36C78619R0083-007.xlsx

XLSX spreadsheet Posted

Attached to
FY19 CSD Continental District - Ft Logan - Mini-Minor Project for Admin Bldg Addition Federal contract opportunity
Solicitation number
36C78619R0083
Issued by
Department of Veterans Affairs National Cemetery Administration

About this file

This solicitation requests offers for the construction of a 900 square foot building addition and attached single public restroom at Fort Logan National Cemetery. The National Cemetery Administration seeks a contractor to furnish all labor, materials, tools, equipment and supervision necessary to complete the project in accordance with provided specifications, drawings, codes and standards. The acquisition is set aside for Service-Disabled Veteran-Owned Small Businesses. Offers are due on the date and time specified in the solicitation. All proposals must be submitted electronically through the Department of Veterans Affairs eCMS Vendor Portal. The contract period of performance is 240 calendar days from notice to proceed with a construction magnitude between $250,000 and $500,000. Prospective offerors must register with SAM and complete representations and certifications at the specified websites.

36C78619R0083 S02_Attachment-6_Contractor Cost Estimate Worksheet.xlsx

View the file

Other files for this federal contract opportunity

Other files attached to FY19 CSD Continental District - Ft Logan - Mini-Minor Project for Admin Bldg Addition, newest first.
File Type Posted
36C78619R0083-0003000.docx DOCX document
36C78619R0083-0003002.pdf PDF
36C78619R0083-0003003.pdf PDF
36C78619R0083-0003001.pdf PDF
36C78619R0083-0002000.docx DOCX document
36C78619R0083-0001002.pdf PDF
36C78619R0083-0001000.docx DOCX document
36C78619R0083-0001001.pdf PDF
36C78619R0083-001.docx DOCX document
36C78619R0083-005.pdf PDF
36C78619R0083-002.pdf PDF
36C78619R0083-003.pdf PDF
36C78619R0083-004.pdf PDF
36C78619R0083-006.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DescriptionUnitCost/Unit# UnitsTotal CostRemarks
Offeror shall use and edit to fit the Project
Division 01 - General Requirements
Project set-upL.S.$0.000$0.00
CoordinationL.S.$0.000$0.00
General DemolitionL.S.$0.000$0.00
Selective demo. GWB / Act ceilingSF$0.000$0.00
Selective demo. of floor fin and floor prep.SF$0.000$0.00
Selective demo. WallsEach$0.000$0.00
Selective demolition & salvageEach$0.000$0.00
Job supervision and misc. laborWeek$0.000$0.00
Mobilization / DemobilizationJob$0.000$0.00
Division 02 - Existing Conditions
$0.000$0.00
Division 03 - Concrete
Concrete floor trenching and infillL.S.$0.000$0.00
Concrete floor prep., flash patchL.S.$0.000$0.00
Division 04 - Masonry
$0.000$0.00
Division 05 - Metals
Misc. equipment supportsL.S.$0.000$0.00
Modification to Metal Window frameEach$0.000$0.00
Division 06 - Wood, Plastics, and Composites
Misc. blocking, framingL.S.$0.000$0.00
Chair RailLF$0.000$0.00
Blocking for CaseworkL.S.$0.000$0.00
Wood Trim (At Tech Station)LF$0.000$0.00
Plywood and wood trim (at Lockers)LF$0.000$0.00
Coat RodEach$0.000$0.00
Division 07 -Thermal & Moisture Protection
FirestoppingLF$0.000$0.00
Joint sealantsLF$0.000$0.00
Division 08 - Openings
New Door and Mtl. FrameEach$0.000$0.00
New Lead-lined door and frame assemblyEach$0.000$0.00
Modifications to existing lead windowsEach$0.000$0.00
Division 09 - Finishes
Acoustical ceiling tileSF$0.000$0.00
Existing Wall PatchingSF$0.000$0.00
Metal stud, gyp.board assembliesLF$0.000$0.00
GWB over exist framingLF$0.000$0.00
PaintSF$0.000$0.00
Vinyl BoarderLF$0.000$0.00
Resilient baseLF$0.000$0.00
Sheet Vinyl flooring and accessoriesSF$0.000$0.00
CarpetYr$0.000$0.00
Division 10 - Specialties
Hospital Curtain and TrackLF$0.000$0.00
Toilet and Bath AccessoriesEach$0.000$0.00
Casework Base and WallLF$0.000$0.00
CountertopsLF$0.000$0.00
Countertops with supportsLF$0.000$0.00
P. Lam ShelvingLF$0.000$0.00
Med. CabinetEach$0.000$0.00
LockersEach$0.000$0.00
Wall HooksL.S.$0.000$0.00
White BoardEach$0.000$0.00
Division 11 - Equipment
$0.000$0.00
Division 12 - Furnishings
-$0.000$0.00

Division 13 - Special Construction

Division 14 - Conveying Equipment

Division 21 - Fire Suppression
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 22 - Plumbing
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 23 - HVAC
RemovalsLS$0.000$0.00
Computer Room A/C % HumidifierEach$0.000$0.00
Electric Reheat CoilsEach$0.000$0.00
Fan Coil UnitEach$0.000$0.00
DuctworkLS$0.000$0.00
RGD'sEach$0.000$0.00
HVAC InsulationLS$0.000$0.00
Temperature ControlsLS$0.000$0.00
Test and BalanaceLS$0.000$0.00
Division 25 - Intergrated Automation
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 26 - Electrical
General Conditions and Administration-$0.000$0.00
Allowance-$0.000$0.00
Wiring DevicesEach$0.000$0.00
Wiring Device CircuitingEach$0.000$0.00
Light Fixtures & CircuitingEach$0.000$0.00
Specialty Light Fixtures & CircuitingEach$0.000$0.00
Relocate Panel board & circuitsEach$0.000$0.00
Relocate Nurse CallLS$0.000$0.00
Telephone / DataEach$0.000$0.00
Cath Equipment Connections & FeederLS$0.000$0.00
HVAC Equipment ConnectionsLS$0.000$0.00
DemolitionLS$0.000$0.00
Division 27 - Communications
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 28 - Electronic Safety and Security
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 31 - Earthwork
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 32 - Exterior Improvements
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 33 - Utilities
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 34 - Transportation
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 35 - Waterway and Marine Construction
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 40 - Process Interconnections
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 41 - Material Processing and Handling
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 42 - Process Heating, Cooling, and Drying
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 43 - Process Gas and Liquid Handling
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 44 - Pollution and Waste Control
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 45 - Industry-Specific Manufacturing
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 46 - Water and Wastewater Equipment
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 48 - Electrical Power Generation
TBDLS$0.000$0.00
TBD-$0.000$0.00
General Construction Subtotal$0.00
Mechanical, Electrical, Plumbing Subtotal$0.00

Total Base Construction Cost $0.00

Overhead0%$0.00
Profit0%$0.00
Bonding (If applicable)0%$0.00

Total Estimated Construction Cost $0.00

&8B & J Multi Services

Relace Water Main&"Arial,Bold"Estimated Construction
Cost Worksheet&8VA-528-07-RP-0135

Project # 528A8-04-808

File details come from the government source that posted it. Updated .