892-043 Ft Rosecrans - Memo Addendum No 1 - 2022-08-29.docx

DOCX document 184 KB Posted

Attached to
Y1JZ--Proj #: 892-045 Roads Improvement; 892-043 Sewer Improvement Fort Rosecrans Nat'l Cemetery; San Diego, CA
Solicitation number
36C78622B0019
Issued by

About this file

This memorandum provides revisions to contract documents as part of Addendum No. 1 for the 892-043 Fort Rosecrans Sewer Improvement project. The revisions include removing references to the RE/COR Field Office and adding references to the Temporary Committal Shelter in the general requirements specification. A geotechnical engineering report prepared by Terracon was added to the specification appendix. Directional drilling was added as a requirement for installing Forcemain 3 under Cabrillo Memorial Drive. Requirements for removing pavement within Cabrillo Memorial Drive during installation of Forcemain 3 were removed from the construction plans.

The related federal contract opportunity is a solicitation for roads and sewer improvement projects at Fort Rosecrans National Cemetery in San Diego, California. The solicitation number is 36C78622B0019 and includes Project 892-045 for roads improvements and Project 892-043 for sewer improvements. The contracting agency is the Department of Veterans Affairs National Cemetery Administration.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

13605 1st Avenue North, Suite 100 ● Plymouth, Minnesota 55441 ● (763) 412-4000 Main ● (763) 412-4090 Fax ● www.ae-mn.com

ClientAnderson Engineering #XXXX
Project NameDATE

M E M O R A N D U M

To:Auvorie Benson - NCA Contracting Officer
From:Adam Thiele, PE – Design Engineer
CC:John Kays – NCA Project Manager
Date:August 29, 2022
Subject:892-043 Fort Rosecrans – Addendum No. 1

Mr. Benson, Please find enclosed the revised contract documents as part of Addendum No. 1. Revisions to the documents are as follows:

1. Removed references to “RE/COR Field Office” from Specification Section 01 00 02 GENERAL REQUIREMENTS (paragraph 1.17)

2. Added reference to “Temporary Committal Shelter” to Specification Section 01 00 02 GENERAL REQUIREMENTS (paragraph 1.17)

3. Added “Geotechnical Engineering Report” prepared by Terracon to specification appendix.

4. Added requirement for directional drilling of Forcemain 3, 1.25” PE Forcemain under Cabrillo Memorial Drive on Sheet CU105 of construction plans

5. Removed requirements for removal of pavement within Cabrillo Memorial Drive as part of installation of Forcemain 3 (Sheets D102, D105, D110)

A Service-Disabled Veteran-Owned Small Business