36C78620Q0049-001.pdf
PDF 191 KB Posted
- Solicitation number
- 36C78620Q0049
About this file
This solicitation requests quotations for the supply and delivery of topsoil to Calverton National Cemetery over five years. The Department of Veterans Affairs seeks to award an indefinite delivery/indefinite quantity contract for furnishing up to 3,000 cubic yards of topsoil annually to the cemetery located in Calverton, New York. The base period of performance is from date of award through September 30, 2020. Four one-year renewal options are included. The solicitation is set aside exclusively for service-disabled veteran-owned small businesses. Quotes are due by October 3, 2019 and award will be made without discussions to the responsible offeror providing the best value based on technical approach, past performance, and price reasonableness.
36C78620Q0049 Bid Schedule - Topsoil Furnish _ Delivery.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78620Q0049-0003001.pdf | ||
| 36C78620Q0049-0003000.docx | DOCX document | |
| 36C78620Q0049-0003001.pdf | ||
| 36C78620Q0049-0003000.docx | DOCX document | |
| 36C78620Q0049-0002000.docx | DOCX document | |
| 36C78620Q0049-0002000.docx | DOCX document | |
| 36C78620Q0049-0001000.docx | DOCX document | |
| 36C78620Q0049-0001000.docx | DOCX document | |
| 36C78620Q0049-002.docx | DOCX document | |
| 36C78620Q0049-004.pdf | ||
| 36C78620Q0049-001.pdf | ||
| 36C78620Q0049-000.docx | DOCX document | |
| 36C78620Q0049-003.docx | DOCX document | |
| 36C78620Q0049-000.docx | DOCX document | |
| 36C78620Q0049-003.docx | DOCX document | |
| 36C78620Q0049-004.pdf | ||
| 36C78620Q0049-002.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule Calverton National Cemetery - Topsoil Requirement
Base Year: October 1, 2019 or from date of award through September 30, 2020
Est Qty
Unit Unit Cost Total Cost
TOPSOIL (Dry Weight Measured) - Furnish / Deliver Topsoil consisting of fertile, friable, natural earth of loamy character, without a mixture of subsoil, uniform in quality with 5% composted material and free of refuse of any nature (i.e., hard clods, stiff clay, sod hard pan, pebbles larger than 1/4” in diameter, course sand, noxious weeds, stick brush, other rubbish, etc.)
3,000
Cubic Yard
(CY)
Option Year I: October 1, 2020 through September 30, 2021
Est
Topsoil consisting of fertile, friable, natural earth of loamy character, without a mixture of subsoil, uniform in quality with 5% composted material and free of refuse of any nature (i.e., hard clods, stiff clay, sod hard pan, pebbles
CY
Option Year II: October 1, 2021 through September 30, 2022 Est
Topsoil consisting of fertile, friable, natural earth of loamy character, without a mixture of subsoil, uniform in quality with 5% composted material and free of refuse of any nature (i.e., hard clods, stiff clay, sod hard pan, pebbles
Option Year III: October 1, 2022 through September 30, 2023
Topsoil consisting of fertile, friable, natural earth of loamy character, without a mixture of subsoil, uniform in quality with 5% composted material and free of refuse of any nature (i.e., hard clods, stiff clay, sod hard pan, pebbles
Option Year IV: October 1, 2023 through September 30, 2024
Topsoil consisting of fertile, friable, natural earth of loamy character, without a mixture of subsoil, uniform in quality with 5% composted material and free of refuse of any nature (i.e., hard clods, stiff clay, sod hard pan, pebbles
Total Estimated Cost ( Base + 4 Option Years)
File details come from the government source that posted it. Updated .