36C78619R0069-0002000.docx
DOCX document 31 KB Posted
- Solicitation number
- 36C78619R0069
About this file
This document contains a solicitation notice for a federal contract opportunity to procure and install decorative fencing at the Puerto Rico National Cemetery. The National Cemetery Administration is seeking offers for this project, which has an estimated value between $250,000 and $500,000. The acquisition is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. Offerors must be registered in the System for Award Management and complete representations and certifications by the stated deadline. The basis for award will be Lowest Technically Acceptable Price based on technical approach and qualifications, past performance, and price factors. Offers are due by June 28, 2019 and must be submitted electronically through the designated portal.
36C78619R0069 0002 36C78619R0069 0002.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78619C0114-000.docx | DOCX document | |
| 36C78619R0069-0001001.pdf | ||
| 36C78619R0069-0001000.docx | DOCX document | |
| 36C78619R0069-003.pdf | ||
| 36C78619R0069-005.docx | DOCX document | |
| 36C78619R0069-004.pdf | ||
| 36C78619R0069-001.docx | DOCX document | |
| 36C78619R0069-002.pdf | ||
| 36C78619R0069-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION
OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM
INISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 3
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO
MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06-18-2019 7882-000004 N/A 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 75 Barrett Heights Road, Suite 309 Stafford VA 22556 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 75 Barrett Heights Road, Suite 309 Stafford VA 22556 To all Offerors/Bidders
36C78619R0069 05-31-2019
X X X
This amendment is written to provide official government responses to all inquiries received against Request for Proposal Number 36C786-19-R-0069. See page 2.
ALL OTHER TERMS AND CONDITIONS REMAINS UNCHANGED.
AMENDMENT NO. 0002 36C786-19-R-0069 DATED: June 18, 2019 PURETO RICO NATIONAL CEMETERY – This amendment supports government response to all questions received against subject requirement. Note: There will be no time extension for receipt of proposals, based on government responses, the official date and time on SF 1442 stands.
QUESTION 1: The information for us to quote the Project says: Contract period of performance will consist of Thirty (30) calendar days, after issuance of Official Notice to Proceed (NTP). Unfortunately, we won't have total control over the manufacturing time of the panels, Nor for delivery time for the steel material from the manufacturer/supplier NOR for the POWDER Coating process time at the provider location. Depending on the times that the materials goes into the production line will determined the Finish goods available to commence the installation of them. Will it be possible to extend the period of performance of the project?? We believe it should be extended around 180 to 360 days. GOVERNMENT RESPONSE: Period of Performance of all work to complete after issuance of the NTP is hereby changed to read one-hundred-eighty (180) calendar days.
QUESTION 2: While reviewing the Technical Factors on the solicitation we notice that what has been requested is for a project related to SIGNS. Can you please provide the Technical Factors that will be required for this Decorative Fence project? GOVERNMENT RESPONSE: The wording “Signs” is hereby changed to read similar projects.
QUESTION 3: The scope of work calls for Galvanized steel material. related to the Posts says "Posts: 2-1/2-inch (63.5 mm) square, 16 gauge". We will like to clarify since the existing POSTS are square 2 1/2" x 2 1/2” BUT BEACUSE THEY ARE ALUMINUM MATERIAL. The Regular Galvanized Posts Gage 16 that are available here are either 2x2 or 3x3 or 4x4. Please Clarify. GOVERNMENT RESPONSE: Provide 2”x2” Galvanized Posts Gage 16.
QUESTION 4: There are a few areas that are shorter than 10 feet long, the specs calls for "closing existing holes that DO NOT match with the new fence and to repair and paint to match the existing footing. AS PER SPECS, If ALL new Fence Panels are to be Fabricated in standard length of 120 inches THEN, they will not fit on the existing measurements of the ladder type footing. SO, WILL IT BE OK TO FABRICATE SHORTER PANELS AS NEEDED? GOVERNMENT RESPONSE: Yes
QUESTION 5: In relation to the Powder Coating finish, WHAT will be the Finish COLOR? GOVERNMENT RESPONSE: The finished color shall be black closely matching the existing panel.
QUESTION 6: Scope of work document dated 2/9/19 page 9 section D.3 states that a mandatory pre-bid site inspection will be arranged through the KO. Please advise time and date for this site inspection. GOVERNMENT RESPONSE: Reference page 8 of 38 to RFP, the information is provided to contact the Director, Mr. Juan Nieves at Puerto Rico National Cemetery, Bayamon, PR, Telephone: 787 798-8400. Note: The Director has the authorization for this meeting.
QUESTION 7: Solicitation section 4.33-Evaluation Factors for Award, in Factor 2-Technical Approach, it requires providing past performance in three (3) sign installation projects. However, this project is for a decorative fence. Can we include past performance on projects with decorative fencing similar to the one proposed for this project? GOVERNMENT RESPONSE: Yes. Please clarify what is meant by “sign installation”. GOVERNMENT RESPONSE: The wording “Signs” is hereby changed to read similar projects (meaning past performance of similar decorative fencing projects).
XXXX LAST ITEM ALL OTHER TERMS AND CONDITIONS REMAINS UNCHANGED.XXX
End of Document
Page 1 of
Page 1 of
File details come from the government source that posted it. Updated .