36C78620Q0049-001.pdf

PDF Posted

Attached to
Calverton National Cemetery | Topsoil Furnish & Delivery Requirement |
Solicitation number
36C78620Q0049
Issued by

About this file

This solicitation is for a topsoil furnish and delivery requirement at Calverton National Cemetery. The Department of Veterans Affairs seeks to award an indefinite delivery/indefinite quantity contract with a one year base period of performance from date of award through September 30, 2020, and four one-year option periods. The contractor shall supply and deliver topsoil consisting of fertile, friable, natural earth of loamy character with 5% composted material. The estimated quantity for the base year and each option period is 3,000 cubic yards. Offers are due by October 3, 2019 and award is intended without discussions. The solicitation is set aside exclusively for service-disabled veteran owned small businesses.

36C78620Q0049 Bid Schedule - Topsoil Furnish _ Delivery.pdf

View the file

Other files

File Type Posted
36C78620Q0049-0003001.pdf PDF
36C78620Q0049-0003000.docx DOCX document
36C78620Q0049-0003001.pdf PDF
36C78620Q0049-0003000.docx DOCX document
36C78620Q0049-0002000.docx DOCX document
36C78620Q0049-0002000.docx DOCX document
36C78620Q0049-0001000.docx DOCX document
36C78620Q0049-0001000.docx DOCX document
36C78620Q0049-002.docx DOCX document
36C78620Q0049-004.pdf PDF
36C78620Q0049-000.docx DOCX document
36C78620Q0049-003.docx DOCX document
36C78620Q0049-000.docx DOCX document
36C78620Q0049-003.docx DOCX document
36C78620Q0049-004.pdf PDF
36C78620Q0049-002.docx DOCX document
36C78620Q0049-001.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule Calverton National Cemetery - Topsoil Requirement

Base Year: October 1, 2019 or from date of award through September 30, 2020

Est Qty

Unit Unit Cost Total Cost

TOPSOIL (Dry Weight Measured) - Furnish / Deliver Topsoil consisting of fertile, friable, natural earth of loamy character, without a mixture of subsoil, uniform in quality with 5% composted material and free of refuse of any nature (i.e., hard clods, stiff clay, sod hard pan, pebbles larger than 1/4” in diameter, course sand, noxious weeds, stick brush, other rubbish, etc.)

3,000

Cubic Yard

(CY)

Option Year I: October 1, 2020 through September 30, 2021

Est

Topsoil consisting of fertile, friable, natural earth of loamy character, without a mixture of subsoil, uniform in quality with 5% composted material and free of refuse of any nature (i.e., hard clods, stiff clay, sod hard pan, pebbles

CY

Option Year II: October 1, 2021 through September 30, 2022 Est

Topsoil consisting of fertile, friable, natural earth of loamy character, without a mixture of subsoil, uniform in quality with 5% composted material and free of refuse of any nature (i.e., hard clods, stiff clay, sod hard pan, pebbles

Option Year III: October 1, 2022 through September 30, 2023

Topsoil consisting of fertile, friable, natural earth of loamy character, without a mixture of subsoil, uniform in quality with 5% composted material and free of refuse of any nature (i.e., hard clods, stiff clay, sod hard pan, pebbles

Option Year IV: October 1, 2023 through September 30, 2024

Topsoil consisting of fertile, friable, natural earth of loamy character, without a mixture of subsoil, uniform in quality with 5% composted material and free of refuse of any nature (i.e., hard clods, stiff clay, sod hard pan, pebbles

Total Estimated Cost ( Base + 4 Option Years)