Copy of Cost Estimate Worksheet.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C78622B0004
About this file
This document includes a federal contract solicitation for infrastructure improvements at the Fargo National Cemetery in North Dakota. The solicitation seeks a contractor to provide all management, labor, equipment, and materials necessary to complete construction of a new restroom, storage structure, and wind walls. The work must be performed within 270 calendar days of receiving a notice to proceed. The solicitation is a 100% set-aside for service-disabled veteran-owned small businesses, who must be verified in Vendor Information Pages and registered in the System for Award Management. Interested contractors must submit a bid bond and price proposal using the provided cost estimate worksheet. Questions are due by a specified date before the solicitation closing, and the award will be a firm-fixed-price contract issued by the Department of Veterans Affairs National Cemetery Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78622B0004 Amendment 0002.pdf | ||
| 36C78622B0004 Amendment 0001.pdf | ||
| 36C78622B0004.docx | DOCX document | |
| Fargo - Technical Specifications.pdf | ||
| Fargo -Plans.pdf | ||
| Wage Determination Fargo Cass County 01072022.pdf | ||
| 36C78622B0004_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number. |
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
| Offeror shall use and edit to fit Task Order Project |
| Project Number: |
| Solicitation Number: |
| Project Title: |
| Division | Unit of Measure | # of Units | Unit Cost $ | Extended/Total Cost $ | Comments / Remarks |
| Division 0 - Special Sections | |||||
| General Conditions and Administration | JB | 1 | |||
| Division 01 - General Requirements | |||||
| Mobilization | JB | 1 |
| Division 02 - Existing Conditions | ||
| Site Investigation | JB | 1 |
| Division 03 - Concrete |
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
| Mechanical, Electrical, Plumbing Subtotal | ||
| General Construction Subtotal | ||
| Total Base Construction Cost | ||
| Insurance (if applicable) | ||
| Bonding (if applicable) | ||
| Overhead | ________ % | $0.00 |
| Profit | ________ % | $0.00 |
| GRAND TOTALS | $ |