 LF
108 LF
99 LF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ de m o en la rg em en ts
.d w ks te bb in d:
4/
/2
2:
lo t:6 /2
2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KEYMAP
NTS
N
CS102 CS103
CS104 CS105
CS107
CS109
V-102 V-103
V-104 V-105
V-107
V-109
CD102 CD103
CD104 CD105
CD107
CD109
KYLE STEBBING
159267
DEMOLITION PLAN 8
CD109
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING FENCE
EXISTING GAS MAIN
EXISTING OVERHEAD WIRES
EXISTING TELEPHONE
EXISTING UNDERGROUND
ELECTRIC
EXISTING HYDRANT AND GV
EXISTING SANITARY MANHOLE
EXISTING STORM SEWER INLET
REMOVE BITUMINOUS
PAVEMENT
REMOVE CONCRETE PAVEMENT
REMOVE CONCRETE CURB &
GUTTER
FULL-DEPTH SAWCUT
REMOVE SHRUBS AND
PLANTINGS. REPLACE IN-KIND
REMOVE & REPLACE TREE
IN-KIND
0 30' 60'
N
1 DEMOLITION PLAN 8
MATCHLINE - SHEET CD107
CNKS
KEY NOTES
SAWCUT PAVEMENT (FULL DEPTH) & DEMO
ASPHALT. FINALLY, REMOVE CONCRETE CURB
AND GUTTER. SEE DETAIL 8/CS501
GENERAL NOTES
1. ALL CURB SHOWN TO BE REMOVED AND REPLACED ARE
APPROXIMATE LOCATIONS AND DIMENSIONS. CONTRACTOR TO
COORDINATE WITH COR FOR CURB REMOVAL LIMITS. ALL CURB
SHALL BE REMOVED WITH A FULL DEPTH SAWCUT AT NEAREST
JOINT AND REPLACED IN-KIND.
2. ALL PAVEMENT REMOVAL SHALL BE TERMINATED WITH A FULL
DEPTH SAWCUT. ALL CONCRETE PAVEMENT AND WALK REMOVALS
SHALL BE TERMINATED WITH A FULL DEPTH SAWCUT AT NEAREST
JOINT.
3. ALL PAVEMENT REMOVAL FOR CURB INSTALLATION SHALL BE
REPLACED WHEN COMPLETED PER DETAIL 8/CS501.
4. CONTRACTOR SHALL MAINTAIN STAFF AND VISITOR ACCESS TO ALL
PUBLIC AREAS OF THE CEMETERY. COORDINATE WITH COR IF
ACCESS CANNOT BE MAINTAINED FOR A PERIOD OF TIME.
5. CONTRACTOR SHALL REMOVE AND DISPOSE ALL DEMOLITION
ITEMS OFFSITE IN ACCORDANCE WITH APPLICABLE FEDERAL,
STATE, AND LOCAL REQUIREMENTS.
6. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO
CONSTRUCTION ACTIVITIES.
7. CONTRACTOR TO INSTALL EROSION CONTROL MEASURES PRIOR
TO STARTING WORK. SEE SHEET CE501.
8. PROTECT ALL TREES AND SHRUBS NOT CALLED OUT TO BE
REMOVED.
9. CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES (ELEV, SIZE,
TYPE...ETC) INSIDE CONSTRUCTION LIMITS PRIOR TO EXCAVATION.
CONTRACTOR SHALL VERIFY BURIED UTILITY LOCATIONS WITH "811"
UNDERGROUND UTILITIES LOCATION CENTER.
10. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND
CITY FOR TEMPORARY UTILITY CONNECTION/DISCONNECTS.
11. COORDINATE ALL SHUTDOWNS A MINIMUM OF 48 HOURS OR MORE
WITH COR/CEMETERY STAFF.
12. PROTECT EXISTING GRAVESITES, PAVEMENTS, UTILITIES,
PLANTING, ETC. FROM DAMAGE. ALL DAMAGE TO BE REPAIRED IN
KIND AT NO COST TO THE GOVERNMENT.
13. ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS OF
THE GEOTECHNICAL ENGINEER AND GEOTECHNICAL REPORT
UNLESS DIRECTED OTHERWISE.
EX. SECTION SS
EX. SECTION RR
EX. SECTION PP
EX. SECTION NN
EX. SECTION X
EX. SECTION MM
EX. SECTION GEX. SECTION L
EX. SECTION L1
387238
3872 3873 3874 3875 3876 3877 3878
38713871
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ de m o
- e xp an si on
.d w cn el so n d:
6/
/2
9:
A lo t:6
/2 2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KEYMAP
NTS
N
KYLE STEBBING
159267
DEMOLITION PLAN - EXPANSION
CD111
KEY NOTES
FULL DEPTH SAWCUT. REMOVE & DISPOSE
CURB & ASPHALT. SEE DETAIL 8/CS501.
REMOVE & DISPOSE CHAIN-LINK FENCE.
REMOVE & SALVAGE RIP - RAP CHANNEL
LINING FULL DEPTH.
REMOVE & DISPOSE CONCRETE CHANNEL
LINING FULL DEPTH.
REMOVE & DISPOSE POLE IN ITS ENTIRETY
AND ALL ASSOCIATED APPURTENANCES (BY
OTHERS).
PROTECT EXISTING POLE IN PLACE
4 3
REMOVE AND DISPOSE
BRUSH PILE
REMOVE AND DISPOSE
OVERHEAD WIRE (BY OTHERS)
KS CN 9
1 DEMOLITION PLAN - EXPANSION 0 40' 80'
N
PROTECT EXISTING
SANITARY MANHOLE
IN PLACE
PROTECT EXISTING
WATERLINE AND
ASSOCIATED
APPURTENANCES IN PLACE
BRUSH PILE
1. ALL CURB SHOWN TO BE REMOVED AND REPLACED ARE APPROXIMATE LOCATIONS AND DIMENSIONS. CONTRACTOR TO COORDINATE WITH COR FOR CURB REMOVAL LIMITS. ALL CURB
SHALL BE REMOVED WITH A FULL DEPTH SAWCUT AT NEAREST JOINT AND REPLACED IN-KIND.
2. ALL PAVEMENT REMOVAL SHALL BE TERMINATED WITH A FULL DEPTH SAWCUT. ALL CONCRETE PAVEMENT AND WALK REMOVALS SHALL BE TERMINATED WITH A FULL DEPTH SAWCUT
AT NEAREST JOINT.
3. ALL PAVEMENT REMOVAL FOR CURB INSTALLATION SHALL BE REPLACED WHEN COMPLETED PER DETAIL 8/CS501.
4. CONTRACTOR SHALL MAINTAIN STAFF AND VISITOR ACCESS TO ALL PUBLIC AREAS OF THE CEMETERY. COORDINATE WITH COR IF ACCESS CANNOT BE MAINTAINED FOR A PERIOD OF
TIME.
5. CONTRACTOR SHALL REMOVE AND DISPOSE ALL DEMOLITION ITEMS OFFSITE IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE, AND LOCAL REQUIREMENTS.
6. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO CONSTRUCTION ACTIVITIES.
7. CONTRACTOR TO INSTALL EROSION CONTROL MEASURES PRIOR TO STARTING WORK. SEE SHEET CE501.
8. PROTECT ALL TREES AND SHRUBS NOT CALLED OUT TO BE REMOVED.
9. CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES (ELEV, SIZE, TYPE...ETC) INSIDE CONSTRUCTION LIMITS PRIOR TO EXCAVATION. CONTRACTOR SHALL VERIFY BURIED UTILITY
LOCATIONS WITH "811" UNDERGROUND UTILITIES LOCATION CENTER.
10. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND CITY FOR TEMPORARY UTILITY CONNECTION/DISCONNECTS.
11. COORDINATE ALL SHUTDOWNS A MINIMUM OF 48 HOURS OR MORE WITH COR/CEMETERY STAFF.
12. PROTECT EXISTING GRAVESITES, PAVEMENTS, UTILITIES, PLANTING, ETC. FROM DAMAGE. ALL DAMAGE TO BE REPAIRED IN KIND AT NO COST TO THE GOVERNMENT.
13. ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER AND GEOTECHNICAL REPORT UNLESS DIRECTED OTHERWISE.
14. ALL CONCRETE AND RIP-RAP CHANNEL LINING SHALL BE REMOVED FULL DEPTH. DISPOSE OF CONCRETE AND EXISTING FABRIC OFFSITE. SALVAGE EXISTING RIP-RAP FOR REUSE.
CONTRACTOR TO VERIFY THAT EXISTING RIP-RAP MEETS PROJECT SPECIFICATIONS. IF MATERIAL DOES NOT MEET SPECIFICATIONS, NOTIFY ENGINEER IMMEDIATELY. CONTRACTOR TO CLEAN RIP-RAP ROCK OF EXCESS DIRT AND DEBRIS BEFORE RE-INSTALLING. UNSUITABLE SUBGRADE SHALL BE REMOVED AND REPLACED PER THE GEOTECHNICAL REPORT.
GENERAL NOTES
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING FENCE
EXISTING GAS MAIN
EXISTING OVERHEAD WIRES
EXISTING TELEPHONE
EXISTING UNDERGROUND
ELECTRIC
EXISTING HYDRANT AND GV
EXISTING SANITARY MANHOLE
EXISTING STORM SEWER INLET
REMOVE BITUMINOUS
PAVEMENT
REMOVE CONCRETE CHANNEL
LINING
REMOVE BRUSH PILE
RIP RAP REMOVAL
REMOVE CONCRETE CURB &
GUTTER
FULL-DEPTH SAWCUT
REMOVE POWER POLE
REMOVE CHAIN-LINK FENCE
REMOVE OVERHEAD WIRE
PROTECT EXISTING
ELECTRICAL BOX
PIV6 PIV7
PIV4
PIV3
PIV2
PI
V 1
PK
PK
PF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ lo gi st ic s.
dw cn el so d:
6/
/2
1:
lo t:6
/2 2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KYLE STEBBING
159267
OVERALL ACCESS & LOGISTICS PLAN
CO101
1 OVERALL ACCESS & LOGISTICS PLAN
PROPERTY LIMITS
SURVEY LIMITS
OVERHEAD POWERLINE
CONSTRUCTION ACCESS ROUTE
USE NORTHWEST ENTRANCE
FOR CONSTRUCTION ACCESS.
NOTES
1. CONTRACTOR TO UTILIZE EXPANSION AREA
FOR EQUIPMENT AND SPOILS STORAGE.
ANY OTHER LAYDOWN AREAS SHALL BE
COORDINATED BY CONTRACTOR W/ COR.
2. CONTRACTOR TO MILL AND OVERLAY 2" OF
EXISTING BITUMINOUS PAVEMENT ON
ACCESS ROUTE ONCE EXPANSION AREA
AND FCA WORK HAS CONCLUDED.
3. CONTRACTOR TO ONLY UTILIZE
MAINTENANCE YARD ENTRANCE ENTERING
AND EXITING THE SITE (NE ENTRANCE
SHOWN ON SHEET).
4. CONTRACTOR TO ONLY UTILIZE
CONSTRUCTION ACCESS ROUTE FOR
EXPANSION AREA WORK.
LEGEND
0 100' 200'
N
KS CN 11
CONSTRUCTION LINE ITEMS
CLIN NAME DESCRIPTION
BASE BID - CLIN 1
GRADE AND DEVELOP GRAVESITE EXPANSION AREA,
IT COMMUNICATIONS IMPROVEMENTS, FACILITY
CONDITION ASSESSMENT DISCREPANCY
CORRECTIONS.
WORK INCLUDES BUT IS NOT LIMITED TO GENERAL CONSTRUCTION , ALTERATIONS,
SITE PREPARATION, MASS EXCAVATION AND EARTHWORK, ROADS, WALKS, GRADING,
DRAINAGE,UTILITY RELOCATION, IRRIGATION, AND LANDSCAPING. DEMOLISH AND
REMOVE ASSOCIATED INFRASTRUCTURE NO LONGER REQUIRED TO SUPPORT NEW
CONSTRUCTION. CONSTRUCT PREPLACED CONCRETE CRYPT SECTIONS TT, UU , VV,
QQ, AND WW, IN GROUND CREMATION SECTIONS W, Y AND ALL SUPPORTING
INFRASTRUCTURE REPAIRS / UPGRADES AS NECESSARY TO EXISTING ASSOCIATED
ASSETS. MAKE IMPROVEMENTS / REPAIRS TO IT COMMUNICATIONS CLOSET AT ADMIN /
MAINTENANCE BUILDINGS. CORRECT FACILITY CONDITION ASSESSMENT
DISCREPANCIES, TO INCLUDE REQUISITE INFRASTRUCTURE OF UTILITIES, SIGNAGE,
SITE FURNISHING, AND ADDITIONAL SUPPORT REQUIREMENTS.
OPTION 1 GRADE & DEVELOP GRAVESITE EXPANSION AREAS
XX & YY
WORK INCLUDES BUT IS NOT LIMITED TO GENERAL CONSTRUCTION , ALTERATIONS,
SITE PREPARATION, MASS EXCAVATION AND EARTHWORK, GRADING, DRAINAGE,
IRRIGATION, AND LANDSCAPING. CONSTRUCT PREPLACED CONCRETE CRYPT
SECTIONS XX, YY AND ALL ALL SUPPORTING INFRASTRUCTURE REPAIRS / UPGRADES
AS NECESSARY TO EXISTING ASSOCIATED ASSETS.
BASE BID:
SECTIONS TT, UU, VV, QQ,
WW, Y, W, AND ROADWAY
OPTION 1:
SECTIONS YY AND XX
BASE BID:
IT COMMUNICATION IMPROVEMENTS
AND FACILITY CONDITION ASSESSMENT
DISCREPANCY CORRECTIONS
PIV6 PIV7
PIV4
PIV3
PIV2
PI
V 1
PK
PK
PF
EX
. S
EC
TI
O N
S S
EX
. S
EC
TI
O N
R R
EX
. S
EC
TI
O N
P P
EX
. S
EC
TI
O N
N N
EX
. S
EC
TI
O N
X
EX
. S
EC
TI
O N
II
EX
. S
EC
TI
O N
J J
EX
. S
EC
TI
O N
M M
EX
. S
EC
TI
O N
G
EX
. S
EC
TI
O N
L
EX
. S
EC
TI
O N
L
CS102 CS103
CS104 CS105
CS107
CS109
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ si te o ve ra ll.
dw ks te bb in d:
4/
/2
:3 lo t:6
/2 2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KEYMAP
NTS
N
CS102 CS103
CS104 CS105
CS107
CS109
KYLE STEBBING
159267
0 120' 240'
N
OVERALL SITE PLAN
CS101
CNKS
1 OVERALL SITE PLAN
LEGEND
PROPERTY LIMITS
SURVEY LIMITS
CONSTRUCTION LIMITS
PROPOSED CONCRETE C&G
PROPOSED BITUMINOUS
PAVEMENT
PROPOSED CONCRETE
PAVEMENT
ACCESSIBLE PARKING SIGN
CONCRETE EQUIPMENT PAD
KEY NOTES
SEE SHEET CS111 FOR
EXPANSION AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ si te e nl ar ge m en ts
.d w js ch m itz er le s av ed
:6 /1
1/
:0 lo t:6
/2 2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KEYMAP
NTS
N
CS102 CS103
CS104 CS105
CS107
CS109
KYLE STEBBING
159267
SITE PLAN 1
CS102
CNKS
PROPERTY LIMITS
KEY NOTES
NEW CONCRETE CURB & GUTTER W/
BITUMINOUS PATCH AND OVERLAY.
CONTRACTOR TO FIELD VERIFY CURB TYPE AND
REPLACE IN-KIND. SEE DETAIL 8/CS501.
LEGEND
PROPERTY LIMITS
SURVEY LIMITS
CONSTRUCTION LIMITS
PROPOSED CONCRETE C&G
PROPOSED BITUMINOUS
PAVEMENT
PROPOSED CONCRETE
PAVEMENT
ACCESSIBLE PARKING SIGN
CONCRETE EQUIPMENT PAD
0 30' 60'
N
1 SITE PLAN 1
MATCHLINE - SHEET CS104
M
AT
C H
LI
N
E
- S
H
EE
T C
S1
INSTALL NEW FUEL TANK. SEE MECHANICAL.
PROTECT EXISTING PIPE BOLLARD.
NEW CONCRETE EQUIPMENT PAD. SEE DETAIL 11/CS502
MAINTENANCE BLDG
VEHICLE STORAGE BLDG
NEW FUEL TANK
3.00
2.
0.
5.00'
1. CONTRACTOR SHALL MAINTAIN STAFF AND
VISITOR ACCESS TO ALL PUBLIC AREAS OF THE
CEMETERY. COORDINATE WITH COR IF ACCESS
CANNOT BE MAINTAINED FOR A PERIOD OF TIME.
2. CONTRACTOR TO INSTALL NEW CURB AND
GUTTER PRIOR TO ASPHALT PATCH AND OVERLAY.
3. ADJUST EXISTING STRUCTURES WITHIN
CONSTRUCTION LIMITS AS NECESSARY. CATCH
BASINS LOCATED IN CURB REPLACEMENT AREAS
SHALL BE ADJUSTED TO MATCH ADJACENT FLOW
LINES.
4. EXISTING UTILITIES ARE APPROXIMATE LOCATIONS
ONLY. CONTRACTOR TO FIELD VERIFY AS
NECESSARY. NOTIFY COR/ENGINEER OF ANY
DISCREPANCIES TO WHAT IS SHOWN ON
CONSTRUCTION PLANS.
5. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR
TO CONSTRUCTION ACTIVITIES.
6. CONTRACTOR TO INSTALL EROSION CONTROL
MEASURES PRIOR TO STARTING WORK.
7. PROTECT ALL EXISTING SITE ELEMENTS (TREES,
UTILITIES, CURB, ETC.) NOT NOTED FOR REMOVAL.
REPLACE IN KIND IF DAMAGED AT NO COST TO
GOVERNMENT.
8. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
ELEVATIONS PRIOR TO CONSTRUCTION.
9. COORDINATE ALL SHUTDOWNS A MINIMUM OF 48
HOURS OR MORE WITH COR/CEMETERY STAFF.
10. PROTECT ALL TREES AND SHRUBS NOT CALLED
OUT TO BE REMOVED.
11. ALL FENCING ADJACENT TO PROPERTY LINE SHALL
BE COORDINATED WITH COR PRIOR TO
COMMENCING ANY FENCING ACTIVITIES.
GENERAL NOTES
2 EQUIPMENT PAD 0 30' 60'
N
FLAG POLE
REPLACE APPROXIMATELY
1410 LF OF JOINT MORTAR.
SEE JOINTING PLAN ABOVE.
PROPERTY LIMITS
SEE THIS SHEET FOR
GETTYSBURG ADDRESS
TABLET CLEANING NOTES.
ADMINISTRATION OFFICE
SPECIAL FINISH CONCRETE. INSTALL
CONCRETE PER DETAIL 3CS/501. HATCHING
PATTERN NOT TO SCALE. MATCH EXISTING
FINISHES (COLOR, SCORING/STAMPING). SEE
PHOTO DETAIL FOR REFERENCE. SEE
SPECIFICATIONS FOR FURTHER INFORMATION.
5'-0" SIGN POST HEIGHT. FINISHED
GRADE TO BOTTOM OF SIGN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ si te e nl ar ge m en ts
.d w js ch m itz av ed
:6 /1
1/
:0 lo t:6
/2 2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KEYMAP
NTS
N
CS102 CS103
CS104 CS105
CS107
CS109
KYLE STEBBING
159267
SITE PLAN 2
CS103
LEGEND
PROPERTY LIMITS
SURVEY LIMITS
CONSTRUCTION LIMITS
PROPOSED CONCRETE C&G
PROPOSED BITUMINOUS
PAVEMENT
PROPOSED CONCRETE
PAVEMENT
ACCESSIBLE PARKING SIGN
CONCRETE EQUIPMENT PAD
0 30' 60'
N
1 SITE PLAN 2
MATCHLINE - SHEET CS105
M
ATC
H
LIN
E - SH
EET C
S102
KEY NOTES
NEW CONCRETE CURB & GUTTER W/ BITUMINOUS
PATCH AND OVERLAY. CONTRACTOR TO FIELD
VERIFY CURB TYPE AND REPLACE IN-KIND. SEE
DETAIL 8/CS501.
2 NEW CONCRETE SIDEWALK. SEE DETAIL 3/CS501.
CNKS
NEW ADA PARKING SIGN. SEE DETAIL 6/CS501
PROTECT EXISTING WALL/COLUMN.
RE-INSTALL SALVAGED CAST STONE MASONRY
SIGN. MATCH EXISTING CONDITIONS.
NEW CONCRETE EQUIPMENT PAD. SEE DETAIL
10/CS502
3 1
FLAG POLE
3 FLAG POLE JOINTING PLAN
NOTES:
1. CLEAN AND REMOVE ALL EXISTING SEALANT AND MORTAR WITHIN THE WORK AREA.
2. CONTRACTOR SHALL MEASURE ALL JOINTS AND FILL PER THE FOLLOWING:
2.1. ALL JOINTS MEASURING LESS THAN 1/2" SHALL BE FILLED WITH SEALANT.
2.2. ALL JOINTS MEASURING GREATER THAN 1/2" SHALL BE FILLED WITH MORTAR.
2.3. IN THE INSTANCE THAT A SINGLE JOINT MEASURES BOTH LESS THAN 1/2" AND GREATER THAN 1/2" ALONG IT'S LENGTH, FILL WITH MORTAR.
3. SEALANT AND MORTAR TO MATCH EXISTING OR BE APPROVED BY COR.
1. CONTRACTOR TO EXAMINE THE OVERALL SURFACE OF THE TABLET.
ANY CRACKS, CREVICES, POCKETS, OR FOLDS IN THE METAL SHALL BE
REPAIRED.
2. ANY DAMAGE TO THE TABLET SHALL BE REPAIRED WITH A COMPATIBLE
EPOXY COMPOUND, RECOMMENDED BY AND UNDER SUPERVISION OF A
STATE HISTORIC PRESERVATION OFFICER (SHPO):
2.1. SAMPLE AREAS TO BE DETERMINED BY SHPO AND PRODUCTS
APPROVED BEFORE FURTHER SURFACE PREPARATION AND
RESTORATION TO BE COMPLETED. SAMPLE AREAS SHALL BECOME
THE STANDARD COMPARISON FOR ALL RESTORATION WORK.
2.2. ALL AREAS DAMAGED BY RUST AND PAINT/SEALANT REMOVAL
SHALL BE REPAIRED WITH THE SAME MATERIALS AND METHODS.
2.3. REFER TO GSA STANDARDS FOR REPAIRING SMALL HOLES, NICKS,
AND MINOR IMPERFECTIONS IN CAST IRON.
3. REMOVE ONLY AS MUCH PAINT AND RUST AS CAN BE PRIMED WITHIN
ONE WORK SESSION. STEEL WILL RUST WITHOUT PROTECTION WITHIN
HOURS AND SHALL NOT BE LEFT UNPROTECTED OUTSIDE OF WORKING
HOURS.
4. SANDBLAST TABLET FOR PAINT, SEALANT AND RUST REMOVAL:
5. PRIMER:
5.1. CONTRACTOR TO CONSULT A PAINT MANUFACTURER AND SHPO
FOR APPROPRIATE PRODUCT.
5.2. PRIMER SHALL BE SILICONE BASED.
GETTYSBURG ADDRESS TABLET
CLEANING NOTES
JOINTING
2 PHOTO DETAIL - STAMPED COLOR CONCRETE
PROPERTY LIMITS
SURVEY LIMITS
CONSTRUCTION LIMITS
PROPOSED CONCRETE C&G
PROPOSED BITUMINOUS
PAVEMENT
PROPOSED CONCRETE
PAVEMENT
ACCESSIBLE PARKING SIGN
EXPANSION JOINT
CONTRACTION JOINT
SPECIAL FINISH CONCRETE
6 SIDEWALK JOINTING PLAN
1. CONTRACTOR SHALL MAINTAIN STAFF AND
VISITOR ACCESS TO ALL PUBLIC AREAS OF THE
CEMETERY. COORDINATE WITH COR IF ACCESS
CANNOT BE MAINTAINED FOR A PERIOD OF TIME.
2. CONTRACTOR TO INSTALL NEW CURB AND
GUTTER PRIOR TO ASPHALT PATCH AND OVERLAY.
3. ADJUST EXISTING STRUCTURES WITHIN
CONSTRUCTION LIMITS AS NECESSARY. CATCH
BASINS LOCATED IN CURB REPLACEMENT AREAS
SHALL BE ADJUSTED TO MATCH ADJACENT FLOW
LINES.
4. EXISTING UTILITIES ARE APPROXIMATE LOCATIONS
ONLY. CONTRACTOR TO FIELD VERIFY AS
NECESSARY. NOTIFY COR/ENGINEER OF ANY
DISCREPANCIES TO WHAT IS SHOWN ON
CONSTRUCTION PLANS.
5. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR
TO CONSTRUCTION ACTIVITIES.
6. CONTRACTOR TO INSTALL EROSION CONTROL
MEASURES PRIOR TO STARTING WORK.
7. PROTECT ALL EXISTING SITE ELEMENTS (TREES,
UTILITIES, CURB, ETC.) NOT NOTED FOR REMOVAL.
REPLACE IN KIND IF DAMAGED AT NO COST TO
GOVERNMENT.
8. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
ELEVATIONS PRIOR TO CONSTRUCTION.
9. COORDINATE ALL SHUTDOWNS A MINIMUM OF 48
HOURS OR MORE WITH COR/CEMETERY STAFF.
10. PROTECT ALL TREES AND SHRUBS NOT CALLED
OUT TO BE REMOVED.
11. ALL FENCING ADJACENT TO PROPERTY LINE SHALL
BE COORDINATED WITH COR PRIOR TO
COMMENCING ANY FENCING ACTIVITIES.
GENERAL NOTES
4 PHOTO DETAIL - FLAG POLE JOINTING
5 PHOTO DETAIL - GETTYSBURG ADDRESS
EX
. S
EC
TI
O N
S S
EX
. S
EC
TI
O N
R R
EX
. S
EC
TI
O N
P P
EX
. S
EC
TI
O N
N N
EX
. S
EC
TI
O N
X
EX
. S
EC
TI
O N
II
EX
. S
EC
TI
O N
J J
EX
. S
EC
TI
O N
M M
EX
. S
EC
TI
O N
G
PROPERTY LIMITS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ si te e nl ar ge m en ts
.d w js ch m itz av ed
:6 /1
1/
:0 lo t:6
/2 2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KEYMAP
NTS
N
CS102 CS103
CS104 CS105
CS107
CS109
KYLE STEBBING
159267
SITE PLAN 3
CS104
KEY NOTES
NEW CONCRETE CURB & GUTTER W/ BITUMINOUS
PATCH AND OVERLAY. CONTRACTOR TO FIELD VERIFY
CURB TYPE AND REPLACE IN-KIND. SEE DETAIL
8/CS501.
RE-INSTALL BENCH. SEE ARCHITECTURAL DRAWINGS
NEW REINFORCED CONCRETE SLAB. SEE
ARCHITECTURAL & STRUCTURAL DRAWINGS.
LEGEND
PROPERTY LIMITS
SURVEY LIMITS
CONSTRUCTION LIMITS
PROPOSED CONCRETE C&G
PROPOSED BITUMINOUS
PAVEMENT
PROPOSED CONCRETE
PAVEMENT
ACCESSIBLE PARKING SIGN
CONCRETE EQUIPMENT PAD
0 30' 60'
N
1 SITE PLAN 3
SHEET CS111
M
AT
C H
LI
N
E
- S
H
EE
T C
S1
MATCHLINE - SHEET CS102
CNKS
SEE ARCHITECTURAL AND STRUCTURAL DRAWINGS
1. CONTRACTOR SHALL MAINTAIN STAFF AND
VISITOR ACCESS TO ALL PUBLIC AREAS OF THE
CEMETERY. COORDINATE WITH COR IF ACCESS
CANNOT BE MAINTAINED FOR A PERIOD OF TIME.
2. CONTRACTOR TO INSTALL NEW CURB AND
GUTTER PRIOR TO ASPHALT PATCH AND OVERLAY.
3. ADJUST EXISTING STRUCTURES WITHIN
CONSTRUCTION LIMITS AS NECESSARY. CATCH
BASINS LOCATED IN CURB REPLACEMENT AREAS
SHALL BE ADJUSTED TO MATCH ADJACENT FLOW
LINES.
4. EXISTING UTILITIES ARE APPROXIMATE LOCATIONS
ONLY. CONTRACTOR TO FIELD VERIFY AS
NECESSARY. NOTIFY COR/ENGINEER OF ANY
DISCREPANCIES TO WHAT IS SHOWN ON
CONSTRUCTION PLANS.
5. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR
TO CONSTRUCTION ACTIVITIES.
6. CONTRACTOR TO INSTALL EROSION CONTROL
MEASURES PRIOR TO STARTING WORK.
7. PROTECT ALL EXISTING SITE ELEMENTS (TREES,
UTILITIES, CURB, ETC.) NOT NOTED FOR REMOVAL.
REPLACE IN KIND IF DAMAGED AT NO COST TO
GOVERNMENT.
8. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
ELEVATIONS PRIOR TO CONSTRUCTION.
9. COORDINATE ALL SHUTDOWNS A MINIMUM OF 48
HOURS OR MORE WITH COR/CEMETERY STAFF.
10. PROTECT ALL TREES AND SHRUBS NOT CALLED
OUT TO BE REMOVED.
11. ALL FENCING ADJACENT TO PROPERTY LINE SHALL
BE COORDINATED WITH COR PRIOR TO
COMMENCING ANY FENCING ACTIVITIES.
GENERAL NOTES
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 v a nc a_ ft bl is s bu ria l e xp an si on c or re ct fc a_ el p as o, tx c iv il\ _0 ca d fil es s he et s\
8_ si te e nl ar ge m en ts
.d w js ch m itz av ed
:6 /1
1/
:0 lo t:6
/2 2/
:4
PM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18528Date:
Office of Design and Construction
Services
FT BLISS NATIONAL CEMETERY
EXPANSION
886CM3026
JUNE 15, 2026
5200 FRED WILSON AVENUE, EL PASO, TEXAS
BID DOCUMENTS
OF 150
FIRE / LOW VOLTAGE / SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER / PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS, CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
COST ESTIMATING
OCMI
2100 NORTH GREENVILLE AVENUE
SUITE 1150
RICHARDSON, TX 75082
469.431.0571
RAYMOND BODO
BID DOCUMENTS
KEYMAP
NTS
N
CS102 CS103
CS104 CS105
CS107
CS109
KYLE STEBBING
159267
SITE PLAN 4
CS105
KE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .