803CM3014 Vendor Questions 01 and Answers.pdf
PDF 1 MB Posted
- Attached to
- Y1PZ--BATH NATIONAL CEMETERY GRAVESITE EXPANSION, PHASE 1, CONSTRUCTION PROJECTS PROJECT NO. 803CM3014
- Solicitation number
- 36C78621B0020
About this file
This document provides details for a federal construction contract solicitation for gravesite expansion at the Bath National Cemetery. The solicitation will be issued as an invitation for bid to construct gravesite expansion in newly acquired land adjacent to the existing cemetery. The contract is set aside for service-disabled veteran-owned small businesses and has an estimated value between $2-5 million. The performance period is 240 calendar days from notice to proceed. Interested vendors must be registered in SAM.gov, VetBiz.gov, and Vets 100 to be considered for award. The projected bid due date is September 10, 2021. The solicitation will be amended as needed and posted to FedBizOpps, so vendors should monitor for amendments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
vacoborgmm Typewritten Text
9/30/2021, NTP
soon after vacoborgmm Typewritten Text contractor to obtain all permits vacoborgmm Typewritten Text Provide proposed performance schedule and proposed construction start in proposal vacoborgmm Typewritten Text Full time to observe all cut and fill work vacoborgmm Typewritten Text Yes vacoborgmm Typewritten Text 12" depth is specified, price accordingly vacoborgmm Typewritten Text 3% vacoborgmm Typewritten Text Means and Methods
T4D02 Text Box All information on the well is in the first geotech report, Appendix A in the Project Manual.
T4D02 Text Box No
T4D02 Text Box Yes
T4D02 Text Box Average 1/day, concern only for extremely loud const. activity, like back hoe mounted jack hammer
T4D02 Text Box GC to provide own water Means and Methods
T4D02 Text Box It is usually NPDES/SWPP. We are not tying into any municipal utilities. The gc may need temp power for the trailer, unless he wants to use a generator.
T4D02 Text Box Typically done to reduce the need for mechanical compactors close to the crypt field.
T4D02 Text Box I don't expect there to be much construction waste, apart from grubbing work and any unsuitable soils.
T4D02 Text Box Yes
T4D02 Text Box Include proposed performance schedule that includes permitting timelines
T4D02 Text Box We have used them before in other Districts. Typically, as long as they are set in a concrete footing held below finished grade, they seem to work well.
T4D02 Text Box We can provide them for the awarded party.
T4D02 Text Box Use current 2021 davis bacon wage rates