This document provides specifications for submittals required under a contract to replace the center road, add new curbs, and replace the irrigation main line at Prescott National Cemetery. The contractor must use an electronic document tracking software to host project schedules, submittals, daily reports, photographs, and document management for items like test reports, certifications, and permits. Submittals must be provided in quadruplicate and include samples, shop drawings, product data, manuals, and other documents for approval. The contractor is responsible for ensuring submittals meet requirements and checking drawings for accuracy before submission. The contracting agency will be the Department of Veterans Affairs National Cemetery Administration, as indicated in the related solicitation for project number 900 MM-FY24-003 to replace the center road, add new curbs and irrigation main line at Prescott National Cemetery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78624B0015 0003.docx | DOCX document | |
| 17197_Addendum-2_Narrative_2024-03-08.pdf | ||
| 36C78624B0015 0002.docx | DOCX document | |
| 900-MM-FY23-004_PRESCOTT_NC_SPECIFICATIONS(rev).pdf | ||
| 17197_Addendum-1_Narrative_2020-02-20.pdf | ||
| 013217NetworkSched.pdf | ||
| 000110TOC.pdf | ||
| 36C78624B0015 0001.docx | DOCX document | |
| WD_YavapaiCounty_Heavy.txt | TXT text file | |
| WD_YavapaiCounty_Highway.txt | TXT text file | |
| IFB_LumpSumDivisionSpreadsheet.xlsx | XLSX spreadsheet | |
| SOW 900-FY24-MM-004 Replace Center Road (rev).pdf | ||
| 900-MM-FY23-004_PRESCOTT_NC_PLANS_REPLACE_CENTER_ROAD_IRRIGATION_MAIN_LINE.pdf | ||
| 900-MM-FY23-004_PRESCOTT_NC_SPECIFICATIONS_REPLACE_CENTER_ROAD_IRRIGATION_MAIN_LINE.pdf | ||
| 36C78624B0015_1.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prescott National Cemetery – Replace Center Road, Addendum 002 New Curbs, and Irrigation Main Line 12-13-2023 VA Project 900-MM-FY23-004
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01 33 23 - 1
SECTION 01 33 23
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
1-1. Refer to Articles titled SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(FAR 52.236-21) and, SPECIAL NOTES (VAAR 852.236-91), in GENERAL
CONDITIONS.
1-2. Electronic document tracking software is required for this Contract.
For the duration of the project the electronic tracking software shall be hosted and maintained by the Contractor. Access shall be given to personal identified by the COR. The electronic tracking software shall host the following capabilities, but not be limited to:
A. Project Schedule
B. Project Submittals C. Daily Reports and photographs
D. Document Management (test reports, certifications, permits, etc.)
1-3. For the purposes of this contract, samples, test reports, certificates, and manufacturers' literature and data shall also be subject to the previously referenced requirements. The following text refers to all items collectively as SUBMITTALS.
1-4. Submit for approval, all of the items specifically mentioned under the separate sections of the specification, with information sufficient to evidence full compliance with contract requirements. Materials, fabricated articles and the like to be installed in permanent work shall equal those of approved submittals. After an item has been approved, no change in brand or make will be permitted unless:
A. Satisfactory written evidence is presented to, and approved by
Contracting Officer, that manufacturer cannot make scheduled delivery of approved item or;
B. Item delivered has been rejected and substitution of a suitable item is an urgent necessity or;
C. Other conditions become apparent which indicates approval of such substitute item to be in best interest of the Government.
1-5. Forward submittals in sufficient time to permit proper consideration and approval action by Government. Time submission to assure adequate lead time for procurement of contract - required items. Delays
VA Project 900-MM-FY23-004
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01 33 23 - 2 attributable to untimely and rejected submittals will not serve as a basis for extending contract time for completion.
1-6. Submittals will be reviewed for compliance with contract requirements by Architect-Engineer, and action thereon will be taken by Resident
Engineer on behalf of the Contracting Officer.
1-7. Upon receipt of submittals, Architect-Engineer will assign a file number thereto. Contractor, in any subsequent correspondence, shall refer to this file and identification number to expedite replies relative to previously approved or disapproved submittals.
1-8. The Government reserves the right to require additional submittals, whether or not particularly mentioned in this contract. If additional submittals beyond those required by the contract are furnished pursuant to request therefor by Contracting Officer, adjustment in contract price and time will be made in accordance with Articles titled CHANGES
(FAR 52.243-4) and CHANGES - SUPPLEMENT (VAAR 852.236-88) of the
GENERAL CONDITIONS.
1-9. Schedules called for in specifications and shown on shop drawings shall be submitted for use and information of Department of Veterans Affairs and Architect-Engineer. However, the Contractor shall assume responsibility for coordinating and verifying schedules. The
Contracting Officer and Architect- Engineer assumes no responsibility for checking schedules or layout drawings for exact sizes, exact numbers and detailed positioning of items.
1-10. Submittals must be submitted by Contractor only and shipped prepaid.
Contracting Officer assumes no responsibility for checking quantities or exact numbers included in such submittals.
A. Submit samples in single units unless otherwise specified. Submit shop drawings, schedules, manufacturers' literature and data, and certificates in quadruplicate, except where a greater number is specified.
B. Submittals will receive consideration only when covered by a transmittal letter signed by Contractor. Letter shall be sent via first class mail and shall contain the list of items, name of Cemetery, name of Contractor, contract number, applicable specification paragraph numbers, applicable drawing numbers (and other information required for exact identification of location for each item), manufacturer and
VA Project 900-MM-FY23-004
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01 33 23 - 3 brand, ASTM or Federal Specification Number (if any) and such additional information as may be required by specifications for particular item being furnished. In addition, catalogs shall be marked to indicate specific items submitted for approval.
1. A copy of letter must be enclosed with items, and any items received without identification letter will be considered "unclaimed goods" and held for a limited time only.
2. Each sample, certificate, manufacturers' literature and data shall be labeled to indicate the name and location of the Cemetery, name of Contractor, manufacturer, brand, contract number and ASTM or
Federal Specification Number as applicable and location(s) on project.
3. Required certificates shall be signed by an authorized representative of manufacturer or supplier of material, and by
Contractor.
C. If submittal samples have been disapproved, resubmit new samples as soon as possible after notification of disapproval. Such new samples shall be marked "Resubmitted Sample" in addition to containing other previously specified information required on label and in transmittal letter.
D. Approved samples will be kept on file by the Resident Engineer at the site until completion of contract, at which time such samples will be delivered to Contractor as Contractor's property. Where noted in technical sections of specifications, approved samples in good condition may be used in their proper locations in contract work. At completion of contract, samples that are not approved will be returned to Contractor only upon request and at Contractor's expense. Such request should be made prior to completion of the contract. Disapproved samples that are not requested for return by Contractor will be discarded after completion of contract.
E. Submittal drawings (shop, erection or setting drawings) and schedules, required for work of various trades, shall be checked before submission by technically qualified employees of Contractor for accuracy, completeness and compliance with contract requirements. These drawings and schedules shall be stamped and signed by Contractor certifying to such check.
VA Project 900-MM-FY23-004
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01 33 23 - 4
1. For each drawing required, submit one legible photographic paper or vellum reproducible.
2. Reproducible shall be full size.
3. Each drawing shall have marked thereon, proper descriptive title, including Cemetery location, project number, manufacturer's number, reference to contract drawing number, detail Section Number, and
Specification Section Number.
4. A space 120 mm by 125 mm (4-3/4 by 5 inches) shall be reserved on each drawing to accommodate approval or disapproval stamp.
5. Submit drawings, ROLLED WITHIN A MAILING TUBE, fully protected for shipment.
6. One reproducible print of approved or disapproved shop drawings will be forwarded to Contractor.
7. When work is directly related and involves more than one trade, shop drawings shall be submitted to Architect-Engineer under one cover.
- - - E N D - - -