About this file

36C78620Q0042 Loudon Park NC - Progress Report Template.docx

View the file

Other files

File Type Posted
36C78620Q0042-0003000.docx DOCX document
36C78620Q0042-0003001.docx DOCX document
36C78620Q0042-0002000.docx DOCX document
36C78620Q0042-0002001.docx DOCX document
36C78620Q0042-0001000.docx DOCX document
36C78620Q0042-002.docx DOCX document
36C78620Q0042-000.docx DOCX document
36C78620Q0042-003.docx DOCX document
36C78620Q0042-001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT - B

WORK SUMMARY & PROGRESS REPORT
Period Covered:
From: _________
To: __________
Cemetery Location:
Contractor:
LOUDON PARK NATIONAL CEMETERY
_______________________________________________

Project Title:

GROUNDS MAINTENANCE SERVICES

Contract No: _____________________________________

Inspection / Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test some or all of the services that have been tendered for acceptance. The Government may require re-performance of nonconforming services at no increase in contract price. The Government shall exercise its post-acceptance rights—

(a) Within a reasonable time after the defect was discovered or should have been discovered; and

(b) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

Work Completed & Submitted for Acceptance (This form is not to be used as an Invoice)

CLIN
Lawn Maintenance Services
10
Complete Mow Cycle: Mow 4.5 acres of turf on a seven (7) day cycle to include removal of all grass clippings.
Quantity / Unit:
· _______ / Job

Date Completed:

11
Headstone & Marker Trimming: Trim 6,500 upright headstones in conjunction with mowing.
Quantity / Unit:
· _______ / Job

Date Completed:

12
Headstone Cleaning: Clean 6,500 upright headstones to be completed annually before Memorial Day & Veterans Day.
Quantity / Unit:
· _______ / Each

Date Completed:

13
Fence Lines, Sidewalks & Curbs: Trim approx 4,100 linear feet of sidewalk, fence and curb lines.
Quantity / Unit:
· _______ / Job

Date Completed:

14
Trees: Grass trimming around base of 50 trees throughout cemetery.
Quantity / Unit:
· _______ / Job

Date Completed:

15
Debris & Trash Removal: Collect and remove all trash & debris in conjunction with each Mow Cycle.
Quantity / Unit:
· _______ / Job

Date Completed:

ATTACHMENT – B (continued)

16
Fall Leaf Removal (Loudon Park): Cleanup and removal of leaves, leaf debris & branches. This leaf cleanup will commence October 15th and occur weekly through December 30th (weather permitting) with all leaves being removed from the cemetery. If necessary, one more weekly cleanup will commence March 1st and be completed before the start of the mowing season.
Quantity / Unit:
· _______ / Job

Date Completed:

17
Tree Maintenance: Deadwood pruning and removal of trees identified by the COR with all debris being chipped or removed from cemetery premises by the Contractor. Removal of trees identified by the COR will include grinding of stump, removal of grindings, backfilling stump cavity with clean topsoil, tamping and seeding.
Quantity / Unit:
· _______ / Job

Date Completed

18
Snow Removal: Snow removal from all roadways, all sidewalks / steps, including areas around the cemetery lodge, flagpole, cemetery entrance. Snow removal process will include the application of calcium chloride to sidewalks and steps and rock salt to asphalt roadways.
Quantity / Unit:
· _______ / Job

Date Completed

Comments (Loudon Park):

Report below any comments, issues and/or circumstances which may have adversely affected work progress such as weather, turf conditions, strikes, delays by the Government, etc.

Signature of Contractor:
Date Signed
Signature of Cemetery Director / COR
Date Signed
_____________________________________
_________
____________________________________
___________

Note: Contractor shall sign confirming that services indicated have been completed. Government shall also sign in acknowledgment of receipt of the Progress Report.

Duplicate Form as Necessary

File details come from the government source that posted it.