Copy of Cost Estimate Worksheet.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Y1AZ--940-MM21-011: Infrastructure Improvements (Restroom/Storage/Wind Walls) Fargo National Cemetery Harwood, ND
Solicitation number
36C78622B0004
Issued by

About this file

This document includes a federal contract solicitation for infrastructure improvements at the Fargo National Cemetery in North Dakota. The solicitation seeks a contractor to provide all management, labor, equipment, and materials necessary to complete construction of a new restroom, storage structure, and wind walls. The work must be performed within 270 calendar days of receiving a notice to proceed. The solicitation is a 100% set-aside for service-disabled veteran-owned small businesses, who must be verified in Vendor Information Pages and registered in the System for Award Management. Interested contractors must submit a bid bond and price proposal using the provided cost estimate worksheet. Questions are due by a specified date before the solicitation closing, and the award will be a firm-fixed-price contract issued by the Department of Veterans Affairs National Cemetery Administration.

View the file

Other files

File Type Posted
36C78622B0004 Amendment 0002.pdf PDF
36C78622B0004 Amendment 0001.pdf PDF
36C78622B0004.docx DOCX document
Fargo - Technical Specifications.pdf PDF
Fargo -Plans.pdf PDF
Wage Determination Fargo Cass County 01072022.pdf PDF
36C78622B0004_2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IFB Contractor Cost Estimate Worksheet
Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number.

If a Division is not being used put N/A in that field.

Additional lines/items can be added if needed or appropriate.

Offeror shall use and edit to fit Task Order Project
Project Number:
Solicitation Number:
Project Title:
DivisionUnit of Measure# of UnitsUnit Cost $Extended/Total Cost $Comments / Remarks
Division 0 - Special Sections
General Conditions and AdministrationJB1
Division 01 - General Requirements
MobilizationJB1
Division 02 - Existing Conditions
Site InvestigationJB1
Division 03 - Concrete

Division 04 - Masonry

Division 05 - Metals

Division 06 - Wood, Plastic, and Composites

Division 07 - Thermal and Moisture Protection

Division 08 - Openings (Doors, Windows, etc...)

Division 09 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12- Furnishings

Division 13 - Special Construction

Division 14 - Fire Suppression

Division 22 - Plumbing

Division 23 - Heat, Ventilating, and Air Conditioning

Division 25 - Integrated Automation

Division 26 - Electrical

Division 27 - Communications

Division 28 - Electronic Safety and Security

Division 31 - Earthwork

Division 32 - Exterior Improvements

Division 33 - Utilities

Mechanical, Electrical, Plumbing Subtotal
General Construction Subtotal
Total Base Construction Cost
Insurance (if applicable)
Bonding (if applicable)
Overhead________ %$0.00
Profit________ %$0.00
GRAND TOTALS$