36C78622B0025 0003.docx

DOCX document 170 KB Posted

Attached to
Y1AZ--Sarasota National Cemetery Expansion Project 931CM3004
Solicitation number
36C78622B0025
Issued by

About this file

This document contains an amendment to a solicitation for the Sarasota National Cemetery Gravesite Expansion project. The amendment provides responses to contractor questions to clarify the scope of work. The project involves expanding the cemetery through additional gravesite development including excavating and grading areas, installing utilities and roadways, constructing concrete walkways and curbs, and installing landscaping. Bids are due by September 23rd, 2022 with work expected to be completed by the early turnover date of December 30th, 2023. The award is to be issued by the Department of Veterans Affairs National Cemetery Administration. Clarifications provided in the amendment include specifications for site materials, construction fencing requirements, utility connection details and rates, as well as as-built plan availability.

View the file

Other files

File Type Posted
AMMEND 9-1-22 Design Sh 133-140 Sarasota Expansion.pdf PDF
AMMEND 9-1-22 Design Spec Appen A Sarasota Expansion.pdf PDF
AMMEND 9-1-22 Design Specifications Sarasota Expansion.pdf PDF
C03 Sarasota Ammended 36C78622B0025 0002.pdf PDF
AMMEND 9-1-22 Design Sh 141-144 Sarasota Expansion.pdf PDF
AMMEND 9-1-22 Design Spec Appen B Sarasota Expansion.pdf PDF
AMMEND 9-1-22 Design Sh 119-132 Sarasota Expansion.pdf PDF
AMMEND 9-1-22 Design Sh 113-117 Sarasota Expansion.pdf PDF
AMMEND 9-1-22 Design Sh 118 Sarasota Expansion.pdf PDF
36C78622B0025 0001.docx DOCX document
Sarasota Expansion Design Sh 012-019b.pdf PDF
Sarasota Expansion Design Sh 095-112.pdf PDF
Sarasota 931004_Specifications.pdf PDF
Sarasota Expansion Design Sh 054-069.pdf PDF
Sarasota Expansion Design Sh 070-094.pdf PDF
Sarasota Expansion Design Sh_020-034.pdf PDF
Sarasota Expansion Design Sh 035-053.pdf PDF
Sarasota Expansion Design Sh 001-011.pdf PDF
Sarasota Expansion Design Sh 113-147.pdf PDF
P07 Sarasota Wage Determination Building.txt TXT text file
S02_Attachment-_Contractor Price Estimate Worksheet.xlsx XLSX spreadsheet
P07 Sarasota Wage Determination Heavy.txt TXT text file
S02_Attachment-_852.219-77_Limitations on Subcontracting-Contractor Certification.pdf PDF
P09 - SSP Sarasota Ph 2 Expansion Project 19 Apr 22.docx DOCX document
P07 Sarasota Wage Determination Highway.txt TXT text file
36C78622B0025.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

931CM3004

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 To all Offerors/Bidders

36C78622B0025 08-25-2022

X X x Please see continuation page for modification content.

Amendment #3 DATED 9-19-2022

Kellyann Bruno Contracting Officer The purpose of this modification is to answer RFI question for IFB 36C78622B025

1. Monument Markers- Standardly in Section 32, no Section Markers are mentioned in the Specifications but on Drawing LS-101 it shows a list of Section Monuments on the Layout Table. It shows 21 Markers and on Drawing LS-302 and its shows Drawing Details. Are any of the 21 Markers existing and why are they not listed in the Specifications.

Answer: The Section Monuments table on LS-101 indicates new monuments. Section monuments are addressed in NCA’s standard specification 10 14 00.

1. Concrete Precast Post shown on Drawing LS303 are listed on Drawings but no mention in the Specifications Answer: Precast concrete is addressed in 04 72 00. A specific product is specified for the Utility Post.

1. There are no specifications or drawings pertaining to or showing the precast concrete vaults. These are the in-ground concrete vaults that would house the casket or cremains urns at the time of service, which are generally preplaced in mass quantity during construction of the cemetery. There are no specifications or drawings as to the construction and dimensions of casket/direct bury (DB) vaults or in-ground cremains (IGC) vaults, depth/elevations of their placement, depth of fill above the vaults, and the depth and type of material that should be used as a base material to support the vaults? There is no information regarding these items. Are they part of the scope? If so, please provide specifications/drawing/details for these.

Answer: Vaults are not part of the Scope.

1. Construction Fence: Before construction operations begin, the Contractor shall provide a chain link construction fence, seven feet minimum height, around the construction area indicated on the drawings. Please verify the minimum height of the fence. Also, please confirm that all metal fencing components to receive privacy screen are to be black vinyl coated as referenced in note 7 (FOR "CONSTRUCTION FENCE - SCREEN," PROVIDE BLACK CLASS 2B VINYL COATING ALL METAL PARTS; AFFIX PS – PRIVACY SCREEN PER PRODUCT SCHEDULE TO OUTSIDE OF ENCLOSURE USING MFR'S STANDARD FASTENERS AS NECESSARY TO PREVENT).

Answer: Minimum fence height is 6’. The CONSTRUCTION FENCE - SCREEN refers to the PRIVACY FENCE indicated on LS-10x plans & LS-301. It is vinyl coated, not the balance of CONSTRUCTION FENCE.

1. Coordination of Construction with Cemetery Director through the RE/COR: The burial activities at a National Cemetery shall take precedence over construction activities. Cooperation and coordination with the Cemetery Director, through the RE/COR, in arranging construction schedule to cause the least possible interference with Cemetery activities in actual burial areas is required. Construction noise during the interment services shall not disturb the service. Coordination of work may require that equipment that is heard from the service location be shut-off, or moved out of the area prior to the service, as acceptable to the Cemetery Director through the RE/COR. Please provide the average number of daily internments as this could potentially affect construction production.

Answer: Average of 11 internments per day

1. Per the contract documents, ETO 01 completion is no later than December 30,2023. Please provide the anticipated issuance date of NTP in order to factor in the potential for an accelerated construction schedule for completion.

Answer: The Anticipated NTP will be no later 30 calendar date from award

1. Please provide anticipated monthly nonwork days due to adverse weather.

Answer: The NCA does not forecast nonwork days due to adverse weather.

1. Accreditation Requirements: Testing Laboratory retained and paid for by Contractor must be accredited by one or more of the National Voluntary Laboratory Accreditation Program (NVLAP)programs acceptable in the geographic region for the project. Furnish to the Resident Engineer/Contracting Officer’s Representative (RE/COR) a copy of the Certificate of Accreditation and Scope of Accreditation. For testing laboratories that have not yet obtained accreditation by a NVLAP program, submit an acknowledgement letter from one of the laboratory accreditation authorities indicating that the application for accreditation has been received and the accreditation process has started, and submit to the RE/COR for approval, certified statements, signed by an official of the testing laboratory attesting that the proposed laboratory, meets or conforms to the ASTM standards listed below as appropriate to the testing field. Upon contacting several testing firms in the region, this certification is not held. Will any deviation be allowed from the NVLAP certification if the testing lab complies with all other appropriate testing parameters?

Answer: This is in the text of NCA’s standard spec section 01 45 29. Additionally, NVLAP’s website allows searches for accredited programs/laboratories. A quick search found labs in Tampa that may be suitable. www.nist.gov/nvlap)

1. Prior to commencing work, general contractor shall provide proof that an OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present. There is no mandatory Competent Person training or official OSHA certification for a “competent person”. An OSHA "competent person" is defined as "one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them" [29 CFR 1926.32(f)]. Please confirm intent.

ANSWER: OSHA 30 is for a superintendent that manages personnel and OSHA 10 is for the worker on site. OSHA 10 (doesn't mean that they couldn't also have OSHA 30), but Superintendent/supervisors must have OSHA 30. work shall be performed in a professional workmanship like manner, adhere to NCA standards, be done in strict accordance with the requirements set forth herein, manufacturer’s requirements, installation guidelines; and be in accordance with applicable Federal, State and Local codes and regulations; inclusive of applicable OSHA Construction Safety Guidelines.

SUPERVISION:

a. At all times during performance of the contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on site a competent Superintendent who is satisfactory to the CO and has authority to act on behalf of the Contractor.

b. The Contractor shall delegate and furnish in writing the name and contact information of the Superintendent who has authority to act on behalf of the Contractor for this specific requirement and provide their respective OSHA 30-hour training card/certificate. The letter must provide the Superintendent complete and full name, telephone number, and email address.

52.236-6 Superintendence by the Contractor.

At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.

Note that Contractor’s managerial personnel means Contractor’s directors, officers, and any of the Contractor’s managers, superintendents, or equivalent representatives who have supervision or direction of-(1) All or substantially all of the Contractor’s business; (2) All or substantially all of the Contractor’s operations at any one plant, laboratory, or separate location at which the contract is being performed; or (3) A separate and complete major industrial operation connected with the performance of this contract.

1. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract. No mention is made to the state in which the “registered professional land surveyor or registered civil engineer” is required to be registered in. Please confirm if the registration is required in the state of Florida.

Answer: Confirmed.

1. Obtain electricity by connecting to the Cemetery electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Where not available or not convenient to connect to the Cemetery distribution system, the contractor shall supply power via portable generators at own expense. Generators shall be acoustically screened so as not to disturb committal services and/or visitation to the adjacent columbarium. Please provide the current rate being paid for electricity by the cemetery.

Answer:

Base Charge /Month
Maximum /Demand Charge ($/kW)
On-Peak Demand Charge ($/kW)
Demand Charge - Firm On-Peak ($/kW)
Demand Charge - Load Control On-Peak ($/kW)
Energy Charge(¢/kWh)
On-Peak Energy Charge (¢/kWh)
Off-Peak Energy Charge (¢/kWh)
Conservation Charge (¢/kWh or $/kW)
Capacity Charge (¢/kWh or $/kW)
Environmental Charge (¢/kWh)
Storm Protection Charge (¢/kWh or $/kW)
Fuel Charge (¢/kWh)
On-Peak Fuel Charge(¢/kWh)
Off-Peak Fuel Charge(¢/kWh)
Transition Credit (¢/kWh or $/kW)

$28.17 $0.66 $9.95 5.058 1.274 $0.47 $0.82 0.267 $0.64 4.092 3.684 -$0.61

1. Drawing Sheet A-200 Existing Columbarium Cap Replacement Narrative “ CAP REPLACEMENT AND OTHER REPAIRS TAKE PLACE DIRECTLY ABOVE AND IN CONTACT WITH OCCUPIED COLUMBARIUM NICHES CONTAINING HUMAN REMAINS. DO NOT REMOVE NICHE COVERS. DO NOT DAMAGE OR CAUSE DAMAGE TO NICHES, NICHE COVERS, OR URNS. SHOULD ANY SUCH DAMAGE OCCUR, IMMEDIATELY STOP WORK AND FOLLOW DIRECTION OF COR AND/OR CEMETERY DIRECTOR. DO NOT RESUME WORK UNTIL DIRECTED IN WRITING BY THE COR. CAPS ARE THOUGHT TO BE SET IN A FULL MORTAR BED DIRECTLY ON THE EXISTING PRECAST CONCRETE SUBSTRATE” Please confirm no As Built information is available for the construction of the existing columbarium. If the caps are not set in the mortar bed referenced above, an adjustment in contract time and cost may be required to complete this portion of work.

ANSWER: As-built plans will be provided to the awardee.

1. Per the Geotechnical report, groundwater was encountered during borehole advancement at all boring locations. The static depth to groundwater at the site is approximately 3 to 5 feet bls. However, it should be anticipated that the groundwater level will fluctuate due to seasonal climactic variations, surface water runoff patterns, construction operations, and other interrelated factors. Please confirm no other hydrologic data is available from months outside of those in which the geotechnical report was conducted.

ANSWER: The geotech reports commissioned for this project are included in their entirety as appendices in the Project Manual.)

1. In the concrete sidewalk area surrounding the columbaria, is this to be typical grey sidewalk or match the exposed aggregate finish around the current columbaria?

ANSWER: No exposed aggregate sidewalk finishes are in Scope.

1. What material is the proposed 10” Reclaim line extension? DIP or PVC?

ANSWER: Provide DIPS PVC per 32 84 00.

1. Sheet CE-201 shows sediment logs being used for sediment control. Is silt fence an acceptable alternative?

ANSWER: Silt fence conforming to the following is acceptable.

1. LI-001 refers to bid alternate #3. The specification on page 01 00 02-2 B.3 only refers up to bid option 2. Please confirm there should only be two alternates.

ANSWER: Refer to Specifications for Bid Options. There are no “bid alternates.”

1. Note #2 on sheet A-101 mentions exposed aggregate concrete. What are the limits of this concrete?

ANSWER: Disregard. No exposed aggregate sidewalk finishes are in Scope.

1. Section 31 20 00 references KYTC standard specs which I believe are Kentucky details. It also lists CL or ML as suitable material which I do not believe is correct. Should this be FDOT standards and per the geotech for suitable material?

ANSWER: Should be FDOT standards and refer to Geotechnical Report.

1. Plan road details show 08” limerock base for roadways. Geotechnical reports suggest 08’ crushed concrete is acceptable. Please confirm that crushed concrete is an acceptable alternative.

ANSWER: Acceptable to Geotechnical Report

1. There appears to be a clay layer present in the pond to the south that is being expanded. The geotechnical report, addendum #2 states we are able to mix this material with other material for reuse. Addendum #1 states that we should not excavate below the clay layer. 1) Are we able to excavate to the proposed elevation of 3? 2) If we are unable to successfully mix the clay material to make it suitable, how will we be paid for haul off and replacement if necessary?

ANSWER: Adhere to the requirements of the geotech reports/addenda. The intent of pond excavation is to meet on-site fill requirements and preclude the need to import fill. The pond may be expanded as necessary to meet that need, as approved by the COR.

ANSWER: If the appropriate clay material is not available on site, it would likely need to be imported, however there should be no haul-off required in any case. Rather excess material can be stockpiled or spread uniformly at a location acceptable to the Cemetery and as app’d by the COR.

1. In the event of excess fill, are we to stockpile onsite for future use?

ANSWER: See response to question 21, part 2.

1. Please confirm the Early Turnover (ETO) date- Spec 0100 02 1.6.G states 12/30/2023.

ANSWER: Confirmed

1. Can we be provided with a schedule? Anticipated start/completion date?

ANSWER: The period of performance is provided in the IFB.

1. Can we be provided with CADD Files? (Existing and Proposed data lines) ANSWER: CADD files will be provided to the winning bidder.

1. Is there any special earthwork requirement for the following sections?

25. Inground Cremains Interment 4’x4’. (Sections 20-28)

25. Traditional Casketed Direct Bury Interment 6’x10’. (Section 30)

25. Can details/ envelope information be provided for the sections above?

ANSWER: No special compaction requirements

1. Can we be provided with the laydown area sectional detail?

ANSWER: No special sectional requirements. Provide temporary improvements as necessary to allow safe and efficient operations. Restore to pre-construction conditions at close of contract.

1. Is there a specific construction entrance location for the expansion of the cemetery?

ANSWER: Refer to CE-101

Bid reading time is going to be via Team call Number +1 872-701-0185, Pin Number 517508492# on September 23rd, 2022 at 10:00 am EST.

All submission dates other than mentioned in this amendment, clauses, Prevision and required documents remains unchanged.

image1.png