2 of 5 899-MM-FY21-006_Bidding Document Plans_2023-04-11.pdf

PDF 10 MB Posted

Attached to
Y1PZ--899-MM-FY24 Drainage in Columbarium 1-5, & Remodel Existing Lookout area at NMCP, Proj# 899-MM-FY24-006
Solicitation number
36C78624B0014
Issued by

About this file

This document relates to a federal solicitation for drainage and remodeling work at the National Memorial Cemetery of the Pacific in Hawaii. The solicitation number is 36C78624B0014 and seeks bids for drainage improvements in Columbariums 1-5 as well as remodeling of an existing lookout area. The work is a project numbered 899-MM-FY24-006 for the Department of Veterans Affairs National Cemetery Administration. Bids are due by the date listed in the associated bidding documents for award in fiscal year 2024. The scope involves drainage and construction services at the cemetery.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTERMENT SECTION

'V'

INTERMENT SECTION

'W'

COURT 5

COURT 4

D101

COLUMBARIA NORTH -

REMOVALS PLAN

0 10' 20'

CNEH

N

M A

T C

H L I N

E

S

E

S

H E

T

D

LEGEND

REMOVE CONCRETE PAVEMENT

REMOVE STORM PIPE

SITE FURNISHING REMOVAL

CONSTRUCTION LIMITS

FULL DEPTH SAWCUT

REMOVE TREE

DEMOLITION NOTES

1. EXISTING ASPHALT, CONCRETE, AND CONCRETE CURB TO BE REMOVED AND

DISPOSED OF OFFSITE. DISPOSE OF ACCORDING TO LOCAL AND STATE POLLUTION

REGULATION STANDARDS.

2. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS AND DISPOSAL CERTIFICATIONS.

3. NOTIFY COR OF ANY DISCREPANCIES PRIOR TO BEGINNING DEMOLITION WORK.

4. ALL EXISTING BURIED UTILITY LINE LOCATIONS ARE APPROXIMATE ONLY.

CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATION EXISTING UTILITIES PRIOR TO

EXCAVATION, DEMOLITION OR RECONNECTION. CONTRACTOR SHALL VERIFY

BURIED UTILITY LOCATIONS WITH "811" UNDERGROUND UTILITIES LOCATION

CENTER.

5. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND CITY FOR

TEMPORARY UTILITY CONNECTION/DISCONNECTS.

6. INSTALL SILT FENCE ON ALL DOWN SLOPE AREAS PER SWPPP PLANS AND ADJUST

AND/OR REINSTALL AS NECESSARY FOR PAVEMENT REMOVALS. SEE EROSION

CONTROL PLAN FOR DETAILS.

7. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY CONSTRUCTION

PERMITS TO CARRY OUT THE ENTIRE PROJECT. PERMITS SHALL BE IN-PLACE PRIOR

TO BEGINNING ANY CONSTRUCTION ACTIVITIES. NOTIFY APPROPRIATE UTILITY

COMPANIES OF ANY AND ALL PROPOSED WORK.

TREE PRESERVATION & PROTECTION NOTES

1. TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION RELATED ACTIVITIES OCCURRING ON SITE.

2. WHERE CONSTRUCTION ACTIVITIES IMPEDE THE CRITICAL ROOT ZONE OF TREES, THE CONTRACTOR SHALL FOLLOW

PROCEDURES OUTLINED IN SPECIFICATION 02 35 00

Dwg. of

HONOLULU, HAWAII

NATIONAL MEMORIAL CEMETERY OF

THE PACIFIC SITE IMPROVEMENTS

04/11/2023

899-MM-FY22-006

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17054

VICINITY MAP

100% BIDDING

DOCUMENT SUBMITTAL

04/11/23

EXP. 04/30/24

NO CONSTRUCTION

ACCESS WILL BE

PERMITTED

NO CONSTRUCTION

ACCESS WILL BE

PERMITTED

INTERMENT SECTION

'U'

INTERMENT SECTION

'W'

COMMITTAL COURT

SHELTER

COURT 3

COURT 2

COURT 1

D102

N

0 10' 20'

CNEH

M A

T C

H L I N

E

S

E

COLUMBARIA SOUTH -

REMOVALS PLAN

LEGEND

REMOVE CONCRETE PAVEMENT

SITE FURNISHING REMOVAL

CONSTRUCTION LIMITS

FULL DEPTH SAWCUT

REMOVE TREE

Dwg. of

HONOLULU, HAWAII

NATIONAL MEMORIAL CEMETERY OF

THE PACIFIC SITE IMPROVEMENTS

04/11/2023

899-MM-FY22-006

13605 1st Ave. N. #100 Pl ymout h, MN 55441 P 763.412.4000 | F 763.412.4090 | ae-mn.com Anderson Engineering of Minnesota, LLC | Proj # 17054

VICINITY MAP

100% BIDDING

DOCUMENT SUBMITTAL

04/11/23

EXP. 04/30/24

DEMOLITION NOTES

1. EXISTING ASPHALT, CONCRETE, AND CONCRETE CURB TO BE REMOVED AND

DISPOSED OF OFFSITE. DISPOSE OF ACCORDING TO LOCAL AND STATE POLLUTION

REGULATION STANDARDS.

2. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS AND DISPOSAL CERTIFICATIONS.

3. NOTIFY COR OF ANY DISCREPANCIES PRIOR TO BEGINNING DEMOLITION WORK.

4. ALL EXISTING BURIED UTILITY LINE LOCATIONS ARE APPROXIMATE ONLY.

CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATION EXISTING UTILITIES PRIOR TO

EXCAVATION, DEMOLITION OR RECONNECTION. CONTRACTOR SHALL VERIFY

BURIED UTILITY LOCATIONS WITH "811" UNDERGROUND UTILITIES LOCATION

CENTER.

5. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND CITY FOR

TEMPORARY UTILITY CONNECTION/DISCONNECTS.

6. INSTALL SILT FENCE ON ALL DOWN SLOPE AREAS PER SWPPP PLANS AND ADJUST

AND/OR REINSTALL AS NECESSARY FOR PAVEMENT REMOVALS. SEE EROSION

CONTROL PLAN FOR DETAILS.

7. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY CONSTRUCTION

PERMITS TO CARRY OUT THE ENTIRE PROJECT. PERMITS SHALL BE IN-PLACE PRIOR

TO BEGINNING ANY CONSTRUCTION ACTIVITIES. NOTIFY APPROPRIATE UTILITY

COMPANIES OF ANY AND ALL PROPOSED WORK.

D103

N

0 10' 20'

CNEH

LEGEND

EXISTING ASPHALT PAVEMENT

REMOVE ASPHALT PAVEMENT FULL-DEPTH

REMOVE CONCRETE PAVEMENT

REMOVE CURB & GUTTER

CONSTRUCTION LIMITS

FULL DEPTH SAWCUT

SIDEWALK AT FRONT ENTRY

PYLON - REMOVALS PLAN

PROTECT EXISTING MONUMENT

AS REQUIRED

REMOVE EXISTING OVER LOOK

IN ITS ENTIRETY

Dwg. of

HONOLULU, HAWAII

NATIONAL MEMORIAL CEMETERY OF

THE PACIFIC SITE IMPROVEMENTS

04/11/2023

899-MM-FY22-006

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17054

VICINITY MAP

100% BIDDING

DOCUMENT SUBMITTAL

04/11/23

EXP. 04/30/24

DEMOLITION NOTES

1. EXISTING ASPHALT, CONCRETE, AND CONCRETE CURB TO BE REMOVED AND

DISPOSED OF OFFSITE. DISPOSE OF ACCORDING TO LOCAL AND STATE POLLUTION

REGULATION STANDARDS.

2. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS AND DISPOSAL CERTIFICATIONS.

3. NOTIFY COR OF ANY DISCREPANCIES PRIOR TO BEGINNING DEMOLITION WORK.

4. ALL EXISTING BURIED UTILITY LINE LOCATIONS ARE APPROXIMATE ONLY.

CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATION EXISTING UTILITIES PRIOR TO

EXCAVATION, DEMOLITION OR RECONNECTION. CONTRACTOR SHALL VERIFY

BURIED UTILITY LOCATIONS WITH "811" UNDERGROUND UTILITIES LOCATION

CENTER.

5. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND CITY FOR

TEMPORARY UTILITY CONNECTION/DISCONNECTS.

6. INSTALL SILT FENCE ON ALL DOWN SLOPE AREAS PER SWPPP PLANS AND ADJUST

AND/OR REINSTALL AS NECESSARY FOR PAVEMENT REMOVALS. SEE EROSION

CONTROL PLAN FOR DETAILS.

7. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY CONSTRUCTION

PERMITS TO CARRY OUT THE ENTIRE PROJECT. PERMITS SHALL BE IN-PLACE PRIOR

TO BEGINNING ANY CONSTRUCTION ACTIVITIES. NOTIFY APPROPRIATE UTILITY

COMPANIES OF ANY AND ALL PROPOSED WORK.

REMOVE CONCRETE

AT NEAREST CONTROL

JOINT

REMOVE CONCRETE

AT NEAREST CONTROL

JOINT

CO

CO

CO

CO

CO

CO

CO

CO

COCO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

M E

M O

R I

A L

R I

V E

CS100

OVERALL CEMETERY - SITE PLAN

0 100' 200'

CNEH

N

P

U

O

W

A

I

A

I

V

E

M

A

I

V

O

R

T

H

M

A

I

U

T

H

I

N

N

I

V

E

I

N

N

I

V

E

O

V

E

R

L

O

O

K

E

X

I

S

T

I

N

G

C

O

L

U

M

B

A

R

I

A

C

O

U

M

E

M

O

R

I

A

L

L

IN

K D

R

IV

E

EXISTING OVERLOOK PATH

MAIN CEMETERY

ENTRANCE GATE

EXISTING 100,000

GALLON TANK

EXISTING PUMPHOUSE

EXISTING PUBLIC RESTROOM

EXISTING COLUMBARIA 14

1. SEE SHEETS CG101 TO CG103 FOR GRADING PLANS.

2. SEE SHEETS CU101 TO CU102 FOR UTILITY PLANS.

SHEET NOTES

EXISTING ASPHALT PAVEMENT

FULL DEPTH ASPHALT PAVEMENT

RECONSTRUCTION

FULL DEPTH CONCRETE PAVEMENT

RECONSTRUCITON

LEGEND

DRAINAGE IMPROVEMENTS AT

COLUMBARIUM COURTS 1-5,

SEE PLAN SHEETS CS101 & CS102

REMODEL SIDEWALK AT

FRONT ENTRY PYLON,

SEE PLAN SHEET CS103

O

U

T

I

R

T

H

O

U

T

I

R

T

H

O

U

T

I

U

T

H

Dwg. of

HONOLULU, HAWAII

NATIONAL MEMORIAL CEMETERY OF

THE PACIFIC SITE IMPROVEMENTS

04/11/2023

899-MM-FY22-006

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17054

VICINITY MAP

100% BIDDING

DOCUMENT SUBMITTAL

04/11/23

EXP. 04/30/24

C

C

O

C

OC

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

INTERMENT SECTION

'V'

INTERMENT SECTION

'W'

COURT 5

COURT 4

3.0'

7.5'15.0'

8.0'

25.0'

CS101

COLUMBARIA NORTH - SITE PLAN

0 10' 20'

CNEH

N

M A

T C

H L I N

E

S

E

NEW CONCRETE PAVEMENT

NEW ROCK MULCH

CONTROL JOINT

EXPANSION JOINT

TEMPORARY CONSTRUCTION FENCE

LEGEND

NOTES

TRASH RECEPTACLE

6' PEDESTRIAN BENCH

8' PEDESTRIAN BENCH

FLOWER VASE RECEPTACLE

CONSTRUCTION FENCE

FLOWER GRAVEL STRIP

KEY NOTES

TEMPORARY CONSTRUCTION FENCE

SHALL TERMINATE INTO CRATER WALL

Dwg. of

HONOLULU, HAWAII

NATIONAL MEMORIAL CEMETERY OF

THE PACIFIC SITE IMPROVEMENTS

04/11/2023

899-MM-FY22-006

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17054

VICINITY MAP

100% BIDDING

DOCUMENT SUBMITTAL

04/11/23

EXP. 04/30/24

VERIFY PLACEMENT OF

CONSTRUCTION FENCE

WITH INTERMENT LIMITS

PRIOR TO INSTALLATION.

CONTRACTOR SHALL

COORDINATE WITH

CEMETERY STAFF

1. ALL CONSTRUCTION ACTIVITIES SHALL BE CONFINED TO THE WORK

LIMITS SHOWN ON PLANS. ANY WORK OCCURRING OUTSIDE OF THE

DEFINED LIMITS SHALL BE APPROVED BY THE COR PRIOR.

2. CONSTRUCTION STAGING AND MATERIAL STORAGE SHALL OCCUR

WITHIN CONSTRUCTION LIMITS. NO STORAGE AREA WILL BE PROVIDED

OR PERMITTED OUTSIDE OF THE WORK LIMITS DURING CONSTRUCTION.

3. NO WALKING, DRIVING OR ACCESSING WORK AREA THROUGH

INTERMENTS WILL BE PERMITTED. CONTRACTOR SHALL ONLY UTILIZE

DESIGNATED ACCESS ROUTE

C

O

C

O

C

O

C

O

C

O

C

O

C

O C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

C

O

INTERMENT SECTION

'U'

INTERMENT SECTION

'W'

COMMITTAL COURT

SHELTER

COURT 3

COURT 2

COURT 1

8.0'

9.92

9.87

25.0'

CS102

COLUMBARIUM SOUTH - SITE PLAN

N

0 10' 20'

M A

T C

H L I N

E

S

E

CNEH

CONTRACTOR MAY ELECT TO UTILIZE

COMMITTAL COURT FOR MATERIAL STORAGE.

CONTRACTOR WILL BE RESPONSIBLE FOR

REPLACING ANY DAMAGED ELEMENTS

CONTRACTOR ACCESS ROUTE

- ALL ACCESS SHALL OCCUR

ON EXISTING CONCRETE

SIDEWALK.

- CONTRACTOR SHALL PROTECT

EXISTING PAVEMENT TO REMOVE

Dwg. of

HONOLULU, HAWAII

NATIONAL MEMORIAL CEMETERY OF

THE PACIFIC SITE IMPROVEMENTS

04/11/2023

899-MM-FY22-006

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17054

VICINITY MAP

100% BIDDING

DOCUMENT SUBMITTAL

04/11/23

EXP. 04/30/24

KEY NOTES

NEW CONCRETE PAVEMENT

NEW ROCK MULCH

CONTROL JOINT

EXPANSION JOINT

TEMPORARY CONSTRUCTION FENCE

LEGEND

NOTES

TRASH RECEPTACLE

6' PEDESTRIAN BENCH

8' PEDESTRIAN BENCH

FLOWER VASE RECEPTACLE

CONSTRUCTION FENCE

FLOWER GRAVEL STRIP

TEMPORARY CONSTRUCTION

ACCESS GATE

1. ALL CONSTRUCTION ACTIVITIES SHALL BE CONFINED TO THE WORK

LIMITS SHOWN ON PLANS. ANY WORK OCCURRING OUTSIDE OF THE

DEFINED LIMITS SHALL BE APPROVED BY THE COR PRIOR.

2. CONSTRUCTION STAGING AND MATERIAL STORAGE SHALL OCCUR

WITHIN CONSTRUCTION LIMITS. NO STORAGE AREA WILL BE PROVIDED

OR PERMITTED OUTSIDE OF THE WORK LIMITS DURING CONSTRUCTION.

3. NO WALKING, DRIVING OR ACCESSING WORK AREA THROUGH

INTERMENTS WILL BE PERMITTED. CONTRACTOR SHALL ONLY UTILIZE

DESIGNATED ACCESS ROUTE

File details come from the government source that posted it. Updated .