This bidding document package outlines requirements for a construction project at the National Memorial Cemetery of the Pacific in Honolulu, Hawaii. The project includes two contract line item numbers (CLINs). CLIN 1 involves general construction, alterations, demolition, excavation, drainage improvements, and reconstruction of pavement and infrastructure within Columbarium Courts 1 through 5. CLIN 2 is an optional item to remove an existing overlook and replace the sidewalk at the front entry pylon. The bidding documents provide existing conditions plans, removal plans, site plans, grading plans, utility plans, landscaping plans, and irrigation plans to guide project execution. Bids are due by April 30, 2024. Construction must be phased and coordinated carefully with cemetery operations to maintain access. The associated federal contract opportunity is solicitation number 36C78624B0014 for project number 899-MM-FY24-006 to be awarded by the Department of Veterans Affairs National Cemetery Administration.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS
NATIONAL MEMORIAL CEMETERY OF THE PACIFIC
REMODEL SIDEWALK AT FRONT ENTRY PYLON
DRAINAGE IMPROVEMENTS AT COLUMBARIUM 1-5
CONSULTANTS
ANDERSON ENGINEERING OF MN, LLC
PROJECT MANAGEMENT, LANDSCAPE ARCHITECTURE,
CIVIL ENGINEERING, LAND SURVEY
SITE DATA
NATIONAL MEMORIAL
CEMETERY OF THE PACIFIC
STREET ADDRESS:
2177 PUOWAINA DR
HONOLULU, HI 96813
COUNTY:
HONOLULU COUNTY
HONOLULU, HAWAII
13605 1ST AVENUE NORTH, SUITE 100
PLYMOUTH, MN 55441
CONTACT: JEFFREY DEITNER, PROJECT MANAGER
PHONE: (763) 412-4000
VICINITY MAP LOCATION MAP
N.T.S.
PROJECT LOCATION
PROJECT LOCATION
PUOWAINA DRIVE
NORTH
N.T.S.
NORTH
PROJECT NO: 899-MM-FY22-006
Dwg. of
HONOLULU, HAWAII
NATIONAL MEMORIAL CEMETERY OF
THE PACIFIC SITE IMPROVEMENTS
04/11/2023
899-MM-FY22-006
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17054
100% BIDDING
DOCUMENT SUBMITTAL
04/11/23
EXP. 04/30/24
SHEET INDEX
SHEET TITLE
SHEET
NUMBER
COVER SHEET GI001
SITE LOGISTICS GI003
OVERALL EXISTING CONDITIONS V-100
EXISTING CONDITIONS - COLUMBARIA COURTS 4-5 V-101
EXISTING CONDITIONS - COLUMBARIA COURTS 1-3 V-102
EXISTING CONDITIONS - OVERLOOK AT FRONT ENTRY V-103
COLUMBARIA NORTH - REMOVALS PLAN D101
COLUMBARIA SOUTH - REMOVALS PLAN D102
SIDEWALK AT FRONT ENTRY PYLON - REMOVALS PLAN D103
OVERALL CEMETERY - SITE PLAN CS100
COLUMBARIA NORTH - SITE PLAN CS101
COLUMBARIUM SOUTH - SITE PLAN CS102
SIDEWALK AT FRONT ENTRY PYLON - SITE PLAN CS103
PRECONSTRUCTION DETAILS CS501
PAVEMENT DETAILS CS502
SITE DETAILS CS503
COLUMBARIA NORTH - GRADING PLAN CG101
COLUMBARIA SOUTH - GRADING PLAN CG102
SIDEWALK AT FRONT ENTRY PYLON - GRADING PLAN CG103
COLUMBARIA NORTH - UTILITY PLAN CU101
COLUMBARIA SOUTH - UTILITY PLAN CU102
UTILITY DETAILS CU501
COLUMBARIUM NORTH LANDSCAPE PLAN LP101
COLUMBARIUM SOUTH LANDSCAPE PLAN LP102
SIDEWALK AT FRONT ENTRY PYLON LANDSCAPE PLAN LP103
LANDSCAPE DETAILS LP501
SIDEWALK AT FRONT ENTRY PYLON IRRIGATION PLAN IR101
IRRIGATION DETAILS IR501
GI001
CNEH
COVER SHEET
CO
CO
CO
CO
CO
CO
CO
CO
COCO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
N
0 100' 200'
P
U
O
W
A
I
N
A
D
R
I
V
E
M
A
L
I
V
E
M
A
I
S
I
N
N
I
O
U
T
H
O
U
T
I
R
T
H
O
U
T
I
U
T
H
O
U
T
I V
E
O
V
E
R
L
O
O
K
L
IN
K D
R
IV
E
EXISTING
MAINTENANCE
FACILITY
LEGEND
CONTRACTOR HAUL ROUTE
GENERAL NOTES
CONSTRUCTION LINE ITEMS
CLIN NAME DESCRIPTION
BASE BID - CLIN 1
GENERAL CONSTRUCTION / REMOVAL
AND RECONSTRUCTION OF
PAVEMENT AND INFRASTRUCTURE
WITHIN COLUMBARIUM COURTS 1-5
WORK INCLUDES BUT IS NOT LIMITED TO, GENERAL CONSTRUCTION, ALTERATIONS, SITE PREPARATION, MASS EXCAVATION AND EARTHWORK, WALKS, GRADING, DRAINAGE ENCOMPASSING THE AREA DEFINED WITHIN THE
PROJECT PLANS. DEMOLISH AND REMOVE EXISTING PAVEMENT AND SITE UTILITIES IN ITS ENTIRETY WHERE THE NEW IMPROVEMENTS WILL BE CONSTRUCTED. CONSTRUCT NEW PAVEMENT, STORMWATER UTILITIES, SITE
FURNISHINGS AND RESTORATION.
OPTION 1 - CLIN 2 REMOVE OVERLOOK AND REPLACE
SIDEWALK AT FRONT ENTRY PYLON
WORK INCLUDES BUT IS NOT LIMITED TO, GENERAL CONSTRUCTION ALTERATIONS, SITE PREPARATION, MASS EXCAVATION AND EARTHWORK, WALKS, GRADING, PAVING AND RESTORATION. REMOVE EXISTING OVERLOOK IN
ITS ENTIRETY AND CONSTRUCT NEW PAVEMENT, GRADING, IRRIGATION AND RESTORATION.
SITE ACCESS
1. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH VA NMCP
(NATIONAL MEMORIAL CEMETERY OF THE PACIFIC) AND MINIMIZE IMPACTS TO THE CEMETERY
ACTIVITIES. CONSTRUCTION ACTIVITIES MAY BE RESTRICTED DURING COMMITTAL SERVICES
AND MUST BE COORDINATED WITH NMCP ON DAILY BASIS.
2. THE CONTRACTOR SHALL SUBMIT A DETAILED CONSTRUCTION SEQUENCE PLAN TO BE
APPROVED BY CONTRACTING OFFICER REPRESENTATIVE (COR) BEFORE CONSTRUCTION. THE
SEQUENCING PLAN INCLUDED IN THE CONTRACT DOCUMENTS SHALL BE INCORPORATED INTO
THE CONTRACTOR'S CONSTRUCTION SEQUENCE PLAN. SEE SPECIFICATIONS FOR ADDITIONAL
INFORMATION
3. CONSTRUCTION TRAFFIC ENTERING AND EXITING THE CEMETERY SHALL BE LIMITED TO THE
MOST DIRECT ROUTE TO THE AREA OF WORK. ALL DAMAGE TO EXISTING CEMETERY
ELEMENTS SHALL BE REPAIRED TO MATCH EXISTING SECTION BY CONTRACTOR AT NO COST
TO THE GOVERNMENT.
4. CONSTRUCTION VEHICLE PARKING (INCLUDING WORKER VEHICLES) LIMITED TO WORK ZONES
ONLY. NO PARKING WILL BE PERMITTED ON CEMETERY ROADS.
5. THE CONTRACTOR IS REQUIRED TO VERIFY PARKING FOR ALL CONSTRUCTION PERSONNEL
WITH COR.
6. MAINTAIN OPEN ACCESS TO ALL PARTS OF CEMETERY AT ALL TIMES. SCHEDULE LIMITED
ROAD CLOSURES FOR UTILITY WORK WITH COR A MINIMUM OF 14 DAYS IN ADVANCE.
7. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY CHAIN LINK FENCE AND
TEMPORARY SIGNAGE TO PREVENT ACCESS BY THE PUBLIC TO THE CONSTRUCTION AND
STAGING AREAS. TEMPORARY FENCING AND SIGNAGE SHALL BE CONTINUALLY MAINTAINED
THROUGHOUT THE PROJECT. ANY REPAIRS REQUESTED BY THE COR SHALL BE COMPLETED
WITHIN 48 HOURS OF THE REQUEST.
8. MAINTAIN ALL ROADS IN CLEAR, SAFE CONDITION. ONGOING STREET SWEEPING SHALL BE
EMPLOYED.
9. THE CONTRACTOR SHALL REMOVE ALL TEMPORARY FACILITIES, FENCING, CONSTRUCTION
DEBRIS AND SIGNAGE BEFORE PROJECT COMPLETION.
STOCKPILES / MATERIAL STAGING
1. STOCK PILE / MATERIAL STAGING LOCATIONS ON SITE ARE LIMITED TO WORK ZONE AREAS
ONLY. IF REQUIRED THE CONTRACTOR SHALL PROCURE ADDITIONAL STOCKPILE LOCATIONS
OFF SITE, AND SUBMIT THE LOCATIONS TO THE COR FOR APPROVAL.
DELIVERIES
1. CONTRACTOR TO COORDINATE DELIVERY OF MATERIALS WITH COR AND NMCP STAFF THAT
OCCUR DURING DAILY CEMETERY OPERATIONS.
CONSTRUCTION PHASING NOTES
COMPLETE CONSTRUCTION IN THE FOLLOWING SEQUENCE:
PHASE 1 -CLIN 1 - COLUMBARIUM COURTS 1-5
PHASE 2 - UPON COMPLETION OF PHASE 1, COMPLETE CLIN 2 - REMOVE OVERLOOK AND REPLACE SIDEWALK AT FRONT ENTRY PYLON
CRITICAL CONSTRUCTION NOTES:
ACCESS TO EXISTING INTERMENT SECTIONS, HONOLULU MEMORIAL AND OVERLOOK:
1. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL INTERMENT SECTIONS, COLUMBARIUM
COURTS AND MEMORIAL WALLS AT ALL TIMES.
NIGHT AND WEEKEND WORK:
1. NIGHT AND WEEKEND WORK MAY BE REQUIRED TO COMPLETE IMPROVEMENTS
ADJACENT TO PUOWAINA DRIVE. THE CONTRACTOR SHALL COORDINATE WITH
CEMETERY STAFF AND COR A MINIMUM OF 14 DAYS PRIOR TO ANY WORK OCCURRING
IN THESE AREAS.
OVERALL SITE - CONSTRUCTION OPERATIONS PLAN
1" = 100'
GI003
CONSTRUCTION ACCESS AND
PHASING
1. MALL DRIVE, INNER DRIVE, AND OUTER DRIVE ARE ALL
ONE-WAY STREETS COUNTER-CLOCKWISE.
PROJECT DURATION
SHEET NOTES
PHASING PLAN
EXISTING
COLUMBARIA
COURT 13
HONOLULU
MEMORIAL
COLUMBARIA COURTS
12-6
COLUMBARIA
COURTS 2-5
COMMITTAL PLAZA
COMMITTAL COURT
BASE BID - CLIN 1
COLUMBARIUM COURTS 1-5
TUNNEL
PARKING
LOT
OPTION 1 - CLIN 2
REMOVE OVERLOOK AND REPLACE
SIDEWALK AT FRONT ENTRY PYLON
I
N
N
I
R
T
H
COLUMBARIA
COURT 1
BASE BID - CLIN 1
COLUMBARIUM
COURTS 1-5
OPTION 1 - CLIN 2
REMOVE OVERLOOK AND
REPLACE SIDEWALK AT
FRONT ENTRY PYLON
Dwg. of
HONOLULU, HAWAII
NATIONAL MEMORIAL CEMETERY OF
THE PACIFIC SITE IMPROVEMENTS
04/11/2023
899-MM-FY22-006
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17054
100% BIDDING
DOCUMENT SUBMITTAL
04/11/23
EXP. 04/30/24
M
M O
R I
A
I
V E
0 100' 200'
N
V-100
OVERALL EXISTING CONDITIONS
Dwg. of
HONOLULU, HAWAII
NATIONAL MEMORIAL CEMETERY OF
THE PACIFIC SITE IMPROVEMENTS
04/11/2023
899-MM-FY22-006
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17054
VICINITY MAP
100% BIDDING
DOCUMENT SUBMITTAL
04/11/23
EXP. 04/30/24
LEGEND
0 10' 20'
N
LEGEND
M A
T C
H
L I N
E
S
H E
T
V-101
EXISTING CONDITIONS -
COLUMBARIA COURTS 4-5
Dwg. of
HONOLULU, HAWAII
NATIONAL MEMORIAL CEMETERY OF
THE PACIFIC SITE IMPROVEMENTS
04/11/2023
899-MM-FY22-006
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17054
VICINITY MAP
100% BIDDING
DOCUMENT SUBMITTAL
04/11/23
N
0 10' 20'
LEGEND
M A
T C
H L I N
E
S
H E
T
V-102
EXISTING CONDITIONS -
COLUMBARIA COURTS 1-3
Dwg. of
HONOLULU, HAWAII
NATIONAL MEMORIAL CEMETERY OF
THE PACIFIC SITE IMPROVEMENTS
04/11/2023
899-MM-FY22-006
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17054
VICINITY MAP
100% BIDDING
DOCUMENT SUBMITTAL
04/11/23
N
0 10' 20'
LEGEND
V-103
EXISTING CONDITIONS -
OVERLOOK AT FRONT ENTRY
Dwg. of
HONOLULU, HAWAII
NATIONAL MEMORIAL CEMETERY OF
THE PACIFIC SITE IMPROVEMENTS
04/11/2023
899-MM-FY22-006
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17054
VICINITY MAP
100% BIDDING
DOCUMENT SUBMITTAL
04/11/23